This document is a solicitation for replacing a chiller at a VA medical center in Pineville, Louisiana. The solicitation is a total set-aside for Service-Disabled Veteran-Owned Small Businesses, with proposals due by a specified date and time. Offerors must be SDVOSB-certified and provide completed VAAR clauses and past performance questionnaires with their proposals. The work includes removing an existing chiller and furnishing all labor, materials, equipment, and supervision to install a new chiller at the specified location within 180 calendar days of notice to proceed. Evaluation criteria cover technical factors such as the offeror's management approach, schedule, and quality control, as well as past performance and price. Relevant contract terms, agency points of contact, and Davis-Bacon wage rates are included as attachments.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Chiller # 3 - Pineville, LA - VA (Project No. 502-21-110), newest first.
File Type Posted
36C25623R0096 0004.docx DOCX document
36C25623R0096 0003.docx DOCX document
Attachment 1A00002 - 2023-08-18 Addendum No. 1.pdf PDF
36C25623R0096 0002.docx DOCX document
Attachment 2A00002 236400 3-20 Packaged Water Chillers - Addendum 1.pdf PDF
36C25623R0096 0001.docx DOCX document
36C25623R0096 - Site Visit Sign in Sheet 502-21-110 Aug 15 23.jpg JPG image
36C25623R0096 EXHIBIT C.docx DOCX document
36C25623R0096 EXHIBIT E.docx DOCX document
PRA 502-21-110 Chiller 3 Replacement - Copy.pdf PDF
DBA WD LA20220041 Mod 5 (6-16-23).pdf PDF
36C25623R0096 EXHIBIT F.docx DOCX document
Final SOW - Formatted.docx DOCX document
36C25623R0096 EXHIBIT A.docx DOCX document
36C25623R0096 EXHIBIT B.docx DOCX document
36C25623R0096 EXHIBIT D.docx DOCX document
36C25623R0096 Design Analysis.pdf PDF
36C25623R0096 Drawings.pdf PDF
36C25623R0096 Specifications.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C25623R0096

X 08-07-2023

TBD

502-23-2-5737-0217

502-21-110 00502

DEPARTMENT OF VETERANS AFFAIRS

NETWORK CONTRACTING OFFICE 16

SLVHCS

1515 Poydras, Ste. 1100 New Orleans LA 70112

DEPARTMENT OF VETERANS AFFAIRS

NETWORK CONTRACTING OFFICE 16

ALEXANDRIA VA HEALTH CARE SYSTEM

2495 Shreveport HWY, 71N

PINEVILLE LA 71360-4004

Luke MIles luke.miles@va.gov VAAR Clause 852.219-75 (included herein) is required to be completed and returned with each proposal. Proposals without a completed VAAR Clause 852.219-75 will be considered ineligible for evaluation and award

This procurement is a total Service Disabled Veteran-Owned Small Business (SDVOSB) set-aside under Public Law 109-461.

Offerors must be registered and certified as an SDVOSB in the SBA Veteran Small Business Certification site at https://veterans.certify.sba.gov. Proposals received from contractors who are not certified as SDVOSB at the SBA site shall not be considered for evaluation and award. This includes Joint Ventures. Joint Venture Agreements must be submitted with proposal to be considered. Contract award shall not be delayed due to loss of SDVOSB certification.

Verification showing seal shall be included with proposal (pricing volume).

SITE VISIT: AN ORGANIZED SITE VISIT WILL BE HELD AT THE DATE/TIME/LOCATION SHOWN IN FAR 52.236-27 SITE VISIT (CONSTRUCTION) ALTERNATE I. THIS WILL BE THE ONLY SITE VISIT CONDUCTED FOR THIS PROCUREMENT.

INFORMATION PROVIDED AT THE SITE VISIT SHALL NOT ALTER THE TERMS AND CONDITIONS OF THE SOLICITATION. TERMS OF THE SOLICITATION REMAIN UNCHANGED UNLESS THE SOLICITATION IS AMENDED IN WRITING. CONTRACTORS ARE REQUIRED TO SUBMIT ALL QUESTIONS IN WRITING, USING EXHIBIT F, (EMAIL IS ACCEPTABLE) TO THE CONTRACT SPECIALIST SHOWN ABOVE NO LATER THAN NOON CT 14 CALENDAR DAYS PRIOR TO THE DATE/TIME SET FOR RECEIPT OF PROPOSALS.

SEE BLOCK 13A FOR SOLICITATION CLOSING DATE.

PER VAAR 836.204 THE ESTIMATED MAGNITUDE OF THIS PROJECT IS BETWEEN $1,000,000 AND $2,000,000

IN NEGOTIATED SOLICITATIONS “BID” AND “BIDDER” MEAN “OFFER” AND “OFFEROR”

NAICS CODE: 238220 SIZE STANDARD: $19M

GEOGRAPHICAL AREA WHERE WORK IS TO BE PERFORMED: Pineville, Rapides Parish (71360), Louisiana

This project is not tax exempt.

Base Offer Item: furnish all labor, tools, materials, equipment and supervision necessary to perform all work associated with Project #502-21-110, Replace Chiller # 3, located at the Alexandria VA Health Care System, 2495 Shreveport HWY, 71N, Pineville, LA 71360.

X X

52.211-10 X

One (1) Email 17:00

CDT

09-07-2023

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( 38 U.S.C. 8127(d)

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

Please see Schedule of Offer Items & Continuation of SF 1442 (Divisions) located in Sections A.3 and A.4

00502

DEPARTMENT OF VETERANS AFFAIRS

NETWORK CONTRACTING OFFICE 16

ALEXANDRIA VA HEALTH CARE SYSTEM

2495 SHREVEPORT HIGHWAY

PINEVILLE LA 71360-4004

FSC e-Invoice Payment http://www.fsc.va.gov/fsc/einvoice.asp Invoice Setup Information 1-877-489-6135 invoice must be submitted electronically 1-877-489-6135

Beth A. Cook VHA-RPOC-2021-14 Contracting Officer

Table of Contents

PART I - THE SCHEDULE1
SECTION A - SOLICITATION/CONTRACT FORM1
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)1
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK2
A.3 Schedule of Offer Items6
A.4 CONTINUATION OF SF 1442 BLOCK # 177
A.5 GENERAL PROPOSAL INFORMATION8
A.6 Proposal Preparation11
A.7 Information Regarding Bidding Material, Bid Guarantee, and Bonds17
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS18
2.1 52.216-1 TYPE OF CONTRACT (APR 1984)18
2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014)18
2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)18
2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)19
2.5 52.228-1 BID GUARANTEE (SEP 1996)20
2.6 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021)21
2.7 52.233-2 SERVICE OF PROTEST (SEP 2006)21
2.8 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)22
2.9 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)22
2.10 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)22
2.11 VAAR 852.209-70 ORGANIZATIONAL CONFLICTS OF INTEREST (OCT 2020)23
2.12 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018)24
2.13 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)24
2.14 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES INCORPORATED BY REFERENCE (JAN 2008)25
REPRESENTATIONS AND CERTIFICATIONS26
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)26
3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)30
3.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)32
3.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021)34
GENERAL CONDITIONS37
4.1 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) ALTERNATE I (APR 1984)37
4.2 52.219-14 LIMITATIONS ON SUBCONTRACTING (OCT 2022)37
4.3 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (MAR 2023)39
4.4 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (OCT 2022)42
4.5 52.227-4 PATENT INDEMNITY—CONSTRUCTION CONTRACTS (DEC 2007) ALTERNATE I (DEC 2007)46
4.6 52.232-19 AVAILABILITY OF FUNDS FOR THE NEXT FISCAL YEAR (APR 1984)47
4.7 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)47
4.8 SUPPLEMENTAL INSURANCE REQUIREMENTS47
4.9 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)48
4.10 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022)51
4.11 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)51
4.12 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (MAY 2020)51
4.13 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018)51
4.14 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR VERIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (NOV 2022)52
4.15 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (NOV 2022)55
4.16 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)56
4.17 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)56
4.18 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (WITHOUT NAS– CPM) (NOV 2018)57
4.19 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)60
4.20 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019)61
4.21 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)62
4.22 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)62
4.23 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020)62
4.24 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)64
4.25 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019)64
4.25 SC-0001 Contractor Performance Assessment Reporting System (CPARS)65
5.0 List of Attachments67
See attached document: 36C25623R0096 EXHIBIT A.67
See attached document: 36C25623R0096 EXHIBIT B.67
See attached document: 36C25623R0096 EXHIBIT C.67
See attached document: 36C25623R0096 EXHIBIT D.67
See attached document: 36C25623R0096 EXHIBIT E.67
See attached document: 36C25623R0096 EXHIBIT F.67
See attached document: Final SOW - Formatted.67
See attached document: 36C25623R0096 Design Analysis.67
See attached document: 36C25623R0096 Drawings.67
See attached document: 36C25623R0096 Specifications.67
See attached document: PRA 502-21-110 Chiller 3 Replacement - Copy.67
See attached document: 36C25623R0096 - WD LA20230051 Mod 5 (6_16_2023).67

A.3 Schedule of Offer Items

Contract Line Item Number CLIN 0001 (See Statement of Work, Contract Specifications and Drawings) AWARD POLICY: The Base Offer for CLIN 0001 includes all labor, tools, materials, equipment and supervision necessary to complete the Replace Chiller # 3 Project #502-21-110, Alexandria VA Health Care System, 2495 Shreveport HWY, 71N, Pineville, LA 71360. Offerors shall submit an offer for CLIN 0001. The Government reserves the right to award the base offer item if sufficient funds are available. Based upon availability of funds, award will be made to the offeror whose offer best conforms to the request for proposal, will be most advantageous to the Government considering past performance factors, technical factors, and price-related factors, as included in the solicitation.

CLIN 0001, BASE OFFER ITEM - GENERAL CONSTRUCTION: Furnish all labor, tools, materials, equipment and supervision necessary to perform all work associated with Project #502-21-110.

PERIOD OF PERFORMANCE – 180 CALENDAR DAYS AFTER RECEIPT OF NOTICE TO PROCEED.

CLIN 0001

A.4 CONTINUATION OF SF 1442 BLOCK # 17

MATERIAL
LABOR
EQUIPMENT
TOTAL
DIVISION 01:
GENERAL REQUIREMENTS
DIVISION 02:
EXISTING CONDITIONS
DIVISION 03:
CONCRETE
DIVISION 04:
MASONRY
DIVISION 05:
METALS
DIVISION 06:
WOOD, PLASTICS & COMPOSITES
DIVISION 07:
THERMAL & MOISTURE PROTECTION
DIVISION 08:
OPENINGS
DIVISION 09:
FINISHES
DIVISION 10:
SPECIALTIES
DIVISION 11:
EQUIPMENT
DIVISION 12:
FURNISHINGS
DIVISION 13:
SPECIAL CONSTRUCTION
DIVISION 14:
CONVEYING EQUIPMENT
DIVISION 21:
FIRE SUPPRESSION
DIVISION 22:
PLUMBING
DIVISION 23:
HVAC
DIVISION 25:
INTEGRATED AUTOMATION
DIVISION 26:
ELECTRICAL
DIVISION 27:
COMMUNICATIONS
DIVISION 28:
ELECTRONIC SAFETY AND SECURITY
DIVISION 31:
EARTHWORK
DIVISION 32:
EXTERIOR IMPROVEMENTS
DIVISION 33:
UTILITIES
DIVISION 34:
TRANSPORTATION
DIVISION 48:
ELECTRICAL POWER GENERATION

SUBTOTAL COST:

GENERAL LIABILITY / INSURANCE:

OVERHEAD & PROFIT:

BOND:

PROJECT TOTAL COST:

A.5 GENERAL PROPOSAL INFORMATION

Project: 502-21-110 Issuing Office: NCO 16 Location of Project: AVAHCS, Pineville, LA 71360.

Point of Contact: Luke Miles, Contract Specialist, NCO 16 – New Orleans, LA E-mail: luke.miles@va.gov

1. Service Disabled Veteran-Owned Small Business Verification: This action is a 100% set aside for Service Disabled Veteran Owned Small Businesses (SDVOSB) registered at Veteran Small Business Certification (sba.gov). The award of this solicitation shall not be delayed due to loss of VOSB certification. Proposals submitted by non-certified SDVOSBs shall be excluded from award consideration.

1. Joint Ventures must be verified SDVOSBs and registered in SAM at the time of solicitation response and at award.

1. VAAR Clause 852.219-75 (included herein) is required to be completed and returned with each proposal. Proposals without a completed VAAR Clause 852.219-75 will be considered ineligible for evaluation and award.

1. VETS-4212: Title 38, USC Section 4212(d), and Public Law 105-339, requires that federal contractors report, at least annually, the number and category of veterans who are within their workforce. This VETS-4212 report can be submitted per the instructions at https://www.dol.gov/agencies/vets/programs/vets4212. For assistance contact VETS-4212 customer support at 1-866-237-0275 or vets4212-customersupport@dolncc.dol.gov. For procurement awards in excess of $150,000, this report must be completed and accepted prior to any Federal contract award. Therefore, all potential contractors are encouraged to file every year.

4. Past Safety Record: VHA DIRECTIVE 7715 SAFETY AND HEALTH DURING CONSTRUCTION requires that Contracting Officers evaluate and consider past safety records of prospective contractors in awarding contracts. OFFERORS SHALL SUBMIT EXHIBIT D CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY AS A PART OF THE PRICE PROPOSAL.

All offerors shall submit, as part of their price proposal, information pertaining to their past Safety and Environmental record using Exhibit D. The information must show that the offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA violation(s) in the past three years. If those totals are exceeded, the offeror shall attach an explain why and submit as much information as possible regarding the circumstances of its past safety and environmental record, including the number of EPA violations and/or the number of serious, repeat, and/or willful OSHA violations, along with a detailed description of those violations.

All offerors shall submit information regarding their current Experience Modification Rate (EMR). This information shall be obtained from the offeror’s insurance carrier and be furnished on the insurance carrier’s letterhead. If an offeror’s EMR is above 1.0, offeror must attach a written explanation of the EMR from its insurance carrier furnished on the insurance carrier’s letterhead, describing the reasons for the EMR, and the anticipated date the EMR may be reduced to 1.0 or below.

Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state-run worker’s compensation insurance rating bureau.

If the NCCI cannot issue an EMR because the offeror lacks insurance history, offeror shall submit a letter indicating so from its insurance carrier furnished on the insurance carrier’s letterhead and include a letter from the NCCI indicating that is has assigned offeror a Unity Rating of 1.0.

This requirement is applicable to all subcontracting tiers, and prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors

The above information, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases, will be used to make an initial Determination of Responsibility.

OFFERORS WHO FAIL TO SUBMIT EXHIBIT D (CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY) AND EXHIBIT E (SURETY FORM) AS A PART OF THEIR PROPOSAL PACKAGE WILL BE RATED LOWER THAN AN OFFEROR THAT DOES PROVIDE. EXHIBITS D AND E ARE ATTACHED ALONG WITH PROJECT SPECIFICATIONS.

1. Site Visit: An organized site is scheduled as shown in clause 52.236-27 (Alternate I). Only one site visit will be conducted. Attendance at the site visit is not mandatory, but highly suggested for proper proposal preparation.

1. Requests for Information (RFIs): RFI’s are due, utilizing Exhibit F, no later than (NLT) 12:00 PM CST 14 calendar days prior to the date set for receipt of proposals or as amended and will not be accepted after this date. RFI’s should be submitted by email to the Contract Specialist, Luke Miles at luke.miles@va.gov. Responses will be provided by amendment to the solicitation in a question and answer format. Example: Subject Line of the RFI e-mail should be as follows: Company Name, RFI #1, 36C25623R0096 and Project #502-21-110.

1. Proposal Due Date: Proposals and Bid Bonds are due NLT the date/time shown in Block 13a of Standard Form (SF) 1442. A hard copy bid bond must be received NLT date/time shown in Block 13A and sent to the below address. All proposals will be submitted by E-Mail (all volumes & a copy of the Bid Bond) and received NLT date/time shown in Block 13A:

· Department of Veterans Affairs

· Network Contracting Office 16 (NCO 16)

· ATTN: Luke Miles/Beth Cook Bldg 10 Engineering

· 400 Veterans Avenue

· Biloxi, MS 39531

7. NOTE: It is the Offeror’s Responsibility to ensure proposals/bid bonds are received by the time/date established in Block 13A on SF 1442.

1. Magnitude of Construction: Pursuant to VAAR 836.204 the magnitude of construction is between $1,000,000.00 and $2,000,000.00.

1. North American Industry Classification (NAICS) code: The applicable NAICS code for this procurement is 238220 Plumbing, Heating, and Air Conditioning Contractors. The Small Business size standard is $19 Million.

1. Wage Determination (WD): The applicable Davis Bacon WD for this solicitation is incorporated as an attachment to this solicitation.

1. Period of Performance: The successful offeror shall begin performance within 10 calendar days after receiving the notice to proceed and complete all work within the time specified in the award. All punch list items must be completed during the established period of performance.

1. Funding: Award is contingent upon the availability of appropriated funds. The Government does not compensate vendors for proposal development and submission.

1. Superintendence: The offeror shall provide, from their own staff, a competent 30-hour OSHA certified superintendent. This individual shall be 100% full time dedicated and assigned to this project while work is being performed on site. The offeror shall not divide or split up their superintendence duties among multiple projects at the same facility. Each project stands alone and requires a dedicated superintendent to be allocated and funded to that particular project.

14. Holidays: The following federal holidays are observed:

New Year's DayMartin Luther King Jr.’s BirthdayPresident's Day
Memorial DayIndependence DayLabor Day
Columbus DayVeterans DayThanksgiving Day

Christmas Day Juneteenth National Independence Day

Any other holiday proclaimed by the President as a Federal Holiday.

When a holiday falls on a Sunday, the following Monday will be observed as a legal holiday. When a holiday falls on a Saturday, the preceding Friday is observed by U.S. Government agencies.

A.6 Proposal Preparation

This part describes the precise mechanism for evaluating and selecting offers for this procurement for:

· To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein. Proposals must be complete, self-sufficient, and respond directly to the requirements of this solicitation. Offerors are required to meet all solicitation requirements. The Government reserves the right to make a final determination on a proposal’s acceptability/unacceptability solely on the basis of the proposal submitted and to proceed without requesting additional information. Failure to meet a requirement may result in an offer being removed from consideration for award.

· Offerors must provide all requested information for each factor. Proposals must address each element of the factors as applicable to be considered responsive to this solicitation. Factor headings should be highlighted in yellow or typed in bold text for identification. It is the offeror’s responsibility to ensure the submitted proposal is in the proper format and the provided information is clear and free of ambiguities.

· Offeror’s proposal should contain the offeror’s best terms from a price standpoint. Offerors are cautioned to submit sufficient information and, in the format, specified in the proposal instructions. Communication conducted to resolve minor or clerical errors would not constitute discussions and the Contracting Officer reserves the right to award a contract without the opportunity for proposal revisions or discussions.

Evaluations: Factor I (Approach – Schedule – Quality Management Technical Factor), Factor II (Professional Qualifications & Specialized Experience Technical Factor), and Factor III (Past Performance) are equal in importance. Factors I, Factor II, and Factor III when combined, are significantly less important than Factor IV (Price).

· THE GOVERNMENT RESERVES THE RIGHT TO AWARD TO OTHER THAN THE OFFEROR WITH THE LOWEST PRICED PROPOSAL OR TO THE OFFEROR WITH THE HIGHEST RATED TECHNICAL PROPOSAL. Offers will be evaluated using the evaluation factors listed. It is the offeror's responsibility to ensure the completeness of the proposal. The SSEB will evaluate solely on the information provided in the initial proposal and will not assume that an offeror possesses any capability that is not specifically identified in the proposal.

a. The objective of the source selection is to select the offer that represents the best value to the Government. In order to select the offeror representing the best value, the Government will rate the offers by conducting an evaluation of all acceptable offers against source selection criteria in the solicitation. Benefits associated with a higher price will be identified and considered by trading off a difference in one or more non-price factors.

Proposal size will be limited as shown and font/size shall be no smaller than Time New Roman 11. Page limits are for single sheets of paper and may be double-sided. Title pages/exhibits do not count towards the page limitations. If these page limits are exceeded, the pages in excess of the limit will not be read or considered.

VOL
TITLE
COPIES
PAGE LIMITS
I
Factor 1 & 2
1 Email
25
II
Factor 3
1 Email
10
III
Factor 4
1 Email
Completed SF1442/SF1442 BACK with acknowledgement of all amendments and completed Schedule of Offer Items (SF 1442 and associated amendments do not count towards the page limitations)

In accordance with FAR 15.306(b)(1)(i), communications may be held with offerors before establishment of the competitive range if the offerors past performance information is the determining factor preventing them from being placed within the competitive range. If discussions are required, the CO will establish a competitive range of the most highly rated proposals and will then enter into negotiations and will allow for Final Proposal Revisions. Final Proposal Revisions shall be submitted as specified except as noted below and will be due at a time and place to be determined.

Basis for Contract Award

1) The Government anticipates discussions being held; however, the possibility exists that no discussions will be needed. As such, offerors are advised to submit their best offer in terms of technical and price at the time of initial submission of offers.

2) The offeror's proposal must conform to the solicitation requirements and be judged to represent a "Best Value" to the Government. The "Best Value" is the most advantageous offer, all factors and significant subfactors considered, and consistent with the Government's stated importance of evaluation criteria.

Evaluation Factors

FACTOR 1— Approach - Schedule – Quality Management Technical Factor

Evaluations will be based on the following subfactors and are in descending order of importance:

SUBFACTORS:

· Subfactor 1a. Management Approach Narrative

· Subfactor 1b. Schedule

· Subfactor 1c. Quality Management

Subfactor 1a Management Approach Narrative:

· Contractor shall demonstrate/explain how this project will be accomplished, based on the contractors best interpretation of the solicitation documents.

· Contractor shall provide a phasing plan and sequencing of work in an effort to minimize impacts to patient care.

· Contractor shall provide techniques for maintaining on-time schedule performance and provide a detailed explanation as to how the project will be implemented and managed to ensure compliance with all OSHA Construction Standards, Fire and Life Safety Issues, and Security Measures.

Subfactor 1b – Schedule:

· Contractor shall provide a Draft Project Schedule with a 10/23/2023 Notice to Proceed fictitious Start Date (for purposes of the Proposed Draft Schedule only). The provided schedule shall be all inclusive from the pre-construction conference, preparation of the site & mobilization, critical milestones of completing the project, punch list items, demobilization, to closeout while adhering to the period of performance.

· The provided schedule shall be consistent with subfactor 1a (i.e. how the project will be accomplished & phasing).

Subfactor 1c – Quality Management:

· Contractor shall provide a detailed explanation of proposed quality control techniques for compliance of the solicitation requirements.

· Contractor shall provide a narrative on how quality issues are managed and resolved for construction projects.

· Contractor shall provide the personnel responsible for the quality management & specify the authority the individual has to ensure quality work is provided.

Factor 2— Professional Qualifications & Specialized Experience Technical Factor

Evaluations will be based on the following subfactors and are in descending order of importance:

SUBFACTORS:

· Subfactor 2a. Key Prime Contractor Staff

· Subfactor 2b. Subcontractors

Subfactor 2a – Key Prime Contractor Staff:

· Contractor shall provide projected personnel names on an Organizational Chart (structured with the proposed Subcontractors projected in subfactor 2b).

· Contractor shall provide Resumes of the offeror’s proposed project management personnel (i.e. Site Superintendent, Project Manager, Quality Control Manager (consistent with subfactor 1c), etc.) complete with education, qualifications, and experience.

· Each Resume shall include current workload and the projected workload to cover the projected period of performance.

· Contractor shall provide a narrative description of how the proposed project management personnel will be best utilized to obtain project completion with the proposed subcontractors.

· Project Manager and Project Superintendent shall have a minimum of five (5) years of experience managing or supervising multiple projects of similar size, scope, and complexity (or greater). If the person listed as proposed Project Manager or Project Superintendent is not a current employee of the offeror but intends to become one upon award of the contract, OFFEROR SHALL SUBMIT A COPY OF A COMMITMENT LETTER FROM THAT PERSON AS A PART OF THE TECHNICAL PROPOSAL to verify Offeror will be hiring him/her and he/she intends to accept the position.

Subfactor 2b – Subcontractors:

· Contractor shall provide the projected key subcontractors and its associated socioeconomic status for the chosen project.

· Contractor shall provide Subcontractor narratives for each of the projected Subcontractors.

· Each narrative shall include their locality and experience with construction at medical centers.

· Each narrative shall include their projected workload to cover the projected period of performance.

Factor 3— Past Performance:

Evaluations will be based on the following subfactors and are in descending order of importance.

***Definitions*** ***Recent-with in past five (5) years from the date of solicitation issuance*** ***Relevant-Construction Contracts of similar Size, Scope, and Complexity to the solicited project***

SUBFACTORS:

· Subfactor 3a. Previous Recent/Relevant construction experience with VA Construction Contracts completed at VA Medical Centers

· Subfactor 3b. Demonstrated Past Performance Information (Any Federal, State, or Local Construction Projects)

Subfactor 3a Previous Recent/Relevant construction experience with VA Construction Contracts completed at VA Medical Centers.

· List of Contract Names (and Brief Description) & Contract Numbers

· Date of Contract Awards

· Contract Dollar Amounts & Date Completed

· Narrative/Paragraph(s) of the Scope Demonstrating Relevancy

· Contract Completed in Delinquent Status: Yes or No

Subfactor 3b – Demonstrated Past Performance Information (Any Federal, State, or Local Construction Projects)

· Letters of Recommendation and/or Referrals from previous customers

· Letters and/or Referrals

· Names, Phone Numbers, & Email Addresses of Persons Authoring Letters and/or Referrals

· Previous Contractor Performance Assessments Reports

· Past Performance Questionnaire (PPQ-Exhibit B):– Offerors shall prepare and forward to prior client(s) for submission to the Contracting Office EXHIBIT B PAST AND PRESENT PERFORMANCE QUESTIONNAIRE for all the projects listed by contractor and submitted using EXHIBIT A PERFORMANCE RELEVANCY SURVEY. This includes correspondence explaining the requirement to obtain an independent evaluation of prior contract performance and the Past and Present Performance Questionnaire for use in evaluating Past Performance. It is preferred that these are the same projects for ease of evaluation and comparison.***PPQ may have been completed be no later than one (1) year prior to the effective date of this action***

· Performance Relevancy Survey (Exhibit A): Utilizing Performance Relevancy Survey (Exhibit A). The offeror shall demonstrate completed/or ongoing (>50% complete) recent and relevant projects at a hospital/ medical center (VA or Non-VA) project of this same size, scope, and complexity (or greater). Note: Clearly identify those examples where an Offeror’s proposed Subcontractor was the Prime (or the Subcontractor) on the Project Examples if utilizing Subcontractor Construction Project Capability.

· An offeror with limited or no past performance may receive a rating based on the evaluation of its subcontractors and/or key personnel, provided an EXHIBIT C SUBCONTRACTOR INFORMATION AND CONSENT FORM has been executed and included in the proposal for proposed subcontractors and/or potential key personnel not employed by the offeror. These ratings shall have the same weight as the ratings of the offeror. Offerors without a record of relevant past performance will be assigned a neutral rating in accordance with FAR 15.305(a)(2)(iv). However, the proposal of an offeror with no relevant Past Performance history, while rated “Neutral” in Past Performance, may not represent the most advantageous proposal to the Government and thus, may be an unsuccessful proposal when compared to the proposal of other offerors.

The Government may evaluate Past/Present Performance information through the use of Exhibit A & B completed by the offeror's references; The Government may evaluate Key Staff-Subcontractor Performance information through the use of Exhibit C completed by the offeror; use data independently obtained from other Government or commercial sources, including, but not limited to, Government databases; and/or rely upon personal business experience with the offeror. The evaluation may take into account Past Performance information regarding predecessor companies, key personnel who have relevant experience, and/or subcontractors that will perform major or critical aspects of the requirement when such information is relevant to this acquisition.

Past Performance information on contracts not listed by the offeror, or that of planned subcontractors, may also be evaluated. The Government may contact references and contact parties other than those identified by the offeror and information received may be used in the evaluation of the offeror’s Past Performance. While the Government may elect to consider data obtained from other sources, the burden of providing current accurate and complete Past Performance information rests with the offeror. The Government reserves the right to obtain and evaluate Past Performance information from any source it deems appropriate.

In accordance with FAR 15.306(a)(2), if award will be made without conducting discussions, an offeror may be given the opportunity to clarify certain aspects of their proposal (i.e. the relevance of an offeror's past performance information) as related to this acquisition, address adverse past performance information to which the offeror has not previously had an opportunity to respond or to resolve minor clerical errors.

Performance Currency, Trends, and Relevancy: The Government will consider the currency, trends and relevancy of the performance information while conducting its performance evaluation. For the purpose of this solicitation, performance currency is performance occurring within the last five (5) years from the proposal issuance date. Within this period, performance occurring later in the period may have greater significance than work occurring earlier in the period. For example, performance information for work occurring during March 2020 may have greater importance than performance information for work occurring during March 2017. Performance Trends may, depending upon the circumstances, have greater significance than sporadic incidents of "Exceptional" or "Unsatisfactory" performance. For the purpose of this solicitation, Performance Relevancy is defined as contracts (ongoing or completed) which are similar in scope, magnitude, and complexity to the current requirement. Higher relevancy will be assessed for contracts that are similar to the effort, or portion of effort, for which that contractor is being proposed, and may contribute to an overall higher relevancy score for the offeror. Based on the evaluation of offers, the Government will assign a performance confidence rating for each proposal at the factor level. The evaluation will consider the sub-factors as described herein. Following assignment of the performance confidence rating for each proposal, each offeror will receive a final risk rating for performance based on the cumulative rating of performance currency, trends, and relevancy.

Factor 4 – Price Vol 3: Offerors shall submit pricing in the Schedule, the SF1442 Back, and in the continuation page of SF 1442 (Block 17) as a part of their price proposal. The purpose of the price evaluation is to provide an assessment of the completeness and reasonableness of the proposed price in relation to the solicitation requirements. Price proposals will be evaluated to determine if the prices and support costs areas are:

· Complete – The proposal contains costs to perform all tasks required by the Scope of Work (SOW), specifications, and design drawings if provided.

· Reasonable – The price is determined fair and reasonable using cost or price analysis techniques described in FAR 15.404.

A.7 Information Regarding Bidding Material, Bid Guarantee, and Bonds

1. All offer materials will be posted on SAM.gov (System for Award Management). No hard copies will be available.

1. An offer guarantee is required in an amount not less than 20 percent of the offer price but shall not exceed $3,000,000. Failure to furnish the required offer guarantee in the proper form and amount, by the time set for opening of offers, will require rejection of the offer in all cases except those listed in FAR 28.101-4, and may be cause for rejection even then.

1. The offeror to whom award is made will be required to furnish two bonds, a Performance Bond, SF 25, and a Payment Bond, SF 25A, each in the penal sum of 100% of the award amount.

(End of Clause)

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

(End of Provision)

2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) (a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of Provision)

2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade
Goals for female participation for each trade
25.7 %
6.9 %

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the—

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Rapides Parish, LA 71360

(End of Provision)

2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of Provision)

2.5 52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20% percent of the bid price or $3M, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of Provision)

2.6 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021)

(a) Offerors shall obtain from each person acting as an individual surety on a bid guarantee—

(1) A pledge of assets that meets the eligibility, valuation, and security requirements described in the Federal Acquisition Regulation (FAR) 28.203–1; and

(2) Standard Form 28, Affidavit of Individual Surety.

(b) The Offeror shall include with its offer the information required at paragraph (a) of this provision within the timeframe specified in the provision at FAR 52.228–1, Bid Guarantee, or as otherwise established by the Contracting Officer.

(c) The Contracting Officer may release the security interest on the individual surety’s assets in support of a bid guarantee based upon evidence that the offer supported by the individual surety will not result in contract award.

(End of Provision)

2.7 52.233-2 SERVICE OF PROTEST (SEP 2006)

Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

Luke Miles

Hand-Carried Address:

DEPARTMENT OF VETERANS AFFAIRS

NCO 16 Contracting Office

1515 Poydras Ste. 1100 New Orleans LA 70112 Mailing Address:

DEPARTMENT OF VETERANS AFFAIRS

NCO 16 Contracting Office

1515 Poydras, Ste. 1100 New Orleans LA 70112

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of Provision)

2.8 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for— 08/15/2023 @ 1330 hrs CT

(c) Participants will meet at— RSVP (Email CS) for Meeting Location NLT COB 08/14/2023.

(End of Provision)

2.9 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the provision.

(b) The use in this solicitation of any VAAR Acquisition Regulation (48 CFR Chapter FEDERAL ACQUISITION REGULATION (48 CFR Chapter 1)) provision with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.

(End of Provision)

2.10 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .