Price Breakdown.docx

DOCX document 21 KB Posted

Attached to
Y1LB--580-16-102 Road Repairs on VA Campus
Solicitation number
36C25623R0048
Issued by

About this file

This document contains a price breakdown and details of a federal contract opportunity for road repairs on a VA campus. The price breakdown lists proposed costs by construction division for a project to complete full depth road repairs and alterations on a VA medical center campus in Houston, Texas. The contract opportunity is a 100% Service-Disabled Veteran-Owned Small Business set-aside with a value between $2-5 million. The solicitation will be issued as a request for proposals on February 1, 2023, with a 90-day proposal acceptance period and requirements for bid, performance, and payment bonds from the awarded contractor. The work must be performed within 180 calendar days of notice to proceed and is classified under NAICS code 237310 for highway, street, and bridge construction with a small business size standard of $45 million in average annual receipts.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTINUATION OF SF 1442 BLOCK # 17 CONTINUED

Project: 580-16-102 Road Repairs VA Campus

Date:

MATERIAL
LABOR
EQUIPMENT
TOTAL
DIVISION 01:
GENERAL REQUIREMENTS
DIVISION 02:
EXISTING CONDITIONS
DIVISION 03:
CONCRETE
DIVISION 04:
MASONRY
DIVISION 05:
METALS
DIVISION 06:
WOOD, PLASTICS & COMPOSITES
DIVISION 07:
THERMAL & MOISTURE PROTECTION
DIVISION 08:
OPENINGS
DIVISION 09:
FINISHES
DIVISION 10:
SPECIALTIES
DIVISION 11:
EQUIPMENT
DIVISION 12:
FURNISHINGS
DIVISION 13:
SPECIAL CONSTRUCTION
DIVISION 14:
CONVEYING EQUIPMENT
DIVISION 21:
FIRE SUPPRESSION
DIVISION 22:
PLUMBING
DIVISION 23:
HVAC
DIVISION 25:
INTEGRATED AUTOMATION
DIVISION 26:
ELECTRICAL
DIVISION 27:
COMMUNICATIONS
DIVISION 28:
ELECTRONIC SAFETY AND SECURITY
DIVISION 31:
EARTHWORK
DIVISION 32:
EXTERIOR IMPROVEMENTS
DIVISION 33:
UTILITIES

SUBTOTAL COST:

GENERAL LIABILITY / INSURANCE:

OVERHEAD & PROFIT:

BOND:

PROJECT TOTAL COST:

File details come from the government source that posted it. Updated .