36C25622R0123 ICRA.pdf
PDF 172 KB Posted
- Attached to
- Z1DA--Project #520-22-174 Access Control and Security System Upgrades and Misc Interior Improvements-Construction - 36C25622R0123 Federal contract opportunity
- Solicitation number
- 520-22-174
About this file
This document is an Infection Control Risk Assessment (ICRA) permit for construction work taking place at the JACC Clinic. The permit covers access control upgrades and improvements including minor demolition and remodeling. It identifies the project start date as to be determined, with an estimated duration also to be determined. Contractor Glenn Bailey is listed as the COTR overseeing the project.
The ICRA classifies the construction activity as a Group 2 medium risk project. It outlines various infection control requirements the contractor must follow depending on the class of work being performed, such as maintaining negative air pressure, controlling dust, isolating HVAC systems, and properly removing waste. Class IV would apply if the work was in a negative pressure room housing TB patients. Additional safety and infection control sign off is required from Tanya Chandler and the COTR respectively.
The related federal contract opportunity is a solicitation for project #520-22-174 covering the same access control and security upgrades and interior improvements at the construction site. The solicitation is attached and the contracting agency is the Department of Veterans Affairs Veterans Health Administration VISN 16.
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Adapted with permission V Kennedy, B Barnard, St Luke Episcopal Hospital, Houston TX, Forms modified and provided courtesy of Judene Bartley, ECSI Inc Beverly Hills MI 2002 Reviewed 2005
Infection Control Construction Permit-ICRA Project Title: Access Control, Upgrades & Improvements Permit No: 520-22-174
Location of Construction: JACC Clinic Project Start Date: TBD
Project Coordinator/COTR: Glenn Bailey Estimated Duration: TBD
Contractor Performing Work: TBD Permit Expiration Date: TBD
Supervisor: Telephone:
YES NO CONSTRUCTION ACTIVITY YES NO INFECTION CONTROL RISK GROUP
TYPE A: Inspection, non-invasive activity GROUP 1: Low Risk
X TYPE B: Small scale, short duration, moderate to high levels
X GROUP 2: Medium Risk
TYPE C: Activity generates moderate to high levels of dust, requires greater 1 work shift for completion
GROUP 3: Medium/High Risk
TYPE D: Major duration and construction activities
Requiring consecutive work shifts
GROUP 4: Highest Risk
CLASS I 1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace any ceiling tile displaced for visual inspection.
3. Minor Demolition for Remodeling
CLASS II
5/3/2022
TSC
1. Provides active means to prevent air-borne dust from dispersing into atmosphere
2. Water mist work surfaces to control dust while cutting.
3. Seal unused doors with duct tape.
4. Block off and seal air vents.
5. Wipe surfaces with disinfectant.
6. Contain construction waste before transport in tightly covered containers.
7. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.
8. Place dust mat at entrance and exit of work area.
9. Remove or isolate HVAC system in areas where work is being performed.
CLASS III
1. Obtain infection control permit before construction begins.
2. Isolate HVAC system in area where work is being done to prevent contamination of the duct system.
3. Complete all critical barriers or implement control cube method before construction begins.
6. Vacuum work with HEPA filtered vacuums.
7. Wet mop with disinfectant
8. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
9. Contain construction waste before transport in
Date 4. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
5. Do not remove barriers from work area until complete project is thoroughly cleaned by Facilities Management Service.
tightly covered containers.
10. Cover transport receptacles or carts. Tape covering.
11. Remove or isolate HVAC system in areas where work is being performed/
Initial
CLASS IV
1. Obtain infection control permit before construction begins.
2. Isolate HVAC system in area where work is being done to prevent contamination of duct system.
3. Complete all critical barriers or implement control cube method before construction begins.
4. Maintain negative air pressure within work site utilizing
HEPA equipped air filtration units.
5. Seal holes, pipes, conduits, and punctures appropriately.
6. Construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that are removed each time they leave the work site.
7. All personnel entering work site are required to wear shoe covers
8. Do not remove barriers from work area until completed project is thoroughly cleaned by the Environmental
Service Dept.
9. Vacuum work area with HEPA filtered vacuums.
10. Wet mop with disinfectant.
11. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
12. Contain construction waste before transport in tightly covered containers.
13. Cover transport receptacles or carts. Tape covering.
14. Remove or isolate HVAC system in areas where work is being performed.
Date
Initial
Construction taking place in negative pressure rooms where TB patients are housed or work with exhaust to these rooms? ___Yes X__No
If yes, the contractor must provide written certification that all employees assigned to the work site have a negative TB screening within 90 days prior to assignment to work area.
Additional Requirements:
Infection Control: Tanya Chandler COTR:
Safety:
| 2022-05-03T12:44:06-0500 | |
| GLENN F. BAILEY 3542311 |
File details come from the government source that posted it. Updated .