RFIs - 2.doc
DOC document 47 KB Posted
- Solicitation number
- 36C25621R0073
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT TO CANCEL - 36C25621R0073 0003.docx | DOCX document | |
| CHILLED WATER IMAGES.pdf | ||
| STEAM IMAGES.pdf | ||
| HEATING HOT WATER IMAGES.pdf | ||
| 36C25621R0073 0002.docx | DOCX document | |
| PRE-BID RFIs.docx | DOCX document | |
| SITE VISIT Sign In Fan Coil B4.pdf | ||
| 36C25621R0073 0001.docx | DOCX document | |
| 564-22-107_ B4 Replace AHU_Combined DWGS.pdf | ||
| WAGE DETERMINATION AR20210035 01-01-2021.pdf | ||
| 564-22-107_B4 Replace FCU_Combined Specifications (002) - REVISED.pdf | ||
| SOLICITATION 36C25621R0073_1.docx | DOCX document | |
| Current Parking Plan Visual.pdf | ||
| EXHIBIT B Past and Present Performance Questionnaire.docx | DOCX document | |
| EXHIBIT C CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY v2.docx | DOCX document | |
| 564-22-107_B4 Replace FCU SOW - revised.pdf | ||
| EXHIBIT A PERFORMANCE RELEVANCY SURVEY v2.docx | DOCX document | |
| 564-22-107_ B4 Replace AHU_Combined DWGS.pdf | ||
| 36C25621R0073.docx | DOCX document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT #
564-22-107
Replace B4 Fan Coil Units
Fayetteville, AR
DATE:
March 19, 2021 ITEM 2 – Bidding Requests For Information
| # |
| Reference |
| Question |
| Answer |
26.
| There appears to be some confusion with the previous RFI’s, specifically numbers 4, 5, 19. The contractors had requested the piping drawings for the replacement of the chilled water and hot water piping systems, but the answer from the VA was to field verify. |
| Drawing(s) of the existing piping do not exist. Contractor must be in accordance with SOW Section II. D. 8 and Contractor must field verify sizes and dimensions. RFI 4, 5, and 19 responses remain as stated. The Pre-bid site walk through allowed the Contractor(s) time to field verify sizes and dimensions. |
27.
| Are we adding isolation valves to each line as we complete this work to allow future maintenance and possible total replacement with the need to drain the entire facility? |
| Replace SOW Section II.D. 1.i) with “Install new heating hot water and chilled water shut-off valves at all branch piping (within 12 inches) from main piping.” |
28.
| For the base bid, it states: Work includes but is not limited to, replacement of the chilled water and hot water piping systems, the steam to hot water heat exchanger piping system, and the condensate piping system of Building 4. All work shall meet code and be performed in accordance with the contract and any applicable drawings and specifications. The drawings that are provided only show locations for FCU’s, VFDs, and Electrical Panels. The contractor is needing a drawing to show how much piping and valve that will be replaced. |
| Drawing(s) of the existing piping do not exist. Contractor must be in accordance with SOW Section II. D. 8 and Contractor must field verify sizes and dimensions. See RFI 4, 5, and 19 responses. The Pre-bid site walk through allowed the Contractors(s) time to field verify sizes and dimensions. |
29.
| What is the Contractor required to furnish for record (aka as-built) drawings? |
| Contractor must furnish record (aka as-built) drawings in accordance with the specifications. In addition, record drawings must include the following: |
1.
Revit (latest version) 3D model of MB1 Pump room and EB1 Transformer room.
2.
Autocad (latest version) Double line 2D model of MB1 Pump room and EB1 Transformer room at ½ inch per foot scale.
3.
Autocad (latest version) Single line 2D model of all other work at ¼ inch per foot scale.
30.
| Will the Government furnish photos in the MB1 Pump room of the Chilled Water, Heating Hot Water, and Steam piping systems? |
| Yes, see attached images. |