36C25622R0088 Visitors Phasing Plan.pdf
PDF 7 MB Posted
- Solicitation number
- 36C25622R0088
About this file
The attached document is a visitors phasing plan for construction work at a federal parking garage. The plan details a multi-phase construction schedule to allow for traffic flow and parking during renovations to levels 1 through 7 of the garage. Phase 1 will focus on levels 2 through 6, with designated traffic patterns, after hours work zones, and zones marked for no parking. Phase 2 will also impact levels 2 through 6, and phase 3 will finish construction on these levels. Separate phasing diagrams are provided for each level. Phase 1 and 2 are also outlined for renovations to level 1. The construction signs and striping work is solicited under opportunity number 36C25622R0088 by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI Register 06222022.docx | DOCX document | |
| 36C25622R0088 0003.docx | DOCX document | |
| 36C25622R0088 0002.docx | DOCX document | |
| Sign In Sheet.pdf | ||
| 36C25622R0088 0001.docx | DOCX document | |
| 36C25622R0088 ICRA-04092022.xlsx | XLSX spreadsheet | |
| 36C25622R0088 VHA Supplemental Contract Requirements for Combatting COVID-19.docx | DOCX document | |
| 36C25622R0088 BLDG 5- Patient Garage Drawings .pdf | ||
| 36C25622R0088 Updated Specs - 04272022.pdf | ||
| 36C25622R0088 EXHIBIT C.docx | DOCX document | |
| 36C25622R0088 EXHIBIT F.docx | DOCX document | |
| 36C25622R0088 WD LA20220011 Mod 1 02252022 .docx | DOCX document | |
| 36C25622R0088 RFP.docx | DOCX document | |
| 36C25622R0088 EXHIBIT B.docx | DOCX document | |
| 36C25622R0088 EXHIBIT D.docx | DOCX document | |
| 36C25622R0088 EXHIBIT A.docx | DOCX document | |
| 36C25622R0088 Staff Phasing Plan .pdf | ||
| 36C25622R0088 Final SOW-04272022 .docx | DOCX document | |
| 36C25622R0088 EXHIBIT E.docx | DOCX document | |
| 36C25622R0088 BLDG 4- Staff Garage Drawings .pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A B C D E F G H I J
After Hours Work
Standard Hours Work
No Parking During Construction
Traffic flow entering the garage
Traffic flow exiting the garage
Phasing Plan - Level 7
After Hours Work
Standard Hours Work
No Parking During Construction
Traffic flow entering the garage
Traffic flow exiting the garage Phasing Plan - Levels 2-6 (Phase 1)
Traffic flow entering the garage
Traffic flow exiting the garage
After Hours Work
Standard Hours Work
No Parking During Construction Phasing Plan - Levels 2-6 (Phase 2)
Traffic flow entering the garage
Traffic flow exiting the garage
After Hours Work
Standard Hours Work
No Parking During ConstructionPhasing Plan - Levels 2-6 (Phase 3)
Phasing Plan - Level 1 (Phase 1)
Traffic flow entering the garage
Traffic flow exiting the garage
After Hours Work
Phasing Plan - Level 1 (Phase 2)
Traffic flow entering the garage
Traffic flow exiting the garage
After Hours Work
File details come from the government source that posted it. Updated .