36C25622R0088 Staff Phasing Plan .pdf
PDF 6 MB Posted
- Solicitation number
- 36C25622R0088
About this file
This document contains a staff phasing plan and details for a federal contract opportunity to install signs and striping in parking garages. The staff phasing plan outlines a multi-phase construction project to install signs and re-stripe parking spaces across six levels of parking garages. The plan shows traffic flow patterns for vehicles entering and exiting during both after-hours work and standard work hours, and notes areas where no parking will be allowed during construction. The related federal contract opportunity was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16 to solicit bids to install signs and striping according to the specifications in the attached staff phasing plan for project number 629-18-115. Bids were due by the date listed in the solicitation number 36C25622R0088. The award date and other contractual terms are not specified.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI Register 06222022.docx | DOCX document | |
| 36C25622R0088 0003.docx | DOCX document | |
| 36C25622R0088 0002.docx | DOCX document | |
| Sign In Sheet.pdf | ||
| 36C25622R0088 0001.docx | DOCX document | |
| 36C25622R0088 ICRA-04092022.xlsx | XLSX spreadsheet | |
| 36C25622R0088 VHA Supplemental Contract Requirements for Combatting COVID-19.docx | DOCX document | |
| 36C25622R0088 BLDG 5- Patient Garage Drawings .pdf | ||
| 36C25622R0088 Updated Specs - 04272022.pdf | ||
| 36C25622R0088 EXHIBIT C.docx | DOCX document | |
| 36C25622R0088 EXHIBIT F.docx | DOCX document | |
| 36C25622R0088 WD LA20220011 Mod 1 02252022 .docx | DOCX document | |
| 36C25622R0088 RFP.docx | DOCX document | |
| 36C25622R0088 Visitors Phasing Plan.pdf | ||
| 36C25622R0088 EXHIBIT B.docx | DOCX document | |
| 36C25622R0088 EXHIBIT D.docx | DOCX document | |
| 36C25622R0088 EXHIBIT A.docx | DOCX document | |
| 36C25622R0088 Final SOW-04272022 .docx | DOCX document | |
| 36C25622R0088 EXHIBIT E.docx | DOCX document | |
| 36C25622R0088 BLDG 4- Staff Garage Drawings .pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A B C D E F G H I J
After Hours Work
Standard Hours Work
No Parking During Construction
Traffic flow entering the garage
Traffic flow exiting the garage
K
After Hours Work
Standard Hours Work
No Parking During ConstructionPhasing Plan - Level 2-6 (Phase 1)
K
Phasing Plan - Level 2-6 (Phase 2)
After Hours Work
Standard Hours Work
No Parking During Construction
K
Phasing Plan - Level 2-6 (Phase 3)
After Hours Work
Standard Hours Work
No Parking During Construction
K
After Hours Work
Standard Hours Work
No Parking During Construction
Traffic flow entering the garage
Phasing Plan - Level 1 (Phase 1)
K
After Hours Work
Standard Hours Work
No Parking During Construction
Traffic flow entering the garage
Phasing Plan - Level 1 (Phase 2)
File details come from the government source that posted it. Updated .