Solicitation Questions Answers and Changes thru Amendment 0001.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
VHS Ozarks Uninterruptable Power Supply Federal contract opportunity
Solicitation number
36C25624Q0351
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16

About this file

This document contains a solicitation for uninterruptible power supply replacement services at the Veterans Healthcare System of the Ozarks facility in Fayetteville, Arkansas. The contractor will be responsible for de-installing the existing GE LP33-100KVA UPS in Building 01, Room 034 and disposing of it, as well as installing a new UPS system that meets or exceeds the specifications of the existing system. The contractor must provide all necessary labor, equipment, transportation, and project management to perform this work. A loading dock and suitable equipment for moving the UPS systems are available on site. Floor plans and pictures of the existing setup will be provided to bidders.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A

Amendment
#Question
#QuestionAnswer
36C25624Q0351 0011What is the desired runtime of the UPS via batteries or how much runtime is the listed battery cabinets providing?177 minutes
36C25624Q0351 0012Is there a loading dock for delivery of the UPS?Yes, there is a loading dock for the UPS.
36C25624Q0351 0013Is there room to store the UPS on site before install?It's possible.
36C25624Q0351 0014Where is the UPS in relation to the loading dock/entry point?Loading dock is basically first floor. The UPS is located in the basement.
36C25624Q0351 0015Is the UPS on the first floor? If not, is there an elevator for use?The UPS is in basement. The elevator that serves loading dock also goes to basement.
36C25624Q0351 0016In relation to the project, I would like to seek clarification on whether it entails a like-for-like replacement or if there is flexibility to consider alternative brands that meet the specified requirements.Please see paragraph 4 Scope of Work / Performance Objectives and paragraph 5 Deliverables in the Performance Work Statement.
36C25624Q0351 0017We kindly request detailed information regarding the current system, encompassing essential details such as location (floor, room, size). Additionally, we would greatly appreciate photographs depicting the current UPS setup.Equipment to be included in the Service Contract

Model UPS Serial Number Qty Associated Batteries LP33-100kva Q1100-4511-B019A 1 (3) strings of 24 DataSafe 12HX400-FR. Pictures will be provided

36C25624Q0351 0018Moreover, we seek clarification on the logistics involved in the UPS delivery to the facility. Could you please confirm if there is a designated loading dock? Furthermore, we would like to ascertain whether the responsibility for unloading the UPS lies with VA personnel.Yes there is a loading dock at back door of bldg 1/bldg 2 . Unloading the UPS equipment is the responsiblty of the Contractor . No VA Staff will unload equipment .
36C25624Q0351 0019Building 01-Room 034, Is that on the 1st floor and if so, is there any kind of loading dock close by?This room is located in the basement of bldg 1 Yes there is a loading dock at back door of bldg 1/bldg 2 floor plan will be provided
36C25624Q0351 00110Are the hallways wide enough for a pallet jack or forklift?Yes Pallet Jack or similar equipment
36C25624Q0351 00111I’m assuming the specs on size given are close to what the UPS is currently that will be removed?yes specs shall meet or exceed existing system.
36C25624Q0351 00112Any floor plans or pictures that can be provided would be helpful.Yes floor plans and pictures will be provided
36C25624Q0351 00113Can I get a blueprint of the building where the UPS will be de installed and installed.floor plan from loading dock to room 034-01
36C25624Q0351 00114We are trying to see what we will need to bring the new UPS in for example is there a loading dock or closer to a loading dockYes there is a loading dock at back door of bldg 1/bldg 2
36C25624Q0351 00115What equipment will be needed to transport the UPS from the truck to its location.Pallet Jack or similar equipment

Summary of Changes

Date
MM/DD/YYAmendment
#Solicitation Revision
#Change
#Changes Made
01/02/2436C25624R0018 0001Revision 11
2
3
4

File details come from the government source that posted it. Updated .