This document package includes a federal contract opportunity solicitation and supporting technical drawings for ductwork replacement at the Southeast Louisiana Veterans Health Care System replacement medical center facility in New Orleans, Louisiana.
The solicitation seeks a contractor to provide air duct cleaning services for the 1.6 million square foot facility consisting of eleven buildings housing patient care, laboratories, and office spaces. Specifically, the selected contractor must complete cleaning of all existing sheet metal and flex ductwork including ancillary equipment like grills and registers. Personnel must be qualified to work on commercial ventilation systems. The drawings provide details on the ductwork locations and schematics to inform proposals. The previous contract for these recurring five-year services was awarded in 2017-2018. No incumbent contractor is currently under contract for this work. Proposals are due based on the solicitation response date.
View the file
Other files
Show 40 more
Latest 50 of 103 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRE
PUMPS
2N125
FUEL
STO.
2N129
GENERATORS
2N128
SWITCHGEAR
2N131
GENERATOR
INTAKE
SHAFT
2N135
STAIR
STN�3
LOBBY
2N123
CORR
2N124
CORR
2N127
BLDG E.J.
BLDG E.J.
HOUSE
PUMPS
2N126
TOILET
2N141
TOILET
2N142
SUPPLIES
2N143
ELEC
SHAFT
SHN�2
HK
2N140
FEC
FEC
FEC
FEC
FEC
ELEVATOR
SHAFT
LOCKSMITH
200 / 280
2N115
21 � 230
FOREMAN
100 / 105
2N119A
21 � 230
CARPENTRY
SHOP
2090 / 1717
2N119
21 � 230
MACHINE
SHOP
840 / 763
2N102
21 � 230
WELDING
144 / 171
2N102A
21 � 230
ELECTRICAL
SHOP
740 / 672
2N106
21 � 230
PAINT
AREA
500 / 385
2N108A
21 � 230
PAINT
SHOP
560 / 464
2N108
21 � 230
PAINT
TOOLS/EQ
80 / 117
2N108B
21 � 230
MEN'S
LOCKER
332 / 160
2N111
21 � 230
12ø SECOND FLOOR WELDING EXHAUST UP
SD�13
SD�13
EG�82
EG�82
EG�82
EG�82
14x6 14x6
14x6
14x6
14x10
14x6
16x8
18x10
14x6
14x14
10ø
22x14
14x6
14x14
16x8
10ø
16x8
14x10
6ø
12ø
16x16
14x10 16x8
16x8
16x10
6ø
16x8 16x8
14x14
16x8 16x8
12ø
14x14
10x6
20x16
S�1 07�2N1
S�2 07�2N1
S�6 07�2N1
S�5 07�2N1
S�4 07�2N1
S�3 07�2N1
S�7 07�2N1
S�8 07�2N1
S�11 07�2N1
S�10 07�2N1
24x18
20x14
SD�12
SD�12
EG�85
SD�13
EG�82
400 SD�12
SD�12
SD�12
200SD�13
SD�13
SD�13
SD�13
SD�13
EG�83
EG�82
SD�12
EG�85
SD�13
SD�13
EG�82
SD�12
EG�85
SD�14
SD�14
SD�11
SD�14
SD�13
SD�13
SD�13
SD�13
RG�85
RG�85
FD
FD
FD
FD
FD
S�13 07�2N1
16x16 PAINT SHOP EXHAUST UP
38x32 SHOPS EXHAUST UP & DN
28X24 SECOND FLOOR SHOPS EXHAUST UP
10ø MED GAS EXHAUST UP & DN
30x22 GENERAL EXHAUST UP 30x16 GENERAL EXHAUST DOWN
26x26 RETURN MAIN UP
16X26 RETURN MAIN DOWN
50X48 SUPPLY MAIN UP
40X48 SUPPLY MAIN DOWN
SD�62
RG�72
18x10
18x10
18x8
18x10
8ø
16x8
EG�85
SD�13
EG�85
18x10
18x10
18x10
EG�85
EG�85
S�12 07�2N1
16x12
10x6
RG�83
SD�13
SD�13
12x12
16x12
8ø
16x8
16x8
16x8
RG�11
SD�13
16x8
16x8
16x8
14x10
14x10
EG�85
EG�83
SD�12
SD�12
S�9 07�2N1
16x8
16x8
16x8
14x6
14x6
14x6
SD�13
10ø FLAMMABLE STORAGE EXHAUST UP & DN
12ø FIRST FLOOR WELDING EXHAUST UP & DN
FD
16x8
10ø
14x6
32x16
24x16
14x6
16x10
14ø
20x10
SD�13
16x8
16x8
14x6
14x6
20x12
12ø
16x8
16x10
20x18
16x12
20x12
18x14
14ø
FD
FD
18x8
18x8
18x8
SD�14
18x10
18x12
18x10
18x10
EG�85
EG�85
550EG�85
EG�85
RG�85
32x20
32x20
6ø
EG�85
16x10
FD
SD�12
SD�12
16x10
14x6
18x10
SD�24
SD�24
RG�24
RG�24
26x14
26x12
CRAC�1
07�2N1
14x8
12" DIA DUCT CONNECTION AT BUILDING SEISMIC JOINT
SEE DETAIL 11 ON DRAWING 7MH508
12x8
SD
07 L07 K07 J07 A07 H07 XA
07 YF07 YE
07 YD
07 YC
07 9
07 7
07 5
07 3
07 1.1
07 1
Y15
Y13
Y11
07 Y9
07 Y8
07 Y6
07 Y4
07 Y2
Y19
Y17
CP�1
07�2N2
HWP�2
07�2N2
HWP�1
07�2N2
BBT�1
07�2N2
HEX�1
07�2N2
HEX�1
07�2N2
DT�1
07�2N2
DT�2
07�2N2
DT�3
07�2N2
66x44 RA UP
60x32 SA UP (2)30x30 SA DN
46x30 RA
UP&DN
M
H �N
M
H �N
S�1 07�2N2
S�2 07�2N2
S�4 07�2N2
S�3 07�2N2
S�5 07�2N2
ET�4
07�2N2
AS�1
07�2N2
FTK�1
07�2N2
AHU�3
07�2N2
28x18
24x16 ø
16x10 16x10
14x16
20x12
24x18
8ø x8 x8
24x12 x1 x1 ø x1 ø
24x8
16ø
18x10
24x8
10x6
16x8 18x8
18x8
12x8
20x12
14x16
16x10
52x76 SA UP
24x18 SA UP
28x18 SA UP
24x12 RA UP x3 x3
26x12 SA UP
26x12
12x12 RA UP
20x10 RA UP
FCU�1
07�2N2
FCU�2
07�2N2
FCU�3
07�2N2
SD
FD
FD
FD
7MH302
SD�11
RG�11
SD�13
EG�11
EG�11
100EG�11
SD�14
RG�14
RG�13
SD�12
SD�12
SD�14
SD�14
SD�13
SD�13
RG�13
RG�74
SD�14
RG�11
RG�14
12x12 RA UP
FD
RG�13
12" DIA EXHAUST UP
SAD�15
07�2N2
SAD�15
07�2N2
07�2N2
AFMD�6
FD
SD
GENERAL RELIEF PLENUM WALL.
REFER TO ARCHITECTURAL PLANS
FOR FURTHER DEFINITION
48x48
24x6
SD�66
SD�66
x8
14x6
RG�61
24x6 x1 x6
10x6 10x610x6
FD
AD AD AD
x1
Q D2 D1
E2 E1
F2 F1
G2 G1
A2
A4
A5
A1
A6
B1
C1 C2
B2
H
J1 J2
L
K
M1 M2 M3
P
N1 N2
A7
D3
E3
F3
R1
R4
R2 R3
A3
PLAN
NORTH
DATE
LOCATION
CHECKED DRAWN
PROJECT TITLE PROJECT NUMBER
DOCUMENT SET PACKAGE
DRAWING NUMBERAPPROVED: PROJECT DIRECTOR
DRAWING TITLEARCHITECT/ENGINEERS:CONSULTANTS:
REVISIONS: DATE
B
A
D
C
E
VA FORM 08-6231
O N
E
EI
G H
T
IN
C H
O
N E
FO
O
T O
N E
Q U
AR
TE
R
IN
C H
O
N E
FO
O
T O
N E
H A L
F
IN
C H
O
N E
FO
O
T
TH
R
EE
Q U
AR
TE
R S
IN
C
H
O N
E
FO
O T
TH
R
EE
IN
C H
ES
O N
E
FO
O T
O N
E
IN
C H
F
O R
TY
F
E E T
(1
0'
6"
6"
0'
0'
123456
F
B
A
D
C
E
F
O N
E
SI
X T
EE
N
TH
IN
C
H
O N
E
FO
O T
O N
E
AN
D O
N E
H
AL
F
IN
C H
ES
O N
E
FO
O T
6"
BUILDING NUMBER
NEW ORLEANS, LOUISIANA
7MH102-N1
BLDG 07 SECOND FLOOR DUCTWORK PLAN -
AREA N1
KJS PDHOctober 31, 2011
07629-HS2-401SLVHCS REPLACEMENT MEDICAL
CENTER PROJECT
SCHRENK & PETERSON CONSULTING ENGINEERS / CIVIL
KORDA/NEMETH ENGINEERING / STRUCTURAL
BR+A CONSULTING ENGINEERS / MECH, ELECT, PLUMBING, LOW VOLTAGE
SCALES ASSOCIATES / FIRE PROTECTION
DESMAN ASSOCIATES / PARKING
CODE CONSULTANTS, INC. / CODE CONSULTANT
THE SEXTANT GROUP / AV & ACOUSTICAL
HAMMER DESIGN ASSOCIATES / FOOD SERVICE
PYBURN & ODOM / ABATEMENT
TATA & HOWARD / TANK CONSULTANT Department of
Veterans Affairs
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
EWP-07
CONSTRUCTION DOCUMENTS 1 1/8" = 1'�0"
7�L2 � Ductwork � N1
GENERAL NOTES:
1. FOR SYMBOL LISTS, ABBREVIATIONS, AND GENERAL
NOTES THAT APPLY TO ALL DRAWINGS SEE THE
7MH�0 SERIES OF DRAWINGS.
2. FOR GENERAL DETAILS SEE THE 7MH�5 SERIES OF
DRAWINGS.
3. FOR CONTROL DIAGRAMS SEE THE 7MH�8 SERIES OF
DRAWINGS.
4. FOR PIPING PLANS SEE THE 7MP�1 SERIES OF DRAWINGS
5. FOR CONTINUATION ABOVE REFER TO 7MH103�N1/N2
6. FOR GENERATOR EXHAUST STACKS SEE 7MP102�N1
1 Addendum 1 12/2/11
RFI:02081 -
Housekeeping pad to be formed around floor drain.
THIS DRAWING HAS BEEN AFFECTED BY THE BIM
COORDINATION PROCESS. PLEASE REFER TO THE
BIM COORDINATED SHOP DRAWINGS FOR DETAILS.
RFI-02649 and 02649.1 for clarification on Sound attenuator supports/pads.
SEE RFI 03396.1:
Adds security mesh to room penetrations over 96 sq inches.
RFI-03411.1: Provide rated sheet metal assembly at floor penetrations
RFI 06218: Confirms 120v damper motor at 12" above level 2 - Circuit EQR722-2