SOLICITATION 36C25621R0073_1.docx

DOCX document 132 KB Posted

Attached to
564-21-1-631-0001 - Project 564-22-107 - B-4 Replace Fan Coil Units
Solicitation number
36C25621R0073
Issued by

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C25621R0073 X 02-23-2021 564-21-1-631-0001 564-22-107 00502

ALEXANDRIA VA HEALTH CARE SYSTEM

NETWORK CONTRACTING OFFICE 16

VETERANS HEALTHCARE SYSTEM OF THE OZARKS

2575 N KEYSTONE CROSSING

FAYETTEVILLE AR 72703

DEPARTMENT OF VETERANS AFFAIRS

SEE INSTRUCTIONS TO OFFERORS

FELICIA LOVELADY

318-466-2912 Note: Any reference contained herein concerning "bid" or "bidder" means "offer" or "offeror".

This procurement is 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) under Public Law (PL) 109-461. Offerors must be verified as a SDVOSB in the VetBiz Vendor Information Pages (VIP at http://www.vetbiz.va.gov.

Offers received from contractors who are not SDVOSB verified in VetBiz will not be considered for award.

Federal Acquistion Regulations require that federal contractors register in the System For Award Management (SAM) database at https://www.sam.gov and enter all mandatory information into the system. Award cannot be made until the contractor has registered. Offerors are encouraged to ensure that they are registered in SAM prior to submitting a proposal.

Project: 564-22-107 Replace B4 Fan Coil Units Contractor shall provide all labor, materials and equipment necessary to replace Fan Coil Units in Building 4 at the Veterans Healthcare System of the Ozarks, Fayetteville, AR.

SITE VISIT: Please see information in solicitation provision FAR 52.236-27 SITE VISIT (CONSTRUCTION) ALTERNATE I.

Forward all questions to the Contracting Officer as specified in the General Proposal Information. All Q&A's will be posted by by amendment within 7 days after the due date of questions.

MAGNITUDE OF CONSTRUCTION PROJECT: In accordance with FAR 36.204 and VAAR 836.204 DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS, the above described project falls between the following price range:

Between $500,000 and $1,000,000

NAICS CODE: 238220 SMALL BUSINESS SIZE STANDARD:$16.5M

GEOGRAPHICAL AREA WHERE WORK IS TO BE PERFORMED: Fayetteville, Arkansas

****NOTE****OFFERORS MUST SUBMIT EXHIBIT A CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY AS A PART OF THE OFFER PACKAGE

IAW FAR 52.232-18, award is contingent upon the availability of appropriated funds. The Government does not compensate for proposal development and submission.

X X 52.211-10 X

2:00 PM

CST

03-23-2021 X

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

Department of Veterans Affairs Alexandria VA Medical Center 2495 Shreveport Hwy 71N Pineville LA 71360 Department of Veterans Affairs Financial Services Center (667) PO Box 149971 Austin TX 78714-9971

Table of Contents

PART I - THE SCHEDULE1
SECTION A - SOLICITATION/CONTRACT FORM1
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)1
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK2
SCHEDULE OF OFFER ITEMS5
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS6
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS7
GENERAL PROPOSAL INFORMATION7
PROPOSAL PREPARATION AND EVALUATION INFORMATION11
2.1 52.216-1 TYPE OF CONTRACT (APR 1984)18
2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014)18
2.3 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)18
2.4 52.228-1 BID GUARANTEE (SEP 1996)19
2.5 52.233-2 SERVICE OF PROTEST (SEP 2006)20
2.6 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)21
2.7 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)21
2.8 VAAR 852.209-70 ORGANIZATIONAL CONFLICTS OF INTEREST (OCT 2020)22
2.9 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)22
2.10 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)23
2.11 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018)23
REPRESENTATIONS AND CERTIFICATIONS24
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)24
3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (OCT 2020)28
3.3 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (JUL 2020)30
GENERAL CONDITIONS33
4.1 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (JUN 2016)33
4.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) ALTERNATE I (APR 1984)34
4.3 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2020)35
4.4 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (NOV 2020)35
4.5 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACTS (SEP 2013)38
4.6 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (JAN 2021)39
4.7 SUPPLEMENTAL INSURANCE REQUIREMENTS42
4.8 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)42
4.9 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)46
4.10 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018)46
4.11 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2019) (DEVIATION)46
4.12 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018)48
4.13 VAAR 852.223-71 SAFETY AND HEALTH (SEP 2019)49
4.14 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)50
4.15 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019)51
4.16 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)52
4.17 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) ALTERNATE I (APR 2019)52
4.18 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020)53
4.19 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019)55
4.20 VAAR 852.246-75 WARRANTY OF CONSTRUCTION—GUARANTEE PERIOD SERVICES (OCT 2018)56
4.21 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008)57
ATTACHMENTS58

SCHEDULE OF OFFER ITEMS

The Base Offer for CLIN 0001 includes all materials, labor, equipment and supervision to replace Building 4 Fan Coil Units at the Veteran Healthcare System of the Ozarks (VHSO) located in Fayetteville, AR. Work includes but is not limited to, replacement of the chilled water and hot water piping systems, the steam to hot water heat exchanger piping system, and the condensate piping system of Building 4. All work shall meet code and be performed in accordance with the contract and any applicable drawings and specifications. Bidders shall submit bids for all CLINs.

The government intends to make a single award on the Base Bid, CLIN 0001 without discussions to the offeror whose proposal conforms to the solicitation requirements and is determined to provide the "Best Value" to the Government in accordance with Federal Acquisition Regulation (FAR) Part 15. The Government reserves the right to cancel this action is in its entirety or to reject any or all offers if such action is in the Government's best interest.

PERIOD OF PERFORMANCE – 180 CALENDAR DAYS AFTER RECEIPT OF NOTICE TO PROCEED.

CLIN 0001: BASE OFFER ITEM - GENERAL CONSTRUCTION: The Contractor shall provide all necessary tools, labor, materials, equipment, permits, license, and supervision to “Replace B4 Fan Coil Units,” Project Number 564-22-107, located at the Veterans Healthcare System of the Ozarks in Fayetteville, AR, in accordance with the drawings and specifications. Work includes, but is not limited to, preparing the site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the replacement of the chilled water and hot water piping systems, the steam to hot water heat exchanger piping system, and the condensate piping system of Building 4.

CLIN 0001, Base Bid – General Construction: $______________________________ ** Offeror shall complete a price breakdown by Specification Divisions for each CLIN CLIN 0002: ALTERNATE NO. 1– Remove the condensate piping system MB1-04 Pump room. The undersigned hereby agrees to deduct from the Base Bid the sum of:

$ ___________________________ (New Total Amount: $___________________________)

CLIN 0003: ALTERNATE NO. 2– Remove the steam to hot water heat exchanger piping system in MB1-04 Pump room. The undersigned hereby agrees to deduct from the Base Bid the sum of:

$ ___________________________ (New Total Amount: $___________________________)

Page 1 of Page 1 of Page 1 of Page 1 of Page 1 of Page 1 of

CONTINUATION OF SF 1442 BLOCK # 17 CONTINUED

Project: 564-22-107 – REPLACE B4 FAN COIL UNITS

Date:

MATERIAL
LABOR
EQUIPMENT
TOTAL
DIVISION 01:
GENERAL REQUIREMENTS
DIVISION 02:
EXISTING CONDITIONS
DIVISION 07:
THERMAL & MOISTURE PROTECTION
DIVISION 22: PLUMBING
PLUMBING
DIVISION 23: HE
HEATING, VENTILATION, AND AIR CONDITIONING
DIVISION 26:
ELECTRICAL
DIVISION 27:
COMMUNICATIONS

SUBTOTAL COST:

GENERAL LIABILITY / INSURANCE:

OVERHEAD & PROFIT:

BOND:

PROJECT TOTAL COST:

Page 1 of

INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS

(a) All offer materials will be posted on https://beta.sam.gov/ (System for Award Management). No hard copies will be available.

(b) An offer guarantee is required in an amount not less than 20 percent of the offer price but shall not exceed $3,000,000. Failure to furnish the required offer guarantee in the proper form and amount, by the time set for opening of offers, will require rejection of the offer in all cases except those listed in FAR 28.101-4, and may be cause for rejection even then.

(c) The offeror to whom award is made will be required to furnish two bonds, a Performance Bond, SF 25, and a Payment Bond, SF 25A, each in the penal sum of 100% of the award amount.

(End of Clause)

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

GENERAL PROPOSAL INFORMATION

GENERAL PROPOSAL INFORMATION

Project: 564-22-107 Replace B4 Fan Coil Units Issuing Office: NCO 16 Location of Project: Veterans Healthcare System of the Ozarks, Fayetteville, AR Point of Contact: Felicia Lovelady, Contract Specialist, NCO 16 – Pineville, LA E-mail: Felicia.lovelady@va.gov

a. Service-Disabled Veteran-Owned Small Business Verification: This action is a 100% set aside for verified Service Disabled Veteran Owned Small Businesses (SDVOSB). The award of this solicitation shall not be delayed due to loss of SDVOSB verification. Proposals submitted by non-verified SDVOSB shall be excluded from award consideration. Offerors must be registered and verified as a SDVOSB in the VetBiz.gov Vendor Information Pages (VIP) at http://www.vetbiz.gov/. Offerors received from contractors who are not verified as a SDVOSB in VetBiz at the time of offer submission and at the time of contract award will be considered non-responsive and will not be considered for award.

b. SYSTEM FOR AWARD MANAGEMENT (SAM): SAM has replaced the Central Contractor Registration (CCR), Online Representations and Certifications Application (ORCA) and the Excluded Parties List System (EPLS). Federal Acquisition Regulations require that federal contractors register in the SAM database at https://www.sam.gov and enter all mandatory information into the system. Award cannot be made until the contractor has registered. Offerors are encouraged to ensure that they are registered in SAM prior to submitting their bid. Completion of Representations and Certifications shall consist of completion of annual representations and certifications electronically via SAM. It is not necessary to complete and return as a part of the offer package FAR 52.204-8, Annual Representations and Certifications, contained in this solicitation unless offeror identifies changes in FAR 52.204-8(d).

c. VETS-4212: Title 38, USC Section 4212(d) and Public Law 105-339, requires that federal contractors report, at least annually, the number and category of veterans who are within their workforce. This VETS-4212 report can be submitted per the instructions at https://www.dol.gov/agencies/vets/programs/vets4212. For assistance contact VETS-4212 customer support at 1-866-237-0275 or vets4212-customersupport@dolncc.dol.gov. For procurement awards in excess of $150,000, this report must be completed and accepted prior to any Federal contract award. Therefore, all potential contractors are encouraged to file every year.

d. Past Safety Record: VHA DIRECTIVE 2011-036 SAFETY AND HEALTH DURING CONSTRUCTION requires that Contracting Officers evaluate and consider past safety records of prospective contractors in awarding contracts. OFFERORS SHALL SUBMIT EXHIBIT C CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY AS A PART OF THE OFFER PACKAGE.

All offerors shall submit information pertaining to their past Safety and Environmental record using EXHIBIT C. The information must show that the offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA violation(s) in the past three years. If those totals are exceeded, the offeror shall attach an explain why and submit as much information as possible regarding the circumstances of its past safety and environmental record, including the number of EPA violations and/or the number of serious, repeat, and/or willful OSHA violations, along with a detailed description of those violations.

All offerors shall submit information regarding their current Experience Modification Rate (EMR). This information shall be obtained from the offeror’s insurance carrier and be furnished on the insurance carrier’s letterhead. If an offeror’s EMR is above 1.0, offeror must attach a written explanation of the EMR from its insurance carrier furnished on the insurance carrier’s letterhead, describing the reasons for the EMR, and the anticipated date the EMR may be reduced to 1.0 or below.

Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state run worker’s compensation insurance rating bureau.

If the NCCI cannot issue an EMR because the offeror lacks insurance history, offeror shall submit a letter indicating so from its insurance carrier furnished on the insurance carrier’s letterhead, and include a letter from the NCCI indicating that is has assigned offeror a Unity Rating of 1.0.

This requirement is applicable to all subcontracting tiers, and prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors

The above information, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases, will be used to make an initial Determination of Responsibility.

OFFERORS WHO FAIL TO SUBMIT EXHIBIT C AND THE ADDITIONAL REQUIRED INFORMATION AS A PART OF THEIR PROPOSAL PACKAGE WILL BE EXCLUDED FROM AWARD CONSIDERATION IF AWARD IS MADE WITHOUT DISCUSSIONS.

e. Site Visit: An organized site visit is scheduled as shown in clause 52.236-27. Only one site visit will be conducted. Attendance at the site visit is not mandatory, but highly suggested for proper proposal preparation. Information provided at the site visit shall not alter the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing.

f. Requests for Information (RFIs): RFI’s are due no later than (NLT) 2:00 PM CST Time March 8, 2021 or as amended and will not be accepted after this date. RFI’s should be submitted by email to the Contract Specialist, Felicia Lovelady at felicia.lovelady@va.gov. Responses will be provided by amendment to the solicitation in a question and answer format within 7 days of RFI submission due date. Subject Line of the RFI e-mail should be as follows: Company Name, RFI #1, 36C256-21-R-0073 and Project Title.

g. Proposal Due Date: Proposals are due NLT the date/time shown in Block 13a of Standard Form (SF) 1442. All proposals including scanned copies of bid bonds must be submitted by email to felicia.lovelady@va.gov copied to andres.apolinar@va.gov. Subject Line of the e-mail should be as follows: Company Name, Proposal #, 36C256-21-R-0073 and Project Title. One hard copy of the complete proposal including bid bonds must be mailed to:

Department of Veterans Affairs – NCO 16 Attn: Andres Apolinar 2575 N. Keystone Crossing Fayetteville, AR 72703

The hard copy and electronic copy of the proposal must be delivered by the closing date and time of the solicitation.

h. Magnitude of Construction: Pursuant to VAAR 836.204 the magnitude of construction is between $500,000.00 and $1,000,000.00.

i. North American Industry Classification (NAICS) code: The applicable NAICS code for this procurement is 238220 Plumbing, Heating, and Air-Conditioning Contractors. The Small Business size standard is $16.5 Million.

j. Wage Determination (WD): The applicable Davis Bacon WD for this solicitation is incorporated as an attachment to this solicitation.

k. Period of Performance: The successful offeror shall begin performance within 10 calendar days after receiving the notice to proceed and complete all work within the time specified in the award. All punch list items must be completed during the established period of performance.

l. Funding: Award is contingent upon the availability of appropriated funds. The Government does not compensate vendors for proposal development and submission.

m. Superintendence: The offeror shall provide, from his own staff, a competent 30 hour OSHA certified superintendent. This individual shall be 100% full time dedicated to supervision and assigned to this project while work is being performed on site. The offeror shall not divide or split up their superintendence duties among multiple projects at the same facility. Each project stands alone and requires a dedicated superintendent to be allocated and funded to that particular project.

n. Holidays: The following federal holidays are observed:

New Year's DayMartin Luther King Jr.’s BirthdayPresident's Day
Memorial DayIndependence DayLabor Day
Columbus DayVeterans DayThanksgiving Day Christmas Day

Any other holiday proclaimed by the President as a Federal Holiday.

When a holiday falls on a Sunday, the following Monday will be observed as a legal holiday. When a holiday falls on a Saturday, the preceding Friday is observed by U.S. Government agencies.

o. Contractor Performance Assessment Reporting System (CPARS):

Upon completion of contract performance and annually if performance is longer than 365 days, the Contracting officer will evaluate contractor performance for use in future contract award decisions. The Contractor shall be provided an opportunity to comment on the contracting officer’s evaluation. If you wish to familiarize yourself with this system, you can find it at https://www.cpars.gov/.

The government retains the evaluations, contractor responses, and review comments, if any, as part of the contract file. The evaluations are available for Federal Agencies for support of future award decisions through CPARS.

The contractor must provide the contracting officer with the name and email address of the contractor CPARS POC. This is the person responsible for responding to these evaluations. This person will be granted access to CPARS during the award and assigned the system role of contractor representative (CR).

36C25621R0073

PROPOSAL PREPARATION AND EVALUATION INFORMATION

This part describes the precise mechanism for evaluating and selecting offers for this procurement for:

PROJECT NO. 564-22-107 Replace B4 Fan Coil Units To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein. Proposals must be complete, self-sufficient, and respond directly to the requirements of this solicitation. Offerors are required to meet all solicitation requirements. The Government reserves the right to make a final determination on a proposal’s acceptability/ unacceptability solely on the basis of the proposal submitted and to proceed without requesting additional information. Failure to meet a requirement may result in an offer being removed from consideration for award.

Offerors must provide all requested information for each factor. Proposals must address each element of the factors as applicable to be considered responsive to this solicitation. Factor headings should be highlighted in yellow or typed in bold text for identification. It is the offeror’s responsibility to ensure the submitted proposal is in the proper format and the provided information is clear and free of ambiguities.

Offeror’s proposal should contain the offeror’s best terms from a price standpoint. Offerors are cautioned to submit sufficient information and in the format specified in the proposal instructions. Communication conducted to resolve minor or clerical errors would not constitute discussions and the Contracting Officer reserves the right to award a contract without the opportunity for proposal revisions or discussions.

Evaluations: - Factor 1 (Technical Factor) is more important than Factor 2 (Past Performance). All Non-Priced Factors (Technical and Past Performance), when combined, are more important than Price (Factor 3).

THE GOVERNMENT RESERVES THE RIGHT TO AWARD TO OTHER THAN THE OFFEROR WITH THE LOWEST PRICED PROPOSAL OR HIGHEST RATED TECHNICAL PROPOSAL. The source selection process will be a negotiated source selection process utilizing a tradeoff strategy for all non-price evaluation factors in accordance with FAR 15.101 and FAR 15.101-1 respectively. Offers will be evaluated using the evaluation factors listed. It is the offeror's responsibility to ensure the completeness of the proposal. The SSEB may evaluate solely on the information provided in the initial proposal and will not assume that an offeror possesses any capability that is not specifically identified in the proposal.

The objective of the source selection is to select the offer that represents the best value to the Government. In order to select the offeror representing the best value, the Government will rate the offers by conducting a comparative assessment of all acceptable offers against source selection criteria in the solicitation. Benefits associated with additional costs will be identified and considered by trading off difference in capability and price. If one offeror has better capability and lower price, then that will be the better value. If one offeror has the better capability and the higher price, then the source selection authority (Contracting Officer) will determine if the higher price is fair and reasonable. NOTE: Price will be evaluated but not ranked by CO.

b. If the source selection authority considers the better capability to be fair and reasonable, then the more capable higher-priced offeror will be the better value. If not, then a less capable, lower-priced offer will be considered. The source selection authority will continue to evaluate offers until they have determined which offeror represents the best value to the Government. Therefore, the source selection may result in the contract being awarded to other than the lowest priced offeror or other than the highest technically rated offer.

Proposal size will be limited as shown and font/size shall be no smaller than Times New Roman 11. If these page limits are exceeded, the pages in excess of the limit will not be read or considered. Page limits are for single sheets of paper and may be double-sided.

VOLTITLECOPIES PAGE LIMITS
ITECHNICAL PROPOSAL125*
IIPAST PERFORMANCE125*
IIIPRICE1Completed SF1442/SF1442 BACK with acknowledgement of amendments and completed Schedule of Offer Items

* EXHIBIT A PERFORMANCE RELEVANCY SURVEY and PAST AND PRESENT PERFORMANCE QUESTIONNAIRE does not count against the 25-page limit for Past Performance.

Basis for Contract Award:

Source Selection: This acquisition will be a “Best Value” source selection process utilizing a tradeoff strategy among cost/price and non-cost/price factors in accordance with FAR 15.101 and FAR 15.101-1 respectively. This process enables the government to consider other than the lowest priced offeror, or other than the highest technically rated offeror. The Government intends to award a single Firm-Fixed-Price contract for construction to the best overall proposal which is determined to be the best value to the Government.

Awarding Without Discussions: In accordance with FAR 52.215-1(f) (4), the Government intends to evaluate proposals and award the contract without discussions. Communication between the Government and offerors will be limited to exchanges for clarification as described in FAR 15.306(a). In accordance with FAR 15.306(b)(1)(i) communications may be held with offerors before establishment of the competitive range if the offerors past performance information is the determining factor preventing them from being placed with the competitive range. Such communications shall address adverse past performance information to which the offeror has not had a prior opportunity to respond. Any proposal that does not have a reasonable chance of receiving award may be accordingly eliminated from competition and further evaluation. A competitive range may be established if discussions are determined to be necessary by the Contracting Officer. Should the Contracting Officer determine that discussions are necessary, they will be held with only those offerors determined to be in the competitive range, after which final proposal revisions will be requested. Final proposal revisions shall be submitted as specified and will be due at a time and place to be determined. Firms submitting final proposal revisions will not be requested to re-submit any documents which are unchanged from their initial proposals. Offerors shall submit necessary changes as individual paragraphs or otherwise as briefly as possible, together with a table of contents, which clarifies where within the initial proposal additional or changed documents would be placed.

Relative Weight of Evaluation Factors: Evaluations: - Factor 1 (Technical Factor) is more important than Factor 2 (Past Performance). All Non-Priced Factors (Technical and Past Performance), when combined, are more important than Price (Factor 3).

EVALUATION FACTORS

Factor 1— Technical: Construction Management Technical Evaluation for Construction Management will be based on the following significant subfactors which are of equal importance:

SUBFACTORS:

Subfactor 1a. Corporate Construction Project Experience;

Subfactor 1b. Key Project Personnel Construction Experience; and Subfactor 1c. Technical/Management Approach (To Include Phasing) 1a. Corporate Construction Project Experience: The offeror shall demonstrate relevant corporate construction project experience, primarily involving large medical facilities and to include any projects that involved Phasing. Provide a list of projects successfully completed by the offeror of similar size, scope, and complexity (in a Hospital facility or similar working conditions) within the last 5 years of proposal issuance date.

1b. Key Project Personnel Construction Experience: Provide the names of the offeror’s proposed project management personnel (i.e. Site Superintendent, Project Manager,) along with a description of the individual’s experience and a list of successfully completed projects of similar size, scope, and complexity (in a Hospital facility or similar working conditions) within the last 5 years (recent) from proposal issuance date. Superintendent shall have a minimum of three (3) years of experience managing or supervising multiple projects of similar size and scope. If the person listed as proposed superintendent is not a current employee of the offeror but intends to become one upon award of the contract, OFFEROR SHALL SUBMIT A COPY OF A COMMITMENT LETTER FROM THAT PERSON AS A PART OF THE TECHNICAL PROPOSAL to verify offeror will be hiring him/her and he/she intends to accept the position.

1c. Technical/Management Approach (To Include Phasing): Contractor shall explain how the project will be accomplished with no interruptions of services in adjacent patient care areas. Contractor shall demonstrate a clear understanding of the project requirements including critical milestones and critical path. Demonstrate techniques for maintaining on-time schedule performance. Contractor shall provide a detailed explanation as to how the project will be implemented and managed to ensure compliance with all OSHA Construction Standards, and Fire and Life Safety issues, and security measures. Contractor shall provide a site-specific Quality Control Plan describing techniques for maintaining quality control for workmanship. In addition, contractor shall explain their understanding of Phasing on this project and how they plan to accomplish Phasing with minimal interruption to the Government.

In addition to the above, offerors shall provide a confirmation letter from an acceptable Surety, indicating their company’s bonding capacity and capability.

TECHNICAL EVALUATION FACTOR RATINGS: The SSEB will rate an offeror's Technical proposal at the factor level using the adjective ratings below that combines technical merit and proposal risk that most accurately defines the offeror's performance risk considering all subfactors identified in this section. The SSEB must establish overall team ratings by consensus and not by vote. If a consensus cannot be reached, the SSEB will provide the SSA with written majority and minority opinions. The SSA and/or SSEB Chair will ensure that none of the SSEB members have misinterpreted or misunderstood any aspects of the proposal prior to issuing the majority and minority opinions.

Rating
Description

Outstanding Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low.

Good Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.

Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.

Marginal Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high.

Unacceptable Proposal does not meet requirements and contains one or more deficiencies. Proposal is not awardable.

· Strength – Any aspect of a proposal that, when judged against a stated evaluation criterion enhances the merit of the proposal or increases the probability of successful performance of the contract.

· Weakness—A flaw in a proposal that increases the risk of unsuccessful contract performance.

· Deficiency—A material failure of a proposal to meet a Government requirement or a combination of weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.

2. Factor 2 — Past Performance:

The Offeror shall demonstrate recent (within the last five years from proposal issuance date) successful performance under contracts (ongoing or completed) which are similar in scope, magnitude, and complexity to the subject requirement via SUBMISSION WITH PAST PERFORMANCE PROPOSAL OF EXHIBIT A PERFORMANCE RELEVANCY SURVEY. SUBMIT EXHIBIT A ON NO LESS THAN THREE (3) PROJECTS, including information on problems encountered and corrective actions.

Past Performance Questionnaire – Offerors shall prepare and forward to prior client(s) for submission to the Contracting Office EXHIBIT B PAST AND PRESENT PERFORMANCE QUESTIONNAIRE for all the projects listed by contractor and submitted using EXHIBIT A PERFORMANCE RELEVANCY SURVEY. This includes correspondence explaining the requirement to obtain an independent evaluation of prior contract performance and the Past and Present Performance Questionnaire for use in evaluating Past Performance. It is preferred that these are the same projects for ease of evaluation and comparison.

Completed Past Performance Questionnaires shall be submitted to the Contracting Office so as to arrive not later than the closing date/time for receipt of proposals shown on the SF1442. Completed questionnaires shall be forwarded via email to felicia.lovelady@va.gov The subject line shall state 36C25621R0073 Past Performance for (Name of Company.) NOTE: Offeror shall not review the Past Performance Questionnaire prior to submission. Past Performance Questionnaire must be submitted by the client/evaluator directly to the Contracting Office. It is the offeror’s responsibility to follow up with their references to ensure that the Past Performance Questionnaires have been submitted by the offer due date to the Contracting Office. Any PPQs submitted directly to the Contracting Officer by the offeror or with the proposal submission will not be considered.

Again, Offerors should follow-up and encourage references to get the questionnaires to the Contracting Office by the time set for receipt of proposals. Do not include copies of the letters or questionnaires in the proposal.

The Government may evaluate Past Performance information through the use of Exhibit B completed by the offeror's references; use data independently obtained from other Government or commercial sources, including, but not limited to, Government databases; and/or rely upon personal business experience with the offeror. The evaluation may take into account Past Performance information regarding predecessor companies, key personnel who have relevant experience, and/or subcontractors that will perform major or critical aspects of the requirement when such information is relevant to this acquisition. Past Performance information on contracts not listed by the offeror, or that of planned subcontractors, may also be evaluated. The Government may contact references and contact parties other than those identified by the offeror, and information received may be used in the evaluation of the offeror’s Past Performance. While the Government may elect to consider data obtained from other sources, the burden of providing current accurate and complete Past Performance information rests with the offeror. The Government reserves the right to obtain and evaluate Past Performance information from any source it deems appropriate.

Offerors without a record of relevant past performance will be assigned a neutral rating in accordance with FAR 15.305(a)(2)(iv).

In accordance with FAR 15.306(a)(2), if award will be made without conducting discussions, an offeror may be given the opportunity to clarify certain aspects of their proposal (i.e. the relevance of an offeror's past performance information) as related to this acquisition, address adverse past performance information to which the offeror has not previously had an opportunity to respond or to resolve minor clerical errors.

Performance Currency, Trends, and Relevancy: The Government will consider the currency, trends and relevancy of the performance information while conducting its performance evaluation. For the purpose of this solicitation, performance currency is performance occurring within the last five (5) years from the proposal issuance date. Within this period, performance occurring later in the period may have greater significance than work occurring earlier in the period. For example, performance information for work occurring during March 2019 may have greater importance than performance information for work occurring during March 2017. Performance Trends may, depending upon the circumstances, have greater significance than sporadic incidents of "Exceptional" or "Unsatisfactory" performance. For the purpose of this solicitation, Performance Relevancy is defined as contracts (ongoing or completed) which are similar in scope, magnitude, and complexity to the current requirement. Higher relevancy will be assessed for contracts that are similar to the effort, or portion of effort, for which that contractor is being proposed, and may contribute to an overall higher relevancy score for the offeror. Based on the evaluation of offers, the Government will assign a performance confidence rating for each proposal at the factor level. Following assignment of the performance confidence rating for each proposal, each offeror will receive a final risk rating for performance based on the cumulative rating of performance currency, trends and relevancy.

The following Performance Relevancy definitions apply:

Rating
Definition
Very Relevant
Present/Past Performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant
Present/Past Performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant
Present/Past Performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant
Present/Past Performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

The following Performance Confidence Rating adjectives and related definitions will be used in the evaluation of Past/Present Performance:

Rating
Description
Substantial Confidence
Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence
Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.

Limited Confidence

Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.

No Confidence
Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will successfully perform the required effort.
Unknown Confidence (Neutral)
No recent/relevant performance record is available, or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.

Following assignment of the performance confidence rating for each proposal, each offeror will receive a final rating for performance based on the cumulative rating of performance currency, trends and relevancy. The SSEB must establish overall team ratings by consensus and not by vote. If a consensus cannot be reached, the SSEB will provide the SSA with written majority and minority opinions. The SSEB will ensure that none of the SSEB members have misinterpreted or misunderstood any aspects of the proposal prior to issuing the majority and minority opinions

3. Factor 3 — Price:

The purpose of the price evaluation is to provide an assessment of the completeness and reasonableness of the proposed price in relation to the solicitation requirements. Offerors shall submit pricing in the Schedule and on the SF1442 Back as a part of their price proposal. Price proposals will be evaluated to determine if the prices and support costs areas are:

(1) Complete – The proposal contains costs to perform all tasks required by the Scope of Work (SOW), Specifications, and Design Drawings if provided.

(2) Reasonable – The price is determined fair and reasonable using price analysis techniques described in FAR 15.404.

Each proposal will be evaluated to determine whether it complies with the stated criteria. Those proposals evaluated as not satisfying all the price criteria may be eliminated from consideration for award unless the SSA determines:

1. A minor clerical error has occurred, then the offeror may be given an opportunity to correct the minor error within the constraints of the "clarifications" process; or

2. After the non-price factors have been evaluated and rankings have been established, price will be compared against these rankings to determine the combination most advantageous to the Government. The evaluation of price will be based on each offeror’s price proposed.

BASIS FOR CONTRACT AWARD: The Government intends to award without discussions to the offeror whose proposal conforms to the solicitation requirements and is determined to provide the "Best Value" to the Government in accordance with Federal Acquisition Regulation (FAR) Part 15. The Government reserves the right to reject any or all offers if such action is in the Government's best interest.

2.1 52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

(End of Provision)

2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) (a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of Provision)

2.3 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of Provision)

2.4 52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—

(1) To unsuccessful bidders as soon as…