Text version
Southeast Louisiana Veterans Health Care System Final: February 18, 2022
1 | P a g e
Department of Veterans Affairs Southeast Louisiana Veterans Health Care System
2400 Canal Street, New Orleans, LA 70119
Statement of Work
629-22-123 Replace Flooring Various Surgery Service Areas Diagnostic and Treatment Building
1. INTRODUCTION:
This Statement of Work is for removal of the existing delaminating sheet vinyl flooring with integral base and adhesive and replacing with resinous epoxy flooring with integral base in the Surgery Service areas of the Diagnostic and Treatment Building, located on the 3rd floor of the Diagnostics & Treatment building at the Department of Veterans Affairs, 2400 Canal St. New Orleans, Louisiana 70119. The work areas are comprised of the following:
NEW ROOM
NUMBER
OLD ROOM
NUMBER (ON
DRAWINGS)
SERVICE FUNCTION SPECIAL CHARACTERISTICS
NET
SQUARE
FOOTAGE
3E220.1-02DT *3E176 SURGERY SERVICE STORAGE, EQUIPMENT CLEAN CORE 973
3E220.2-02DT *3E148 SURGERY SERVICE STORAGE, EQUIPMENT CLEAN CORE 1162
3E220A-02DT *3E148A SURGERY SERVICE OTHER SPACE INTRUMENT PREP. STOR 262
3E223-02DT *3E151 SURGERY SERVICE OTHER SPACE CYSTO ROOM 667
3E226-02DT *3E144 SURGERY SERVICE OPERATING ROOM OPERATING ROOM 674
3E227-02DT *3E149 SURGERY SERVICE OPERATING ROOM OPERATING ROOM 716
3E230-02DT *3E146 SURGERY SERVICE OPERATING ROOM OPERATING ROOM 671
3E231-02DT 3D174 SURGERY SERVICE OPERATING ROOM OPERATING ROOM 673
3E234-02DT 3D160 SURGERY SERVICE OPERATING ROOM OPERATING ROOM 651
3E235-02DT 3D172 SURGERY SERVICE OPERATING ROOM OPERATING ROOM 674
3E238-02DT 3D162 SURGERY SERVICE OPERATING ROOM OPERATING ROOM 646
3F200-02DT 3F165C SURGERY SERVICE OTHER SPACE INSTRUMENT ROOM 2026
3F201-02DT 3F167 SURGERY SERVICE OPERATING ROOM IR PROCEDURE 697
3F201A-02DT 3F167D SURGERY SERVICE OTHER SPACE SCRUB ROOM 31
3F201B-02DT 3F167C SURGERY SERVICE OTHER SPACE CONTROL ROOM 145
3F201C-02DT 3F167B SURGERY SERVICE OTHER SPACE SCRUB ROOM 75
3F202-02DT 3F164 SURGERY SERVICE OTHER SPACE CARDIAC CATH 653
3F202A-02DT 3F164A SURGERY SERVICE OTHER SPACE SCRUB ROOM 31
3F202B-02DT 3F164B SURGERY SERVICE OTHER SPACE CONTROL ROOM 139
3F202C-02DT 3F164C SURGERY SERVICE OTHER SPACE SCRUB ROOM 78
3F203-02DT 3F169 SURGERY SERVICE OPERATING ROOM IR PROCEDURE 664
3F203A-02DT 3F169D SURGERY SERVICE OTHER SPACE SCRUB ROOM 31
3F203B-02DT 3F169C SURGERY SERVICE OTHER SPACE CONTROL ROOM 143
3F203C-02DT 3F169B SURGERY SERVICE OTHER SPACE SCRUB ROOM 82
3F204-02DT 3F166 SURGERY SERVICE OPERATING ROOM CARDIAC CATH 667
3F204A-02DT 3F166A SURGERY SERVICE OTHER SPACE SCRUB ROOM 31
3F204B-02DT 3F166B SURGERY SERVICE OTHER SPACE CONTROL ROOM 141
3F204C-02DT 3F166C SURGERY SERVICE OTHER SPACE SCRUB ROOM 81
3F205-02DT 3F171 SURGERY SERVICE OPERATING ROOM PRECEDURE ROOM 674
3F205A-02DT 3F171D SURGERY SERVICE OTHER SPACE SCRUB ROOM 79
3F205B-02DT 3F171C SURGERY SERVICE OTHER SPACE CONTROL ROOM 142
3F205C-02DT 3F171B SURGERY SERVICE OTHER SPACE SCRUB ROOM 79
3F206-02DT 3F168 SURGERY SERVICE OTHER SPACE CARDIAC CATH 806
3F206A-02DT 3F168A SURGERY SERVICE OTHER SPACE SCRUB ROOM 82
3F206B-02DT 3F168B SURGERY SERVICE OTHER SPACE CONTROL ROOM 105
3F206C-02DT 3F168C SURGERY SERVICE OTHER SPACE SCRUB ROOM 59
3D-C08B CORR 3D-C08B SURGERY SERVICE OTHER SPACE CORRIDOR 768
3D-C09 CORR 3D-C09 SURGERY SERVICE OTHER SPACE CORRIDOR 637
3D160A 3D160A SURGERY SERVICE OTHER SPACE STRETCHER ALCOVE 32
3E-C11 CORR 3E-C11 SURGERY SERVICE OTHER SPACE CORRIDOR 759
3E-C10 CORR 3E-C10 SURGERY SERVICE OTHER SPACE CORRIDOR 1065
3E 156 3E 156 SURGERY SERVICE OTHER SPACE CC 32
3E-C05 3E-C05 SURGERY SERVICE OTHER SPACE CORRIDOR 920
3E228 3E 145 SURGERY SERVICE OTHER SPACE XRAY STORAGE 225
3E232 3E 147 SURGERY SERVICE OTHER SPACE ORTHO STORAGE 223
3F-C09A 3F-C09A SURGERY SERVICE OTHER SPACE CORRIDOR 676
3F-C09B 3F-C09B SURGERY SERVICE OTHER SPACE CORRIDOR 690
3F-C08 3F-C08 SURGERY SERVICE OTHER SPACE CORRIDOR 850
3F-C08A 3F-C08A SURGERY SERVICE OTHER SPACE CORRIDOR 470
2 | P a g e
The existing sheet vinyl welded seams have separated in several areas and the sheet vinyl has numerous cuts, gouges, and abrasions including at the integral base and presents an infection control risk. The approximate square footage floor area of all work areas is as shown in the table above. An integral vinyl wall base of approximately 6 inches comprises approximately 3,360 square feet.
2. SCOPE OF WORK:
2.1 OVERVIEW:
The Contractor shall provide all supervision, labor, material, tools, and equipment for removal of the existing sheet vinyl and adhesive, and field verification, receiving, delivery, installation and inspection of all new resinous flooring.
The VA will coordinate and approve the start of all phases based upon availability of space(s). The VA will also review and approve the combining of phases depending on Surgery Service scheduling. The grouping of phases listed below are for conceptual purposes only and shall be confirmed and verified by the Contractor prior to starting work:
Phase 1 - Area D Rooms and Perimeter Corridors;
Phase 2 - Area E Rooms and Perimeter Corridors;
Phase 3 - Area F Rooms, Perimeter Corridors, and 3 Procedure Rooms West;
Phase 4 - Area F Rooms, Perimeter Corridors, and 3 Procedure Rooms East;
Phase 5 - Areas D and E Clean Corridor; and
Phase 6 - Area F Clean Corridor
Portions of the work may require the Contractor to complete after normal work hours and possibly on weekends.
The Contractor shall possess previous experience removing and replacing flooring in active Operating Rooms.
2.2 DEMOLITION:
2.2.1 Contractor shall remove existing sheet vinyl flooring, integral cove base, flooring adhesive, and all deleterious materials in areas listed in paragraph 1 of this scope of work.
2.2.2 Contractor shall ensure the concrete substrate is smooth and all floor patch delamination is removed in accordance with manufacturer’s installation instructions.
2.2.3 Contractor shall notify, immediately, the VA Contracting Officer Representative (COR) upon discovery of any suspect condition that could potentially cause a faulty re-installation and shall accept complete responsibility for any faulty installation failing contractor’s adherence to the aforementioned.
2.2.4 Contractor shall coordinate all demolition activities with the COR and the VA. It is anticipated that mechanical demolition operations will take place after normal work hours and/or on weekends. The Contractor shall provide 7 days advance notice of after-hours/weekend work to the COR for approval.
2.3 DELIVERY AND INSTALLATION
2.4.1 DELIVERY:
2.4.1.1 Delivery, Set-up, and Installation shall be coordinated with a SLVHCS Contracting Officer Representative (COR). Be aware of site-specific protocols for badging, escort, and hours for delivery and field operations, stated in sections below when considering your delivery and install cost.
2.4.1.2 Contractor shall review all items needed for this project with the SLVHCS COR to ensure all items requested on the project are included.
2.4.1.3 Installation of new work including resinous flooring and appurtenances shall be coordinated with
COR.
2.4.2 INSTALLATION:
3 | P a g e
2.4.2.1 Contractor shall install the flooring according to manufacturer's written instructions to assure proper installation.
2.4.2.2 Contractor shall reference Attachment 2 Floor plan for locations.
2.4.2.4 Flooring installers shall be authorized by the flooring manufacturer to install the manufacturer’s flooring system so as not to void any warranties offered by the manufacturer given in normal commercial practice for their flooring system. Flooring installation shall comply with all necessary VA and safety regulations.
2.4.2.5 Contractor shall perform a flatness test and moisture test after demolition of existing flooring and before installing new flooring. Follow manufacturer’s installation procedure including the required moisture vapor testing requirements.
2.4.2.6 The Contractor shall remove and dispose of all related shipping debris and cleanup daily, any construction associated with delivery and installation of the specified items. Contractor shall remove all packaging from the SLVHCS premises. The Contractor shall be responsible for any damage to the building that occurs due to Contractor error or neglect and shall be repaired at the Contractor’s expense.
2.4.2.7 Delivery and unloading shall be at the loading docks off Tulane Ave. between South Galvez and Rocheblave. Elevators will be available for delivery of products. Elevators may be shared with other contractors. The contractor shall protect the interior of the elevator to prevent damage to the interior walls of the elevator during construction activities.
2.4.2.8 Reference SOW Attachment 1, Site Map for building locations and travel distance for delivery and installation.
2.4.2.9 The contractor shall coordinate all deliveries, staging areas, installations, and parking arrangements with the COR.
2.4.2.10 SLVHCS does not have the ability to accept drop shipments. There will be no staging and/or storage at the SLVHCS loading dock or warehouse. All products shall be off loaded by awarded vendor and delivered from the loading dock directly to the installation location.
2.4.2.11 Awarded vendor is responsible for any equipment needed to unload products and/or for transferring product the installation locations.
2.4.3 INSTALLATION SCHEDULE:
2.4.3.1 The installation of resinous flooring shall be completed in accordance with the manufacturer’s installation instructions and specifications. As part of this project the work shall be done in phases as approved by the COR.
2.4.3.2 Contractor shall develop an phased installation schedule, which shall include installation and inspection of the specified item as well as a final walk through with the COR in coordination with the COR. The contactor shall provide the installation schedule and location plan within 10 business days of award for COR final approval.
2.5 SITE CONDITIONS:
2.5.1 There shall be no smoking inside the entire hospital campus at any time. During periods of work breaks and lunch the Contractor can utilize the public restrooms and cafeteria but shall abide by SLVHCS rules of behavior.
3. PERIOD OF PERFORMANCE AND WORKING HOURS:
3.1 PERIOD OF PERFORMANCE
3.1.1 The period of performance is 150 days from notice to proceed.
4 | P a g e
3.2 WORKING HOURS AND FEDERAL HOLIDAYS
3.2.1 The working hours are from 7:30am until 4:00pm, Monday through Friday except Federal holidays (see list below) or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government-directed facility closing. The Contractor may for his/her convenience request authorization in advance from the COR to work outside of regular working hours of regular workdays at no additional cost to the facility. At least a one week notice is required for VA stakeholder review of the request. Authorization shall be at the discretion of the COR. Any construction testing that is required as part of the scope of work can be performed during normal business hours if it does not interfere with building operations. When testing will interfere with building operations it shall be performed after normal business hours.
3.2.2 Recognized Federal Holidays include the following:
New Year’s Day January 1*
Martin Luther King Jr. Day (Third Monday in January)
Washington’s Birthday (President’s Day-Third Monday in February)
Memorial Day (Fourth Monday in May)
Juneteenth June 19*
Independence Day July 4*
Labor Day (First Monday in September)
Columbus Day (Second Monday in October)
Veterans Day November 11*
Thanksgiving Day (Fourth Thursday in November)
Christmas Day December 25*
*Note, if a federal holiday occurs on a Saturday, the holiday will be observed on the preceding Friday; if the holiday occurs on a Sunday, the holiday will be observed on the following Monday.
4. INSPECTION AND ACCEPTANCE:
4.1 INSPECTION
The Government is required to monitor contractor performance and certify the work was done in accordance with the contract. This monitoring is done by the COR and will require engineered construction documents for review and approval. The contractor shall adhere to infection control guidelines and interim life safety measurements. The Contractor is responsible to provide a construction schedule at construction kick off meeting. All safety and infection control parameters must be in place and monitored. The COR will require all submittals prior to delivery and installation and will perform daily job inspections and daily safety inspections to ensure compliance. The COR shall inspect all phases of delivery and installation. The Contractor will be required to submit progress payments for approval by both the Contractor Superintendent and the COR prior to formally submitting an invoice for payment.
Performance will be monitored according to construction progress and the construction schedule.
4.2 ACCEPTANCE
The Contractor shall conduct a prefinal punch list of construction deficiencies with completion dates and provide the list to the COR upon successful completion of the punch list. Contractor shall also provide replacement parts and/or short ship items from the manufacturer(s). Following the prefinal the Contractor shall schedule and conduct a final acceptance inspection with the COR once all flooring has been installed and the Contractor verifies completion. The COR shall then provide the Contractor a punch list of all deficient scope of work items. The COR shall ensure all work is completed satisfactorily prior to acceptance and if disputes arise, they shall be resolved by the Contracting Officer.
5 | P a g e
5. DELIVERY/STORAGE REQUIREMENTS:
5.1 The Contractor shall deliver materials to the job site approved location in manufacturer's original-sealed containers with brand name marked thereon.
5.2 The Contractor shall ensure the packaging is protected to prevent damage or deterioration during shipment, handling, storage, and installation in accordance with the manufacturer’s instructions.
5.3 The Contractor shall deliver specified items only when the site is ready for installation work to proceed.
5.4 The Contractor shall store products in dry condition inside enclosed facilities.
5.5 The Contractor shall coordinate this ordering arrangement at order placement with the COR.
5.7 The Contractor shall schedule and conduct a pre-delivery meeting 10 days prior to initial negotiated delivery date for verification of delivery and installation dates.
5.8 NOTE: SLVHCS does not have the ability to accept drop shipments. There will be no staging and/or storage at the SLVHCS loading dock or warehouse. All products shall be delivered from the loading dock directly to the approved installation location.
5.9 The Contractor shall have provisions for electrical service for the work areas. Access to electrical power can be found in the D,E, and F Electrical rooms on the floor. The Contractor shall isolate the power from the Hospital Critical Loads and install a separate electrical sub panel for each area as needed. An electrical outage is required 2 weeks in advance and coordinated with the VA Electrical Shops and Engineering Service. An electrical generator isn’t feasible due to the location of the work.
5.10 The Contractor shall provide a HEPA-filtered air scrubber for worker protection while working in the work areas. There are purge fans that the VA will operate in the areas of work to exhaust the fumes and dust. The Contractor shall coordinate the sequencing of the purge fans with the COR and the VA Mechanical Shops.
5.11 The Contractor shall provide an ICRA to the COR 14 days prior to start of work for approval with a full list of precautions that need to be implemented to avoid the risk of infection with staff, patients, and contractors. All necessary equipment, personnel, material, and construction and removal of work area isolation rooms shall be at the Contractors cost. All barriers to prevent air, surface, and noise contamination shall also be implemented by the Contractor.
5.12 All current facility COVID-19 regulations in place should be followed by staff working on project. Staff are to enter facility at first floor visitor screening stations. Contractors are to wear a mask at all times while within the facility except for when taking breaks to eat or drink. Fabric face coverings are not permitted on the SLVHCS campus. Please perform hand hygiene upon entering and exiting the OR area. Please cover all vents and equipment that cannot be removed.
6. DELIVERABLES:
6.1 SAMPLES AND LITERATURE FOR VERIFICATION
Provide samples, not less than six (6) inches square, of same thickness, same finish and material indicated for the work. Samples shall be submitted within five (5) business days after award. If finishes involve normal color and texture variations, include sample sets showing the full range of variations expected. Literature and specifications shall be submitted within five (5) business days after award.
6.2 CONSTRUCTION SCHEDULE
The Contractor shall submit a construction schedule within ten (10) calendar days after Notice to Proceed. The construction schedule shall be prepared in terms of calendar days (not working days). Once the construction schedule is submitted by the Contractor and approved by the CO, no lateness in the schedule shall be tolerated without the CO’s approval.
6.3 QUALITY CONTROL PLAN
6 | P a g e
Contractor shall establish a quality control plan for all work, including that of his subcontractors, to assure compliance with the contract provisions. Contractor shall submit a copy of his quality control plan concurrently with the quote.
6.4 SAFETY PLAN
The contractor shall submit a project specific safety plan for all work, including that of his subcontractors, to assure compliance with the contract provisions. Contractor shall submit a copy of his safety plan concurrently with the quote.
6.5 CLOSE OUT DOCUMENTATION
6.5.1 Two (2) complete sets of documentation, as listed below, shall be provided to the SLVHCS COR at the completion of installation.
6.5.2 Operations and Maintenance (O&M) manuals shall be provided in pdf format via CD or flash drive with cover page, table of contents, MSDS, and maintenance procedures.
6.5.3 Product Binders shall be provided and include product brochures, specified flooring cut sheets, color selection samples, manufacturer’s technical representative local contact, manufacturer’s certified installer, and technical recommendations.
7. VA MAINTENANCE STAFF:
7.1 The VA Environmental Management Service (EMS) is responsible for moving the VA owned furniture, tools and equipment from each room both prior to demolition and after completion of flooring installation. The Contractor shall coordinate with the EMS and COR at least 7 days prior to starting It will be moved to another location in the general vicinity of the room(s) being worked. The time frame is based upon staff availability and will be coordinated accordingly. The VA Environmental Management Service is responsible for terminal cleaning.
7.2 The Contractor shall provide manufacturer on-site training for the proper maintenance of products to the SLVHCS staff. Scheduling of training shall be coordinated with the SLVHCS COR after installation is complete. The minimum training shall be in accordance with manufacturer of resinous flooring for healthcare maintenance worker training. All training shall include daily care of resinous flooring, approved chemical cleaning products, and identifying and notification of flooring surface damage.
8. PROTECTION OF PROPERTY:
8.1 Contractor shall protect all existing surfaces and newly installed construction materials from damage. The Contractor shall take precaution against damage to the building(s), grounds and furnishings. The Contractor shall replace or replace any items related to building(s) or grounds damaged accidentally or on purpose due to actions by the Contractor at no additional cost to the Government.
8.2 The Contractor shall perform an inspection of the building(s) and grounds with the COR prior to commencing work. To ensure that the Contractor shall be able to replace or replace any items, components, building(s) or grounds damaged due to negligence and/or actions taken by the Contractor. The source of all replaces beyond simple surface cleaning is the facility construction contractor (or appropriate subcontractor), so that building warranty is maintained. Concurrence from the VA Facilities Management POC and COR is required before the Contractor may perform any significant replace work. In all cases, replaces shall utilize materials of the same quality, size, texture, grade, and color to match adjacent existing work.
8.3 The Contractor shall be responsible for security of the areas in which the work is being performed prior to completion.
8.4 Contractor shall provide floor protection while working in all VA facilities. All material handling equipment shall have rubber wheels.
9. SECURITY REQUIREMENTS:
7 | P a g e
9.1 The Contractor is responsible for notifying the COR for project escorting duties prior to arriving at the facility.
The Contractor personnel shall check in with VA Police upon arrival and departure each day. All contractor personnel must provide one form of valid picture identification at the time of check-in to receive a visitor’s badge. Badges must be always worn above the waist and visible while on the jobsite. All contractor personnel will always be accompanied by a cleared HSPD-12 member of the contractor (PIV card holder) or SLVHCS representative while on the jobsite.
9.2 The Contractor and their personnel shall follow all VA policies, standard operating procedures, applicable laws and regulations while on VA property. Violations of VA regulations and policies may result in citation and disciplinary measures for persons violating the law.
9.3 The Contractor shall obtain all necessary licenses and/or permits required to perform the work, with the exception being software licenses that need to be procured from a Contractor or vendor in accordance with the VA OIT requirements document. The Contractor shall take all reasonable precautions necessary to protect persons and property from injury or damage during the performance of this contract.
9.4 The VA does not provide the Contractor with parking spaces at the work site under this contract. However, the contractor key personnel can request and obtain parking at the work site but is only allowed if approved by the COR and VA Police. It is the responsibility of the Contractor to park in the appropriate designated parking areas at the 5th level or higher of the Visitor Garage. VA will not invalidate or make reimbursement for parking violations of the Contractor under any conditions.
9.5 As previously stated in this SOW, smoking is prohibited inside and outside any building on SLVHCS campus.
9.6 The possession of weapons such as guns and knives are prohibited on the person and in the vehicle.
10. SPECIFICATION REQUIREMENTS
10.1 All work performed under this contract shall be in accordance with the VA Master Specifications http://www.cfm.va.gov/til/spec.asp) listed below and attached as part of this SOW:
Division 01 - General requirements 000110 Table Of Contents 000115 List of Drawings 010000 General Requirements 013216-15 Project Schedules 013323 Shop Drawings, Product Data, and Samples 013526 Safety Requirements 014219 Reference Standards 017419 Construction Waste Management
Division 02 - Existing Conditions 024100 Demolition
Division 09 - Finishes
096723.40 Resinous Poured in Place Resilient Flooring (RES-4)
10.2 All work shall comply with all local, state, and federal rules and regulations. In the event of a code discrepancy the stricter of the ordinances shall prevail.
11. WARRANTY & REPLACES:
11.1 All specified products shall be under standard manufacturer’s warranties except as otherwise indicated in the SOW and Specifications.
11.2 Contractor must respond and provide a report for service and warranty replace request within 24 hours of notification for COR review and approval. COR will provide review within 24 hours of receipt of report.
Contractor must coordinate with the COR the service or warranty replace service 3 days prior to start of service.
http://www.cfm.va.gov/til/spec.asp)%20listed%20below%20and%20attached%20as%20part%20of%20this%20SOW:
http://www.cfm.va.gov/til/spec.asp)%20listed%20below%20and%20attached%20as%20part%20of%20this%20SOW:
8 | P a g e
12. QUALITY ASSURANCE:
12.1 Quality Assurance. The COR will inspect for compliance with Contract terms throughout the Contract period.
Evaluation will be based on the Contractor’s compliance with the requirements set forth in this Scope of Work.
13. LIST OF ATTACHMENTS:
Attachment 1 Site Map
Attachment 2 Floor Plans
Attachment 1 Site Map
9 | P a g e
10 | P a g e - -
Attachment 2 Floor Plans
(See Floor Plans on the following pages)
O N
E S
IX
T
E E
N T
H I
N C
H
O N
E F
O
T
E E
IG
H
T I
N C
H
O N
E F
O
E Q
U A
R T
E R
I N
C H
O
N E
F O
E
H A
L F
I N
C H
O
N E
F O
H
R E
E Q
U A
R T
E R
S I
N C
H
O N
E F
O
E A
N D
O N
E H
A L
F I
N C
H E
S
O N
E F
O
R E
E I
N C
H E
S
O N
E F
O
O N
E I
N C
H
F O
R T
Y F
E E
T
D
.1
.2
.6
6 5 4 3 2
190SF DN
3STD05
STAIR
STD-05
UP
CR
STP
116SF
3D120N
SECTION
HEAD
3D114
120SF
3D120M
SECTION
HEAD
3D113
119SF
3D120L
SECTION
HEAD
3D112
116SF
3D120K
SECTION
HEAD
3D111
120SF
3D120J
SECTION
HEAD
3D110
120SF
3D120H
SECTION
HEAD
3D109
116SF
3D120G
SECTION
HEAD
3D108
119SF
3D120F
SECTION
HEAD
3D107
119SF
3D120E
SECTION
HEAD
3D106
116SF
3D120D
ANESTHES
CHIEF
3D105
144SF
3D120C
CHIEF
SURGICAL
3D104
97SF
3D120.8
SECY/
WAIT
3D103
116SF
3D120A
ASSIST
CHIEF
3D102
3D120.1
81SF
DICT
3D138
3D120.2
638SF
3D107
SERV
ELEV
LOBBY
3D220
DN
192SF
3STD01
STAIR
STD-01 UP
STP
3D128 3D120A.1 1054SF 65SF 3D120A.2 929SF 3D-C04
CUBICLES AREA CLER CORR ANESTH ANESTH ANESTH ANESTH CUBICLES AREA ANESTH
3D120P
CLER
3D144F
CLER
3D119A
CLER #1
3D119B 3D119D CLER
3D119E
3D-C04 3D133A 3D133C 3D133E 3D134A #2 3D134E 131SF
3D104
109SF
3D104A
414SF
CORR
3D-C08A
NM
3D128
?SF
3D120Q
OR
COORD
3D130
3D130
222SF
CORR
3D-C06
3D120.31
3D120.32
3D120.30
3D120.33
3D120.29
3D120.34
3D120.28
3D120.35
3D120.27
3D120.36
3D120.26
3D120.37 3D123
128SF
3D120W
CLIN
COORD
3D123
3D120
72SF
3D126
ST
88SF
CORR
3D-C04A
3D120
3D120.16
3D120.15
ANESTH
3D133B
3D120.17
3D120.14
ANESTH
3D134B
3D120.18
3D120.13
ANESTH
3D133D
3D120.19
3D120.12
3D120.20
3D120.11
3D120.21
3D120.10
A NESTH
3D134C
3D120.22
3D120.9
ANESTH
3D134D
341SF
3D120A.3
CUBICLES AREA
#3
CLER
3D135B 3D120.23
CLER
3D135A
205SF
CORR
3D-C05
3D120.3
RECPT
3D139
3D120.4
RECPT
88SF
3D105
SCRUBS
ALC
3D100A
ELEV
DS-09
ELEV
DS-10
307 SF
CORR
3D-C01A
FEC
SECURITY
3D223B
TELECOM
3D223A
171SF
3D102
3D131
30SF
159SF
3D120R
3D118
129SF
129SF
122SF 3D120U 156SF
3D120
FEC
139SF
3D124 98SF 129SF
254SF
3D120
SECY/ 378 SF
53SF
3D103
253SF
3D100A
SOILED
LINEN
3D225
3D136 3D120R.1 3D120R.2 3D120S 3D120T CLIN 3D120V
75SF
3D121 227SF ELEV 3D122 3D120B WAIT CORR SCRUBS PAT
EC
3D131
PURCH
AGENT
3D118B
PURCH
AGENT
3D118A
NM
3D127
NM
3D126
729 SF
CORR
3D-C07
COORD
3D125
CLIN
COORD
3D124
3D128
ST
3D121
CORR
3D-C07A
ELEV
DS-12
EQUIP
3D142
3D142
HK
3D141
3D141
712 SF
CORR
3D-C07B
RES
WORK
3D137
3D136 3D120.5
RECPT
3D-C03A
CG4A
ALC
3D100B
ELEV
LOBBY
3D221
333 SF
CORR
3D-C01
94SF
3D100
HK
3D217
HVC
DP 81SF
3D135
GAS
CYLINDER
3D171
290SF
3D133
CONFERENCE
ROOM
3D170
DP DP
131SF
3D131
BIOMED
3D167
105SF
3D129
FROZEN
SECTION
3D166
3D165
138SF
3D127
HK
3D165
DP
DP
25SF
3D140B
323SF
3D141
SOILED
107SF
3D123
WORK/
STORAGE
3D147
293SF
3D121
CONFERENCE
ROOM
3D146
263SF
3D145A
ST
3D145A
32SF
3D145B
HC
SHWR
3D145B
34SF
3D145C
CG4A HVC
DP
31SF 674SF
3E235
OPERATING
ROOM
3D172
3D140.2 3D140.1
DP
221SF
3D140
NURSE
WORK
3D163
3D163
87SF
3D140A
SCRUB
3D162B
CC
3D164
3D148.2
3D149
3D148
226SF
3D143
CLEAN
CART
345SF
CORR
3D145.2
527SF
3D145
MALE
3D145C
ST
3D145C
1962SF
3D101
SERVICE
768SF
3D-C08B
DP
3D172.1
83SF
3E233A
SCRUB
3D172B
29SF
DP
DP
3D173.1
228SF
3E233
NEURO
EQUIPMENT
3D173
673SF
3E231
OPERATING
ROOM
3D174
DP
DP DP
973SF
3E220
CLEAN
CORE DP DP
3D176 646SF
3E238
OPERATING
ROOM
3D162
LEAD
225SF
3E236
PUMP
ROOM
3D161
DP
3D161.1
DP
3D162.1
DP
32SF
87SF
3E236A
SCRUB
3D160B
DP
3D160.1
637SF
CORR
3D-C09
3D149
3D-C10.1
ELEV
DS-11
83SF
3D148
ELEV
EQUIP
3D154
349SF
3D150
STAFF
3D-C10
3D150.2
42SF
3D147B
HC
SHOWER
3D150B
3D152.1
188SF
3D147A
T/S 3D150A
LOCKER
3D145
606SF
3D147
FEMALE
LOCKER
3D150
651SF
3D149
STAFF
LOUNGE
3D152
754SF
3D-C03B
FEW
UP
SHAFT
SHD03
STAIR
STD-14
BAY
3D227
136SF
3D101A
NORM
ELEC
3D227A
151SF
3D101B
EMER
ELEC
3D227B
FEC
3D174.1
92SF
3E229A
SCRUB
3D174B
DP
3D175.1
LEAD
224SF
3E229
EQUIP
STOR
3D175
DP DP
651SF
3E234
OPERATING
ROOM
3D160
LEAD
LOUNGE
3D153
EXTERIOR : OPEN
TO BELOW
2AI103-D1
2AI103-E1
09 Q
B1 B2
HVC
D2 D1 A1 01
D3
2AI103-D2
2AI103-E2
3E147.2
STORAGE
ORTHO
3E147
3E147.1
SCRUB
3E146B
E3 E2
F3 F2
G2
E1 A2 C1 C2
F1 A3 00
A4 G1
NEW AND OLD ROOM NUMBER LEGEND
04 K
H 03 A5
J1 J2
DIAGNOSTIC AND TREATMENT BUILDING
BLDG 2 THIRD FLOOR PLAN - AREA D1 AND D2
SCALE: 1/8" = 1'-0"
EXAM
1D###
125 S.F
1D###
ROOM NAME
NEW ROOM #
SQ. FOOTAGE
OLD ROOM #
PLAN
NORTH
R1
R2 M1 M2 R3
R4
08 P
00 A6
L
M3
A7
N1 N2
CONSULTANTS: ARCHITECT/ENGINEERS: DRAWING TITLE PROJECT TITLE PROJECT NUMBER
CONSTRUCTION DOCUMENTS 1
FULLY SPRINKLERED
BUILDING NUMBER
DESMAN ASSOCIATES / PARKING BLDG 2 THIRD FLOOR PLAN - AREA D2 SLVHCS REPLACEMENT MEDICAL 629-HS2-401 02 OFFICE OF
REVISED STAIRWELL NUMBER
19 BULL 015C - VE
16 BULL 015B - VE
06/10/2020
10/15/2013
08/30/2013
CODE CONSULTANTS, INC. / CODE CONSULTANT
THE SEXTANT GROUP / AV & ACOUSTICAL
HAMMER DESIGN ASSOCIATES / FOOD SERVICE
PYBURN & ODOM / ABATEMENT
TATA & HOWARD / TANK CONSULTANT
SCHRENK & PETERSON CONSULTING ENGINEERS / CIVIL
KORDA/NEMETH ENGINEERING / STRUCTURAL
BR+A CONSULTING ENGINEERS / MECH, ELECT, PLUMBING, LOW VOLTAGE
ARCHITECTURAL ENGINEERING / PLUMBING
APPROVED: PROJECT DIRECTOR
CENTER PROJECT
LOCATION
NEW ORLEANS, LOUISIANA
DOCUMENT SET PACKAGE
WP_08
DRAWING NUMBER
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 ADDENDUM 1 05/23/2012 I.S.C. GROUP, INC. / IRRIGATION SCALES ASSOCIATES / FIRE PROTECTION DATE CHECKED DRAWN Department of
REVISIONS:
VA FORM 08-6231
DATE
DAN EUSER WATER ARCHITECTURE, INC. / WATER FEATURE
5 4
3 February 29, S
F
E
B
A
R
E T
C H
R
-C
-S T
D -0
R E
T C
H
R E
T C
H
-C
C
R E
T C
H
-C
-C
V
-C
.7
-C
I1
-D
I1
I1
I1
-A
I1
A I1
E H
A L
F I N
C H
O
N E
F O
R E
T C
H
R E
T C
H
81SF
3D135
GAS
CYLINDER
3D171
290SF
3D133
RES
CONF/
CLASSROOM
3D170
131SF
3D131
BIOMED
3D167
105SF
3D129
FROZEN
SECTION
3D166
221SF
138SF
3D127
HK
3D165 25SF
3D140B
CC
3D164
323SF
3D141
SOILED
3D148
108SF
3D123
WORK/
STORAGE
3D147
293SF
3D121
CONF
ROOM
3D146
263SF
3D145A
ST
3D145A
32SF
3D145B
HC
SHWR
3D145B
34SF
3D145C
ST
3D145C
3D145.1
CG4A CR 3D-C01.2
HVC 3D-C01.1
SHD02A
A
31SF 674SF
3E235
OPERATING
ROOM
3D172
973SF
3E220.1
CLEAN
CORE
3D176
3D140.2 3D140.1 3D140
NURSE
WORK
3D163
646SF
3E238
87SF
3D140A
SCRUB
3D162B
637SF
CORR
226SF
3D143
CLEAN
CART
3D149
345SF
CORR
3D-C10
188SF
3D147A
527SF
3D145
MALE
LOCKER
3D145
606SF
3D147
FEMALE
LOCKER
3D150
754SF
CORR
3D-C03B
3D227
FEW
1962SF
3D101
SERVICE
BAY
3D227
SHD02B
A
SHD02C
B
768SF
CORR
3D-C08B
FEC
83SF
3E233A
SCRUB
3D172B
29SF
228SF
3E233
NEURO
EQUIPMENT
3D173
673SF
3E231
OPERATING
ROOM
3D174
224SF
OPERATING
ROOM
3D162
225SF
3E236
PUMP
ROOM
3D161
651SF
3E234
OPERATING
ROOM
3D160
87SF
3E236A
3D160B
32SF
3D-C09
ELEV
DS-11
83SF
3D148
ELEV
EQUIP
3D154
349SF
3D150
STAFF
LOUNGE
3D153
42SF
3D147B
HC
SHOWER
3D150B
T/S 3D150A
651SF
3D149
STAFF
LOUNGE
3D152
3D150.1
3D152.2
UP
SHAFT
SHD03
STAIR
STD-14
136SF
3D101A
NORM
ELEC
3D227A
EXTERIOR:
151SF
3D101B
EMER
ELEC
3D227B
B
92SF
3E229A
SCRUB
3D174B
3E229
EQUIP
STOR
3D175
OPEN TO BELOW
2AI103
2AI103
2AI103-D2
2AI103-E2
C
HVC
716SF
3E227
OPERATING
ROOM
3E149
LEAD
DP
DP
3E147.2
223SF
3E232
STORAGE
ORTHO
3E147
83SF
3E232A
SCRUB
3E146B
DP
DP 3E146.1
136SF 142SF 140SF
139SF
3E136
142SF
3E134 143SF
C
109SF
3E130
HVC
DP
3E149.1
85SF
3E225A
SCRUB
3E149B
DP
3E150.1
222SF
3E225
EQUIP
STOR
3E150
DP 671SF
DP 3E230
OPERATING
ROOM
3E146
LEAD
32SF
3E230A
3E142
RECOV
3E111
3E-C06A.1
DP
3E140
RECOV
3E110
3E138
RECOV
3E109
453SF
CORR
3E-C06A
ISO
RECOV
3E108
3E-C06A.2
ISO
PRE/REC
3E105
3E132
PRE/REC
3E106
217SF
3E-C06B
EQUIP
ALCOVE
3E107
DP
DP 3E-C06B
3E227
FEW
1619SF
3E102
SERVICE
BAY
3E227
USED BY
OIT OR
CLINICAL
ENGINEERING
SHAFT
SHE06
30SF
3E223A
STRETCHER
3E151A
667SF
3E223
CYSTO
ROOM
1162SF
3E220.2
CLEAN
CORE
3E148
DP
225SF
3E228
X-RAY
STORAGE
3E145
3E145.1 91SF
3E228A
SCRUB
3E144B
DP
920SF
118SF
3E144
RECOV
3E115
182SF
3E145
NURSE
STATION
3E128
CR
112SF
3E135
3E130
211SF
3E127
NURSE
STATION
3E130
505SF
CORR
3E-C07
137SF
3E128
PRE/REC
3E104
CR CR
D
DP
3E151
3E151
DP
DP
DP 674SF
DP 3E226
OPERATING
ROOM
3E144
3E144.1 CORR
3E-C05
118SF
3E146
RECOV
3E116
515SF
CORR
3E-C09
243SF
3E131.2
MEDICINE
PREP
3E129
182SF
3E125
CLEAN
3E131
3E131.1
139SF
3E126
PRE/REC
3E103
798SF
CORR
3E-C03
UP
95SF
3E102A
TELECOM
3E227A
64SF
3E102B
SECURITY
3E227B
SHAFT
SHE07
161SF
3E102C
NORM
ELEC
3E227D
D
159SF
3E102D
EMER
ELEC
3E227C
87SF
3E221A
SCRUB
3E151B
CR 3E152.1
226SF
3E221 CR
SPECIAL
RECORD
3E152
31SF
111SF
3E148
RECOV
3E117
3E147
NURSE
STATION
3E127 3E155
STRETCHER
3E126 56SF 60SF 3E102
61SF
3E124
T
3E102 60SF
3E100F
61SF
3E100E
61SF
3E100D NEW AND OLD ROOM NUMBER LEGEND
759SF 30SF 96SF
3E226A
3E142
50SF 3E157
ST
3E125
3E123 T
3E124
DP
ALCOVE
3E-CO2A
ALCOVE
3E-CO2B
ALCOVE
3E-CO2C 320SF
3E100C
PAIN MEDICINE EXAM ROOM NAME
CORR
3E-C11
3E153
211SF
3E210
EQUIP.
STORAGE
3E153
414SF
3E206
ANESTHESIA
3E155
262SF
3E220A
INSTRUMENT
PREP
STORAGE
3E148A
3E224
ELEC
3E148B
3E200
BLOOD
GAS
3E142
118SF
3E150
RECOV
3E118
246SF
CORR
3E-C08B
3E-C08B
DP
3E101
3E100
139SF
3E122
EQUIP
STOR
3E101
3E-C02
304SF
3E100A
173SF
3E100
CORR
3E-C02
3E137
EXAM #3
3E137
315SF
3E100B
1D###
125 S.F
1D###
NEW ROOM #
SQ. FOOTAGE
OLD ROOM #
3E143
340SF
3E202 125SF 127SF 134SF
PAIN MEDICINE
EXAM #1
3E135 3E136 PAIN MEDICINE
EXAM #2 00
139SF
3E208
PACS
WORK
98SF
3E222
DECONTAM
98SF
3E204
CLEAN-UP
CONTROL
3E138
121SF
3E152
RECOV
3E119
3E154
RECOV
3E120
3E156
RECOV
3E121
3E158
NOURISH
3E122
140SF
3E120
SOILED
3E100
3E135 3E136
09 Q B1 B2 E D2 D1 A1 01
D3
3E154
DP
1065SF
CORR
3E-C10
CC
3E156
3E143 3E141
DP DP
602SF
CORR
3E-C04
DP 3E-C04.1
DP
3E-C01 DP
522SF
CORR
3E-C01
2AI103-E1
2AI103-F1
E3 E2 E1 A2
F3 F2 F1
A3
A4 G2 G1
H
A5
C1 C2
2AI103-E2
2AI103-F2
3F200 3F165F
64SF
3F140
ST
3F117 3F117 135SF
3F141
PRE/REC
109SF
3F122
CLEAN
3F114
HW
3F112A
85SF
3F121
HK
3F110
3F104 170SF
3F101
CONSULT
K
R1
R2 M1 M2 R3
R4
00 A6
M3
A7
J1 J2
L
06 N1 N2
DIAGNOSTIC AND TREATMENT BUILDING
BLDG 2 THIRD FLOOR PLAN - AREA E1 AND E2
SCALE: 1/8" = 1'-0"
PLAN
NORTH
08 P
F
CONSULTANTS: ARCHITECT/ENGINEERS: DRAWING TITLE PROJECT TITLE PROJECT NUMBER
CONSTRUCTION DOCUMENTS 1
FULLY SPRINKLERED F
BUILDING NUMBER
SERVICE BAY USE UPDATE 08/24/2020
DESMAN ASSOCIATES / PARKING
CODE CONSULTANTS, INC. / CODE CONSULTANT
THE SEXTANT GROUP / AV & ACOUSTICAL
HAMMER DESIGN ASSOCIATES / FOOD SERVICE
PYBURN & ODOM / ABATEMENT
SCHRENK & PETERSON CONSULTING ENGINEERS / CIVIL
KORDA/NEMETH ENGINEERING / STRUCTURAL
BR+A CONSULTING ENGINEERS / MECH, ELECT, PLUMBING, LOW VOLTAGE
BLDG 2 THIRD FLOOR PLAN - AREA E2
APPROVED: PROJECT DIRECTOR
SLVHCS REPLACEMENT MEDICAL
CENTER PROJECT
LOCATION
NEW ORLEANS, LOUISIANA
629-HS2-401 02
DOCUMENT SET PACKAGE
WP_08
DRAWING NUMBER
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
REVISED STAIRWELL NUMBER
REVISIONS:
VA FORM 08-6231
06/10/2020
DATE
TATA & HOWARD / TANK CONSULTANT
I.S.C. GROUP, INC. / IRRIGATION
DAN EUSER WATER ARCHITECTURE, INC. / WATER FEATURE
ARCHITECTURAL ENGINEERING / PLUMBING
SCALES ASSOCIATES / FIRE PROTECTION
4 3
DATE
February 29, 2012
CHECKED
ML
DRAWN
AG/DMK
Department of
Veterans Affairs
O N
E S
IX
T
E E
N T
H I N
C H
O
N E
F O
E
E
IG
H T
I N
C H
O
N E
F O
E
Q U
A R
T E
R I N
C H
O
N E
F O
R
E E
Q U
A R
T E
R S
I N
C H
O
N E
F O
E
A N
D O
N E
H A
L F
I N
C H
E S
O
N E
F O
R
E E
I N
C H
E S
O
N E
F O
O N
E I N
C H
F
O R
T Y
F E
E T
R
E T
C H
-C
-C
R E
T C
H
R E
T C
H
R E
T C
H
-C
-C
-C
-C
E DP
R E
T C
H
R E
T C
H
R E
T C
H
6 5 4 3 2 1
3E-C01
2AI103-E2
2AI103-F2
A
64SF
3F140
ST
3F117
130SF
3F142
PRE/REC
3F115
3F117
3F132
135SF
3F141
PRE/REC
3F113
157SF
3F143
MED
ROOM
3F132
109SF
3F122
CLEAN
3F114
3F114
HW
3F112A
341SF
3F120
85SF
3F121
HK
3F110
126SF
3F123
PRE/REC
3F111
3F104
3F103
170SF
3F101
CONSULT
3F104
A
EXTERIOR EXTERIOR
123SF
3F144
122SF 122SF
3F134 3F132
NURSES
STATION
3F112
126SF
3F125
534SF
CORR
144SF
3F103
CONSULT
3F103
312SF
676SF
CORR
3F-C09A
OPEN TO
BELOW
OPEN TO
BELOW
470SF
CORR
3F-C08A
PRE/REC
3F116
69SF
3F146
T
747SF
CORR
3F-C03A
PRE/REC
3F130
3F130
PRE/REC
3F131
3F131
276 SF
CORR
3F-C04
CC
3F112B
466SF
CORR
3F-C02B1
PRE/REC
3F109
59SF
3F127
T 3F108
3F-C01
3F102
144SF
3F105
CONSULT
3F102
OPEN
TO
BELOW
SURGERY
RECEPT
3A206
HVC
3F118
118SF
3F148
3F118
249SF
3F129
124SF
3F133
3F128
128SF
3F131
3F108
135SF
3F101
168SF
3F107
B
DP 30SF 105SF 3F168B.1 59SF
PRE/REC
3F119
3F149
NURSES
STATION
3F125
PRE/REC
3F129
PRE/REC
3F128
DP
HVC
3F129
PRE/REC
3F107
CONSULT
3F101
B
HVC 3F206B 3F206C
230SF
3F227
WORKROOM
3F186 3F186
FEC
139SF
3F227A
ALCOVE
3F187
674SF
3F205
PROCEDURE
ROOM
EP
3F171
DP DP
82SF
3F206A
SCR
3F168A
HYBRID
CONTROL
3F168B
HYBRID
SCRUB
3F168C
DP DP
3F168.1
FEC
HVC
126SF
3F150
PRE/REC
3F120
HW
3F125A
118SF
3F151
PRE/REC
3F126
HVC 3F126 FEC
125SF
3F153
PRE/REC
3F127
HVC
DP
120SF
3F155
PRE/REC
3F106 279SF
CORR
3F-C01A
3F220
HVC
574SF
PUB
ELEV
LOBBY
3F220
CR
205SF
3STF04
STAIR
STF-04
DP
3F171.1
DP
DP
LEAD
3F171.2 INSTRUMENT
ROOM
3F165D
3F168.2
DP DP
806SF
3F206
CARDIAC
CATH
HYBRID
3F168
3F-C05A.2
HVC
79SF
CORR
3F-C05A
3F1513F-C05A.1
196SF
CORR
3F-C05B
3F152
3F127 CR
DP
3F-C05B
3F-STF-02 CR
UP
DN
ELEV
FP-13
ELEV
FP-14
253SF
ELEV
FP-15
241SF
3F225
SOILED
LINEN
3F184
C
3F184
CR
HVC
98SF
3F223
79SF
3F205C
SCRUB
3F171B
31SF
3F171C.1
142SF
3F205B
CONTROL
3F171C
79SF
3F205A
SCR
3F171D
2026SF
3F200
INSTRUMENT 79SF
LEAD
3F166B.1 81SF
DP
850SF
CORR
3F-C08
121SF
3F152
PRE/REC
3F150
HVC
130SF
3F154
PRE/REC
3F151
131SF
3F156
PRE/REC
3F152
HW
3F153A
261SF
3F160
NURSES
STATION
3F153
900SF
CORR
136SF
3F161
PRE/REC
3F135
205SF
3STF02
STAIR
STF-02
401SF
3F309A
SERV
ELEV
ELEV
FS-16
193SF
SHAFT
SHF04
C
229SF
3F221
VIEWING-
PACS
3F182A
UNASSIGNED
3F182B
3F182B
3F182A
690SF
CORR
3F-C09B
664SF
3F203
IR
PROCEDURE
3F169
DP DP
ROOM
3F165C
3F204A
SCR
3F166A
3F166.2
141SF
3F204B
CONTROL
3F166B
3F204C
SCRUB
3F166C
3F166.1
129SF
3F189
PRE/REC
3F149
125SF
3F191
PRE/REC
3F155
3F155
132SF
3F193
PRE/REC
3F154
3F154
276SF
3F-C02B
129SF
3F163
PRE/REC
3F136
66SF
STAIR
2F153
CR
63SF
110SF
3F109
LOBBY
3F221
149SF
3F113A
NORM
ELEV
FS-17
150SF
3F113B
EMER
NEW AND OLD ROOM NUMBER LEGEND
301SF
3F219
3F172
3F169.1
DP
DP
LEAD 3F169.2
INSTRUMENT
ROOM DP
3F165B
DP
667SF
3F204
CARDIAC
CATH
3F166
61SF
3F187
T 3F148 3F148
CORR
3F-C06
3F157 3F158
3F165 T
3F137 3F137
3F111
SECURITY
3F227B
TELECOM
3F227A
ELEC
3F227C
SWITCH
3F227D EXAM
1D###
125 S.F 1D###
ROOM NAME
NEW ROOM #
SQ. FOOTAGE
OLD ROOM #
CATH
EQUIP
CLEAN-UP
3F172
D
471SF
92SF
ELEV
FS-18
119SF
3F217
NORM
ELEC
3F180
3F180
72SF
3F215
HK
3F178
82SF
3F203C
SCRUB
3F169B
31SF
3F169C.1
143SF
3F203B
CONTROL
3F169C
697SF
3F201
IR
PROCEDURE
3F167
LEAD
80SF
3F203A
SCR
3F169D
IR
CORE
3F165
77SF
3F202A
SCR
3F164A
LEAD
139SF
3F202B
CONTROL
3F164B
3F164B.1 78SF
3F202C
3F164C
31SF
DP FEC
134SF
3F185
PRE/REC
3F147
137SF
3F183
PRE/REC
3F146
581SF
3F-C03B
273SF
3F180
NURSES
STATION
3F156
HW
3F155A
139SF
3F192
PRE/REC
3F157
SHF15
115SF
3F176
SOILED
3F160
122SF
3F194
PRE/REC
3F158
125SF
3F174
PRE/REC
3F159
135SF
3F167
PRE/REC
3F138
143SF
3F169
PRE/REC
3F139
CR
550SF
CORR
3F-C01B
3F227.2
FEW
3F227.1
UP
SHAFT
SHF08
1914SF
00AI103-A3
00AI103-A4
D
3F213
CATH
EQUIP
STOR
3F174
3F174
HVC
3F176
3F167.1
DP
DP
75SF
DP DP
3F167.2
145SF 80SF
3F164.2
DP DP
653SF
3F202
CARDIAC
CATH
3F164
LEAD
3F164.1
DP DP
HVC
DP
DP
66SF
CORR
3F-C07A
3F-C07A
116SF
3F181
PREP/
276SF
CORR
3F-C07B
3F144
129SF
3F159
3F143 3F142
122SF 120SF
3F140 62SF
3F171
T 3F140
122SF
3F113
SERVICE
BAY
3F227
USED BY
INTERIOR
DESIGN
SHAFT
SHF10
249SF
3F211
SOILED
3F176
3F201C
SCRUB
3F167B
DP
HVC
3F167C.1
3F201B
CONTROL
3F167C
3F201A
SCR
3F167D
HVC
DP
?SF
CORR
HVC
DP
CORR
3G-C05
31SF
HVC
DP
ALIGN
INDUCT
3F145
3F179
PRE/REC
3F144
3F177
PRE/REC
3F143
3F175
PRE/REC
3F142
3F173
PRE/REC
3F141
3G-C05
E 09 Q
B1 B2 E D2
D3
D1 A1 01
2AI103-F2
2AI103-G2
195SF
3G308
PHYS
LOUNGE
3G191
421SF
3G244
STAFF
LOCKERS
115SF
3G244A
HC
ST/S
3G192C 454SF
3G242
STAFF
115SF
3G242A
HC
ST/S
3G193C
432SF
3G240
STAFF
LOUNGE
3G194
EXTERIOR
OPEN TO
BELOW
204SF
CORR
3G-C02A EXTERIOR
OPEN TO
BELOW
2AI103-F1
2AI103-G1
E3 E2
F3 F2
G2
E1 A2 C1 C2
F1 A3 00
A4 G1
H 03 A5
DIAGNOSTIC AND TREATMENT BUILDING
BLDG 2 THIRD FLOOR PLAN - AREAS F1 AND F2
SCALE: 1/8" = 1'-0"
3G192
LOCKERS
PLAN
NORTH
04 K
R1
R2 M1 M2 R3
R4
08 P
J1 J2
00 A6
L
M3
A7
N1 N2
F
CONSULTANTS: ARCHITECT/ENGINEERS: DRAWING TITLE PROJECT TITLE PROJECT NUMBER
CONSTRUCTION DOCUMENTS 1
FULLY SPRINKLERED F
BUILDING NUMBER
REVISED ELEVATOR CAB NUMBERS
SERVICE BAY USE UPDATE
REVISED STAIRWELL NUMBER
02/04/2021
08/24/2020 06/10/2020
DESMAN ASSOCIATES / PARKING
CODE CONSULTANTS, INC. / CODE CONSULTANT
THE SEXTANT GROUP / AV & ACOUSTICAL
HAMMER DESIGN ASSOCIATES / FOOD SERVICE
PYBURN & ODOM / ABATEMENT
TATA & HOWARD / TANK CONSULTANT
SCHRENK & PETERSON CONSULTING ENGINEERS / CIVIL
KORDA/NEMETH ENGINEERING / STRUCTURAL
BR+A CONSULTING ENGINEERS / MECH, ELECT, PLUMBING, LOW VOLTAGE ARCHITECTURAL ENGINEERING / PLUMBING
BLDG 2 THIRD FLOOR PLAN - AREA F2
APPROVED: PROJECT DIRECTOR
SLVHCS REPLACEMENT MEDICAL
CENTER PROJECT
LOCATION
NEW ORLEANS, LOUISIANA
629-HS2-401 02
DOCUMENT SET PACKAGE
WP_08
DRAWING NUMBER
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
REVISED STAIRWELL NUMBER
REVISIONS:
VA FORM 08-6231
06/10/2020
DATE
I.S.C. GROUP, INC. / IRRIGATION
DAN EUSER WATER ARCHITECTURE, INC. / WATER FEATURE
SCALES ASSOCIATES / FIRE PROTECTION
4 3
DATE
February 29, 2012
CHECKED
ML
DRAWN
AG/DMK 2AI103-F2
Department of
Veterans Affairs
O N
E S
IX
T
E E
N T
H I
N C
H
O N
E F
O
E E
IG
H
T I
N C
H
O N
E F
O
E Q
U A
R T
E R
I N
C H
O
N E
F O
E
H A
L F
I N
C H
O
N E
F O
R E
E Q
U A
R T
E R
S I
N C
H
O N
E F
O
E A
N D
O N
E H
A L
F I
N C
H E
S
O N
E F
O
R E
E I
N C
H E
S
O N
E F
O
O N
E I
N C
H
F O
R T
Y F
E E
T
G
-C
-C
R E
T C
H
C L
T
R E
T C
H
-C
-C
-C
-C
C F
-C
C
F -C
-C
I1
-F
A I1
CR
File details come from the government source that posted it. Updated .