This document is a solicitation for a replacement chiller project at a VA medical center in Pineville, Louisiana. The solicitation number is 36C25623R0096 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16.

The project involves replacing Chiller #3. Drawings and specifications are provided for demolishing the existing chiller and related mechanical and electrical systems and installing a new water-cooled chiller, chilled water pump, variable frequency drives, and all associated mechanical piping and electrical work. The required products and services include a new 650-ton water-cooled chiller, chilled water pump, variable frequency drives, conduit, wiring, and all other components necessary for a fully functioning and code-compliant system. The contractor will also be responsible for demolition and disposal of the existing equipment.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Chiller # 3 - Pineville, LA - VA (Project No. 502-21-110), newest first.
File Type Posted
36C25623R0096 0004.docx DOCX document
36C25623R0096 0003.docx DOCX document
36C25623R0096 0002.docx DOCX document
Attachment 1A00002 - 2023-08-18 Addendum No. 1.pdf PDF
Attachment 2A00002 236400 3-20 Packaged Water Chillers - Addendum 1.pdf PDF
36C25623R0096 0001.docx DOCX document
36C25623R0096 - Site Visit Sign in Sheet 502-21-110 Aug 15 23.jpg JPG image
36C25623R0096.docx DOCX document
36C25623R0096 EXHIBIT F.docx DOCX document
Final SOW - Formatted.docx DOCX document
36C25623R0096 EXHIBIT C.docx DOCX document
36C25623R0096 EXHIBIT E.docx DOCX document
PRA 502-21-110 Chiller 3 Replacement - Copy.pdf PDF
DBA WD LA20220041 Mod 5 (6-16-23).pdf PDF
36C25623R0096 EXHIBIT A.docx DOCX document
36C25623R0096 EXHIBIT B.docx DOCX document
36C25623R0096 EXHIBIT D.docx DOCX document
36C25623R0096 Design Analysis.pdf PDF
36C25623R0096 Specifications.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHILLER #3 REPLACEMENT

PROJECT NUMBER: 502-21-110

2495 SHREVEPORT HIGHWAY, PINEVILLE, LA 71360

ALEXANDRIA VA HEALTH CARE SYSTEM

DRAWING TITLEDWG

NO.

INDEX OF DRAWINGS

DRAWING TITLEDWG

NO.

BID DOCUMENTS

PROJECT

LOCATIONPROJECT

LOCATION

COVER SHEET

G001

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

CHILLER #3 REPLACEMENT

PINEVILLE, LOUISIANA

502-21-110

Project Director

11-09-2022 JH SJRevisions: Date:

AutoCAD SHX Text

NTS

AutoCAD SHX Text

AREA MAP

AutoCAD SHX Text

NTS

AutoCAD SHX Text

LOCATION MAP

AutoCAD SHX Text

GENERAL

AutoCAD SHX Text

ARCHITECTURAL

AutoCAD SHX Text

AD101

AutoCAD SHX Text

FIRST FLOOR DEMO PLAN

AutoCAD SHX Text G001

AutoCAD SHX Text

COVER SHEET

AutoCAD SHX Text G002

AutoCAD SHX Text

LEGENDS, ABBREVIATIONS AND NOTES

AutoCAD SHX Text

TRUE NORTH

AutoCAD SHX Text

TRUE NORTH

AutoCAD SHX Text A101

AutoCAD SHX Text

FIRST FLOOR PLAN

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text M001

AutoCAD SHX Text

MECHANICAL LEGEND, ABBREVIATIONS, AND NOTES

AutoCAD SHX Text

MD101

AutoCAD SHX Text

CHILLER PLANT MECHANICAL DEMOLITION PLAN

AutoCAD SHX Text

MP101

AutoCAD SHX Text

CHILLER PLANT MECHANICAL PIPING PLAN

AutoCAD SHX Text M401

AutoCAD SHX Text

ENLARGED MECHANICAL PIPING PLAN

AutoCAD SHX Text M501

AutoCAD SHX Text

MECHANICAL DETAILS

AutoCAD SHX Text M601

AutoCAD SHX Text

MECHANICAL SCHEDULES

AutoCAD SHX Text M801

AutoCAD SHX Text

WATER COOLED CHILLER CONTROL SEQUENCE AND SCHEMATIC

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text E001

AutoCAD SHX Text

ELECTRICAL GENERAL NOTES AND ABBREVIATIONS

AutoCAD SHX Text E002

AutoCAD SHX Text

ELECTRICAL LEGEND

AutoCAD SHX Text

ED101

AutoCAD SHX Text

ELECTRICAL DEMOLITION PLAN

AutoCAD SHX Text E101

AutoCAD SHX Text

MECHANICAL POWER PLAN

AutoCAD SHX Text

STRUCTURAL

AutoCAD SHX Text S001

AutoCAD SHX Text

STRUCTURAL NOTES

AutoCAD SHX Text S101

AutoCAD SHX Text

ROOF FRAMING PLAN

AutoCAD SHX Text

590 MEANS STREET NW STE. 200 ATLANTA, GA 30318

GENERAL ARCHITECTURAL NOTESGENERAL PROJECT NOTES ARCHITECTURAL ABBREVIATIONSARCHITECTURAL LEGEND

LEGENDS, ABBREVIATIONS AND

NOTES

G002

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

CHILLER #3 REPLACEMENT

PINEVILLE, LOUISIANA

502-21-110

Project Director

11-09-2022 JH SJRevisions: Date:

AutoCAD SHX Text A. DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO: DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO: FACE OF EXISTING WALL SURFACE FACE OF NEW MASONRY FACE OF NEW WALL STUDS TOP OF SLAB TOP OF MASONRY ALIGN NEW WALLS WITH EXISTING WHERE NOT OTHERWISE INDICATED. B. COORDINATE WITH ALL DISCIPLINE DRAWINGS FOR COORDINATE WITH ALL DISCIPLINE DRAWINGS FOR ADDITIONAL REQUIREMENTS. COORDINATE OPENINGS IN SLABS, ROOF, AND WALLS. WHERE NEW HOLES IN EXISTING WALLS AND SLABS ARE CREATED FOR CONDUIT, DUCT, OR PIPE PENETRATIONS, COORDINATE SIZE AND LOCATION. PATCH HOLES CAUSED BY THE REMOVAL OF EQUIPMENT, PIPING, CONDUIT, DUCT, GRILLES, ETC. WITH MATERIALS MATCHING EXISTING SLAB OR WALL IN STRUCTURE, MATERIAL, THICKNESS, ALIGNMENT, GRADES, AND QUALITY. C. COORDINATE AND PROVIDE SOLID FIRE RETARDANT TREATED COORDINATE AND PROVIDE SOLID FIRE RETARDANT TREATED WOOD BLOCKING FOR WALL-MOUNTED ITEMS BETWEEN STUDS. COORDINATE LOCATIONS WITH COR FOR GOVERNMENT FURNISHED EQUIPMENT. D. `PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, `PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, STORAGE, HANDLING, INSTALLATION, ADJUSTMENT, AND CLEANING FOR THE ITEM INDICATED. E. SEAL PIPE PENETRATIONS THROUGH SLABS, MASONRY, SEAL PIPE PENETRATIONS THROUGH SLABS, MASONRY, SMOKE RATED PARTITIONS AND FIRE-RATED PARTITIONS WITH THE APPROPRIATE FIRESTOP TO MAINTAIN THE RATING OF THE WALL OR SLAB. SUBMIT CUT SHEETS AND SPECIFICATIONS TO THE COR FOR APPROVAL PRIOR TO INSTALLATION. PROVIDE UL LISTED ASSEMBLIES. F. SKIM COAT ALL DAMAGED EXISTING WALL SURFACES THAT SKIM COAT ALL DAMAGED EXISTING WALL SURFACES THAT REQUIRE PAINTING. G. REMOVED MATERIALS WHICH ARE INDICATED TO BE TURNED REMOVED MATERIALS WHICH ARE INDICATED TO BE TURNED OVER TO THE COR SHALL BE DELIVERED BY THE CONTRACTOR TO A PLACE INDICATED BY THE COR IF APPLICABLE. H. REMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE REMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE DRAWINGS AND AS REQUIRED FOR NEW CONSTRUCTION. EDGES AND FACES OF DEMOLISHED AREAS SHALL BE REPAIRED TO ACCEPT NEAT INSTALLATION OF NEW CONSTRUCTION OR FINISHES. WHERE EXISTING MATERIALS ARE TO BE REPLACED (WALLS, INSULATION, FLOORING, ETC.) EXISTING MATERIALS, ADHESIVES, ETC. SHALL BE REMOVED AND EXPOSED SURFACES SHALL BE PREPARED AS INDICATED OR SPECIFIED PRIOR TO INSTALLATION OF NEW MATERIALS. I. PREVENT DAMAGE TO MATERIALS AND FINISHES TO REMAIN. PREVENT DAMAGE TO MATERIALS AND FINISHES TO REMAIN. REPAIR DAMAGES FROM CONSTRUCTION ACTIVITIES TO EXISTING ITEMS TO REMAIN, AT NO ADDITIONAL COST. WHERE SUCH EXPOSED MATERIALS OR FINISHES TO REMAIN ARE DAMAGED.

AutoCAD SHX Text A. THE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY THE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY MATERIALS OR EQUIPMENT UNTIL SUBMITTALS FOR SUCH HAVE BEEN APPROVED. B. THE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING THE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FOR EACH MEMBER OF HIS WORK FORCE. VALID FORMS OF I.D. ARE REQUIRED TO RECEIVE BADGES. COORDINATE WITH COR. C. ANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR ANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR EXPOSURE TO CONSTRUCTION SMOKE, DUST, AND DEBRIS SHALL BE SUITABLY PROTECTED TO PREVENT ACCIDENTAL ALARM. ALL SUCH ACTION MUST BE FIRST COORDINATED AND CLEARED WITH COR. ALL FIRE ALARM DEVICES SHALL BE ACTIVE WHENEVER CONTRACTOR'S FORCES ARE NOT PRESENT IN WORK AREA. D. CONTRACTOR SHALL COORDINATE ONLY WITH THE COR AND CONTRACTOR SHALL COORDINATE ONLY WITH THE COR AND CONTRACTING OFFICER. E. CONTRACTOR SHALL FIELD VERIFY DIMENSIONS & ALL CONTRACTOR SHALL FIELD VERIFY DIMENSIONS & ALL EXISTING CONDITIONS PRIOR TO PROCEEDING WITH THE WORK. EXISTING CONDITIONS ARE BASED ON GOVERNMENT FURNISHED EXISTING DRAWINGS AND LIMITED FIELD INVESTIGATION. NOTIFY COR OF ANY DISCREPANCIES PRIOR TO PROCEEDING. F. ALL FINISH COLORS TO BE SELECTED BY COR WHERE NOT ALL FINISH COLORS TO BE SELECTED BY COR WHERE NOT OTHERWISE INDICATED.

AutoCAD SHX Text

AIR CONDITIONING

AutoCAD SHX Text

ACOUSTICAL CEILING TILE

AutoCAD SHX Text

ABOVE FINISH FLOOR

AutoCAD SHX Text

ALUMINUM

AutoCAD SHX Text

BATT INSULATION

AutoCAD SHX Text

BOTTOM OF

AutoCAD SHX Text

CEMENTITIOUS BACKER BOARD

AutoCAD SHX Text

CEMENTITIOUS CRYSTALLINE WATERPROOFING

AutoCAD SHX Text

COLD-FORMED METAL FRAMING

AutoCAD SHX Text

CORNER GUARD

AutoCAD SHX Text

CENTERLINE

AutoCAD SHX Text

CERAMIC MOSAIC TILE

AutoCAD SHX Text

CONCRETE MASONRY UNIT

AutoCAD SHX Text

CASED OPENING

AutoCAD SHX Text

COMMUNICATION

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

CONTINUOUS

AutoCAD SHX Text

CONTRACTING OFFICER'S REPRESENTATIVE

AutoCAD SHX Text

CERAMIC TILE

AutoCAD SHX Text

CERAMIC TILE BASE

AutoCAD SHX Text

CARPET TILE

AutoCAD SHX Text

DIAMETER

AutoCAD SHX Text

ELECTRIC WATER COOLER

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text

EQUAL

AutoCAD SHX Text

EXPOSED STRUCTURE

AutoCAD SHX Text

ET CETERA

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

EXPOSED

AutoCAD SHX Text

FLOOR DRAIN

AutoCAD SHX Text

FIRE EXTINGUISHER CABINET

AutoCAD SHX Text

FIRE HOSE CABINET

AutoCAD SHX Text

FINISHED FLOOR

AutoCAD SHX Text

FINISH

AutoCAD SHX Text

FLOOR

AutoCAD SHX Text

FACE OF

AutoCAD SHX Text

FIELD VERIFY (PRIOR TO ORDERING OR CUTTING)

AutoCAD SHX Text

FABRIC WALLCOVERING

AutoCAD SHX Text

GAGE

AutoCAD SHX Text

GYPSUM WALL BOARD

AutoCAD SHX Text

HANDICAPPED

AutoCAD SHX Text

HOLLOW METAL

AutoCAD SHX Text

HIGH-PRESSURE DECORATIVE LAMINATE

AutoCAD SHX Text

HEATING VENTILATION AND AIR-CONDITIONING

AutoCAD SHX Text

MATERIAL

AutoCAD SHX Text

MAXIMUM

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

MANUFACTURER

AutoCAD SHX Text

MINIMUM

AutoCAD SHX Text

MASONRY OPENING

AutoCAD SHX Text

METAL

AutoCAD SHX Text

NOT IN CONTRACT

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

ON CENTER

AutoCAD SHX Text

OPPOSITE HAND

AutoCAD SHX Text

PORCELAIN BASE

AutoCAD SHX Text

PLASTIC LAMINATE

AutoCAD SHX Text

PRESSURE TREATED

AutoCAD SHX Text

PAIR

AutoCAD SHX Text

PAINT

AutoCAD SHX Text

QUARRY TILE

AutoCAD SHX Text

RESILIENT BASE

AutoCAD SHX Text

REFRIGERATOR

AutoCAD SHX Text

REQUIRED

AutoCAD SHX Text

RESINOUS FLOORING

AutoCAD SHX Text

RESINOUS EPOXY WALL - CEILING

AutoCAD SHX Text

ROUGH OPENING

AutoCAD SHX Text

RUBBER FLOORING

AutoCAD SHX Text

SEALED HIGH BUILD GLAZED COATING

AutoCAD SHX Text

SOLID CORE WOOD

AutoCAD SHX Text

SIMILAR

AutoCAD SHX Text

SPECIAL FACED

AutoCAD SHX Text

STAINLESS STEEL

AutoCAD SHX Text

STEEL

AutoCAD SHX Text

SUBSTRATE

AutoCAD SHX Text

SHEET VINYL

AutoCAD SHX Text

SOLID VINYL TILE

AutoCAD SHX Text

TO BE DETERMINED

AutoCAD SHX Text

TELEPHONE

AutoCAD SHX Text

TOP OF

AutoCAD SHX Text

TYPICAL

AutoCAD SHX Text

UNLESS NOTED OTHERWISE

AutoCAD SHX Text

VINYL COMPOSITION TILE

AutoCAD SHX Text

VINYL WALL COVERING

AutoCAD SHX Text

WALL COVERING

AutoCAD SHX Text

WOOD

AutoCAD SHX Text

WELDED SEAM SHEET FLOORING

AutoCAD SHX Text

AC

AutoCAD SHX Text

ACT

AutoCAD SHX Text

AFF

AutoCAD SHX Text

ALUM

AutoCAD SHX Text

BATT

AutoCAD SHX Text

BO

AutoCAD SHX Text

CBB

AutoCAD SHX Text

CCW

AutoCAD SHX Text

CFMF

AutoCAD SHX Text

CG

AutoCAD SHX Text C

AutoCAD SHX Text

CMT

AutoCAD SHX Text

CMU

AutoCAD SHX Text

CO

AutoCAD SHX Text

COMM

AutoCAD SHX Text

CONC

AutoCAD SHX Text

CONT

AutoCAD SHX Text

COR

AutoCAD SHX Text

CT

AutoCAD SHX Text

CTB

AutoCAD SHX Text

CT

AutoCAD SHX Text

DIA

AutoCAD SHX Text

EWC

AutoCAD SHX Text

ELEC

AutoCAD SHX Text

EQ

AutoCAD SHX Text

ES

AutoCAD SHX Text

ETC

AutoCAD SHX Text

EXIST

AutoCAD SHX Text

EXP

AutoCAD SHX Text

FD

AutoCAD SHX Text

FEC

AutoCAD SHX Text

FHC

AutoCAD SHX Text

FF

AutoCAD SHX Text

FIN

AutoCAD SHX Text

FLR

AutoCAD SHX Text

FO

AutoCAD SHX Text

FV

AutoCAD SHX Text

FWC

AutoCAD SHX Text

GA

AutoCAD SHX Text

GWB

AutoCAD SHX Text

HC

AutoCAD SHX Text

HM

AutoCAD SHX Text

HPDL

AutoCAD SHX Text

HVAC

AutoCAD SHX Text

MATL

AutoCAD SHX Text

MAX

AutoCAD SHX Text

MECH

AutoCAD SHX Text

MFR

AutoCAD SHX Text

MIN

AutoCAD SHX Text

MO

AutoCAD SHX Text

MTL

AutoCAD SHX Text

NIC

AutoCAD SHX Text

NTS

AutoCAD SHX Text

OC

AutoCAD SHX Text

OH

AutoCAD SHX Text

PB

AutoCAD SHX Text

PLAM

AutoCAD SHX Text

PT

AutoCAD SHX Text

PR

AutoCAD SHX Text P

AutoCAD SHX Text

QT

AutoCAD SHX Text

RB

AutoCAD SHX Text

REF

AutoCAD SHX Text

REQ'D

AutoCAD SHX Text

RES

AutoCAD SHX Text

RES-W

AutoCAD SHX Text

RO

AutoCAD SHX Text

RF

AutoCAD SHX Text

SC

AutoCAD SHX Text

SCW

AutoCAD SHX Text

SIM

AutoCAD SHX Text

SP

AutoCAD SHX Text

SS

AutoCAD SHX Text

STL

AutoCAD SHX Text

SUBS

AutoCAD SHX Text

SV

AutoCAD SHX Text

SVT

AutoCAD SHX Text

TBD

AutoCAD SHX Text

TELE

AutoCAD SHX Text

TO

AutoCAD SHX Text

TYP

AutoCAD SHX Text

UNO

AutoCAD SHX Text

VCT

AutoCAD SHX Text

VWC

AutoCAD SHX Text

WC

AutoCAD SHX Text

WD

AutoCAD SHX Text

WSF

AutoCAD SHX Text L

AutoCAD SHX Text

SEALED CONCRETE

AutoCAD SHX Text

SCONC

AutoCAD SHX Text

PORCELAIN TILE

AutoCAD SHX Text

POR

AutoCAD SHX Text

CONTROL JOINT

AutoCAD SHX Text

CJ

AutoCAD SHX Text

GALVANIZED METAL STUD(S)

AutoCAD SHX Text

GMS

AutoCAD SHX Text

REFLECTED CEILING PLAN

AutoCAD SHX Text

RCP

AutoCAD SHX Text

LUXURY VINYL TILE

AutoCAD SHX Text

LVT

AutoCAD SHX Text

COMPOUNDING ASEPTIC CONTAINMENT ISOLATOR

AutoCAD SHX Text

CACI

AutoCAD SHX Text F.E.C.

AutoCAD SHX Text

FIRE EXTINGUISHER CABINET

AutoCAD SHX Text

ROOM NAME AND NUMBER

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

NAME

AutoCAD SHX Text

AutoCAD SHX Text

SOLID SURFACE MATERIAL

AutoCAD SHX Text

SSM

AutoCAD SHX Text

WALL PROTECTION

AutoCAD SHX Text

WP

590 MEANS STREET NW STE. 200 ATLANTA, GA 30318

147-P-4147-P-2147-P-3

147-P-1

CHILLER

CHILLER

CHILLER

147-P-9

(E)AIR

SEPARATOR

147-P-6

CHILLER

147-P-8

147-P-7

WTR TMT

MUW

EL

EC

TR

IC

AL

EL

EC

TR

IC

AL

ELECTRICAL ELECTRICAL

CONCRETE

PAD (TYP)

TANK

FFM

FIRST FLOOR DEMO PLAN

AD101

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

CHILLER #3 REPLACEMENT

PINEVILLE, LOUISIANA

502-21-110

Project Director

11-09-2022 JH SJRevisions: Date:

DEMO KEY NOTES

DEMO PLAN LEGEND

DEMO GENERAL NOTES

AutoCAD SHX Text

EXISTING WINDOW UNIT

AutoCAD SHX Text

SIEMENS CTRL PANEL

AutoCAD SHX Text

EXISTING UNIT HEATER

AutoCAD SHX Text

EXISTING ELEC. EQUIP

AutoCAD SHX Text

CHWP-1 VFD

AutoCAD SHX Text

CDWP-3 VFD

AutoCAD SHX Text

CHWP-2

AutoCAD SHX Text

CDWP-4

AutoCAD SHX Text

EXISTING ELEC. EQUIP

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

COOLING TWR #3

AutoCAD SHX Text

COOLING TWR #6

AutoCAD SHX Text

COOLING TWR #5

AutoCAD SHX Text

EXISTING EF

AutoCAD SHX Text

EXISTING EXHAUST DUCT

AutoCAD SHX Text

CEILING MOUNTED EXHAUST FAN TO ROOF

AutoCAD SHX Text

REFRIGERATED AIR DRYER

AutoCAD SHX Text

EXISTING ELEC. EQUIP

AutoCAD SHX Text

45 KVA TRANSFORMER

AutoCAD SHX Text

PANEL HA

AutoCAD SHX Text

EXISTING FRIDGE

AutoCAD SHX Text

147-CT-2

AutoCAD SHX Text

147-CT-1

AutoCAD SHX Text

FD

AutoCAD SHX Text

COOLING TWR #1

AutoCAD SHX Text

COOLING TWR #2

AutoCAD SHX Text

COOLING TWR #4

AutoCAD SHX Text

147-CT-6

AutoCAD SHX Text

BRANCH#4 UNDERGROUND CS/R LINES TO BLDG 7

AutoCAD SHX Text

BRANCH#3 UNDERGROUND CS/R LINES TO BLDGS 4, 5, 6, 49, & 9

AutoCAD SHX Text

BRANCH#1 UNDERGROUND CS/R LINES TO BLDGS 7, 45, & 46

AutoCAD SHX Text

BRANCH#2 UNDERGROUND CS/R LINES TO BLDG 1, 2, 3, 7 & 8

AutoCAD SHX Text

AD101

AutoCAD SHX Text

AutoCAD SHX Text 1/4" = 1'-0"

AutoCAD SHX Text

FIRST FLOOR DEMO PLAN

AutoCAD SHX Text

AutoCAD SHX Text

NTS

AutoCAD SHX Text

DEMOLITION ELEVATION

AutoCAD SHX Text SAW CUT CMU AND BRICK VENEER FOR WIDENED OPENING AND INSTALL OF NEW LINTEL BEAM (SEE STRUCTURAL)

AutoCAD SHX Text

EXIST CMU W/ CELLS SAW CUT FOR JAMB REINFORCING BOTH SIDES (SEE STRUCTURAL)

AutoCAD SHX Text

EXIST HM FRAME AND HM DOOR REMOVED. STORE AND PREP FOR REINSTALL.

AutoCAD SHX Text EXIST SCREEN PANEL FRAME, TRANSOM AND SCREEN DOOR REMOVED. STORE AND PREP FOR REINSTALL

AutoCAD SHX Text

590 MEANS STREET NW STE. 200 ATLANTA, GA 30318

AutoCAD SHX Text

1. DEMOLISH EXISTING MASONRY CONSTRUCTION AS SHOWN TO INSTALL NEW DEMOLISH EXISTING MASONRY CONSTRUCTION AS SHOWN TO INSTALL NEW WORK. MAKE ALL CUTS CLEAN AND SHARP. PATCH MASONRY WHERE CHIPPED OR DAMAGED. 2. REMOVE EXISTING HM DOOR AND FRAME. STORE AND PREPARE FOR REMOVE EXISTING HM DOOR AND FRAME. STORE AND PREPARE FOR REINSTALLATION AFTER COMPLETION OF MECHANICAL WORK. RETAIN DOOR HARDWARE FOR REUSE. 3. REMOVE EXISTING METAL SCREEN WIRE DOOR AND FRAME. STORE AND REMOVE EXISTING METAL SCREEN WIRE DOOR AND FRAME. STORE AND PREPARE FOR REINSTALLATION AFTER INSTALLATION OF HM FRAME. RETAIN DOOR HARDWARE FOR REUSE. 4. EXISTING ELECTRICAL PANELS TO BE REMOVED AND RELOCATED. SEE EXISTING ELECTRICAL PANELS TO BE REMOVED AND RELOCATED. SEE ELECTRICAL DRAWINGS FOR MORE INFORMATION. 5. EXISTING MECHANICAL EQUIPMENT TO BE REMOVED. SEE MECHANICAL EXISTING MECHANICAL EQUIPMENT TO BE REMOVED. SEE MECHANICAL DRAWINGS FOR MORE INFORMATION.

AutoCAD SHX Text A. DEMOLISH EXISTING WALL AND BASE FINISHES AS REQUIRED TO INSTALL NEW WORK. DEMOLISH EXISTING WALL AND BASE FINISHES AS REQUIRED TO INSTALL NEW WORK. B. WHERE WALL IS BEING REMOVED TO INSTALL NEW WORK, PROTECT EXISTING WALL WHERE WALL IS BEING REMOVED TO INSTALL NEW WORK, PROTECT EXISTING WALL MOUNTED OR SUSPENDED DEVICES AND COMPONENTS. EXISTING DEVICES MAY BE TEMPORARILY SUPPORTED AND PROTECTED IN PLACE WHERE POSSIBLE. IF REQUIRED FOR NEW WORK INSTALLATION, REMOVE EXISTING DEVICES AND COMPONENTS, STORE AND REINSTALL COORDINATED WITH OTHER WORK. REPLACE DAMAGED DEVICES AND COMPONENTS TO MATCH EXISTING. THIS NOTE APPLIES TO ALL DEVICES AND COMPONENTS HUNG FROM STRUCTURE ABOVE REQUIRED TO BE REMOVED TO INSTALL NEW WORK. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.

AutoCAD SHX Text

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE DEMOLISHED

147-P-4147-P-2147-P-3

147-P-1

CHILLER

CHILLER

CHILLER

147-P-9

(E)AIR

SEPARATOR

147-P-6

CHILLER

147-P-8

147-P-7

MUW

EL

EC

TR

IC

AL

EL

EC

TR

IC

AL

ELECTRICAL ELECTRICAL

CONCRETE

PAD (TYP)

TANK

FFM

FIRST FLOOR PLAN

A101

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

CHILLER #3 REPLACEMENT

PINEVILLE, LOUISIANA

502-21-110

Project Director

11-09-2022 JH SJRevisions: Date:

PLAN KEY NOTES

PLAN LEGEND

GENERAL NOTES

AutoCAD SHX Text

EXISTING WINDOW UNIT

AutoCAD SHX Text

SIEMENS CTRL PANEL

AutoCAD SHX Text

EXISTING UNIT HEATER

AutoCAD SHX Text

EXISTING ELEC. EQUIP

AutoCAD SHX Text

CHWP-1 VFD

AutoCAD SHX Text

CDWP-3 VFD

AutoCAD SHX Text

CHWP-2

AutoCAD SHX Text

CDWP-4

AutoCAD SHX Text

EXISTING ELEC. EQUIP

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

COOLING TWR #3

AutoCAD SHX Text

COOLING TWR #6

AutoCAD SHX Text

COOLING TWR #5

AutoCAD SHX Text

EXISTING EF

AutoCAD SHX Text

EXISTING EXHAUST DUCT

AutoCAD SHX Text

CEILING MOUNTED EXHAUST FAN TO ROOF

AutoCAD SHX Text

REFRIGERATED AIR DRYER

AutoCAD SHX Text

EXISTING ELEC. EQUIP

AutoCAD SHX Text

45 KVA TRANSFORMER

AutoCAD SHX Text

PANEL HA

AutoCAD SHX Text

EXISTING FRIDGE

AutoCAD SHX Text

147-CT-2

AutoCAD SHX Text

147-CT-1

AutoCAD SHX Text

FD

AutoCAD SHX Text

COOLING TWR #1

AutoCAD SHX Text

COOLING TWR #2

AutoCAD SHX Text

COOLING TWR #4

AutoCAD SHX Text

147-CT-6

AutoCAD SHX Text

BRANCH#4 UNDERGROUND CS/R LINES TO BLDG 7

AutoCAD SHX Text

BRANCH#3 UNDERGROUND CS/R LINES TO BLDGS 4, 5, 6, 49, & 9

AutoCAD SHX Text

BRANCH#1 UNDERGROUND CS/R LINES TO BLDGS 7, 45, & 46

AutoCAD SHX Text

BRANCH#2 UNDERGROUND CS/R LINES TO BLDG 1, 2, 3, 7 & 8

AutoCAD SHX Text A101

AutoCAD SHX Text

AutoCAD SHX Text 1/4" = 1'-0"

AutoCAD SHX Text

FIRST FLOOR PLAN

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text

NTS

AutoCAD SHX Text

DOOR TYPES

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NTS

AutoCAD SHX Text

FRAME TYPES

AutoCAD SHX Text

STEEL LINTEL (SEE STRUCTURAL)

AutoCAD SHX Text

EXIST CMU W/ CELLS GROUTED SOLID BOTH SIDES (SEE STRUCTURAL)

AutoCAD SHX Text

ALUM LOUVER W/ BUG SCREEN

AutoCAD SHX Text

EXIST HM FRAME REINSTALLED

AutoCAD SHX Text

EXIST STEEL FRAME FOR SCREEN DOOR REINSTALLED

AutoCAD SHX Text

EXIST SCREEN PANEL REINSTALLED

AutoCAD SHX Text

EXISTING HM DOORS TO BE REINSTALLED W/ EXISTING HARDWARE

AutoCAD SHX Text

EXISTING SCREEN DOORS TO BE REINSTALLED W/ EXISTING HARDWARE

AutoCAD SHX Text

1. PATCH AND REPAIR FLOOR AND WALL FINISHES TO MATCH EXISTING INTERIOR PATCH AND REPAIR FLOOR AND WALL FINISHES TO MATCH EXISTING INTERIOR AND EXTERIOR FINISHES. PAINT TO EXTENT DETERMINED BY COR. 2. REINSTALL EXISTING HM DOOR AND FRAME. RESTORE TO FULL FUNCTIONALITY. REINSTALL EXISTING HM DOOR AND FRAME. RESTORE TO FULL FUNCTIONALITY. 3. REINSTALL EXISTING WIRE SCREEN DOOR, TRANSOM AND FRAME. RESTORE TO REINSTALL EXISTING WIRE SCREEN DOOR, TRANSOM AND FRAME. RESTORE TO FULL FUNCTIONALITY 4. INSTALL NEW 2'-0" WIDE ALUM LOUVER WITH BIRD/INSECT SCREEN. INSTALL NEW 2'-0" WIDE ALUM LOUVER WITH BIRD/INSECT SCREEN. 5. CLEAN EXISTING CONTROL JOINT OF REMNANTS OF OLD CAULK. RESEAL JOINT CLEAN EXISTING CONTROL JOINT OF REMNANTS OF OLD CAULK. RESEAL JOINT WITH NEW CAULK TO MATCH EXISTING ADJACENT FINISHES AS APPROVED BY COR.

AutoCAD SHX Text A. REPAIR EXISTING FLOOR AND WALL FINISHES AS REQUIRED TO INSTALL NEW REPAIR EXISTING FLOOR AND WALL FINISHES AS REQUIRED TO INSTALL NEW WORK. B. PATCH, REPAIR AND PAINT WALLS OR STRUCTURE ABOVE WHERE IMPACTED BY PATCH, REPAIR AND PAINT WALLS OR STRUCTURE ABOVE WHERE IMPACTED BY REPAIR AND PAINT WALLS OR STRUCTURE ABOVE WHERE IMPACTED BY NEW WORK TO EXTENT AS DETERMINED BY COR. MATCH EXISTING FINISHES UNLESS NOTED OTHERWISE. . C. WHERE DEVICES OR EQUIPMENT WERE REMOVED TO INSTALL NEW WORK, WHERE DEVICES OR EQUIPMENT WERE REMOVED TO INSTALL NEW WORK, REINSTALL EXISTING DEVICES AND COMPONENTS. THIS NOTE APPLIES TO ALL DEVICES AND COMPONENTS WHERE REMOVED TO INSTALL NEW WORK. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.

AutoCAD SHX Text

EXISTING CONSTRUCTION TO REMAIN

NEW CONSTRUCTION

3380 T rickum Road

W oodstock, G A. 30188 770-517-5507 voice 770-517-5508 fax

B ldg. 500, Ste. 100 ww w.ie iusa.com

IN C O R PO R A TED

INNO VATIVE

EN G IN EER IN G

Veterans Affairs

VA FO R M 08-6231

1 2 3 4 5 6 7 8 9

D ate:

D raw ing T itle :

A pproved: Pro ject D irector

P ro ject T itle :

1 2 3 4 5 6 7 8 9

590 M EA N S ST N W

P hase P roject N um ber

B uild ing N um ber

D raw ing N um berLocation

Issue D ate C heckedFU LLY SPR IN KLER ED

S TA M P

S TE . 200

A TLA N TA , G A 30318

AR C H ITEC T/EN G IN EE R O F R EC O R DC O N SU LTAN T

F ile

P a th

A

B

C

D

E

F

U .S. D epartm ent of V eterans A ffairs

O ffice o f C onstruction and Facilities M anagem ent

D raw n

R evisions:

A

B

C

D

E

F

STR U C TU R AL N O TES C H ILLER #3 R EPLAC EM EN T

PIN EVILLE, LO U IS IANA

S001

502-21-110

11-09-2022

BID D O C U M EN TS

D C AS LW

S101

R E

F

/4

REF.

91' - 5 1/4"

NEW LINTEL,

SE E ELE VATIO N

EXIST. LO AD BE ARING 8"

CM U W ALL, E NTIRE

PE RIM ETER O F BUILD ING

EXIST. PRECA ST

DO UBLE TEE RO O F

PA NELS

A B

SEE NO TE 4

PLAN

NO RTH

TRUE

NO RTH

1. F IELD V ERIFY EXISTING CO NDIT IO NS P RIO R TO SUB M ISS IO N O F

SHO P DRA W IING S FO R REVIEW

2. REF . DENO TES FO R REFE RENCE O NLY. CO NTRACTO R S HALL

FIELD V ERIFY

3. ALL EXTERIO R EXPO SED STEEL SHA LL BE HO T D IPPE D

G ALVANIZED

4. SHO RE E XIST ING RO O F AND W ALL AS RE Q UIRE D TO INSTALL

NEW LINTEL. DESIG N AND CO NSTRUCTIO N O F ALL SHO RING

SHA LL BE BY THE CO NTRACTO R. SUBM IT ALL S HO RING DES IG N

CALCULATIO NS AND DRAW ING S FO R REVIEW . DES IG N

CALCULATIO NS SHA LL BE S IG NED AND SE ALED BY A

PRO FESSIO NAL E NG INE ER LICENSED IN THE STA TE O F THE

PRO JECT.

IND ICATES EXISTING PRECA ST RO O F DO UBLE TEES

INDICATES NEW LINTEL

INDICATES EXISTING CM U

10'-0" MAX.

EXIST 8"

CM U W ALL

FILL CELLS W ITH 3,000

P S I G RO UT TYP.

A

A

TYP.

8" MIN.

HSS12x8X1/4 LSH

EXISTING SLA B

NO TE S:

1. REB AR SHO W N O NLY REQ UIRED IF NO T FO UND IN E XIST ING CO NDITIO N

2. CO O RDINATE DO O R / O P ENING RE M O V AL W ITH ARCH. DRAW ING S

3. HSS S HALL BE HO T D IPPE D G A LVANIZE D

4. CO O RDINATE LO CA TIO N / RELO CA TIO N O F E XIST ING W ALL M O UNTED

UTILIT IES W ITH A LL D ISC IPLINE DRAW ING S

DRILL HO LE INTO EXISTING CO NCRETE 10

BA R D IAM S DEE P BY O NE BAR D IAM + 1/4"

M AX IN D IAM ETE R A ND E PO XY DO W EL INTO

FO O TING AND BO ND BE AM A BO VE IN

ACCO RDA NCE W ITH M ANUFACTURERS

RECO M M ENDATIO NS

(1) #5

EXIST. PRECA ST DO UBLE TEE

E X

IS

T

IN

G

F

IE

LD

V

E R

IF

Y

EXIST. 8"

CM UHS S 12x8x1/4 LSH

SEC TIO N A-A

EXIST. BR ICK

O PE NING

HO LLO W BLO CK

O NE PER CELL AS REQ UIRED

ALIG N SAW CUT W ITH W EBS

FILL CHASE W ITH G RO UT

3380 T rickum Road

W oodstock, G A. 30188 770-517-5507 voice 770-517-5508 fax

B ldg. 500, Ste. 100 ww w.ie iusa.com

IN C O R PO R A TED

INNO VATIVE

EN G IN EER IN G

Veterans Affairs

VA FO R M 08-6231

1 2 3 4 5 6 7 8 9

D ate:

D raw ing T itle :

A pproved: Pro ject D irector

P ro ject T itle :

1 2 3 4 5 6 7 8 9

590 M EA N S ST N W

P hase P roject N um ber

B uild ing N um ber

D raw ing N um berLocation

Issue D ate C heckedFU LLY SPR IN KLER ED

S TA M P

S TE . 200

A TLA N TA , G A 30318

AR C H ITEC T/EN G IN EE R O F R EC O R DC O N SU LTAN T

F ile

P a th

A

B

C

D

E

F

U .S. D epartm ent of V eterans A ffairs

O ffice o f C onstruction and Facilities M anagem ent

D raw n

R evisions:

A

B

C

D

E

F

R O O F FR AM IN G PLAN C H ILLER #3 R EPLAC EM EN T

PIN EVILLE, LO U IS IANA

S101

502-21-110

11-09-2022

BID D O C U M EN TS

D C AS LW

3/16" = 1 '-0"S101

1 R O O F FR A M IN G PLAN R O O F FR AM IN G N O TE SR O O F FR AM IN G LEG EN D

3/8" = 1 '-0"S101

2 ELEVATIO N AT N EW O P EN IN G

1 1/2" = 1 '-0"S101

3 SE C TIO N

CO2

CO

H

HS

NO2

S

TH

TS

T

MS

2"

4"

4"

PIPE RISE

PIPE DROP

PIPE TEE REDUCING 45

DEGREE TEE

45 DEGREE TEE

2" DOM. WM

PIPE ACCESSORY TAGS

DOMESTIC WATER

METER

BALANCING VALVE

1/4 TURN BALL VALVE

CHECK VALVE

3-WAY MIXING VALVE

MOTORIZED CONTROL

VALVE

3 WAY MOTORIZED

CONTROL VALVE

PRESSURE REDUCING

VALVE

REFRIGERANT SOLENOID

VALVE

BUTTERFLY VALVE

2"

BALANCING

2" SHUTOFF

2" CHECK

2" TMV

2" M-CNTRL

2" 3-WAY

CNTRL

2" PRV

3/8"

SOLENOID

2"

BUTTERFLY

CAP

PLUG

* NOTE *

ALL OF GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL

OTHER DRAWINGS IN THIS SET.THE SYMBOLS AND ABBREVIATIONS SHOWN

ON THIS SHEET MAY OR MAY NOT BE USED IN THIS SET OF DRAWINGS.

F

S

M

B

D

C

48"x2 1/2"

SLB3

LINEAR BAR

GRILLE

RTU-XX

VAV-XX

EQUIPMENT

TAG

EQUIPMENT TAG

VAV TERMINAL

AIR HANDLING UNIT

MANUAL BALANCING

DAMPER

BACKDRAFT DAMPER

COMBINATION

FIRE/SMOKE

DAMPER

FIRE DAMPER

SMOKE DAMPER

MOTORIZED DAMPER

CWS

CD

MPS

CR

CS

HWR

HWS

LPS

CWR

CHILLED WATER

RETURN

CHILLED WATER

SUPPLY

CONDENSATE

DRAINAGE

MEDIUM PRESSURE

STEAM

CONDENSER WATER

RETURN

CONDENSER WATER

SUPPLY

HEATING WATER

RETURN

HEATING WATER

SUPPLY

LOW PRESSURE

STEAM

LPSR

LOW PRESSURE

STEAM RETURN

MPSR

PCD

CDR

MEDIUM PRESSURE

STEAM RETURN

PUMP CONDENSATE

DISCHARGE

CONDENSATE

RETURN

GENERAL MECHANICAL NOTES

A. CONTRACTOR SHALL PHASE ALL WORK AS REQUIRED TO MAINTAIN

CONTINUOUS OPERATION OF THE HOSPITAL.

B. HOSPITAL OPERATIONS SHALL NOT BE INTERRUPTED DUE TO THE

WORK OF THIS PROJECT EXCEPT FOR SCHEDULED SHUTDOWNS OF

NO LONGER THAN ONE HOUR. CONTRACTOR SHALL GIVE

REASONABLE NOTICE TO COR BEFORE ANY SUCH SHUTDOWN OR

INTERRUPTION.

C. WHERE LONGER SHUTDOWNS ARE REQUIRED TO COMPLETE THE

WORK DESCRIBED IN THIS DOCUMENT, THE CONTRACTOR SHALL

SCHEDULE THE EVENT A MINIMUM OF 3 WEEKS PRIOR TO

COMMENCING WORK. ALL SUCH SHUTDOWNS AND INTERRUPTIONS

SHALL BE MINIMIZED AND SHALL UTILIZE WEEKENDS, FEDERAL

HOLIDAYS, NIGHTS, AND OTHER TIMES WHEN HOSPITAL OPERATIONS

ARE MINIMIZED AND OTHER SUCH TIMES AGREEABLE TO THE COR.

D. WHERE NECESSARY TO INTERRUPT CONTINUOUS OPERATION OF THE

HOSPITAL, THE CONTRACTOR SHALL DIVIDE WORK INTO PHASED

CONSTRUCTION THAT IS NOT NECESSARILY SHOWN ON THESE

DOCUMENTS. AS PART OF SCHEDULING AN INTERRUPTION OR

SHUTDOWN, THE CONTRACTOR SHALL PROVIDE THE COR WITH A

DETAILED SHUTDOWN PLAN INDICATING THE SYSTEMS AFFECTED,

INCLUDING BUT NOT LIMITED TO ARCHITECTURAL, ELECTRICAL,

MECHANICAL, PLUMBING, FIRE PROTECTION, AND OTHER SYSTEMS

INVOLVED. THE PLAN SHALL INCLUDE THE WORK TO BE PERFORMED,

THE LENGTH OF INTERRUPTION, AND A DETAILED PHASING AND

MANNING DESCRIPTION. THE PLAN SHALL INCLUDE AND ADDRESS

CONTINGENCY FOR MITIGATING ANY DELAYS THAT MAY OCCUR IN THE

PLANNED WORK. PROVIDE THIS PLAN TO THE COR 5 WEEKS BEFORE

THE EVENT FOR APPROVAL.

A. THE TEST AND BALANCE CONTRACTOR SHALL BE A SUBCONTRACTOR

TO THE PRIME CONTRACTOR AND NOT A SUBCONTRACTOR TO THE

MECHANICAL OR ANY OTHER SUBCONTRACTOR.

PHASING MECHANICAL NOTES

TEST AND BALANCE MECHANICAL NOTES

PIPING SYMBOLSHVAC SYMBOLS

CONTINUATION SYMBOL

NUMBER OF SHEET WHERE DETAIL APPEARS

NUMBER OF DETAIL ON SHEET

REVISION NUMBER - SHOWN ON PLANS

GENERAL MECHANICAL SYMBOLS

ROOM NAME AND NUMBER

LIMIT OF DEMOLITION

(E)

2"

1/8" / 12" SLOPE

PIPE SIZE TAG (DIAMETER)

BELOW GROUND PIPING

EXISTING PIPE TAG

PIPING BEING DEMOLISHED

INVERT: -105' - 1" PIPE INVERT ELEVATION TAG

PIPE SLOPE TAG

NEW WORK NOTES

DEMOLISHED WORK NOTES

CONNECT NEW DUCT TO EXISTING DUCT

ACCESS DOOR ON TOP OF DUCT

ACCESS DOOR ON SIDE OF DUCT

ACCESS DOOR ON BOTTOM OF DUCT

Room

AREA NOT IN CONTRACT

SHEET NOMENCLATURE

M P # # #

SHEET

SERIES

MECHANICAL

(H) HVAC

(P) PIPING

(D) DEMO

SERIES

0 - SYMBOLS AND NOTES

1 - PLAN VIEWS

3 - ELEVATIONS AND SECTIONS

4 - LARGE SCALE - PLANS AND SECTIONS

5 - SCHEMATICS AND DETAILS

6 - SCHEDULES

8 - CONTROLS

16"x8"

16"/8"

16"Ø

EXISTING DUCT TAG

OVAL DUCT SIZE TAG (WIDTH / HEIGHT)

SQUARE DUCT SIZE TAG (WIDTH x HEIGHT)

RECTANGULAR SUPPLY/OUTSIDE AIR DUCT RISE

RECTANGULAR RETURN/TRANSFER AIR DUCT RISE

ROUND DUCT SIZE TAG (DIAMETER)

DUCT BEING DEMOLISHED

ROUND SUPPLY/OUTSIDE AIR DUCT RISE

ROUND RETURN/TRANSFER AIR DUCT RISE

RECTANGULAR EXHAUST/RELIEF AIR DUCT RISE

ROUND EXHAUST/RELIEF AIR DUCT RISE

DROP

DROP

DROP

DROP

DROP

DROP

(E)16"Ø

3-CONE

DIFFUSER

CFM

NECK SIZE

TYPE (SEE SCHEDULE)

EGGCRATE

RETURN GRILLE

10"x10"

RG1

CFM

NECK SIZE

TYPE (SEE SCHEDULE)

10"Ø

SD1

VAV-XX

RTU-XX

EQUIPMENT ID

SYMBOL

SENSOR

MANUAL SWITCH

THERMOSTAT

TEMPERATURE SENSOR

TEMPERATURE & HUMIDITY

SENSOR

HUMIDITY SENSOR

NITROGEN DIOXIDE SENSOR

CARBON MONOXIDE SENSOR

CARBON DIOXIDE SENSOR

HUMIDISTAT

TYPE (SEE SCHEDULE)

CFM

ACTIVE SLOT LENGTH

(PLENUM LENGTH)

GRILLES, REGISTERS & DIFFUSERS TAG

MECHANICAL EQUIPMENT TAGS

DATA DEVICE TAGS

DAMPER TAGS

ABBREVIATIONS

KG KILOGRAM

KG/HR KILOGRAM PER HOUR

kPa KILOPASCAL

KW KILOWATT

KWH KILOWATT HOUR

L LITER

L/h LITERS PER HOUR (or LITERS/HOUR) L/m LITERS PER MINUTE (or LITERS/MINUTE) L/s LITERS PER SECOND (or LITERS/SECOND)

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LGT LEAVING GLYCOL TEMPERATURE

LH LATENT HEAT

LPG LIQUEFIED PETROLEUM GAS

LPR LOW PRESSURE RETURN (STEAM

CONDENSATE)

LPRC LOW PRESSURE STEAM RETURN

(CLEAN)

LLHX LIQUID TO LIQUID HEAT EXCHANGER

LPS LOW PRESSURE STEAM

LPSC LOW PRESSURE STEAM (CLEAN)

LSD LINEAR SLOT DIFFUSER

LTCP LOCAL TEMPERATURE CONTROL PANEL

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

M METER, SI UNIT

M/S METERS PER SECOND

(OR METERS/SECOND)

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAU MAKE-UP AIR UNIT

MAV MANUAL AIR VENT

MAX MAXIMUM

MB MIXING BOX

MBH 1,000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY REPORTING

VALUE

MH MANHOLE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MOV MOTOR OPERATED VALVE

MPR MEDIUM PRESSURE RETURN

(STEAM CONDENSATE)

MPS MEDIUM PRESSURE STEAM

MRI MAGNETIC RESONANCE IMAGING

MTD MEAN TEMPERATURE DIFFERENCE

MVD MANUAL VOLUME DAMPER

MZ MULTI-ZONE

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NG NATURAL GAS

NGFM NATURAL GAS FLOWMETER

Nm NEWTON METER

NO NORMALLY OPEN

NOAA NATIONAL OCEANIC &

ATMOSPHERIC ADMINISTRATION

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NPSHA NET POSITIVE SUCTION HEAD

AVAILABLE

NPSHR NET POSITIVE SUCTION HEAD

REQUIRED

NTS NOT TO SCALE

OA OUTSIDE AIR

OAD OUTDOOR AIR DAMPER

OAG OUTSIDE AIR GRILLE

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

OFM OIL FLOWMETER

OR OPERATING ROOM

P PUMP

Pa PASCAL

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PEF PROPELLER (TYPE) EXHAUST FAN

PF PRE-FILTER

PG PRESSURE GAGE

PGW PROPYLENE GLYCOL-WATER

(SOLUTION)

PHC PREHEAT COIL

PPM PARTS PER MILLION

PRS PRESSURE REGULATING (VALVE)

STATION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH –

ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

PSS PRIMARY SECONDARY SYSTEM

PSV PRESSURE SAFETY VALVE

PTAC PACKAGED TERMINAL AIR

CONDITIONER

R/E RETURN OR EXHAUST

RA RETURN AIR

RAD RETURN AIR DAMPER

RAF RADIO FREQUENCY

RAHX ROTARY AIR HEAT EXCHANGER

RAT RETURN AIR TEMPERATURE

RCCH REMOTE CONDENSER CHILLER

RCU RECIPROCATING CHILLER UNIT

RD REFRIGERANT DISCHARGE

RDS ROOM DATA SHEETS

REA RELIEF AIR

RELAD RELIEF AIR DAMPER

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RO REVERSE OSMOSIS

RPM REVOLUTIONS PER MINUTE

RR RETURN REGISTER

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

RV RELIEF VALVE

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCFM STANDARD CUBIC FEET PER MINUTE

SCI SPINAL CODE INJURY

SCR SILICON CONTROLLED RECTIFIER

SD SMOKE DETECTOR

SD SUPPLY AIR DIFFUSER

SD-1 SCHEMATIC DESIGN (SUBMISSION1)

SD-2 SCHEMATIC DESIGN (SUBMISSION2)

SDPR SMOKE DAMPER

SDR SMOKE DAMPER (RETURN)

SDS SMOKE DAMPER (SUPPLY)

SEN SENSIBLE HEAT

SF SUPPLY FAN

SG SUPPLY AIR GRILLE

SH STEAM HUMIDIFIER

SHC STEAM HEATING COIL

SI SQUARE INCHES

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPD SUPPLY PROCESS AND

DISTRIBUTION

SPRV STEAM PRESSURE REDUCING

VALVE

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT (FEET)

SR SUPPLY AIR REGISTER

SS STAINLESS STEEL

SSHX STEAM TO STEAM HEAT

EXCHANGER

SSR SOLID SEPARATOR

ST STEAM TRAP

SUH STEAM UNIT HEATER

SV STEAM PRESSURE REDUCING

VALVE

SVS STEAM VENT SILENCER

SW SOFTWATER

SWHX STEAM TO WATER HEAT

EXCHANGER

T&PCV TEMPERATURE AND PRESSURE

CONTROL VALVE

TAB TESTING, ADJUSTING, BALANCE

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TG TRANSFER GRILLE

TP TRAP

TR TOP REGISTER

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

TWU THRU-WALL UNIT

UC UNDER CUT

UC UNIT COOLER

UH UNIT HEATER

U UNDERWRITERS LABORATORY

URV UPBLAST UNIT VENTILATOR

V VALVE

V VENT

VAF VANE-AXIAL FAN

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL

OPPOSED BLADE)

VFD VARIABLE FREQUENCY DRIVE

VHA VETERANS HEALTH

ADMINISTRATION

VI VIBRATION ISOLATOR

VP VACUUM PUMP

VPS VARIABLE PRIMARY SYSTEM

VR VACUUM (STEAM CONDENSATE)

RETURN

VSD VARIABLE SPEED DRIVE

VUH VERTICAL UNIT HEATER

W WATTS

WAG WASTE ANESTHESIA GAS

Wb WET-BULB (TEMPERATURE)

WC WATER COOLED

WCCH WATER COOLED CHILLER

WCCU WATER COOLED CONDENSING UNIT

WCHP WATER COOLED HEAT PUMPS

WCPU WATER COOLED PACKAGED UNIT

WEF WALL EXHAUST FAN

WF WATER FILTER

WFCV WATER FLOW CONTROL VALVE

WFM WATER FLOWMETER

WFMD WATER FLOW MEASURING DEVICE

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

YR YEAR

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EC EVAPORATIVE COOLER

ECC ENGINEERING CONTROL CENTER

ECU EVAPORATIVE CONDENSER UNIT

EDH ELECTRIC DUCT HEATER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EGS EMERGENCY GAS SHUTOFF

EGT ENTERING GLYCOL TEMPERATURE

EH EXHAUST HOOD

EJ EXPANSION JOINT

EMD END OF MAIN DRIP (STEAM)

ENT ENTERING

ER EXHAUST REGISTER

ERC ELECTRIC REHEAT COIL

ERP ELECTRIC RADIANT PANEL

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

ETO ETHYLENE OXIDE

EUH ELECTRIC UNIT HEATER

EWC EVAPORATIVE WATER COOLER

EWT ENTERING WATER TEMPERATURE

EX EXISTING

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

F/SDPR COMBINATION FIRE SMOKE DAMPER

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT (4 PIPE)

FCUC FAN COIL UNIT COOLING ONLY

FCUH FAN COIL UNIT HEATING ONLY

FCW FORWARD CURVED WHEEL (FAN)

FD FLOOR DRAIN

FD FIRE DAMPER

FF FINAL FILTER

FHX FLUE GAS/FEEDWATER HEAT

EXCHANGER

FM FLOW METER

FOP FUEL OIL PUMP

FOT FUEL OIL TANK

FOHX FUEL OIL HEAT EXCHANGER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FPTU FAN POWERED TERMINAL UNIT

FR FLOOR REGISTER

FRP FIBER REINFORCED POLYESTER

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT WC FEET OF WATER COLUMN

FT-LB FOOT-POUND

FTR FIN TUBE RADIATION

FV FACE VELOCITY

GA GAUGE

GAL GALLONS

GH GRAVITY HOOD

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GS GALVANIZED STEEL

H HUMIDIFIER

HAC HOUSEKEEPING AID CLOSET

HB HOSE BIBB

HC HEATING COIL

HD HOOD

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HORSEPOWER

HPDT HIGH PRESSURE DRIP TRAP

HPR HIGH PRESSURE RETURN

(STEAM CONDENSATE)

HPS HIGH PRESSURE SUPPLY (STEAM)

HRC HEAT RECOVERY COIL

HRD HEAT RECOVERY DEVICE

HRP HYDRONIC RADIANT (CEILING) PANEL

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HTM HUMIDIFIER TERMINAL

HUM HUMIDIFIER UNIT MOUNTED

HVU HEATING AND VENTILATING UNIT

HW HOT WATER

HWC HOT WATER COIL

HWHC HOT WATER HEATING COIL

HWP HEATING HOT WATER PUMP

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

HWUH HOT WATER UNIT HEATER

HVD HOISTWAY VENT DAMPER

HX HEAT EXCHANGER

HZ HERTZ

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ICF IN-LINE CENTRIFUGAL FAN

ICU INTENSIVE CARE UNIT

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTEGRATED PART LOAD VALUE

IRH INTRARED HEATER

IS INSECT SCREEN

IU INDUCTION UNIT

IV INLET VANES

J INTENTIONALLY LEFT BLANK

A/E ARCHITECT / ENGINEER

AAHX AIR TO AIR HEAT EXCHANGER

AAV AUTOMATIC AIR VENT

AB AIR BLENDER

ACC AIR COOLED CONDENSER

ACCH AIR COOLED CHILLER

ACCU AIR COOLED CONDENSING UNIT

ACD AUTOMATIC CONTROL DAMPER,

MODULATING

ACD-TP AUTOMATIC CONTROL DAMPER,

TWO POSITION

ACU AIR CONDITIONING UNIT

AD ACCESS DOOR

AF AFTER FILTER

AFCV AIR FLOW CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AFMS AIR FLOW MEASURING STATION

AFW AIR FOIL WHEEL (FAN)

AHU AIR-HANDLING UNIT

AMP AMPERE

AP ACCESS PANEL

APD AIR PRESSURE DROP

AQST AQUASTAT

ARI AIR CONDITIONING AND

REFRIGERATION INSTITUTE

AS AIR SEPARATOR

ASHRAE AMERICAN SOCIETY OF HEATING

REFRIGERATION AIR CONDITIONING

ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

AW AIR WASHER

AXF AXIAL FLOW

B BOILER

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BDR BASE BOARD RADIATOR

BE BOTTOM ELEVATION

BFP BACKFLOW PREVENTER

BFT BOILER PLANT FIRE TUBE

BG BOTTOM GRILLE

BHP BRAKE HORSEPOWER

BHW HOT WATER HEATING BOILER

BHX BOILER BLOWDOWN HEAT EXCHANGER

BIW BACKWARD INCLINED WHEEL (FAN)

BMT BONE MARROW TRANSPLANT

BR BOTTOM REGISTER

BSC BIOLOGICAL SAFETY CABINETS

BT BLOWOFF TANK

BTC BLOWOFF TANK CONTROL VALVE

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

BWT BOILER PLANT WATER TUBE

C CENTIGRADE (CELSIUS)

CAV CONSTANT AIR VOLUME

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CD CEILING DIFFUSER

CD-1 CONSTRUCTION DOCUMENTS

(SUBMISSION1)

CD-2 CONSTRUCTION DOCUMENTS

(SUBMISSION2)

CENT CENTRIFUGAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CFP CHEMICAL FEED PUMP

CG CEILING GRILLE

CH CHILLER

CHP CHILLED WATER PUMP

CHW CHILLER WATER

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CI CAST IRON

CM CARBON MONOXIDE

CM CUBIC METER

CM/S CUBIC METER PER SECOND

CO CLEAN OUT

CO2 CARBON DIOXIDE

COMP COMPRESSOR UNIT

COP COEFFICIENT OF PERFORMANCE

CP CONDENSATE PUMP

CR CEILING REGISTER

CS CONDENSATE STORAGE TANK

CSG CLEAN STEAM GENERATOR

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

CWCC CHILLED WATER COOLING COIL

CWP CONDENSER WATER PUMP

CWR CONDENSER WATER RETURN (TO

COOLING TOWER)

CWS CONDENSER WATER SUPPLY (FROM

COOLING TOWER)

D DAMPER - AUTOMATIC

Db DRY-BULB TEMPERATURE

DB DECIBELS

DCW DOMESTIC COLD WATER

DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)

DD-2 DESIGN DEVELOPMENT (SUBMISSION 2)

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DF DIFFUSER

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DIA DIAMETER

DIW DEIONIZED WATER

DP DEW POINT TEMPERATURE

DP DIFFUSER PLATE

DPA DIFFERENTIAL PRESSURE ASSEMBLY

DPS DIFFERENTIAL PRESSURE SENSOR

DX DIRECT EXPANSION

DXCC DIRECT EXPANSION COOLING COIL

A. EQUIPMENT INDICATED TO BE REMOVED SHALL BE REMOVED FROM

THE PROJECT SITE IN ITS ENTIRETY INCLUDING ALL HANGERS,

ELECTRICAL CONDUIT, WIRING, JUNCTION BOXES, PIPING, CONTROLS,

ACCESSORIES AND ALL APPURTENANCES THAT ARE RENDERED

USELESS OR ABANDONED BY THE REMOVAL OF THE INDICATED

EQUIPMENT.

B. WHERE THESE DOCUMENTS REQUIRE REMOVAL OF PIPING,

EQUIPMENT OR ASSOCIATED APPURTENANCES, CONTRACTOR SHALL

PROTECT ALL EXISTING-TO-REMAIN COMPONENTS FROM DAMAGE.

CONTRACTOR SHALL COVER ALL OPENINGS IN DUCT, PIPING,

EQUIPMENT, AND ANY OTHER DEVICE FROM CONSTRUCTION DUST

AND DEBRIS.

C. WHERE EQUIPMENT OR PIPING IS TO BE REMOVED THAT IS IN-

SERVICE, CONTRACTOR SHALL GIVE NOTICE TO THE COR OF ANY

INTERRUPTIONS ANTICIPATED. IT IS THE RESPONSIBILITY OF THE

CONTRACTOR TO COORDINATE ALL SHUTDOWNS OR INTERRUPTIONS

TO THE SATISFACTION OF THE COR AND HOSPITAL STAFF.

DEMOLITION MECHANICAL NOTES

AI

GROE

G

KNO

W

L E S

J E R

E M Y

NO. 034176

PROFESSIONAL

TIS RE

DEER

G

E

NG I NEE

R

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

590 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 200

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

Revisions:

PINEVILLE, LOUISIANA

M001

502-21-110

JMK JSP11/09/2022

MECHANICAL LEGEND, ABBREVIATIONS,

AND NOTES

CHILLER #3

REPLACEMENT

BID DOCUMENTS

A. THE CONTRACTOR SHALL BE FAMILIAR WITH ALL THE CONDITIONS,

BOTH EXISTING AND THOSE ILLUSTRATED BY THESE DOCUMENTS, AS

WELL AS THOSE WHICH CAN BE REASONABLY ANTICIPATED

INCLUDING, BUT NOT LIMITED TO ARCHITECTURAL, ELECTRICAL,

PLUMBING, FIRE PROTECTION, AND OTHER SYSTEMS INVOLVED ON

THIS PROJECT.

B. FINAL PRODUCT SHALL BE A COMPLETE AND FUNCTIONING SYSTEM

AND SHALL CONFORM TO ALL CURRENT REQUIREMENTS FOUND IN

THE UNITED STATES DEPARTMENT OF VETERANS AFFAIRS TECHNICAL

INFORMATION LIBRARY, INCLUDING BUT NOT LIMITED TO THE

PHYSICAL SECURITY MANUAL, HVAC DESIGN MANUAL, AND STEAM,

HEATING HOT WATER, AND OUTSIDE DISTRIBUTION SYSTEM DESIGN

MANUAL. ALL WORK SHALL ALSO CONFORM TO ALL FEDERAL, STATE,

AND LOCAL CODES, INCLUDING BUT NOT LIMITED TO THE

INTERNATIONAL BUILDING CODE AND INTERNATIONAL MECHANICAL

CODE.

C. INSTALL ALL EQUIPMENT AND DEVICES IN ACCORDANCE WITH THEIR

RESPECTIVE MANUFACTURER’S INSTALLATION INSTRUCTIONS AT A

LEVEL OF QUALITY AND WORKMANSHIP CONSISTENT WITH THESE

DOCUMENTS. ANY DEVIATIONS BETWEEN THE INSTALLATION

INSTRUCTIONS AND THESE DOCUMENTS WILL BE BROUGHT TO THE

ATTENTION TO THE COR BEFORE ANY COURSE OF ACTION BY THE

CONTRACTOR IS INITIATED, INCLUDING PURCHASE OF EQUIPMENT.

D. CONTRACTOR SHALL COORDINATE ALL WORK DESCRIBED AND

ILLUSTRATED IN THESE DRAWINGS. LOCATIONS OF PIPING AND

EQUIPMENT AS INDICATED ON THESE DRAWINGS ARE APPROXIMATE

AND SUBJECT TO ADJUSTMENTS IN THE FIELD. OFFSET PIPING, AND

SHIFT EQUIPMENT AS REQUIRED TO AVOID INTERFERENCE AND

CONFLICTS IN THE FIELD. COORDINATE DUCT AND PIPE ROUTING AND

EQUIPMENT LOCATIONS WITH PLUMBING AND ELECTRICAL

INSTALLATIONS AND WITH BUILDING STRUCTURAL MEMBERS.

E. THESE MECHANICAL DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE

NOT TO BE SCALED. BEFORE BEGINNING WORK, THE CONTRACTOR

SHALL VISIT THE SITE AND COMPLETE MEASURED SURVEY AND

CREATE LAYOUT DRAWINGS AS REQUIRED BY THE

SPECIFICATIONS. WORK SHALL NOT BEGIN UNTIL ALL LAYOUT

DRAWINGS ARE APPROVED BY THE COR.

F. PIPE SUPPORTS ARE NOT SHOWN ON DRAWINGS.

G. SUPPORT ALL PIPING, AND EQUIPMENT FROM PRIMARY BUILDING

STRUCTURAL MEMBERS. PROVIDE ADDITIONAL STRUCTURAL

MEMBERS WHERE NECESSARY TO ACCOMPLISH THIS REQUIREMENT.

H. NEW AND EXISTING SUPPORT, RODS, AND ASSOCIATED

APPURTENANCES SHALL NOT RESTRICT EQUIPMENT SERVICE AND

MAINTENANCE ACCESS. EXISTING SUPPORTS SHALL BE MODIFIED TO

PROVIDE FOR EQUIPMENT SERVICE AND MAINTENANCE ACCESS.

I. CONTRACTOR SHALL PROVIDE A LIST OF ALL MECHANICAL

EQUIPMENT, DEVICES, AND ALL APPURTENANCES REQUIRING POWER

TO THE COR FOR REVIEW AND APPROVAL AS PART OF COORDINATION

FOR THIS PROJECT. LIST ALL ELECTRICAL REQUIREMENT

CHARACTERISTICS, INCLUDING BUT NOT LIMITED TO VOLTAGE,

AMPERAGE, PHASE, DISCONNECTING MEANS, OVER CURRENT

PROTECTION AND ALL CHARACTERISTICS FOR A FULLY FUNCTIONAL

AND COORDINATED SYSTEM. REFER TO ELECTRICAL DRAWINGS FOR

VOLTAGE REQUIREMENTS OF ALL EQUIPMENT.

J. DO NOT USE SCHEDULED EQUIPMENT IDENTIFICATION NUMBERS

SHOWN ON DRAWINGS FOR FINAL EQUIPMENT SIGNS AND FOR

CONTROL SYSTEM SCHEMATICS. CONTACT COR AND OBTAIN FROM

REFRIGERATION AND HVAC MAINTENANCE SUPERVISOR THE

CORRECT NOMENCLATURE AND EQUIPMENT NUMBERS FOR

INCLUSION IN SIGNAGE, CONTROL SCHEMATICS, AND AS-BUILT

DRAWINGS.

SIEMENS CTRL

PANEL

EXISTING

UNIT

HEATER

EXISTING

ELEC. EQUIP

EXISTING

ELEC. EQUIP

FD

FD

FD

COOLING TWR #3COOLING TWR #6COOLING TWR #5

EXISTING

EF

EXISTING

EXHAUST

DUCT

CEILING

MOUNTED

EXHAUST

FAN TO

ROOF

REFRIGERATE

AIR DRYER

EXISTING ELEC. EQUIP

45 KVA

TRANSFORMER

PANEL

HA

EXISTING

FRIDGE

147-CT-2147-CT-1

FD

COOLING TWR #1 COOLING TWR #2

COOLING TWR #4

147-CT-6

CONCRETE

PAD (TYP)

EXISTING

ELEC. EQUIP

EXISTING

ELEC. EQUIP

(E)147-P-4 (E)147-P-2(E)147-P-3

(E)147-P-1

(E)CHILLER 1

(E)CHILLER 4

(E)CHILLER 2

(E)147-P-9

(E)AIR SEPARATOR

(E) 147-P-6

(E)CHILLER 3

(E)147-P-8

(E) 8" CWR

(E

8" C

R

(E

8" C

R

(E

8" C

W R

(E) 10" CWS

(E) 10" CWR

(E) 8" CWS

(E) 10" CR

(E) 8" CWR

(E) 6" CWR

(E) 6" CWS

(E) 10" CWS

(E

C W

R

(E

C W

S

(E

C S

(E) 8" CWR

(E)147-P-7

(E)MUW

(E) 10" CWR

E

LE

C T

R

IC

A L

E

LE

C T

R

IC

A L

ELECTRICAL ELECTRICAL

CONCRETE

PAD (TYP)

(E)TANK

(E

C W

S

(E)FFM

(E)FFM

(E

8" C

W R

(E)VFD - P-3 (E)VFD - P-2 (E)VFD - P-4

(E)VFD - P-5

(E)VFD - P-1

(E)WATER

TREATMENT

(E)VFD - P-6

(E)VFD - P-7

(E)TANK

(E)CHEMICAL

TREATMENT

AI

GROE

G

KNO

W

L E S

J E R

E M Y

NO. 034176

PROFESSIONAL

TIS RE

DEER

G

E

NG I NEE

R

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

590 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 200

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

PLAN

NORTH

TRUE

NORTH

PINEVILLE, LOUISIANA

MD101

502-21-110

JMK RCP/JSP11/09/2022

CHILLER #3

REPLACEMENT

CHILLER PLANT MECHANICAL

DEMOLITION PLAN

BID DOCUMENTS

MD101 DEMOLITION NOTES

NOTE

NUMBER NOTE TEXT

1 (E)147-P-7, CONDENSER WATER PUMP TO BE REUSED IN PROJECT.

CONTRACTOR SHALL EXERCISE THE ISOLATION VALVES TO VERIFY

FUNCTIONALITY BEFORE BEGINNING WORK. THE INTENT IS TO REUSE

EXSTING VALVES, STRAINERS, AND CHECK VALVES FOR THIS

ASSEMBLY. THE CONTRACTOR SHALL PREPARE TO REPLACE ALL

THERMOMETERS AND GAUGES.

2 (E)147-P-6, CONTRACTOR SHALL REMOVE CHILLED WATER PUMP

COMPLETELY. CONTRACTOR SHALL EXERCISE THE ISOLATION VALVES

TO VERIFY FUNCTIONALITY BEFORE BEGINNING WORK. THE INTENT IS

TO REPLACE ALL HYDRONIC SPECIALTY COMPONENTS. REMOVE

EXISTING INERTIA BASE. PATCH AND REPAIR FLOOR AND PREPARE FOR

NEW WORK.

3 (E)CHILLER 3, CONTRACTOR SHALL REMOVE WATER COOLED CHILLER

COMPLETELY. REMOVE ALL CONTROL WIRING, ELECTRICAL WIRING,

AND ALL APPURTENANCES. IT IS THE INTENT TO REUSE THE EXISTING

HOUSEKEEPING PAD.

4 CONTRACTOR SHALL REMOVE EXISTING VFD FOR PUMP (E)147-P-6 AND

ALL ITS APPURTENANCES.

5 CONTRACTOR SHALL REMOVE EXISTING VFD FOR PUMP (E)147-P-7 AND

ALL ITS APPURTENANCES.

1/4" = 1'-0"MD101

1 CHILLER PLANT MECHANICAL PIPING DEMOLITION PLAN

0 4' 8'2'

EXISTING

UNIT

HEATER

EXISTING

ELEC. EQUIP

EXISTING

ELEC. EQUIP

FD

FD

FD

COOLING TWR #3COOLING TWR #6COOLING TWR #5

EXISTING EF

EXISTING

EXHAUST

DUCT

CEILING

MOUNTED

EXHAUST

FAN TO

ROOF

REFRIGERATED AIR DRYER

EXISTING ELEC. EQUIP

45 KVA

TRANSFORMER

PANEL

HA

EXISTING

FRIDGE

147-CT-2147-CT-1

FD

COOLING TWR #1 COOLING TWR #2

COOLING TWR #4

147-CT-6

CONCRETE

PAD (TYP)

EXISTING

ELEC. EQUIP

EXISTING

ELEC. EQUIP

M401

(E)CHILLER 2(E)CHILLER 1

(E)CHILLER 4

(E)147-P-4(E)147-P-2(E)147-P-3

(E)147-P-1

(E)147-P-9

(E)AIR SEPARATOR

(E)147-P-8

147-P-6

(E) 8" CWR

(E) 8" CWR

(E) 8" CWR (E

8" C

R

(E

8" C

R

(E) 6" CWR

(E) 6" CWS

(E) 10" CWS

(E

C W

R

(E

C W

S

(E) 8" CWR

(E) 8" CWS

(E

8" C

R

(E

8" C

R

(E

8" C

W R

(E) 10" CWS

(E) 10" CWR

(E

8" C

W R

(E) 10" CWR

(E)147-P-7

(E) 10" CWS

(E) 10" CWR

(E)TANK

(E)MUW

E

LE

C T

R

IC

A L

E

LE

C T

R

IC

A L

ELECTRICAL ELECTRICAL

CONCRETE

PAD (TYP)

8" CWS

(E)VFD - P-3

(E)VFD - P-2 (E)VFD - P-4

(E)VFD - P-5

(E)VFD - P-1

(E

8" C

W S

(E) 8" CWR

(E) 8" CWS

(E) 6" CWS

(E) 6" CWR

(E

8" C

W R

(E

C W

S

(E

C W

R

(E)WATER

TREATMENT

FFM-2

M-CONTRL-2

FFM-1

M-CONTRL-1

147-CH-3

(E)FFM

(E) 10" CR

10" CS8" CWS

8" CWR

VFD - P-6

VFD - P-7

(E)TANK

(E)CHEMICAL

TREATMENT

RECONNECT EXISTING

CHEMICAL TREATMENT.

AI

GROE

G

KNO

W

L E S

J E R

E M Y

NO. 034176

PROFESSIONAL

TIS RE

DEER

G

E

NG I NEE

R

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

590 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 200

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

PLAN

NORTH

TRUE

NORTH

PINEVILLE, LOUISIANA

MP101

502-21-110

JMK JSP11/09/2022

CHILLER #3

REPLACEMENT

CHILLER PLANT MECHANICAL PIPING

PLAN

BID DOCUMENTS

1/4" = 1'-0"MP101

1 CHILLER PLANT MECHANICAL PIPING PLAN

MP101 NEW WORK NOTES

NOTE

NUMBER NOTE TEXT

1 CONTRACTOR SHALL INSTALL NEW CHILLER IN APPROXIMATE

LOCATION AS EXISTING. REUSE EXISTING HOUSEKEEPING PAD AND

ENLARGE TO FIT NEW EQUIPMENT.

2 CONTRACTOR SHALL INSTALL NEW CHILLED WATER PUMP IN

APPROXIMATE LOCATION AS EXISTING. PROVIDE NEW INERTIA

BASE TO SUPPORT PUMP. GROUT PUMP BASE AFTER FINAL

BALANCING.

3 CONTRACTOR SHALL REMOVE AND REPLACE INSULATION ON

CHILLED WATER SUPPLY AND CHILLED WATER RETURN PIPING TO

THE LIMITS INDICATED. (DEDUCTIVE ALTERNATE)

4 CONTRACTOR SHALL WIDEN EXISTING OPENING TO FIT NEW

EQUIPMENT. SEE ARCHITECTURAL. CLEAR DOOR OPEN SIZE

APPROXIMATELY 88½”X 116½”.

5 CONTRACTOR SHALL INSTALL NEW VFD FOR PUMP 147-P-6 AND ALL

ITS APPURTENANCES. SEE ELECTRICAL PLAN.

6 CONTRACTOR SHALL INSTALL NEW VFD FOR PUMP 147-P-7 AND ALL

ITS APPURTENANCES. SEE ELECTRICAL PLAN.

7 RECONNECT EXISTING CHEMICAL TREATMENT.

0 4' 8'2'

SIEMENS CTRL

FD

FD

M401

(E

C R

147-P-6

(E) 10" CWS

(E) 10" CWR

(E

8" C

W R

(E)CHILLER 4

(E) 8" CWS

(E) 8" CWR

(E) 8" CWR

M401

M401

(E) 6" CWR

(E) 6" CWS

(E) 8" CWR

(E) 8" CR

(E) 8" CR

(E

8" C

W S

(E

C S

8" C

W S

(E

8" C

W R

(E

8" C

W R

(E)147-P-7

(E

8" C

R

(E

8" C

R

(E) 8" CR

(E) 10" CWR

(E) 10" CWS

(E) 8" CWR

(E) 8" CWS

(E) 6" CWR

(E) 6" CWS

EXISTING CONCRETE PAD

147-CH-3

M-CONTRL-2

10" CS

(E) 10" CS

(E)WATER

TREATMENT

8" CWR

8" C

W S

FFM-1

M-CONTRL-1

(E)FFM

10" CR

(E) 8" CWR

(E)CHEMICAL

TREATMENT

Level 1 0' - 0"

Roof 14' - 0"

(E)147-P-7

(E

8" C

W R

EXISTING CONCRETE PADEXISTING CONCRETE PAD

8" CWS

(E) 10" CWR

(E) 8" CWR

(E) 8" CWS

(E) 10" CWS

10" CR

8" CWR

8" CWR

8" CWS

(E

C

S

10" CS

(E) 10" CR

(E) 8" CWR

147-CH-3

(E)WATER

TREATMENT

FFM-2

M-CONTRL-2

FFM-1

M-CONTRL-1

TO PIPING ON ROOF

Level 1 0' - 0"

Roof 14' - 0"

147-P-6

8" C

W R

NEW CONCRETE PAD

(E) 8" CWR

(E) 10" CR

8" C

W R

10" M-CNTRL

NEW INTERTIA BAS

Level 1 0' - 0"

Roof 14' - 0"

EXISTING CONCRETE PAD

(E) 10" CWR

147-CH-3

8" C

W S

8" C

W R

10" CS

AI

GROE

G

KNO

W

L E S

J E R

E M Y

NO. 034176

PROFESSIONAL

TIS RE

DEER

G

E

NG I NEE

R

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

590 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 200

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

PLAN

NORTH

TRUE

NORTH

PINEVILLE, LOUISIANA

M401

502-21-110

JMK RCP/JSP11/09/2022

CHILLER #3

REPLACEMENT

ENLARGED MECHANICAL PIPING PLAN BID DOCUMENTS

1/2" = 1'-0"M401

1 ENLARGED NEW MECHANICAL ROOM MECHANICAL PIPING PLAN

1/2" = 1'-0"M401

2 SECTION MECHANCIAL PIPING NEW WORK

0 2' 4'1'

0 2' 4'1' 1/2" = 1'-0"M401

4 SECTION MECHANICAL PIPING NEW WORK

0 2' 4'1'1/2" = 1'-0"M401

3 SECTION MECHANICAL PIPING NEW WORK

0 2' 4'1'

M401 NEW WORK NOTES

NOTE

NUMBER NOTE TEXT

1 CONNECT NEW CHILLED WATER RETURN PIPING TO EXISTING PIPE

AT THIS APPROXIMATE LOCATION.

2 CONNECT NEW CONDENSER SUPPLY PIPING TO EXISTING PIPE AT

THIS APPROXIMATE LOCATION.

3 CONNECT NEW CHILLED WATER SUPPLY PIPING TO EXISTING PIPE

AT THIS APPROXIMATE LOCATION.

4 NEW 147-CH-3 ON EXISTING CONCRETE PAD. EXTEND PAD AS

NECESSARY TO INSTALL NEW CHILLER.

5 CONNECT NEW CHILLED WATER RETURN PIPING TO EXISTING PIPE

AT THIS APPROXIMATE LOCATION.

6 CONNECT NEW CHILLED WATER RETURN PIPING TO EXISTING PIPE

AT THIS APPROXIMATE LOCATION.

7 CONTRACTOR SHALL REMOVE AND REPLACE INSULATION ON

CHILLED WATER PIPING TO THE LIMITS INDICATED. (DEDUCTIVE

ALTERNATE)

8 CONTRACTOR SHALL INSTALL NEW CHILLED WATER PUMP IN

APPROXIMATE LOCATION AS EXISTING. PROVIDE NEW INERTIA

BASE TO SUPPORT PUMP. GROUT PUMP BASE AFTER FINAL

BALANCING.

9 CONNECT NEW CONDENSER RETURN PIPING TO EXISTING PIPE AT

THIS APPROXIMATE LOCATION.

10 RECONNECT EXISTING CHEMICAL TREATMENT.

(E) TANK

TO PIPING ON ROOF

VAPOR BARRIER AND

MOISTURE MIGRATION

SEAL

PIPE

INSULATION

APPLY INSULATION AND

VAPOR JACKET SEAL

AROUND ROD ON COLD

SERVICE INSTALLATION

TYPE 3 DOUBLE

BOLT PIPE

CLAMP

ADHESIVE (TYPICAL)

TAPE APPLIED AT

EACH BUTT JOINT

TYPE 17

WELDLESS

EYENUT

IN…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .