This notice describes a federal contract opportunity for renovation services. The Michael E. DeBakey VA Medical Center in Houston, Texas is seeking proposals for site preparation and construction work related to Project 586-18-101 to renovate approximately 26,000 square feet of space currently used as an inpatient ward into physical therapy and occupational therapy facilities. The solicitation will be set aside exclusively for service-disabled veteran-owned small businesses. Interested parties should monitor the website for release of the Request for Proposals and amendments on or around August 4, 2021. Proposals will be accepted for 90 days, and performance and payment bonds will be required from the contractor receiving the award. The work must be completed within 365 calendar days of notice to proceed. The contract value is estimated between $1,000,000 to $5,000,000.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL NOTES APPLICABLE TO ALL DRAWINGS FOR
THIS PROJECT
1. ALL NOTES ON ALL DRAWINGS PERTAIN TO THE CONTRACTOR.
2. NO SMOKING IN AREAS OTHER THAN OFFICIALLY MARKED AS SMOKING AREA WILL BE PERMITTED ON VA
PREMISES.
3. THE CONTRACTOR SHALL BE PREPARED TO STOP ANY WORK AND CLEAR UP THE WORK AREA IF SO ASKED
IN MEDICAL SITUATIONS REQUIRING SUCH ACTION.
4. ALL TOOLS AND MATERIAL USED IN THE PROJECT SHALL BE PROPERLY SECURED AT ALL TIMES BY THE CONTRACTOR TO REDUCE THE POSSIBILITY OF ANY OF THESE TOOLS BEING A HAZARD TO PATIENTS, VISITORS OR STAFF.
5. ALL VA PROPERTY THAT IS NOT PERMANENTLY REMOVED FROM VA PREMISES UNDER THIS PROJECT WHICH IS DAMAGED BY CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR REPAIRED TO MATCH OR
EXCEED THE QUALITY THAT EXISTED BEFORE THE DAMAGE.
6. THE CONTRACTOR, AT HIS EXPENSE WILL BE RESPONSIBLE FOR TRAINING EACH MEMBER OF HIS WORK FORCE ON VA POLICIES FOR ON-SITE WORK BEFORE ANY MEMBER WILL BE ALLOWED TO PERFORM WORK ON VA PREMISES. BACKGROUND CHECKS WILL BE REQUIRED ON ALL EMPLOYEES AND ALL EMPLOYEES
MUST BE BADGED IN ACCORDANCE WITH VA POLICE DEPARTMENT AND THE VA.
7. ABSOLUTELY NO VA TOOLS, MATERIALS OR EQUIPMENT WILL BE LOANED OR GIVEN BY THE VA TO ANY
MEMBER OF THE CONTRACTOR’S WORK FORCE AT ANY TIME.
8. ANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR EXPOSURE TO CONSTRUCTION SMOKE, DUST AND DEBRIS SHALL BE SUITABLY ATTENDED TO IN ORDER TO PREVENT ACCIDENTAL ALARM. ALL SUCH ACTION MUST BE FIRST COORDINATED AND CLEARED WITH THE COR AND THE VA SAFETY OFFICER. ALL FIRE ALARM DEVICES SHALL BE ACTIVE WHEN CONTRACTOR’S FORCES ARE VACANT FROM ANY AREA AT ANY
TIME.
9. CONTRACTOR SHALL COORDINATE WITH THE COR AND CONTRACTING OFFICER.
10. SEE SPECIFICATION SECTION 01 35 26 SAFETY REQUIREMENTS.
11. GENERAL HOURS OF WORK SHALL BE RESTRICTED FROM 0730 TO 1600 MONDAY THRU FRIDAY EXCEPT FEDERAL HOLIDAYS. CONTRACTOR MAY SUBMIT A REQUEST FOR OFF-HOUR WORK A MINIMUM 72 HOURS IN ADVANCE. APPROVAL IS AT SOLE DISCRETION OF THE VA. WHEN SOME NIGHT/WEEKEND WORK IS
REQUIRED, COORDINATE WITH PHASING PLAN SHEET A101.
1111 Louisiana 26th Floor Houston, TX 77002
713.665.5665 phone . eypae.com
VA APPROVAL
DEPARTMENT SIGNATURES
MEDICAL CENTER DIRECTOR
MEDICAL CENTER ASSOCIATE DIRECTOR
CHIEF OF STAFF
ASSOCIATE DIRECTOR OF PATIENT CARE
DEPUTY CHIEF OF STAFF /
PHYSICAL MEDICINE & REHAB
SERVICE REPRESENTATIVE
SAFETY OFFICE
PROJECT MANAGER
INFECTION PREVENTION
ENGINEERING CHIEF
DEPARTMENT OF VETERANS AFFAIRS
G.V. (SONNY) MONTGOMERY VAMC
JACKSON, MS
AD101 SECOND FLOOR DEMOLITION
AD102 SECOND FLOOR REFLECTED CEILING DEMOLITION
A101 EXISTING / PHASING PLAN
A102 FIRST FLOOR PLAN
A103 SECOND FLOOR PLAN
A104 LARGE SCALE PLAN
A105 LARGE SCALE PLAN
A106 LARGE SCALE PLAN
A107 1ST FLOOR REFLECTED CEILING PLAN
A108 2ND FLOOR REFLECTED CEILING PLAN
A201 INTERIOR ELEVATIONS
A202 INTERIOR ELEVATIONS
A203 INTERIOR ELEVATIONS
A204 INTERIOR ELEVATIONS
A301 SECTIONS
A401 ENLARGED PLANS
A501 DETAILS
A601 SCHEDULES & DIAGRAMS
G001 COVER SHEET
G002 PROJECT DATA
LS101 LIFE SAFETY PLAN
Project Location
INDEX OF DRAWINGS
ELECTRICAL
ARCHITECTURAL
MECHANICAL
PROJECT NO. 586-18-101
RENOVATE WARD 2A
VICINITY MAP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
5190 Canal Boulevard, Suite 201 New Orleans, LA 70124 (504)835-8013
LACHIN
Architects, apc
Architecture . Planning . Project Management
C :\R ev it
L oc al \V
A In pa tie nt W ar d
2A _l ac hi n-ar ch ite ct s.
rv t
9/
/2
4:
:4
PM
G001
COVER SHEET
Michael G. Lachin
Renovate Ward 2A
1500 E. Woodrow Wilson Dr. Jackson, MS 39216
586-18-101
August 18, 2020 PF BB
FINAL SUBMISSION
P001 PLUMBING SYMBOLS AND ABBREVIATIONS
PD101 PLUMBING - FIRST FLOOR DEMOLITION
PD102 PLUMBING - SECOND FLOOR DEMOLITION PLAN
P101A PLUMBING - FIRST FLOOR PLAN - AREA A
P101B PLUMBING - FIRST FLOOR PLAN - AREA B
P101C PLUMBING - FIRST FLOOR PLAN - AREA C
P101D PLUMBING - FIRST FLOOR PLAN - AREA D
P102A PLUMBING - SECOND FLOOR PLAN - AREA A
P102B PLUMBING - SECOND FLOOR PLAN - AREA B
P102C PLUMBING - SECOND FLOOR PLAN - AREA C
P102D PLUMBING - SECOND FLOOR PLAN - AREA D
P401 PLUMBING - WASTE & VENT ISOMETRIC
P402 PLUMBING - WATER ISOMETRIC
P601 PLUMBING - DETAILS & SCHEDULES
M001 MECHANICAL SYMBOLS AND ABBREVIATIONS
MD102 MECHANICAL - SECOND FLOOR DEMOLITION PLAN
M102A MECHANICAL - SECOND FLOOR PLAN - AREA A
M102B MECHANICAL - SECOND FLOOR PLAN - AREA B
M102C MECHANICAL - SECOND FLOOR PLAN - AREA C
M102D MECHANICAL - SECOND FLOOR PLAN - AREA D
M501 MECHANICAL DETAILS
M502 MECHANICAL DETAILS
M601 MECHANICAL SCHEDULES
M900 MECHANICAL CONTROLS - SYMBOLS AND
SEQUENCES
M901 MECHANICAL CONTROLS - POINTS LIST
M902 MECHANICAL CONTROLS - ROOM TYPICAL
CAMPUS MAP
Project Location
T001 TECHNOLOGY SYMBOLS & ABBREVIATIONS
TD102 TECHNOLOGY - SECOND FLOOR DEMOLITION PLAN
TD202 TECHNOLOGY DEMOLITION DETAILS
T102 TECHNOLOGY - SECOND FLOOR PLAN
T202 TECHNOLOGY ROOM DETAIL SHEET
T501 TECHNOLOGY DETAILS
T801 RTLS SYMBOLS AND ABBREVATIONS
T802 RTLS - SECOND FLOOR PLAN
TECHNOLOGY
FIRE PROTECTION
F001 FIRE PROTECTION SYMBOLS AND ABBREVIATIONS
FD101 FIRE PROTECTION - SECOND FLOOR DEMOLITION
PLAN
F102 FIRE PROTECTION - SECOND FLOOR PLAN
F501 FIRE PROTECTION DETAILS
PLUMBING
E001 ELECTRICAL SYMBOLS AND ABBREVIATIONS
ED102 ELECTRICAL - SECOND FLOOR DEMOLITION PLAN
E501 ELECTRICAL DIAGRAMS
E601 ELECTRICAL DETAILS
E602 FIRE ALARM RISER AND MATRIX
E701 ELECTRICAL SCHEDULES
E702 ELECTRICAL SCHEDULES
E710 LIGHTING SCHEDULES
EL102 LIGHTING - SECOND FLOOR PLAN
EP102A POWER - SECOND FLOOR PLAN - AREA A
EP102B POWER - SECOND FLOOR PLAN - AREA B
EP102C POWER - SECOND FLOOR PLAN - AREA C
EP102D POWER - SECOND FLOOR PLAN - AREA D
ES102 SYSTEMS - SECOND FLOOR PLAN
Revisions: Date:
M
IC
HAEL G.
HCAL
IN
REG ISTE RED ARCHITECT
STATE OF
ISIUOL
ANA
Reg. No. 3470
WOOD
WOOD FINISH
ALUMINUM
STEEL
EARTH
GYPSUM - PLASTER
MASONRY -
CONCRETE BLOCK
RIGID INSULATION
BATT INSULATION
PLYWOOD
CONCRETE
NORTH ARROW
Room name
101ROOM TAG
EQUIPMENT TAG
COLUMN GRID TAG
LEVEL ANNOTATION
BUILDING SECTION
VIEW / DETAIL TITLE
PARTITION TAG
DOOR TAG
CENTERLINE
REVISION CLOUD
BREAK LINE
SPOT ELEVATION
ENLARGED PLAN / DETAIL REFERENCE
x'-x"
BUILDING ELEVATION
WALL SECTION
REVISION
INTERIOR ELEVATION
GLAZING TYPE TAG
SECTION / DETAIL
FLOOR LINES IN EXTERIOR ELEVATION; CENTER
PROPERTY LINE, BOUNDARY LINES
MATCH LINE
FX
BX
WX
WX
WX WXROOM FINISH TAG
FLOORWALL FINISH
BASE
FINISH MATERIAL TAG XX-##
PARTITION WITH CORNER GUARD
PARTITION WITH WALL GUARD
PARTITION WITH END CAP
PARTITION WITH ADDITIONAL BRACING
A203
A1
DRAWING BLOCK TITLE
SCALE: 1"=1'-0"
Name Elevation
A-100
A001
A
A-101
A-101
A-101
A-101
2010: ADA STANDARDS FOR ACCESSIBLE DESIGN.
OCCUPATIONAL SAFETY AND HEALTH STANDARDS, U.S. DEPARTMENT OF LABOR
(OSHA): 29 CFR, PART 1926, AS AMENDED, INCLUDING FINAL RULE.
2019: NFPA 241, CONSTRUCTION, ALTERATION AND DEMOLITION OPERATIONS.
2018: INTERNATIONAL BUILDING CODE, NO LOCAL AMENDMENTS.
2017: NFPA 70, NATIONAL ELECTRICAL CODE.
2017: VA BARRIER FREE DESIGN STANDARD REV. 11/1/18
2018: IPC INTERNATIONAL PLUMBING CODE, NO LOCAL AMENDMENTS.
2018: IMC INTERNATIONAL MECHANICAL CODE, NO LOCAL AMENDMENTS.
ICC / ANSI 117.1 - 2009 AMERICAN NATIONAL STANDARD FOR ACCESSIBLE AND
USEABLE BUILDINGS AND FACILITIES.
2018: NFPA 101, LIFE SAFETY CODE FOR LOCAL JURISDICTION COMPLIANCE.
2018: NFPA 101, LIFE SAFETY CODE FOR FEDERAL CERTIFICATION. *(COMPLY WITH THE
MOST RESTRICTIVE REQUIREMENTS IF THESE TWO NFPA 101 STANDARDS
CONFLICT).
2018: NFPA 99, HEALTH CARE FACILITIES.
2018: GUIDELINES FOR DESIGN AND CONSTRUCTION OF HEALTH CARE FACILITIES,
FACILITIES GUIDELINES INSTITUTE.
JOINT COMMISSION FOR ACCREDITATION OF HEALTHCARE ORGANIZATIONS
(JCAHO), STANDARD EC5.50, INTERIM LIFE SAFETY MEASURES (ILSM), AS
PUBLISHED IN THE COMPREHENSIVE ACCREDITATION MANUAL FOR HOSPITALS:
THE OFFICIAL HANDBOOK (CAMH), 2004 EDITION.
2019: NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS.
2019: NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE.
FIRE PROTECTION OFFICE OF SAFETY, HEALTH AND ENVIRONMENTAL
COMPLIANCE (10NA8), 7th EDITION, Dec. 2015.
THE RENOVATE WARD 2A PROJECT INCLUDES RENOVATION OF APPROXIMATELY
19,967 SQUARE FEET OF AREA WITHIN THE EXISTING VA MEDICAL CENTER.
THE WORK GENERALLY INCLUDES BUT IS NOT LIMITED TO:
1. INSTALLATION OF TEMPORARY PARTITIONS, DOOR AND OTHER PROTECTIVE
MEASURES TO ISOLATE THE CONSTRUCTION AREA. PROVIDE NEGATIVE
PRESSURE FOR DUST CONTROL AND ACOUSTICAL SEPARATION SO AS NOT TO
DISRUPT THE ONGOING ACTIVITIES IN THE HOSPITAL.
2. TEMPORARY MODIFICATIONS OR RELOCATION OF EXISTING SYSTEMS TO
PRESERVE EXISTING LIFE SAFETY FEATURES SUCH AS EXITS, SPRINKLER
SYSTEMS, ALARM SYSTEMS AND OTHER SPECIAL SYSTEMS.
3. DEMOLITION OF THE EXISTING CONSTRUCTION IN THE FOOTPRINT OF THE
PROJECT SITE AND SAFE REMOVAL AND DISPOSAL OF DEBRIS.
4. INSTALLATION OF NEW PARTITION SYSTEM, CEILING SYSTEM AND ALL
PLUMBING, MECHANICAL AND ELECTRICAL SYSTEMS AS DEFINED IN THE
DOCUMENTS TO INTERFACE WITH EXISTING SYSTEMS.
5. PHASING OF THE WORK SUCH THAT THE ABOVE CEILING WORK OUTSIDE OF
THE PROJECT SITE AND SIMILAR WORK OUTSIDE OF THE PROJECT AREA BE
SCHEDULED TO MINIMIZE DISRUPTION AND DOWN-TIME TO AREAS OUTSIDE OF
THE PROJECT SITE.
6. INSTALLATION OF ALL ARCHITECTURAL FINISHES AND BUILT-IN EQUIPMENT.
7. FINAL CLEANING AND REMOVAL OF ALL TEMPORARY PARTITION SYSTEMS AND
PROTECTIVE MEASURES. REPAIR OR RESTORATION OF ANY EXISTING
FINISHES OR CONSTRUCTION DAMAGED DURING THE CONSTRUCTION
PROCESS.
8. FINAL TESTING OF NEW SYSTEMS, TRAINING AND DEMONSTRATION OF NEW
SYSTEMS AND SUBMISSION OF CLOSE-OUT DOCUMENTS.
9. MODIFICATIONS TO EXISTING HVAC, PLUMBING, ELECTRICAL, FIRE
PROTECTION AND SPECIAL SYSTEMS.
GENERAL NOTES
A. DRAWINGS AND SPECIFICATIONS ARE INTENDED TO BE
COMPLEMENTARY. SPECIFIC INFORMATION MAY BE FOUND IN
EITHER OR BOTH.
B. CONTRACTOR TO VISIT THE SITE PRIOR TO BIDDING AND
BECOME FAMILIAR WITH ALL ASPECTS OF THE WORK. FAILURE
TO INSPECT THE SITE OR FULLY ACQUAINT HIMSELF WITH THE
PLANS AND SPECIFICATIONS PRIOR TO BIDDING WILL NOT
RELIEVE THE CONTRACTOR OF PERFORMANCE OF ANY OF THE
WORK REQUIRED BY EXISTING CONDITIONS OR THE INTENT OF
THE CONTRACT DOCUMENTS. BID SUBMITTAL SHALL REFLECT
ANY EXTRANEOUS CONDITIONS THAT MAY OCCUR.
C. LAYOUT OF WORK
1. EXERCISE PROPER PRECAUTION TO VERIFY ALL EXISTING
CONDITIONS AND LAYOUT OF THE WORK. CONTRACTOR TO
NOTIFY THE CONTRACTING OFFICER OF ANY DISCREPANCIES
IMMEDIATELY.
.2 CONTRACTOR IS RESPONSIBLE FOR ANY ERROR
RESULTING FROM FAILURE TO EXERCISE SUCH PRECAUTION.
SUCH ERROR WILL NOT BE CONSIDERED SUBSEQUENTLY AS A
BASIS FOR EXTRA COMPENSATION.
3. GC TO LAYOUT WORK AND BE RESPONSIBLE FOR ALL
LINES, MEASUREMENTS OF THE BUILDING AND OTHER WORK
EXECUTED UNDER CONTRACT.
4. SHOULD A CONTRACTOR FIND DISCREPANCIES IN, OR
OMISSIONS FROM THE DRAWINGS OR SPECIFICATIONS OR
SHOULD HE BE IN DOUBT AS TO THEIR MEANING, HE SHOULD
NOTIFY THE CONTRACTING OFFICER AT ONCE.
D. EXAMINATION
1. ANY DISCREPANCIES, ERRORS OR OMISSIONS
DISCOVERED IN THE CONTRACT DOCUMENTS BY THE
CONTRACTOR SHALL BE BROUGHT TO THE ATTENTION OF THE
CONTRACTING OFFICER BEFORE PROCEEDING WITH RELATED
WORK, OTHERWISE THE CORRECTION OF SUCH ITEMS IS THE
RESPONSIBILITY OF THE CONTRACTOR.
E. CODES AND STANDARDS
1. ALL WORK, MATERIALS AND INSTALLATION SHALL BE IN
STRICT ACCORDANCE'S WITH ALL VA AND NATIONAL BUILDING
CODES, LATEST EDITION.
2. DESIGN LOADS AND CODE RESTRICTIONS FOR ALL DESIGN
CONSIDERATIONS SHALL CONFORM TO THE VA AND NATIONAL
GOVERNING CODES.
F. DEMOLITION
1. THIS SECTION IS INCLUDED FOR GENERAL REFERENCE OF
DEMO WORK BY THE GENERAL CONTRACTOR.
2. DEMOLITION INCLUDES OBJECTS IDENTIFIED BY THE
CONTRACT DOCUMENTS AND SPECIFICATIONS.
3. ARRANGE WITH THE OWNER A CONVENIENT TIME TO
PERFORM DEMOLITION WORK.
4. THE CONTRACTOR SHALL REPAIR, RESTORE AND
REPLACE PORTIONS OF CONSTRUCTION WHERE INDICATED ON
DRAWINGS OR AS REQUIRED TO INSTALL THE WORK. ANY
PORTIONS OF THE CONSTRUCTION WHICH ARE CRACKED,
SPALLED, BROKEN, MISSING OR OUT OF LINE OR ADJUSTMENT,
MECHANICALLY OR STRUCTURALLY UNSOUND OR UNSAFE,
SHALL BE REMOVED, REPLACED, RESTORED OR
SATISFACTORILY REPAIRED.
5. REMOVE, PROTECT AND REINSTALL ALL ITEMS AFFECTED BY
CONSTRUCTION THAT ARE NOT INDICATED TO BE REMOVED
INCLUDING, BUT NOT LIMITED TO SPEAKERS, WIFI AND OTHER
EXISTING MISCELLANEOUS DEVICES.
G. ALL WORK SHALL BE PERFORMED IN CONFORMANCE WITH
APPLICABLE STANDARD SPECIFICATIONS. WORKMANSHIP AND
MAINTAINING STANDARDS OF QUALITY SHALL BE THE
RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE
GENERAL CONTRACTOR SHALL PROVIDE ALL WORK SHOWN IN
THESE CONTRACT DOCUMENTS AND IS REQUIRED TO PROVIDE
A COMPLETE, FINISHED, FULLY OPERABLE INSTALLATION,
UNLESS OTHERWISE NOTED. IT IS THE RESPONSIBILITY OF THE
CONTRACTOR AND EACH OF THE SUBCONTRACTORS TO BE
ACQUAINTED WITH ALL PROJECT REQUIREMENTS AND BUILDING
STANDARDS REGARDLESS OF WHETHER THEY HAVE BEEN
SPECIFICALLY REFERENCED IN THE DOCUMENTS OR NOT.
I. CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING
OFFICER THE SELECTION AND APPROVAL OF ALL SUBSTITUTED
ITEMS PRIOR TO SUBMISSIONS OF THE BID. IT IS EACH
CONTRACTOR'S RESPONSIBILITY TO ENSURE AND TO
DEMONSTRATE THAT ALL SUBSTITUTIONS USED IN THE WORK
COMPLY WITH THE CONTRACT DOCUMENTS. SHOULD A
SUBSTITUTED PRODUCT FAIL TO PERFORM FOR ANY REASON,
WHERE THE ORIGINALLY SPECIFIED PRODUCT WOULD HAVE
PERFORMED PROPERLY, THE CONTRACTOR SHALL PERFORM
ALL WORK NECESSARY TO INCORPORATE THE ORIGINALLY
SPECIFIED PRODUCT AT NO ADDITIONAL COST.
J. EACH SUBCONTRACTOR SHALL CHECK AND VERIFY PRIOR TO
BID, ALL PLANS, SPECIFICATIONS, EXISTING CONDITIONS AND
DIMENSIONS AT THE JOB SITE AND SHALL NOTIFY THE
CONTRACTING OFFICER OF ANY DISCREPANCIES IN OR
BETWEEN THE CONTRACT DOCUMENTS AND THE FIELD
CONDITIONS PRIOR TO COMMENCING THE WORK.
K. DO NOT TAKE SCALED MEASUREMENTS FROM THESE
DRAWINGS. CONSULT WITH THE COR FOR MISSING DIMENSIONS.
L. EACH CONTRACTOR SHALL ANALYZE THE CONTRACT
DOCUMENTS AND IMMEDIATELY REPORT ANY DISCREPANCIES
TO THE CONTRACTING OFFICER PRIOR TO BID. EACH
CONTRACTOR SHALL BE REQUIRED TO CORRECT ANY
DEFECTIVE WORK CAUSED BY WORK DONE AS A RESULT OF
INCONSISTENCIES OR DISCREPANCIES IN THE DRAWINGS WHEN
CLARIFICATION FROM THE CONTRACTING OFFICER HAS NOT
BEEN SOUGHT.
M. ARCHITECTURAL, PLUMBING, ELECTRICAL, MECHANICAL AND
ALL OTHER DOCUMENTS SHALL BE REVIEWED AND
COORDINATED BY THE CONTRACTOR. REPORT ANY
INCONSISTENCIES WITHIN THE DOCUMENTS TO THE
CONTRACTING OFFICER.
N. CONTRACTOR SHALL PROVIDE THE COR WITH A SET OF
REPRODUCIBLE AS-BUILT DOCUMENTS AND DVD AT THE
PROJECT CLOSE-OUT PER SPECIFICATIONS.
O. AS SCOPE AND PERFORMANCE DOCUMENTS, THE DRAWINGS
AND SPECIFICATIONS INDICATE THE MINIMUM WORK REQUIRED
FOR THE PERFORMANCE AND COMPLETION OF BUILDING
ASSEMBLIES. THE CONTRACTOR SHALL BE SOLELY
RESPONSIBLE FOR THE FABRICATION AND INSTALLATION OF ALL
MISCELLANEOUS METAL ITEMS INDICATED, DESCRIBED OR
IMPLIED ON ALL DRAWINGS. MISCELLANEOUS METAL ITEMS,
WITHIN OR REQUIRED TO SUPPORT AN ASSEMBLY, WHETHER
OR NOT ATTACHED TO THE STRUCTURE, ARE THE
RESPONSIBILITY OF THE GENERAL CONTRACTOR AND HIS
SUBCONTRACTORS WHETHER THEY ARE SHOWN OR NOT
SHOWN ON THE ARCHITECTURAL, STRUCTURAL, CIVIL,
MECHANICAL OR ELECTRICAL DRAWINGS. SUCH ASSEMBLIES
INCLUDE BUT ARE NOT LIMITED TO EXTERIOR AND INTERIOR
WALL, CEILING, PARTITION, ROOF, MECHANICAL AND
ELECTRICAL ASSEMBLIES AS WELL AS ALL SIMILAR
ASSEMBLIES. ANY MISCELLANEOUS METAL ITEMS INDICATED
ON THE ARCHITECTURAL DRAWINGS AND NOT SHOWN ON
STRUCTURAL DRAWINGS SHALL BE A MINIMUM OF L3x3x1/2", C7x9.8, 3/8" PLATE OR TS4x4x3/8" UNLESS OTHERWISE
APPROVED BY THE STRUCTURAL ENGINEER. STEEL BEAMS
SHOWN ON THE ARCHITECTURAL DRAWINGS BUT NOT ON THE
STRUCTURAL DRAWINGS SHALL BE ASSUMED TO BE A MEDIUM
WEIGHT BEAM CONNECTED FROM COLUMN TO COLUMN WITH A
SIZE CONSISTENT WITH THE SCALED HEIGHT OF THE BEAM.
P. ALL CONTRACTORS WORKING IN THE HOSPITAL WILL HAVE
TO GO THROUGH A BASIC BACKGROUND CHECK. THE PROCESS
WILL REQUIRE FINGERPRINTING AND APPROXIMATELY THREE
WEEKS OF PROCESSING TIME BEFORE WORKERS /
CONTRACTORS CAN ENTER THE PROJECT AREA.
AFF ABOVE FINISHED FLOOR
ACT ACOUSTICAL CEILING TILE
ALUM ALUMINUM
BD BOARD
BOT BOTTOM
BUR BUILT-UP ROOFING
CIP CAST-IN-PLACE
CEM CEMENT
CTR CENTER
CL CENTER LINE
CT CERAMIC TILE
CFCI CONTRACTOR FURNISHED, CONTRACTOR INSTALLED
CO CLEANOUT, CASED OPENING
COL COLUMN
CONC CONCRETE
COR CONTRACTING OFFICER OF RECORD
CJ CONTROL JOINT
DET DETAIL
DIA DIAMETER
DIM DIMENSION
DR DOOR
DS DOWNSPOUT
EWC ELECTRIC WATER COOLER
EQ EQUAL
EXP EXPANSION
EJ EXPANSION JOINT
FRP FIBER REINFORCED POLYESTER
FIN FLR FINISH FLOOR
FE FIRE EXTINGUISHER
FD FLOOR DRAIN
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GYP GYPSUM
HVAC HEATING, VENTILATING & AIR CONDITIONING
HEPA HIGH EFFICIENCY PARTICULATE AIR
HM HOLLOW METAL
INT INTERIOR
LAM LAMINATE
LAV LAVATORY
MO MASONRY OPENING
MECH MECHANICAL
MTL METAL
MOD BIT MODIFIED BITUMEN
MS MOP SINK
NIC NOT IN CONTRACT
NTS NOT TO SCALE
OC ON CENTERS
OPP OPPOSITE
O/O OUT TO OUT
OA OVERALL
OH OVERHANG
PT PAINT
PNL PANEL
PTD PAPER TOWEL DISPENSER
PLAS PLASTER
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PL PROPERTY LINE
QT QUARRY TILE
RA RETURN AIR
REV REVISION
RTU ROOF TOP UNIT
RO ROUGH OPENING
SAB SOUND ATTENUATION BATTS
SND SANITARY NAPKIN DISPENSER
SJ SCORED JOINT
SS SERVICE SINK, STAINLESS STEEL
SIM SIMILAR
SD SOAP DISPENSER
SC SOLID CORE
TER TERRAZZO
TPD TOILET PAPER DISPENSER
TO_ TOP OF_
UNO UNLESS NOTED OTHERWISE
UR URINAL
VFCI VA FURNISHED, CONTRACTOR INSTALLED
VFVI VA FURNISHED, VA INSTALLED
VAV VARIABLE AIR VOLUME
VTR VENT THROUGH ROOF
VCT VINYL COMPOSITION TILE
WC WATER CLOSET
WR WEATHER RESISTANT
WD WOOD
GENERAL SCHEDULING NOTE TO CONTRACTOR
1. WORK FOR EACH AREA IS TO BE COORDINATED WITH THE COR OR PROJECT ENGINEER.
THE BUILDING SHALL REMAIN OCCUPIED THROUGHOUT CONSTRUCTION. WORK SHALL
BE ARRANGED TO ALLOW AS LITTLE INTERRUPTION AND INCONVENIENCE AS POSSIBLE.
2. THE CONTRACTOR IS TO SUBMIT A WRITTEN SCHEDULE OF WORK TO THE COR FOR
APPROVAL WHICH DETAILS CONSTRUCTION START AND CONSTRUCTION COMPLETION
FOR EACH AREA. SCHEDULE OF WORK SHALL BE SUBMITTED AND APPROVED BY THE
COR PRIOR TO STARTING ANY WORK ACTIVITIES
1111 Louisiana 26th Floor Houston, TX 77002
713.665.5665 phone . eypae.com
MATERIAL SYMBOLS
GRAPHIC SYMBOLS
CODES
PROJECT DESCRIPTION
CLIENT
PROJECT NAME
PROJECT ADDRESS
OCCUPANCY TYPE
PROJECT GROSS FLOOR
AREA
HEIGHT ABOVE GROUND
NUMBER OF STORIES
TYPE OF CONSTRUCTION
Veterans Administration
Renovate Ward 2A
1500 E. WOODROW WILSON AVE, JACKSON, MS
PROJECT DATAABBREVIATIONS
20,018 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
5190 Canal Boulevard, Suite 201 New Orleans, LA 70124 (504)835-8013
LACHIN
Architects, apc
Architecture . Planning . Project Management
C :\R ev it
L oc al \V
A In pa tie nt W ar d
2A _l ac hi n-ar ch ite ct s.
rv t
8/
/2
8:
:1
AM
G002
PROJECT DATA
Michael G. Lachin
Renovate Ward 2A
1500 E. Woodrow Wilson Dr. Jackson, MS 39216
586-18-101
August 18, 2020 PF BB
FINAL SUBMISSION
Revisions: Date:
M
IC
HAEL G.
HCAL
IN
REG ISTE RED ARCHITECT
STATE OF
ISIUOL
ANA
Reg. No. 3470
HEALTH CARE (NFPA)
INSTITUTIONAL I2 (IBC)
28'
4 STORIES
TYPE 1A (IBC)
TYPE 1 (332)(NFPA)
SP
SP
SP SP
SP
SP
SP
SP
SP
SP
SP SPSP SP SP SP SP SP SP SP
SP SPSP SP SP SP SP SP SP SP SP SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
S S
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP SPSP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP
SP
SP
SP
SP
SP
SP SPSP
SP
SP
SP
SP
SP
SP
SP
SP
SP
S S
S S
S SS
S S
S S
S
SP
SP
SP
SP
SP
SP
SP
SP
SP SPSP SP SP SP SP SP SP SP SP SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP SPSP SP SP SPSP SP SP SP SP SP SP SP
SP SPSP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP
SP SPSP SP SP SP SP SP
SP
SP
S S
S S
S S
S S
S S
S S
S S
S S
S S
S
S S
S S
SP
SP
SP SP
S S
SS
S S
SP
SP
SP SPSP SP SP SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP SPSP SP SP SP SP SP
SP
SP
S S
S
S S
S S
S S
S S
S S
S S
S SS
SP SPSP
SP SP
SP SP
SP
SP
SP
SP
SP SPSP SP SP
SP SP
S S
SP
SP
SP ONE HOUR FIRE BARRIER WALL ASSEMBLY
TWO HOUR FIRE BARRIER WALL ASSEMBLY
30 MINUTE SMOKE BARRIER WALL ASSEMBLY
SMOKE PARTITION WALL ASSEMBLY
TRAVEL DISTANCE TO EXIT (TD)
EXIT LIGHT SIGN (SEE ELECT)
COORDINATE WALL VERSUS CEILING MOUNTED
RECESSED FIRE EXTINGUISHER & CABINET
RATED DOOR; INDICATES REQUIRED RATING
ACCUMULATION SPACE
HAZARDOUS AREA
LEGEND
FEC
S S
SP SP
1111 Louisiana 26th Floor Houston, TX 77002
713.665.5665 phone . eypae.com
TD = 176 FT to Exit
EXIT
Treatment
Treatment
Treatment
Student Room
Conference / Multipurpose
Patient Toilet 234 Treatment
Treatment 236 Splint Fabrication
Yoga/Tai Chi Room
CVT Room
OT Gymnasium
Staff Workroom
Staff Workroom
PT Gymnasium
Housekeeping
Vestibule
Storage
Rec Supervisor
Rec Gym
Elevator
Womens Restroom
Vestibular Rehab
UV Treatment
Treatment 275Mobility Storage
Mobility
Storage
Cube Stations
Office Supply
Chief
Stair
Reception
Waiting Area
Supervisor
Cardio/Pulmonary
Sub-Wait
Patient Toilet 214Treatment
Treatment
Break Room
Female Staff RR
EMG
Male Staff RR
Supervisor
EMG
Mechanical
Elect
Storage
Stair
Mens Restroom
Stair
Elec / Storage Room
Provider Workroom
Treatment
Treatment
Treatment
Scales
Nursing Workroom
Storage
Lymphedema/CVT
Clean Supply
Medication
Telecommunications
Chute
AO Office
Staff Toilet
ADL
Waiting
MAS
Gym Storage
Priv Treatment
Priv Treatment
Priv Treatment
Corridor 200B
Corridor 200C
Corridor 200D
Corridor 200A
Toilet
Janitor
TD = 181 FT
TD = 170 FT to Exit
EXIT
FEC
FEC
FEC
FEC
FEC
Storage
FEC
TD
FT
FEC
FEC
TD
= 7
4 F T
TO
FE
C
FEC
FEC
Janitor
EXIT
EXISTING STAIR TO REMAIN
EXISTING STAIR TO REMAIN
EXISTING STAIR TO REMAIN
EXISTING TO REMAIN
EXISTING 1 HOUR FIRE RATED WALL & DOOR TO REMAIN
Fire Alarm 269.1
45 45
EXISTING RATED FIRE
WALLS TO REMAIN
5"
ACCUMULATION SPACE :
6 SQ FT / AMBULATORY PERSON OR
30 SQ FT / NON-AMBULATORY PERSON
STAIR EGRESS CAPACITY :
STAIRS 48" ÷ .3 = 160 PERSONS
DOORS 34" ÷ .2 = 170 PERSONS
STAIR EGRESS CAPACITY :
STAIRS 48" ÷ .3 = 160 PERSONS
DOORS 34" ÷ .2 = 170 PERSONS
STAIR EGRESS CAPACITY :
STAIRS 48" ÷ .3 = 160 PERSONS
DOORS 34" ÷ .2 = 170 PERSONS
SMOKE COMPARTMENT 2A SMOKE COMPARTMENT 2B
SMOKE COMPARTMENT 2A SMOKE
COMPARTMENT
2B
SMOKE
COMPARTMENT
2C
SMOKE
COMPARTMENT
2A
SMOKE
COMPARTMENT
2C
SMOKE
COMPARTMENT
2C
SMOKE
COMPARTMENT
2A
SMOKE
COMPARTMENT
2C
SMOKE
COMPARTMENT
2A
TD = 123 FT to Smoke COMPARTMENT 2A
TD
FT
to Sm oke
CO
MP
AR
TM
EN
T 2 A
SUITE 2A SUITE 2A
COMPARTMENT 2A CMPT 2BCOMPARTMENT 2C TD = 95 FT to Smoke COMPARTMENT 2B
EXISTING WALL & DOOR TO REMAIN
EXISTING WALL &
DOOR TO REMAIN
1. ALL FIRE WALLS, FIRE BARRIERS, FIRE PARTITIONS & SMOKE BARRIERS AND SMOKE PARTITIONS OR ANY OTHER WALL REQUIRED TO HAVE PROTECTED OPENINGS OR PENETRATIONS SHALL BE EFFECTIVELY AND PERMANENTLY IDENTIFIED WITH SIGNS OR STENCILING. THE ARE TO BE LOCATED IN ACCESSIBLE CONCEALED FLOOR, FLOOR- CEILING OR ATTIC SPACES; BE LOCATED WITHIN 15 FEET OF THE END OF EACH WALL AND AT INTERVALS NOT EXCEEDING 30' MEASURED HORIZONTALLY ALONG THE WALL OR PARTITION; AND INCLUDE LETTERING NOT LESS THAN 3" IN HEIGHT WITH A MINIMUM 3/8" STROKE IN A CONTRASTING COLOR INCORPORATING THE SUGGESTED
WORDING. "FIRE AND/OR SMOKE BARRIER-PROTECT ALL OPENINGS" OR OTHER WORDING.
2. PROVIDE SURFACE MOUNTED LIGHT FIXTURES AT RATED CEILINGS, UNLESS NOTED/DETAILED OTHERWISE.
3. REFER TO ELECTRICAL DRAWINGS FOR STROBE, FIRE ALARM AND CARBON MONOXIDE DETECTORS, EMERGENCY LIGHTS, PULL STATIONS, FIRE PANEL LOCATIONS, OTHER
AUDIO AND VISUAL DEVICES, INCLUDING LOCATIONS AND MOUNTING HEIGHT.
4. PROVIDE CORRESPONDING RATED ACCESS PANEL AT RATED WALLS/CEILINGS. LATCHING AND FINISH TO BE AS SPECIFIED.
5. REFER TO CORRESPONDING ARCHITECTURAL DRAWINGS FOR WALL AND FLOOR DETAILS.
6. GC TO PROVIDE CORRESPONDING FIRE CAULK AT RATED WALLS.
7. SMOKE & DRAFT CONTROL - FIRE DOOR ASSEMBLIES SHALL ALSO MEET THE REQUIREMENTS FOR A SMOKE AND DRAFT CONTROL DOOR ASSEMBLY TESTED IN
ACCORDANCE WITH UL1784. DOOR LOUVERS ARE PROHIBITED. INSTALLATION OF SMOKE DOORS SHALL BE IN ACCORDANCE WITH NFPA 105.
8. PER NFPA 101-8.3.4 GLAZING IN DOOR ASSEMBLIES - IN A 20-MINUTE FIRE DOOR ASSEMBLY, THE GLAZING MATERIAL IN THE DOOR ITSELF SHALL HAVE A MINIMUM FIRE-
PROTECTION RATED GLAZING OF 20 MINUTES AND SHALL BE EXEMPT FROM THE HOSE STREAM TEST.
9. PROVIDE THROUGH-PENETRATION FIRESTOP SYSTEM AS REQUIRED PER THE FIRE RESISTANCE RATING OF THE WALL. REFER TO NFPA 101-8.3.5.
10. PENETRATIONS OF A FLOOR, FLOOR/CEILING ASSEMBLY OF THE CEILING MEMBRANE OR A ROOF/CEILING ASSEMBLY SHALL COMPLY WITH NFPA 101-8.3.5.
11. PROVIDE WALL MOUNTED EXIT SIGNS. LOCATE ABOVE ALL EXIT DOORS. REFER TO ELECTRICAL DRAWINGS FOR MOUNTING HEIGHTS AND MODELS.
12. WHERE AN AIR DUCT PENETRATES ONLY ONE FLOOR OR ONE FLOOR AND AN AIR-HANDLING EQUIPMENT PENTHOUSE FLOOR, AND THE AIR DUCT CONTAINS A FIRE DAMPER
LOCATED WHERE THE DUCT PENETRATES THE FLOOR, AN AIR DUCT ENCLOSURE SHALL NOT BE REQUIRED.
13. FIRE DAMPERS, SMOKE DAMPERS, COMBINATION FIRE/SMOKE DAMPERS AND CEILING RADIATION DAMPERS LOCATION TO BE COORDINATED AT ALL SMOKE AND/OR FIRE
RATED PARTITIONS. REFER TO CODE COMPLIANCE PLANS, ELECTRICAL DRAWINGS FOR WIRING DESIGN AND MECHANICAL DRAWINGS.
14. PORTABLE FIRE EXTINGUISHERS SHALL BE SELECTED, INSTALLED AND MAINTAINED IN ACCORDANCE NFPA 10. BASED ON THIS OCCUPANCY TYPE, CLASS A FOR
ORDINARY(MODERATE) HAZARD OCCUPANCY TYPE 2-A FIRE EXTINGUISHERS ARE REQUIRED NO MORE THAN 75' APART AND ON EACH STORY PER TABLE 6.2.1.1 IN NFPA 10.
15. PROVIDE RECESSED FIRE EXTINGUISHERS AS INDICATED. MOUNT FIRE EXTINGUISHER IN OR WITHOUT CABINET AT 48" AFF TO THE HANDLE. REFER TO SPECIFICATIONS.
16. CONTRACTOR TO PROVIDE PORTABLE FIRE EXTINGUISHERS EVERY 75’ ON THE JOB SITE DURING CONSTRUCTION.
17. BUILDING UNDER EMERGENCY GENERATOR POWER AS WELL AS UPS. REFER TO OWNER PROVIDED INFORMATION FOR EXISTING SYSTEM REQUIREMENTS.
18. WHERE CONDUIT, CABLES, AND OTHER ELECTRICAL PROVISIONS PENETRATE RATED WALL AND FLOOR PENETRATIONS PROVIDE ASSEMBLIES CLASSIFIED WITH A UL
DESIGNATION AND COMPLY WITH ALL APPLICABLE CODES AND CORRESPONDING TESTING. SUBMIT SUBMITTALS WITH INDICATED UL DESIGNATIONS FOR EACH CONDITION.
19. CONTRACTOR TO SEAL ALL VOIDS AT INTERSECTION OF PARTITIONS AND FLOOR OR SLAB CONDITIONS, BETWEEN PIPE SLEEVES, AND OTHER PENETRATIONS AT SMOKE
AND FIRE RATED WALL AND FLOOR PENETRATIONS.
20. NO PENETRATIONS UNRELATED FOR THE PURPOSE OF THE EXIST ACCESS STAIRWAY SHALL BE PERMITTED IN EXIT ACCESS STAIRWAY ENCLOSURES. CONTRACTOR TO
NOT INSTALL ELECTRICAL BOXES/OUTLETS, SWITCHES, ETC NOT FOR USE FOR THE EXIT ACCESS STAIRWAY AT ALL THE FIRE RATED PARTITIONS.
21. REFER TO ELECTRICAL DRAWINGS FOR EMERGENCY GENERATOR LOCATION AND REQUIREMENTS.
22. EMERGENCY LIGHTING SHALL BE DESIGNED IN ALL PATHS OF EGRESS, IN ROOMS WITH AN OCCUPANCY LOAD OF 50 OR MORE.
CODE COMPLIANCE GENERAL NOTES
OCCUPANCY TYPE ______________________
OCCUPANT LOAD ______________________
MAXIMUM TRAVEL DISTANCE ______________________
MAXIMUM COMMON PATH OF TRAVEL ______________________
MAXIMUM DEAD END ______________________
MAXIMUM EXIT CAPACITY ______________________
HEALTH CARE (NFPA 101)
194 PERSONS
200 FT.
100 FT.
30 FT.
480 OCCUPANTS
SMOKE COMPARTMENT SIZE SF ALLOWABLE SIZE SF ALLOWABLE TRAVEL DISTANCE FT ACTUAL TRAVEL DISTANCE TO ANOTHER ZONE
SMOKE COMPARTMENTS (nfpa 101 19.3.7)
SMOKE COMPARTMENT 2A 11,098 22,500 200 95
SMOKE COMPARTMENT 2B N/A 22,500 200 N/A
SMOKE COMPARTMENT 2C 8,920 22,500 200 181
SUITE SUITE ID NAME USE SIZE (SF) MAX SIZE (SF) VARIANCE
SUITE INFORMATION (nfpa 101 19.2.5.7.3)
2A OT GYMNASIUM &
PT GYMNASIUM 5,449 10,000 SF NO VARIANCE
AS TWO EXITS PROVIDED
ROOMS 241, 242, 250, 251,
252, 253, 254, 255, 256, 257, 258, 259
OCCUPATIONAL THERAPY, PHYSICAL THERAPY,
PATIENT CARE, NON-SLEEPING SUITE
TYPE AREA LOAD FACTOR OCCUPANTS
OCCUPANCY LOADS
(nfpa 101 7.3.1.2)
EXERCISE ROOMS WITH EQUIPMENT
WAITING
STORAGE
INPATIENT TREATMENT
DEPARTMENTS
(ALL AREAS OUTSIDE OF THOSE
LISTED ABOVE)
4,746
13,735
50 SF / PERS
15 SF / PERS
500 SF / PERS
240 SF / PERS
TOTAL
95 PERSONS
47 PERSONS
2 PERSONS
50 PERSONS
194 PERSONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
5190 Canal Boulevard, Suite 201 New Orleans, LA 70124 (504)835-8013
LACHIN
Architects, apc
Architecture . Planning . Project Management
C :\R ev it
L oc al \V
A In pa tie nt W ar d
2A _l ac hi n-ar ch ite ct s.
rv t
8/
/2
1:
:0
PM
LS101
LIFE SAFETY PLAN
Michael G. Lachin
Renovate Ward 2A
1500 E. Woodrow Wilson Dr. Jackson, MS 39216
586-18-101
August 18, 2020 PF BB
FINAL SUBMISSION
1/8" = 1'-0"LS101
1 Second Floor Egress Plan
Revisions: Date:
M
IC
HAEL G.
HCAL
IN
REG ISTE RED ARCHITECT
STATE OF
ISIUOL
ANA
08/26/2020
F F
G G
H H
E E
D D
C C
B B
A A
20'
- 0
20'
- 0
25'
- 0
20'
- 0
25'
- 0
20'
- 0
20'
- 0
A-234
A-233
A-233a
A-234a
A-235
A-237 A-238
A-238a
A-239a
A-239
A-240
A-241a
A-240a A-241 A-244
A-242 A-244a
A-246a A-246
A-247b
A-247a
A-247 A-250
A-250a
A-251
A-250b
A-252
A-252a
A-236
A-229a
A-243a
A-229
A-243
A-227
A-245
A-225 A-224 A-223
A-221 A-220
Shaft
A-248 A-249
A-210a
A-232
A-232a
A-231a
A-231
A-230
A-228 A-226a
A-228a
A-226 A-222a
A-222b
A-219a
A-222 A-219
A-219b
A-218
A-213
A-212
A-257
A-256
A-255a
A-255
A-210
A-214
A-214a
A-211 A-208 A-206 A-203 A-201
A-208a
A-206a
A-201a
A-203a
A-209 A-207
A-259 A-261
A-205a
A-263a
A-263
A-205
A-204 A-202
A-258 A-260 A-262 A-264 A-265
A-264a
A-265a
A-262a
A-260a
A-217a
A-217
A-215a
A-215 Chase
Stair
JAN
Stair
Chase
JAN
A-253
A-253a
Electrical / Storage Room
Stair
20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 24' - 10" 15' - 2" 20' - 0" 20' - 0" 20' - 0" 19' - 11 1/2" 20' - 0" 22' - 0"
5 5
EXISTING DOORS & FRAME ARE TO
REMAIN - PROTECT FROM DAMAGE
INSTALL TEMPORARY 1 HOUR
FIRE RATED CONSTRUCTION
DOORS PRIOR TO DEMOLITION
LIMITS OF WORK
THIS PARTITION AND THIS SIDE
FINISHES ETC, TO REMAIN
INSTALL TEMPORARY 1 HOUR
FIRE RATED CONSTRUCTION
DOOR PRIOR TO DEMOLITION
LINE OF TEMPORARY ONE HOUR
FIRE RATED PARTITION - INSTALL
PRIOR TO DEMOLITION AND NEW
WORK
REMOVE EXISTING DOOR AND
FRAME AND INSTALL
TEMPORARY ONE HOUR FIRE
RATED CONSTRUCTION
EXISTING DOOR & FRAMES ARE TO
REMAIN - PROTECT FROM DAMAGE
5 5
GENERAL DEMOLITION NOTES
1. ALL EXISTING PLUMBING FIXTURES MAY NOT BE SHOWN IN THIS DRAWING BUT ARE TO
BE REMOVED WITH LINES CAPPED UNDER THIS SCOPE. GC IS TO REFER TO PREVIOUS
RENOVATION DRAWINGS DATED 1/14/97 FOR MORE DETAIL OF ITEMS TO BE REMOVED.
2. REMOVE EXISTING FLOORING THROUGHOUT THE LIMITS OF WORK.
3. REMOVE ALL EXTERIOR WALL FINISHES. EXTERIOR WALL CONSTRUCTION IS TO
REMAIN UNLESS NOTED OTHERWISE.
4. ITEMS SHOWN DASHED ARE TO BE REMOVED, INCLUDING ALL CABINET WORK.
5. REMOVE EXISTING PARTITIONS HANDRAILS, CRASHRAILS, CORNERGUARDS, AND
SHEET WALL PROTECTION PANELS THROUGHOUT THE LIMITS OF WORK.
6. REMOVE EXISTING CEILING AND ALL CEILING DEVICES THROUGHOUT THE LIMITS OF
WORK. SEE ELECTRICAL FOR ITEMS TO BE RELOCATED
7. REMOVE AND DELIVER TO COR ALL EQUIPMENT, FIXTURES, OR ACCESSORIES
IDENTIFIED BY THE COR TO BE SALVAGED. DELIVER SALVAGEABLE ITEMS TO THE COR
AS DIRECTED.
8. REMOVE ALL EXISTING PLUMBING FIXTURES THROUGHOUT THE LIMITS OF WORK.
CONTRACTOR TO COORDINATE REMOVAL OF PLUMBING FIXTURES AND CAPPING
PIPING TO MINIMIZE DISRUPTION TO PLUMBING ABOVE AND BELOW THIS SECOND
FLOOR. RE-ROUTING OF PLUMBING LINES THAT SERVE THE FIRST AND THIRD FLOORS
WILL NEED TO BE PHASED AND COORDINATED WITH THE COR TO MINIMIZE
DISRUPTIONS TO SYSTEMS ABOVE AND BELOW THE SECOND FLOOR.
9. COORDINATE SLAB DEMOLITION AND RESTORATION WITH NEW PLUMBING WORK.
10. COORDINATE DEMOLITION MATERIALS REMOVAL PROCEDURES WITH THE COR.
DEMOLITION KEY NOTES
EXISTING CEILING SYSTEMS TO REMAIN - PROTECT FROM DAMAGE.
TEMPORARILY REMOVE EXISTING CEILING SYSTEM TO INSTALL NEW ABOVE
CEILING WORK. RESTORE OR REPLACE EXISTING CEILING SYSTEM TO MATCH
AFTER INSTALLATION.
REMOVE ALL EXISTING PLUMBING FIXTURES
EXISTING FINISHES ARE TO REMAIN IN THIS AREA - PROTECT FROM DAMAGE
REMOVE ALL DRYWALL AND FURRING AT EXTERIOR WALL AND AROUND ALL
COLUMNS, TYPICAL
1111 Louisiana 26th Floor Houston, TX 77002
713.665.5665 phone . eypae.com
1/8" = 1'-0"AD101
1 Second Floor Demolition Plan
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
5190 Canal Boulevard, Suite 201 New Orleans, LA 70124 (504)835-8013
LACHIN
Architects, apc
Architecture . Planning . Project Management
C :\R ev it
L oc al \V
A In pa tie nt W ar d
2A _l ac hi n-ar ch ite ct s.
rv t
9/
/2
:0 4:
A
M
AD101
SECOND FLOOR DEMOLITION
Michael G. Lachin
Renovate Ward 2A
1500 E. Woodrow Wilson Dr. Jackson, MS 39216
586-18-101
August 18, 2020 PF BB
FINAL SUBMISSION
Revisions: Date:
M
IC
HAEL G.
HCAL
IN
REG ISTE RED ARCHITECT
STATE OF
ISIUOL
F F
G G
H H
E E
D D
C C
B B
A A
A-234
A-233
A-233a
A-234a
A-235
A-237 A-238
A-238a
A-239a
A-239 A-240
A-241a
A-240a
A-241 A-244
A-242 A-244a
A-246a
A-246
A-247b
A-247a
A-247 A-250
A-250a
A-251
A-250b
A-252
A-252a
A-236
A-229a
A-243a
A-229
A-243
A-227
A-245
A-225 A-224 A-223
A-221 A-220
Shaft
A-248 A-249
A-210a
A-232 A-232a
A-231a
A-231
A-230
A-228 A-226a
A-228a
A-226 A-222a
A-222b
A-219a
A-222 A-219
A-219b
A-218
A-213
A-212
A-257
A-256
A-255a
A-255
A-210
A-214
A-214a
A-211 A-208 A-206 A-203 A-201
A-208a
A-206a
A-201a
A-203a
A-209 A-207
A-259 A-261
A-205a
A-263a
A-263
A-205
A-204 A-202
A-258 A-260 A-262 A-264 A-265
A-264a
A-265a
A-262a
A-260a
A-217a
A-217
A-215a
A-215 Chase
Stair A-216
Stair Chase
A-254 A-253
A-253a
Electrical / Storage Room
Stair
1111 Louisiana 26th Floor Houston, TX 77002
713.665.5665 phone . eypae.com
SUPPLY AIR GRILL
RETURN AIR GRILL
LIGHT FIXTURE, LAY-IN
LIGHTING FIXTURE, RECESSED
DOWNLIGHTING
REFLECTED CEILING DEMOLITION LEGEND
SUSPENDED ACOUSTICAL
CEILING TILE AND GRID
PLASTER CEILING, PAINTED-
PROVIDE ACCESS PANELS WHERE
REQ'D TO ACCESS MEP VALVES,
CONTROLS, J-BOXES, ETC.
TYPE A
TYPE B
EXIT LIGHTS
A B
GENERAL REFLECTED CEILING DEMOLITION NOTES
1. REMOVE ALL EXISTING CEILING SYSTEMS INCLUDING ALL CEILING MOUNTED DEVICES AND
SYSTEMS WITHIN THE PROJECT AREA. COORDINATE WITH THE COR AND ITEMS TO BE
SALVAGED OR RE-USED. NOT ALL CEILING MOUNTED DEVICES ARE SHOWN ON THIS DRAWING.
CONTRACTORS ARE TO VISIT THE SITE AND TAKE NOTE OF THE SCOPE OF ALL EXISTING
DEVICES TO BE REMOVED.
2. REMOVE ALL EXISTING WINDOW COVERINGS WITHIN THE PROJECT AREA.
3. COORDINATE ANY REMOVAL OF ANY SYSTEM(S) THAT MIGHT DISRUPT OR INTERRUPT THE
ONGOING OPERATIONS OF ANY AREA OUTSIDE OF THE PROJECT AREA.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
5190 Canal Boulevard, Suite 201 New Orleans, LA 70124 (504)835-8013
LACHIN
Architects, apc
Architecture . Planning . Project Management
C :\R ev it
L oc al \V
A In pa tie nt W ar d
2A _l ac hi n-ar ch ite ct s.
rv t
8/
/2
5:
:1
PM
AD102
SECOND FLOOR REFLECTED
CEILING DEMOLITION
Michael G. Lachin
Renovate Ward 2A
1500 E. Woodrow Wilson Dr. Jackson, MS 39216
586-18-101
August 18, 2020 PF BB
FINAL SUBMISSION
1/8" = 1'-0"AD102
1 Second Floor Reflected Ceiling Plan Demo
Revisions: Date:
M
IC
HAEL G.
HCAL
IN
REG ISTE RED ARCHITECT
STATE OF
ISIUOL
1111 Louisiana 26th Floor Houston, TX 77002
713.665.5665 phone . eypae.com
F F
G G
H H
E E
D D
C C
B B
A A
J J
A-234
A-233
A-233a
A-234a
A-235
A-237 A-238
A-238a
A-239a
A-239
A-240
A-241a
A-240a A-241 A-244
A-242 A-244a
A-246a A-246
A-247b
A-247a
A-247 A-250
A-250a
A-251
A-250b
A-252
A-252a
A-236
A-229a
A-243a
A-229
A-243
A-227
A-245
A-225 A-224 A-223
A-221 A-220
Shaft
A-248 A-249
A-210a
A-232
A-232a
A-231a
A-231
A-230
A-228 A-226a
A-228a
A-226 A-222a
A-222b
A-219a
A-222 A-219
A-219b
A-218
A-213
A-212
A-257
A-256
A-255a
A-255
A-210
A-214
A-214a
A-211 A-208 A-206 A-203 A-201
A-208a
A-206a
A-201a
A-203a
A-209 A-207
A-259 A-261
A-205a
A-263a
A-263
A-205
A-204 A-202
A-258 A-260 A-262 A-264 A-265
A-264a
A-265a
A-262a
A-260a
A-217a
A-217
A-215a
A-215 Chase
Stair
HVAC
Stair
Chase
HVAC
A-253
A-253a
Electrical / Storage Room
Stair
B-228
B-230
B-227 B-225
B-232B-231
TEMPORARY PARTITION, DOOR & FRAME
COORDINATE THE ACCEPTABLE
USE OF THIS DOOR WITH COR
TEMPORARY PARTITION,
DOOR AND FRAME
COORDINATE ACCEPTABLE
CORRIDOR CLEARANCE WITH COR
269.1
GENERAL PHASING NOTES
CONTRACTOR TO COORDINATE WITH COR AND SUBMIT A DETAILED
PHASING PLAN FOR THE WORK BEFORE CONSTRUCTION BEGINS.
PHASING PLAN SHALL BE APPROVED BY THE COR.
THE DETAILED PHASING PLAN SHOULD INCLUDE PHASED DISRUPTION
DURATIONS OF SPACES ABOVE THE SECOND FLOOR AND SPACES
BELOW THE SECOND FLOOR THAT WILL BE NECESSARY TO INSTALL
THIS NEW WORK.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
5190 Canal Boulevard, Suite 201 New Orleans, LA 70124 (504)835-8013
LACHIN
Architects, apc
Architecture . Planning . Project Management
C :\R ev it
L oc al \V
A In pa tie nt W ar d
2A _l ac hi n-ar ch ite ct s.
rv t
8/
/2
5:
:4
PM
A101
EXISTING / PHASING PLAN
Michael G. Lachin
Renovate Ward 2A
1500 E. Woodrow Wilson Dr. Jackson, MS 39216
586-18-101
August 18, 2020 PF BB
FINAL SUBMISSION
1/8" = 1'-0"A101 1 Second Floor Phasing Plan
Revisions: Date:
M
IC
HAEL G.
HCAL
IN
REG ISTE RED ARCHITECT
STATE OF
ISIUOL
UP
F F
G G
H H
E E
D D
C C
B B
A A
J J
Closet A-124
Pharmacy A-129
Prosthesis A-127
Elect A-119
HVAC
Patient E-148E Patient
E-148C
Patient Toilet A-120
Isolation A-121
Ex/Trt A-123
Ex/Trt A-125
Ex/Trt A-127 Ex/Trt
A-129
Storage A-109B
S.U.
A-109A
Corridor
Signal Closet A-104
Transformer A-118
Female Toilet A-117
Police Break D-101
E-152
Toilet A-118
On-Call A-118
E-150
Clean Supply E-149B
HVAC
E-140
Linen E-141
E-139
Outpatient Xray E-138C
Medication E-142B
Staff Tlt E-142A
Isol Patient A-148C
Ambulance Entrance E-149
Check-In A-119
Toilet A-132
Toilet E-144A
Procedure P-528
Soiled Uniforms
A-130
Elect A-131
Mens Toilet E-136
Womens Toilet E-136
General Xray E-143
E-138A
E-143A
Social Activities
A-115
Narcotics Vault A-122A
Staff Tlt A-123
Waiting A-109
Air Lock
Male Toilet A-117
Ex/Trt A-122
Ex/Trt A-124
Ex/Trt A-126 Ex/Trt
A-128 A-101A
Corridor A-129A
Patient E-148F
Patient E-148D
Office A-107
Office A-108
Office A-105
Office A-106
Office A-102
Office A-103
Voluntary Service Chief B-117A
Observation A-114
Group Therapy A-113
Chief A-111
Stairs
Corridor A-100
Vestibule
Secretary A-110
Ambulatory Care Pharmacy
A-119
Controlled Substance A-122
Flammable Storage
A-125
Stretcher/Exam A-101
Staff Lounge E-144
Pharmacy Office A-126 Waiting
A-119A
Head Nurse E-146
Patient E-148A
Patient E-148B
Linen A-109
Isol Patient E-148
Nurse Station E-142
Toilet D-102
E-151
Stairs
Pharmacy Waiting A-120
Police Office
EKG
A-129C
Vitals Triage A-133
Vitals Triage A-119B
1111 Louisiana 26th Floor Houston, TX 77002
713.665.5665 phone . eypae.com
GENERAL NOTES
1. THIS SHEET IS INCLUDED AS A COURTESY AND SHOWS APPROXIMATE LOCATIONS OF
EXISTING SPACES AND PARTITIONS ON THE FLOOR BELOW THE AREA OF WORK TO ASSIST
THE CONTRACTOR IN COORDINATING AND SCHEDULING THE ABOVE CEILING WORK WITH
THE COR. ACCURACY OF THIS PLAN IS NOT GUARANTEED AS IT WAS DRAWN FROM THE
BEST AVAILABLE AS-BUILT DRAWINGS PROVIDED BY THE OWNER. CONTRACTOR TO VISIT
THE SITE TO CONFIRM EXISTING CONDITIONS.
2. WITH THE EXCEPTION OF ABOVE CEILING WORK AND REPAIR OR REPLACEMENT OF CEILING
AND RELATED SYSTEMS, NO NEW WORK IS TO OCCUR ON THIS FLOOR EXCEPT AS
NECESSARY TO INSTALL THE WORK AT THE SECOND FLOOR.
3. ANY DAMAGES OR DISRUPTIONS TO THE EXISTING CONSTRUCTION ON THIS FLOOR AS A
RESULT OF INSTALLING WORK FOR THE SECOND FLOOR SHALL BE REPAIRED AND
COORDINATED WITH THE COR.
CEILING AREAS TO BE DISRUPTED TO
INSTALL / MODIFY ABOVE CEILING
CONSTRUCTION
LEGEND
NOTE
SOME AREAS OF THE FIRST FLOOR SUCH AS PHARMACY AND OTHER AREAS ARE
PARTICULARLY SENSITIVE TO DISRUPTION. THEY WILL REQUIRE CLOSE COORDINATION WITH
THE COR TO IDENTIFY THE AVAILABLE TIMES AND LENGTH OF DISRUPTION THAT WILL BE
ACCEPTABLE TO MINIMIZE DOWN-TIME IN THESE AREAS. SOME AFTER-HOURS WORK SHOULD
BE ANTICIPATED AND CAREFULLY SCHEDULED WITH THE COR. TEMPORARY RE-ROUTING OF
PLUMBING MAY BE REQUIRED TO MINIMIZE DISRUPTION OF SERVICES TO THE THIRD FLOOR
ABOVE THE WORK AREA UNTIL THE PERMANENT PLUMBING SYSTEM IS IN PLACE.
THIS FLOOR PLAN ILLUSTRATES THE GENERAL LAYOUT OF AREAS ON THE FIRST FLOOR BELOW
THE SECOND FLOOR WARD 2A AREA WHERE THE BULK OF DEMOLITION AND CONSTRUCTION
WILL BE OCCURRING. AS THIS DRAWING WAS CREATED FROM THE BEST AVAILABLE DRAWINGS
OF THIS AREA AT THAT TIME, SOME DIFFERENCES TO THE LAYOUT SHOULD BE EXPECTED AS
THERE HAS BEEN SOME MINOR RENOVATION WORK THAT HAS OCCURRED SINCE THE DRAWING
WAS CREATED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
5190 Canal Boulevard, Suite 201 New Orleans, LA 70124 (504)835-8013
LACHIN
Architects, apc
Architecture . Planning . Project Management
C :\R ev it
L oc al \V
A In pa tie nt W ar d
2A _l ac hi n-ar ch ite ct s.
rv t
8/
/2
5:
:5
PM
A102
FIRST FLOOR PLAN
Michael G. Lachin
Renovate Ward 2A
1500 E. Woodrow Wilson Dr. Jackson, MS 39216
586-18-101
August 18, 2020 PF BB
FINAL SUBMISSION
1/8" = 1'-0"A102 1 First Floor Plan
Revisions: Date:
M
IC
HAEL G.
HCAL
IN
REG ISTE RED ARCHITECT
STATE OF
ISIUOL
F F
G G
H H
E E
D D
C C
B B
A A
18'
- 0
20'
- 0
20'
- 0
25'
- 0
20'
- 0
25'
- 0
20'
- 0
20'
- 0
J J
A301
A301
Treatment
Treatment
Treatment
Student Room
Conference / Multipurpose
Patient Toilet 234 Treatment
Treatment
Splint Fabrication
Yoga/Tai Chi Room
CVT Room
OT Gymnasium
Staff Workroom
Staff Workroom
PT Gymnasium
Housekeeping
Vestibule
Storage
Rec Supervisor
Rec Gym
Elevator
Womens Restroom
Vestibular Rehab
UV Treatment
Treatment
Mobility Storage
Mobility
Storage
Cube Stations
Office Supply
Chief
Stair
Reception
Waiting Area
Supervisor
Cardio/Pulmonary
Sub-Wait
Patient Toilet 214Treatment
Treatment
Break Room
Female Staff RR
EMG
Male Staff RR 231 Supervisor
EMG
Mechanical
Elect
Storage
Stair
Mens Restroom
Existing Elevators
Stair
Elec / Storage Room
Provider Workroom
Treatment
Treatment
Treatment
Scales
Nursing Workroom
Storage
Lymphedema/CVT
Clean Supply
Medication
Telecommunications
Chute
AO Office
Staff Toilet
ADL
Waiting
MAS
Gym Storage
Priv Treatment
Priv Treatment
Priv Treatment
Corridor 200A
Corridor 200B
Corridor 200C
Corridor 200D
Toilet
Janitor
20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 24' - 10" 15' - 2" 20' - 0" 20' - 0" 20' - 0" 19' - 11 1/2" 20' - 0" 22' - 0"
Corridor 200B
Corridor 200D
Janitor
Storage
A104
A105
A106
A106
Vestibule 249A
Vestibule 249B
Corridor 200GCorridor
200E
Corridor 200F
Corridor 200H
Corridor 200H
G3 G2 G2 G2 G2 G2 G2
E2
G3 G3
H G2
G2
E2
H
H
E
G2
G2
G2 G3 G2 G2 G3 G2 G2 E2 E2
G2
M
G2B2I
E2
IB2
G2
G2G2G2B2G2G2
G2
G2
G2
G2
G2
G2
G2
G2 E2 M
J2 E2
E2
G2 G2B2
H
G2 G2
G2 G3
G2
I
G2 G2
E2
I
E2
G2
E
G2
G2
G2
G2
G2
I
H
E
M2
M2
M2
M2
M2
M2
M2 M2
M2
M2
Fire Alarm 269.1
1111 Louisiana 26th Floor Houston, TX 77002
713.665.5665 phone . eypae.com
A6
D
E2
E2s
E
B
F
G2
G3
H
I
Ia
M2
J2
M
1/8" = 1'-0"A103 1 Second Floor Plan − Overall
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
5190 Canal Boulevard, Suite 201 New Orleans, LA 70124 (504)835-8013
LACHIN
Architects, apc
Architecture . Planning . Project Management
C :\R ev it
L oc al \V
A In pa tie nt W ar d
2A _l ac hi n-ar ch ite ct s.
rv t
9/
/2
:0 5:
A
M
A103
SECOND FLOOR PLAN
Michael G. Lachin
Renovate Ward 2A
1500 E. Woodrow Wilson Dr. Jackson, MS 39216
586-18-101
August 18, 2020 PF BB
FINAL SUBMISSION
Revisions: Date:
KEY PLAN
2/A106
2/A106
1/A105 1/A104
M
IC
HAEL G.
HCAL
IN
REG ISTE RED ARCHITECT
STATE OF
ISIUOL
ANA
Signage Types
F F
E E
D D
C C
A2011A201 2
A201 8
1a
200c
1c
OT Gymnasium
Staff Workroom
Staff Workroom
PT Gymnasium
Housekeeping
Vestibule
Storage
Rec Supervisor
Rec Gym
Elevator
Womens Restroom
Vestibular Rehab
UV Treatment
Treatment
Mobility Storage
Mobility 277Storage
Cube Stations
Waiting Area
Supervisor
Storage
Stair
Mens Restroom
ADL
Waiting
MAS
Gym Storage
Priv Treatment
Priv Treatment
Priv Treatment
Corridor 200A
Corridor 200B Corridor
200C Corridor
200D
Toilet
200b
0a
Corridor 200D
A401
A401
25'
- 0
20'
- 0
25'
- 0
A20117 16
A203
FEC
FEC
15' - 2" 20' - 0" 20' - 0" 20' - 0" 19' - 11 1/2" 20' - 0"
7' - 7 1/2" 4 7/8" 9 5/8" 7' - 0" 7 1/4" 7' - 6 3/4" 1' - 11 1/4" 4 7/8" 8' - 0" 4 7/8" 8' - 2 3/4" 4 7/8" 7 3/8" 7' - 4 5/8" 4 7/8" 10' - 2 1/2" 4 7/8" 1' - 7 1/8" 14' - 3 1/16" 4 7/8" 5' - 4 1/16" 19' - 6 3/4" 7 1/2"
8' - 4 3/4" 1' - 2 1/2"
10' - 2"
135°
3' - 1 13/16" 8' - 8 11/16" 5' - 0" 10 1/2" 4' - 0" 4' - 5" 4' - 0" 5' - 0" 3' - 2" 4' - 0" 10 1/2"
4' - 0" 7' - 11 1/2" 1' - 4" 3' - 0" 10' - 5" 4 7/8" 2' - 0" 6' - 0" 10' - 4 1/4" 4' - 0" 2' - 5 3/8" 5"
3' - 10" 11' - 2 3/4" 4' - 0" 6 1/4"
9' - 10 1/4" 4' - 0" 1' - 3 3/4" 40' - 0" 2' - 4" 4' - 0" 8' - 5" 5' - 3" 17' - 6 1/8" 7' - 4 3/4" 4' - 0" 2' - 0" 3' - 0" 6' - 0 5/8"
4 7/8" 6' - 8 1/2" 15' - 2" 6' - 6 7/8" 4 7/8" 12' - 0" 4 7/8" 11' - 10 1/8" 4 7/8" 8' - 4 3/8" 20' - 0" 6' - 6 3/8" 7 1/4" 11' - 9 5/8" 4 7/8" 10' - 9 5/8" 4 7/8" 9' - 4 7/8"
5' - 5"
4' - 0"
6' - 4 7
/8" 4' -
0" 5' -
2 1 /8"
1' - 2 3
/4" 4' -
0" 1' -
4 7 /8"
4' - 0"
9' - 9"
4 7 /8"
8' - 0"
4 7 /8"
15'
- 9
5/8
13'
- 7
3/8
4 7 /8"
5' -
3/4
4 5 /8"
4 7 /8"
6' -
3/4
4 7 /8"
2' - 0"
8' - 0"
4' - 0"
8' - 0"
9 1 /2"
1' - 10 1/4"
1' -
1/4
20'
- 7
3/8
4 7 /8"
8" 9' -
0" 14'
- 3 3/4
6' - 6 7/8" 5' - 10 7/8" 4' - 0" 5' - 9" 4' - 0" 5' - 4 7/8" 8' - 4 3/8"
KINETRON
WEIGHT
RACKS
EXERCISE MATEXERCISE MAT
EXERCISE MAT
EXERCISE MAT
TREATMENT
TABLE
TREATMENT
TABLE
TREATMENT
TABLE
TREATMENT
TABLE
DYNAVISION
COPIER COPIER
ST
AT
ION
AR
Y B
IKE
ST
AT
ION
AR
Y B
IKE
ST
AT
ION
AR
Y B
IKE
ST
AT
ION
AR
Y B
IKE
SC
I-F
IT B
IKE
COLD PACHOT PAC
ICE
MACHCO
LD
PA
C
HO
T P
AC
PARALLEL BARS
CEILING MOUNTED PATIENT LIFT SYSTEM
CEILING MOUNTED
SINGLE TRACK
PATIENT LIFT SYSTEM
CEILING MOUNTED PATIENT LIFT SYSTEM
NU
ST
EP
NU
ST
EP
EXERCISE RAMP
TR
EA
DM
ILL
WEIGHT
CART
TH
ER
AP
Y S
HE
LF
BTE
w / DATA EISOMETER
ENDORPHIN EXERCISE MAT
PULLEY
RICKSHAW
REBANDER
FLUIDS
TREATMENT TABLE
BIKE
ROWING MACHINE
BOW
FLEX
CARD
TABLE
TV
D3R
C3S
A1
C3
C3S
C3S
D3R
D3R
D3RD6R
D3R
C3A
C6S
D3R
C3A
C3A
C3A
C3S
A3
C6S
A3
D3R
C3S
C3S
A3
A3
C3A
C6
D3R
C3A
C3A
C6
C3A
A6A3
A2 A2
A2 A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
C6S
C3A
C3S
C3S
C3A C3S
E3R
A2
C3A
D3R
D3R
TUB
A2026
A20122
FEC
FEC
A201 15
A2
7' - 2"
4' - 0"
5' - 0 1
/2" 8' -
0"
A2
A2
1' - 10 1/4"
1' -
1/4
A2
D3R
C3S
E3R
A2 A2A2A2 A2
A2
A2
A2
A2
A2
A2 A2
A2 A2 A2 A2 A2 A2 A2 A0
A2
A2
A3
C3S
D3R
C6
C6
C3A
C3SC3SC3S C3S
A2
A2
A2
A2
E3R
E3R
D6R
C3S C3A
C3
A202
WALL MOUNTED
SMART TV CFCI
** * * * *A2 * cg cg cg cg cg cg cg cg cg cg cg cg cg cg cgcg cg cg cgcgcgcgcgcgcgcgcgcgcg cg cg cg cgcg cg cg cg cgcg cg cg cg cgcg cg cg cgcg cg cg cg cg cg cg cg cg cg cg
A3D3R
A202 1011
A20115
OPP
A2025 4
A2043
A2
A3
C2
A2 cg cg cg cg
A20214
EJ
EJ
EJ
EJ
1" EXPANSION JOINT
NE
W
FL
OO
RIN
G
EX
IST
ING
FL
OO
RIN
G
TO
RE
MA
IN
A2*
D3R
A0
A2
A2 *
1b
REPLACE EXISTING METAL PANEL
WITH MATCHING SPANDREL GLASS
EXP JT
A501
A501
A501
WALL MIRROR, GC TO
COORDINATE OPENINGS
TO ACCOMMODATE
OUTLETS & SWITCHES
WALL MIRROR
WALL MIRROR
WALL MIRROR
WALL MIRROR
A20117 16 sim
FEC
FEC
9.1
Fire Alarm 269.1
A204
A20419
A204 14
A20416
A301
251d
1111 Louisiana 26th Floor Houston, TX 77002
713.665.5665 phone . eypae.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
5190 Canal Boulevard, Suite 201 New Orleans, LA 70124 (504)835-8013
LACHIN
Architects, apc
Architecture . Planning . Project Management
C :\R ev it
L oc al \V
A In pa tie nt W ar d
2A _l ac hi n-ar ch ite ct s.
rv t
9/
/2
:0 6:
A
M
A104
LARGE SCALE PLAN
Michael G. Lachin
Renovate Ward 2A
1500 E. Woodrow Wilson Dr. Jackson, MS 39216
586-18-101
August 18, 2020 PF BB
FINAL SUBMISSION
1/4" = 1'-0"A104 1 Large Scale Plan − East
Revisions: Date:
KEY PLAN
* TERMINATE WALLS AT UNDERSIDE OF
WINDOW SILL, SEE DETAIL 2/A301
M
IC
HAEL G.
HCAL
IN
REG ISTE RED ARCHITECT
STATE OF
ISIUOL
713.665.5665 phone . eypae.com
F F
E E
D D
C C
A2013
A201
A201
A2019
25'
- 0
20'
- 0
25'
- 0
9b
Treatment
Treatment
Treatment
Student Room
Conference / Multipurpose
Patient Toilet 234 Treatment
Treatment
Splint Fabrication
OT Gymnasium
Storage
Cube Stations
Waiting Area
Supervisor
Cardio/Pulmonary
Sub-Wait
Patient Toilet
Treatment
Treatment
Break Room
Female Staff RR
EMG
Male Staff RR 231 Supervisor
EMG
Mechanical
Elect
Storage
Provider Workroom
Treatment
Treatment
Treatment
Scales
Nursing Workroom
Storage
Lymphedema/CVT
Clean Supply
Medication
Telecommunications
Chute
ADL
Corridor 200B
251d
9a
20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 24' - 10"
A401
A401
A401
A401
A401
A201 21
A201
A201 4
A201
A2016
A203
FEC
FEC
FEC
FEC
Storage
14'
- 5
1/2
4 7 /8"
6" 3' -
0" 6' -
7 5 /8"
3' - 8 1
/16
4' - 0"
1' - 4 7
/8" 4' -
0" 6' -
1/8
1' -
4 9 /16
4' -
0" 15'
- 2 7/1
6" 4' -
0" 4 3
/8"
6' - 0"
4 7 /8"
3' - 8 3
/4" 8' -
2 1 /16
4 7
/8" 11'
- 5 1/8
5 1
1/1 6"
4 7 /8"
11'
- 1
0 1 3/1
6" 4 7
/8" 11'
- 9
/16
6" 6"
6"
15'
- 7
1/4
7 1 /4"
8' - 0"
7 1 /4"
11'
- 2
4 7
/8" 8' -
7 3 /8"
4 5 /8"
4 7 /8"
8' - 0"
4 7 /8"
8' -
4 7
/8" 6' -
6 3 /4"
16' - 11 1/2" 4 7/8" 2' - 7 5/8" 5' - 4 3/8" 4 7/8" 8' - 0" 4 7/8" 5' - 9 7/8" 2' - 2 1/8" 4 7/8" 8' - 0 1/2" 4 7/8" 8' - 0" 11 5/8" 8' - 0 1/2" 10' - 8 1/4" 4 7/8" 10 3/8"
9' - 1 5/8" 4 7/8" 10' - 5 1/2" 8' - 2 1/4" 4 7/8" 7' - 0" 4 7/8" 7' - 7 1/2"
10' - 7 1/4" 7 1/4" 5' - 9" 4' - 2 1/16" 4' - 0" 10 1/2" 4' - 0" 7' - 11 1/4" 4' - 0" 10 1/2" 4' - 0" 8' - 0 9/16" 4' - 0" 6 7/8" 8' - 0" 3' - 0 3/4" 5' - 0" 4' - 6" 4' - 7 5/8" 4' - 0" 11' - 4 3/8" 2' - 10 7/16" 4' - 0" 5' - 6 1/2"
8' - 0" 9 1/2" 28' - 2" 4' - 0" 1' - 4 7/8" 4' - 0" 2' - 5 1/8" 11' - 2 1/2" 8' - 0" 9 1/2" 9' - 0" 3' - 6" 3' - 0" 3' - 0" 1' - 6" 1' - 0" 4' - 0" 19' - 10"
9 1/2" 9' - 6 7/8" 5' - 0 1/2" 4 7/8" 4' - 11 3/4" 12' - 8" 4 7/8" 6' - 11 1/8" 10' - 9 5/8" 4 7/8"
15'
- 7
1/4
7 1 /4"
8' - 0"
4 7 /8"
20'
- 9
1/4
4 7 /8"
8' - 0"
4 7 /8"
15'
- 9
5/8
4 7/8" 9' - 0" 4 7/8" 3' - 10 5/8" 4 7/8"
5' - 6 1/2" 7' - 0 1/4" 11' - 10 1/8" 4 7/8"
6' - 8 1/2"
6' - 4 7/8" 3' - 0" 2' - 1 1/8" 3' - 0" 5' - 6" 14' - 8 1/4" 3' - 0" 2' - 3 3/4" 11' - 2 1/2" 5' - 1 3/8" 3' - 0" 1' - 4 7/8" 3' - 0" 7' - 5 3/4" 11 1/2" 4' - 0" 4' - 9 15/16" 4 7/8" 7' - 11 3/16"
9 1/2" 4' - 5 3/8" 4' - 0" 11' - 6 5/8" 11' - 1 9/16" 4' - 0" 4' - 2" 4' - 0" 1' - 3 5/16" 4' - 0" 9' - 6 7/16" 4' - 0" 1' - 4 7/8" 4' - 0" 9' - 8 3/8" 4' - 0" 6 7/8" 8' - 0" 4 7/8" 14' - 7 11/16"
9' - 4" 4 7/8"
10' - 7 3/4" 15' - 8 5/16" 8' - 6 1/8" 9' - 0" 4 7/8" 6' - 4 11/16" 2' - 7 5/16" 4 7/8" 9' - 7 1/2" 4 7/8" 6' - 11 7/16" 1' - 4 9/16"
C3A
C3S
C6S
C3S
C3A
D3R
D3R
C3S D3R
C6S
D3R
C3S
C3A C3S
C3A
C6S
C3A
C3A
C3A
C6S
C3A
D3R
C3A C3S
C3S
C3S
A3
D3R
D3R
C6S
C3A
C3A
C6S
C3A
C3A
C3A
C3S
C6S
C3SC3A
C3S
C3A
C3A
C3S
C3S
C3S
A3
C3S
A0
A0
A0
A0
A2
A2
A2
A2
A2
A2 A2
A2
A2
A2
A2
A2
A2
A2
A2
C3S
C3A
C3S
C3S
A2
A2
C3A
C3A
A3
C3A
A3
A3
D3R
C3S
C3A D3R
C3A A1
A1
C3S
C6S
D6R
C6S D3R
C6SC6S
C3S
C6S
E3R
E3R
D3R
A401
Corridor 200E
Corridor 200F
Corridor 200H
Corridor 200G
M8
M8 M8
M8
D…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .