This solicitation is for an open MRI site preparation project at the Michael E. DeBakey VA Medical Center in Houston, Texas. The project includes specialized construction labor and supervision for architectural, mechanical, electrical, plumbing, medical gas, radiation protection, fire protection and demolition work. The contractor shall furnish all supervision, labor, material, tools, and equipment to prepare the site for the replacement of the existing Open MRI located on the 1st floor of building 100. The period of performance is 150 calendar days from notice to proceed. The estimated value is between $500,000 and $1,000,000. This is a 100% service-disabled veteran-owned small business set-aside acquired pursuant to the Veterans First Program. The selected firm must spend at least 15% of labor costs on disabled veterans. Offerors must be registered in the System for Award Management, Vendor Information Pages, and Representations and Certifications databases. The North American Industry Classification code is 236220 and the small business size standard is $39.5M in average annual receipts. Proposals are due within 90 days of solicitation issue with performance and payment bonds required from the awardee.

View the file

Other files

File Type Posted
GI-002 ICRA.pdf PDF
ASI-2 DECK INFILL.pdf PDF
M-101 MECH PLAN.pdf PDF
Ext-Window.pdf PDF
000110 TOC.pdf PDF
AD-101 DEMO PLAN-REV 1.pdf PDF
010000 Gen Reqs R1.pdf PDF
100-S164R.PDF PDF
ASI 1 RF WINDOW.pdf PDF
220511 common sprinkler.pdf PDF
100-S119R.PDF PDF
CASEWORK.pdf PDF
Site Visit Sign-In Sheet.pdf PDF
Dimplex MRI Chiller Installation Guide.pdf PDF
Open MRI Site Prep-ICRA.pdf PDF
36C25621R0066 0002.docx DOCX document
MD-101 MECH DEMO R1.pdf PDF
36C25621R0066 0001.docx DOCX document
580-18-119_Open MRI_Wage Determinaiton TX20210253 01_01_2021.pdf PDF
36C25621R0066.docx DOCX document
580-18-119_Open MRI_Site Visit Instructions.docx DOCX document
580-18-119 Project Specifications.pdf PDF
580-18-119 Project Drawings.pdf PDF
580-18-119_Open MRI_Statement of Work.docx DOCX document
580-18-119_Open MRI_SF24 BID BOND.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ferroguard Assure & MRISM Installation Checklist & Cut Sheet (Left Handle)

This document contains Metrasens proprietary information and all content is © Metrasens Ltd. 2019 Revision 7/7/20 Page 1 of 6.

Metrasens Inc | Lisle Business Center | 2150 Western Court, Suite 360 | Lisle, IL 60532 USA | Tel: +1 (630) 541-6509 | info@metrasens.com | www.metrasens.com mailto:info@metrasens.com http://www.metrasens.com/

This document contains Metrasens proprietary information and all content is © Metrasens Ltd. 2019 Revision 7/7/20 Page 2 of 6.

Metrasens Inc | Lisle Business Center | 2150 Western Court, Suite 360 | Lisle, IL 60532 USA | Tel: +1 (630) 541-6509 | info@metrasens.com | www.metrasens.com

This document contains Metrasens proprietary information and all content is © Metrasens Ltd. 2019 Revision 7/7/20 Page 3 of 6.

Metrasens Inc | Lisle Business Center | 2150 Western Court, Suite 360 | Lisle, IL 60532 USA | Tel: +1 (630) 541-6509 | info@metrasens.com | www.metrasens.com

This document contains Metrasens proprietary information and all content is © Metrasens Ltd. 2019 Revision 7/7/20 Page 4 of 6.

Metrasens Inc | Lisle Business Center | 2150 Western Court, Suite 360 | Lisle, IL 60532 USA | Tel: +1 (630) 541-6509 | info@metrasens.com | www.metrasens.com

This document contains Metrasens proprietary information and all content is © Metrasens Ltd. 2019 Revision 7/7/20 Page 5 of 6.

Metrasens Inc | Lisle Business Center | 2150 Western Court, Suite 360 | Lisle, IL 60532 USA | Tel: +1 (630) 541-6509 | info@metrasens.com | www.metrasens.com

Pre-Installation Actions & Requirements - to be completed by MR Facility electricians, before arrival of Metrasens Field Service Engineer:

1) MRI magnet ramped 100%. ☐

2) Site access arranged (badges, keys, host etc.) ☐

3) Contact name & number for MRI room access. ☐

4) Site contact for the installation process (if different then MRI contact). ☐

5) Contact for training provided (if different then MRI contact). ☐

6) Electrician name & contact cell phone number provided. ☐

7) Stepladder made available for Metrasens Engineer to access Hub in ceiling during Final Installation. ☐

8) Hub: 1 - Photograph must be provided to Metrasens ☐

a. Hub installed by an electrician above ceiling just above the Zone-4 entry door. ☐

b. AC power connected to Hub via Isolation Switch. ☐

c. AC power confirmed as working - the green light will illuminate when the Isolation switch is turned ON. ☐

9) Magnetic Sensor Units (a.k.a. ‘poles’): 2 - Photographs must be provided to Metrasens (1 - for the Left Side and 1 - for the Right Side) ☐

a. (1) 1.25” holes with conduit and pull strings on the-left side entry of the MRI doorway (No J-boxes). ☐

b. (1) 1.25” hole with conduit and pull string on the right-side entry of the MRI doorway (No J-boxes). ☐

c. Pull strings from left side & right-side pole cable holes installed through to Hub via conduit. ☐

d. Obstructions removed to allow poles to mount on wall (signs, switches, guard rails). ☐

10) ODAS Door Sensor: 1 - Photograph must be provided to Metrasens ☐

a. (1) 1.25” hole with conduit and pull string drilled - at 10" from Hinge side of door, NOT handle side, flush, no J-boxes. ☐

b. Pull string installed through to Hub (via conduit).

11) MRISM Touchscreen: 1 - Photograph must be provided to Metrasens ☐

a. (1) 1.25” hole with conduit and pull string drilled under control desk - flush, no J-boxes. A power outlet MUST be within 24” of the hole. ☐

b. Pull string installed through to Hub (via conduit) Unless cables are routed via surface mounted. ☐

c. Desk grommet present below touch screen mounting position. ☐

12) Door Entryway: 1 - Photograph must be provided to Metrasens ☐

a. Please be sure there is at least 4” of clearance on the left and right side of the MRI door near the corner edges of the door frame. ☐

13) Total Pictures provided to Metrasens – 6. ☐

14) Ferroguard units are onsite and unopened. ☐

*NOTE: If the Prework is not completed upon the arrival of the Metrasens installer, an additional Travel Fee of $3,000 will be assessed for a return visit.

This document contains Metrasens proprietary information and all content is © Metrasens Ltd. 2019 Revision 7/7/20 Page 6 of 6.

Metrasens Inc | Lisle Business Center | 2150 Western Court, Suite 360 | Lisle, IL 60532 USA | Tel: +1 (630) 541-6509 | info@metrasens.com | www.metrasens.com

MRI Contact

Name

Cell

Site contact for the installation process (if different then MRI contact)

Training Contact

Electrician

Security

Other Contact

ferro-det
Ferroguard Installation

File details come from the government source that posted it. Updated .