About this file

This solicitation is seeking air duct cleaning services for the Southeast Louisiana Veterans Health Care System replacement facility located in New Orleans, Louisiana. The 1.6 million square foot facility consists of eleven buildings housing patient care areas, laboratories, and office spaces. Services are required to clean all existing sheet metal and flex ductwork including grills, registers, and screens throughout the facility. Personnel must be specifically qualified to work on commercial ventilation systems. Similar services were last provided in 2017-2018 under a previous contract. Drawings accompanying the solicitation annotate the locations and areas of ducts requiring cleaning. The Department of Veterans Affairs Veterans Health Administration VISN 16 is the contracting agency.

View the file

Other files

File Type Posted
S06 Final Amendment 0004 36C25622Q1090 Final CTR Questions PWS Changes.pdf PDF
S06 Final Amendment 0003 36C25622Q1090 0001 Address Drawings Provided.pdf PDF
CEP L02.pdf PDF
OUT L01.pdf PDF
VA garage lobbies 00971-00MH401.pdf PDF
DNT L02 F-G.pdf PDF
RESEARCH 2nd mech plan.pdf PDF
INP L05.pdf PDF
DNT L03 F-G.pdf PDF
Public Elevator Lobbies 00972-00MH402.pdf PDF
OUT L02.pdf PDF
Level 2 F.pdf PDF
DNT L04i D-E.pdf PDF
CEP L03.pdf PDF
OUT L05.zip ZIP file
068-7MH103-N2 CEP.pdf PDF
DNT L02 D-E.pdf PDF
INP L02.pdf PDF
TLR L04.pdf PDF
RESEARCH 3 5 mech plan.pdf PDF
DNT L04 F-G.pdf PDF
065-7MH102-N1 CEP.pdf PDF
PANAM 105.pdf PDF
CEP L04.pdf PDF
067-7MH103-N1 CEP.pdf PDF
OUT L04.pdf PDF
DNT L04i F-G.pdf PDF
DNT L01 D-E.pdf PDF
DNT L03 D-E.pdf PDF
OUT L01 J2.pdf PDF
DNT L03i F-G.pdf PDF
OUT L07.pdf PDF
DNT L05 F.pdf PDF
03041-3MH701 OP airflow riser.pdf PDF
Concourse Level 4 Interstitual.pdf PDF
064-7MH101-N2 CEP.pdf PDF
OUT L08.pdf PDF
CEP L01.pdf PDF
PANAM 103.pdf PDF
INP L04.pdf PDF
DNT L06 D.pdf PDF
RESEARCH 3rd mech plan.pdf PDF
TLR L02.pdf PDF
RESEARCH East Mechanical.pdf PDF
DNT L01 F-G.pdf PDF
Concourse Level 3.pdf PDF
DNT L04i F-G_01.pdf PDF
OUT L03.pdf PDF
DNT L01i F-G_01.pdf PDF
DNT L01i F-G.pdf PDF
Show 40 more

Latest 50 of 103 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

6" CHS&R UP

4" CHS&R UP

3" HWS&R UP

2" HWS&R DN

SD

SD

AFMD

FD

AHU-3

02-2D

36x24

44x24

RF-3

02-2D

RF-2

02-2D

FD

ATC

AFMD

AHU-2

02-2D

AFMD

AFMD-10

02-2D

AFMD-6

02-2D

AFMD-12

02-2D x2 x2

FOR CONTINUATION

CONCOURSE REFER TO DRAWING

0MH-102-A1

CONCOURSE SUPPLY AIR

54x42 UP 42x18 DN

CONCOURSE RETURN AIR

52x36 UP 24x18 DN

SF-3 RF-3

FCU-1

02-2D1

RF-2 SF-2

AFMD AFMD-15

02-2D

FD

FD

GENERAL EXHAUST

24x14 UP

DOAS SUPPLY

26x38 UP

ED PURGE EXHAUST

30x24 UP

DOAS SUPPLY

24x28 UP & DN

ED PURGE EXHAUST

20x28 UP

GENERAL EXHAUST

18x58 UP 18x32 DN

FD

FD

(2)ACD-TP

30x24

30x24 x2

26x38

(2)ACD-TP

ACD

(2)ACD-TP

28x20 x1

28x12 x2

DOAS SUPPLY

36x24 UP

28x20

30x24

20x28

2 1/2" CHR

2 1/2" CHS

2 1/2" CHS

2 1/2" CHR

3" C H R

3" C H S

3" CHR

3" CHS

CORR

2D-C03

NORM

ELEC

2D227A

EMER

ELEC

2D227B

SERVICE

BAY

2D227

SHAFT

SHD03

SHAFT

SHD02

XA

Y20

A.5

AA

AA.2

3.2

3.3

2.7

3.7

A

A.3

02 4

SD-23

12ø

12ø

12x12 OPEN END DUCT

WITH WIRE MESH SCREEN

300 CFM

12x12 OPEN END DUCT

WITH WIRE MESH SCREEN

450 CFM

SD-23

SD-62

16x10

16x14

14x12

14x10 OPEN END DUCT

WITH WIRE MESH SCREEN

500 CFM

R-1 02-2D1

36x24

(2)ACD-TP

FD

FD

FD

SD

02-2D

VFD-3

02-2D

VFD-43

02-2D

VFD-42

02-2D

VFD-2

6" MPR

6" LPR UP

6" MPR UP

3" MPR

6" LPR

1 1/2" LPR

1 1/4" LPR

1 1/4" LPR UP

6" VENT UP 4" PC UP

1" HPR UP

14x14

4" VENT DN TO CONDENSATE PUMP

8" LPR DN TO CONDENSATE PUMP

4" PC

6" VENT

6" LPR

4" VENT DN

1 1/4" LPR

1" HPR

6" M

P R x1

24x20

16x14

26x24

FTK-1

02-2D1

AFMD

AFMD-13

02-2D

AFMD

AFMD-8

02-2D

1-1/2" D FROM AHU-2 DN

TO LEVEL 1

1-1/2" D FROM AHU-3 DN

TO LEVEL 1

CO

CO

3" D UP & DN

2" D

1/ 2" D

1-1/2" D FROM AHU-4 UP

LEVEL 3

1-1/2" D FROM AHU-5 UP TO

LEVEL 3

2" D

CO

CO

1/ 2" H W R

1/ 2" H W S

2MH305

2MH305

EQUIPMENT PAD

12x12 FUME HOOD EXHAUST

UP & DN

3/4" CW

3/ 4" C W

3/ 4" C W

3/4" CW UP AND 1-1/2" DN .

6" L P R

24x14

(2)ACD-TP

(2)ACD-TPACD

1 1/4" HWR

1 1/4" HWS

1 1/4" HWS/R TO CONCOURSE

FOR CONTINUATION REFER TO

0MP102-A1

S-1 02-2D1

56x24

30x30

FD

FD

FD

SD

AFMD

SD

2" LPR

5" CHS&R UP

4" CHS&R DN

3" HWS&R UP

2" HWS&R DN

2" LPS UP

1 1/4" LPR UP & DN

ATCRF-10SF-13RF-9SF-12

AFMD-48

02-2E

AFMD-49

02-2E

AFMD

AFMD-51

02-2E

AFMD-47

02-2E

GENERAL EXHAUST

18x12 UP

DOAS SUPPLY

20x44 UP

DOAS SUPPLY

14x14 UP

DOAS SUPPLY

20x20 UP & DN

GENERAL EXHAUST

18x24 UP 14x22 DN

AFMD-52

02-2E

14x12 ISOLATION

EXHAUST UP

FCU-1

02-2E1

44x20

FD

3" CHS

3" CHR

2 1/2" CHR

2 1/2" CHS

4" C H R

4" C H S

54x22

AFMD-54

02-2E

AHU-13

02-2E

RF-10

02-2E x1

AFMD-56

02-2E

SD-23

SD-23

12ø 12ø

SD-62

x1 x1

14x10 OPEN END DUCT

WITH WIRE MESH

SCREEN. 500 CFM

12x12 OPEN END DUCT

WITH WIRE MESH SCREEN

450 CFM

12x12 OPEN END DUCT

WITH WIRE MESH SCREEN

300 CFM

CAC-1

02-2E1

SD-24

SD-25

22x16

30x12 OPEN END DUCT WITH

1/2" WIRE MESH SCREEN

2100 CFM

20x10 TRANSFER DUCT WITH

1/2" WIRE MESH SCREEN

SD-24

x2

30x12

14x14

AHU-12

02-2E

26x26 DUCT

DOWN TO AHU

RF-9

02-2E

ACD

ED PURGE

20x30 UP

FD

FD

16x10

26x26

20x30

42x16

44x20

TELECOM

2E227A

SERVICE

BAY

2E227

NORM

ELEC

2E227C

EMER

ELEC

2E227D

SECURITY

2E227B

SHAFT

SHE06

SHAFT

SHE07

XA

A.5

AA

5.3

AA.2

6.1

A

1" LPR DN

1" LPR

2" H W S

2" H W R

ACD

4" CHR

4" CHS

2" HWR

2" HWS

2" LPR

02-2E

VFD-12

02-2E

VFD-49

02-2E

VFD-13

02-2E

VFD-50

8" CHS & R UP

4" HPS UP

2" PC UP

1-1/2" D FROM AHU-13

DN TO LEVEL 1

1-1/2" D FROM AHU-12

DN TO LEVEL 1

CO

CO

3" D UP & DN

1-1/2" D FROM AHU-14 UP

TO LEVEL 3

1-1/2" D FROM AHU-15

UP TO LEVEL 3

1 1/2" D

2" D

CO

CO

CO

1 1/4" CHR

1 1/4" CHS

1 1/4" D

C.O.

CO

1 1/4" D

1/ 4" D

2MH306

2MH306

EQUIPMENT PAD

EQUIPMENT PAD

1 1 x1

1 1/4" CHR

1 1/4" CHS

14x12

2" CHR2" CHS

3/4" CW

3/4"CW UP AND

1-1/2" CW DN

A

4" HPS UP

ANCHOR AT

LEVEL 3 SLAB

G G

G

A

18x12

FTK-1

02-2E1

1" MPR

(2)ACD-TP

(2)ACD-TP

Q D2 D1

E2 E1

F2 F1

G2 G1

A2

A4

A5

A1

A6

B1

C1 C2

B2

H

J1 J2

L

K

M1 M2 M3

N1 N2

A7

D3

E3

F3

R1

R4

R2 R3

A3

08 P

PLAN

NORTH

DATE

LOCATION

CHECKED DRAWN

PROJECT TITLE PROJECT NUMBER

DOCUMENT SET PACKAGE

DRAWING NUMBERAPPROVED: PROJECT DIRECTOR

DRAWING TITLEARCHITECT/ENGINEERS:CONSULTANTS:

REVISIONS: DATE

B

A

D

C

E

VA FORM 08-6231

O N

E

EI

G H

T

IN

C H

O

N E

FO

O

T O

N E

Q U

AR

TE

R

IN

C H

O

N E

FO

O

T O

N E

H A L

F

IN

C H

O

N E

FO

O

T

TH

R

EE

Q U

AR

TE

R S

IN

C

H

O N

E

FO

O T

TH

R

EE

IN

C H

ES

O N

E

FO

O T

O N

E

IN

C H

F

O R

TY

F

E E T

(1

0'

6"

6"

0'

0'

123456

F

B

A

D

C

E

F

O N

E

SI

X T

EE

N

TH

IN

C

H

O N

E

FO

O T

O N

E

AN

D O

N E

H

AL

F

IN

C H

ES

O N

E

FO

O T

6"

BUILDING NUMBER

NEW ORLEANS, LOUISIANA

2MH403

BLDG 02 SECOND FLOOR SERVICE BAY

ENLARGED PLANS - AREA D & E

KJS SLWFebruary 29, 2012

02629-HS2-401SLVHCS REPLACEMENT MEDICAL

CENTER PROJECT

SCHRENK & PETERSON CONSULTING ENGINEERS / CIVIL

KORDA/NEMETH ENGINEERING / STRUCTURAL

BR+A CONSULTING ENGINEERS / MECH, ELECT, PLUMBING, LOW VOLTAGE

ARCHITECTURAL ENGINEERING/ PLUMBING

SCALES ASSOCIATES / FIRE PROTECTION

DESMAN ASSOCIATES / PARKING

CODE CONSULTANTS, INC. / CODE CONSULTANT

THE SEXTANT GROUP / AV & ACOUSTICAL

HAMMER DESIGN ASSOCIATES / FOOD SERVICE

PYBURN & ODOM / ABATEMENT

TATA & HOWARD / TANK CONSULTANT

I.S.C. GROUP, INC./ IRRIGATION

DAN EUSER WATER ARCHITECTURE, INC./ WATER FEATURE

Department of

Veterans Affairs

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

WP_08

CONSTRUCTION DOCUMENTS 1

FULLY SPRINKLERED

1/4" = 1'-0"

SECOND FLOOR Enlarged Mechanical Room Area D

SCALE: 1/4" = 1'-0"

SECOND FLOOR Enlarged Mechanical Room Area E

GENERAL NOTES:

1. FOR SYMBOL LISTS, ABBREVIATIONS, AND GENERAL

NOTES THAT APPLY TO ALL DRAWINGS SEE THE

MH-0 SERIES OF DRAWINGS.

2. FOR GENERAL DETAILS SEE THE MH-5 SERIES OF

DRAWINGS.

3. FOR CONTROL DIAGRAMS SEE THE MH-8 SERIES OF

DRAWINGS.

4. FOR VALVE INFORMATION SEE NOTE 30 ON MH002.

INDICATES ROOMS WITH HORIZONTAL CAP.

ALL DUCTWORK AND PIPING ROUTED ABOVE

THE HORIZONTAL CAP EXCEPT WHERE NOTED.

DUCT DROP THRU CAP TO ROOM BELOW.

KEY NOTES:

RFI 3396.3: Install security mesh at duct entering RM 2E227B

CONDENSATE

COOLER

RFI 08308: Condensate coolers required to connection to DCW

File details come from the government source that posted it. Updated .