36C25622R0088 Visitors Phasing Plan.pdf

PDF 7 MB Posted

Attached to
Z2LZ--Project #629-18-115 Install Signs and Striping for Garages - Construction
Solicitation number
36C25622R0088
Issued by

About this file

The attached document is a visitors phasing plan for construction work at a federal parking garage. The plan details a multi-phase construction schedule to allow for traffic flow and parking during renovations to levels 1 through 7 of the garage. Phase 1 will focus on levels 2 through 6, with designated traffic patterns, after hours work zones, and zones marked for no parking. Phase 2 will also impact levels 2 through 6, and phase 3 will finish construction on these levels. Separate phasing diagrams are provided for each level. Phase 1 and 2 are also outlined for renovations to level 1. The construction signs and striping work is solicited under opportunity number 36C25622R0088 by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16.

View the file

Other files

File Type Posted
RFI Register 06222022.docx DOCX document
36C25622R0088 0003.docx DOCX document
36C25622R0088 0002.docx DOCX document
Sign In Sheet.pdf PDF
36C25622R0088 0001.docx DOCX document
36C25622R0088 ICRA-04092022.xlsx XLSX spreadsheet
36C25622R0088 VHA Supplemental Contract Requirements for Combatting COVID-19.docx DOCX document
36C25622R0088 BLDG 5- Patient Garage Drawings .pdf PDF
36C25622R0088 Updated Specs - 04272022.pdf PDF
36C25622R0088 EXHIBIT C.docx DOCX document
36C25622R0088 EXHIBIT F.docx DOCX document
36C25622R0088 WD LA20220011 Mod 1 02252022 .docx DOCX document
36C25622R0088 RFP.docx DOCX document
36C25622R0088 EXHIBIT B.docx DOCX document
36C25622R0088 EXHIBIT D.docx DOCX document
36C25622R0088 EXHIBIT A.docx DOCX document
36C25622R0088 Staff Phasing Plan .pdf PDF
36C25622R0088 Final SOW-04272022 .docx DOCX document
36C25622R0088 EXHIBIT E.docx DOCX document
36C25622R0088 BLDG 4- Staff Garage Drawings .pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A B C D E F G H I J

After Hours Work

Standard Hours Work

No Parking During Construction

Traffic flow entering the garage

Traffic flow exiting the garage

Phasing Plan - Level 7

After Hours Work

Standard Hours Work

No Parking During Construction

Traffic flow entering the garage

Traffic flow exiting the garage Phasing Plan - Levels 2-6 (Phase 1)

Traffic flow entering the garage

Traffic flow exiting the garage

After Hours Work

Standard Hours Work

No Parking During Construction Phasing Plan - Levels 2-6 (Phase 2)

Traffic flow entering the garage

Traffic flow exiting the garage

After Hours Work

Standard Hours Work

No Parking During ConstructionPhasing Plan - Levels 2-6 (Phase 3)

Phasing Plan - Level 1 (Phase 1)

Traffic flow entering the garage

Traffic flow exiting the garage

After Hours Work

Phasing Plan - Level 1 (Phase 2)

Traffic flow entering the garage

Traffic flow exiting the garage

After Hours Work