SPS Addendum No. 2.pdf

PDF 30 MB Posted

Attached to
Y1DA--Project No. 586-18-102 "Renovate for Expanded SPS" (VA-20-00011843)
Solicitation number
36C25620R0044_1
Issued by

About this file

This document provides details for a federal construction solicitation. The solicitation number is 36C25620R0044_1 and seeks construction services to renovate and expand the SPS facility under project number 586-18-102. The work will be performed for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16 and specifications can be found in the attachments. Offerors should review all attachments for full requirements and pricing terms. The response deadline has not been provided.

View the file

Other files

File Type Posted
36C25620R0044 0003.docx DOCX document
RFI Questions Renovate for Expanded SPS RFI (003).docx DOCX document
Wage Determination Jackson.txt TXT text file
Bid Schedule SPS.docx DOCX document
36C25620R0044 0002.docx DOCX document
Statement of Work.pdf PDF
36C25620R0044 0001.docx DOCX document
586-18-102 Addendum 0001 03.26..20.pdf PDF
PAST PERFORMANCE SURVEY SPS.docx DOCX document
Specifications.pdf PDF
Asbestos Spec--Jackson--February 2019--Large Projects.pdf PDF
Asbestos warning statement--Renovate for Sterile Processing_edit.pdf PDF
SPS Renovation Geotechnical Report.pdf PDF
SPS Renovations Combined Dwg Set.pdf PDF
36C25620R0044_1.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

06-17-20

11 71 01-4 - 1

SECTION 11 71 01-4

MOBILE STERILE PROCESSING SERVICE (SPS) TRAILER

PART 1 - GENERAL

1.1 DESCRIPTION

A. This Section described the requirements for a fully functional, mobile

SPS unit to support the immediate needs of the Hospital for either temporary or sustained operations.

B. Contractor shall include all costs necessary for installation as shown on the Contract Documents including, but not limited to, site/structure demolition, site development costs, utility installation, and any associated costs for the rent/lease and maintenance of the Mobile SPS unit for the duration of the Project until such time as the renovated

SPS space has been completed, accepted, and made operational.

1.2 RELATED WORK

A. Demolition of existing structure(s), as necessary.

B. Site grading and preparation.

C. Connection of all utilities.

D. Renovations to existing structure(s) for installation of Mobile SPS unit.

E. Coordination with Mobile SPS provider for all installation, testing, and commissioning prior to operations.

F. Site restoration and renovations to existing structure(s) following de-mobilization and removal of the Mobile SPS unit.

1.3 SUBMITTALS

A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT

DATA, AND SAMPLES.

B. Manufacturer's Literature and Data:

1. Description of Mobile SPS Unit, including all installation and utility requirements.

2. Maintenance Instructions: Submit manufacturer’s written instructions for recommended maintenance practices.

1.4 QUALITY ASSURANCE

A. Pre-Installation Conference:

1. Convene a meeting not less than thirty days prior to starting work.

2. Attendance:

a. Contractor

b. VA Resident Engineer

c. Project Architect

11 71 01-4 - 2

d. Project Engineer

e. Manufacturer and Installer's Representative

3. Review the following:

a. Requirements at the site for the Manufacturer’s Installer.

b. All site preparations, including utilities.

c. Scheduling.

d. Field safety and quality control.

e. Coordination with other work

B. Manufacturer’s Field Services: Manufacturer’s representative shall provide technical assistance and guidance.

PART 2 - PRODUCTS

2.1 DESCRIPTION

A. The STERIS Mobile SPD unit is the basis of design of the Construction

Documents, including civil, structural, the covered walkway, and all utility requirements/connections. Should the Contractor propose a standard unit by another manufacturer, the Contractor shall include any and all costs related to changes required to use another unit that is a functional equivalent, in the opinion of the Contracting Officer, including changes in the design by an Architect/Engineer registered in the State of Mississippi.

B. The mobile unit shall be a fully, self-contained SPS mobile unit including all required equipment and services for a fully functional

SPS Department.

C. Manufacturer shall have at least 2 factory trained representatives within a 1 hour drive of the VA Medical Center in Jackson, MS

D. The mobile SPS unit shall meet all of the current Criteria and guidelines of the Department of Veterans Affairs for medical device sanitation and SPS operations.

E. Mobile unit must fit in the designated area as shown on the Contract

Documents.

2.2 SYSTEM REQUIREMENTS

A. Mobile Sterile Processing unit that is easily transported and setup for temporary purposes. Unit should be fully compliant with all FGI, ASHRAE 170, TIR34, ANZI, VA and DOD design standards and requirements when in operation for design, HVAC, safety, surfaces and finishes. Unit should have all utilities fully engineered with single point connections for all utilities required for operation. Unit should come

11 71 01-4 - 3 with all significant equipment required to have a fully functional SPS department.

B. Manufacturer/System Provider past performance requirements:

1. Should have completed 40 plus dedicated sterile processing mobile deployments in North America.

2. Should have successfully completed VA / DOD mobile sterile processing deployments.

3. Should provide as part of its Mobile SPS solution:

a. Clinical consulting to aid with the operational workflow while using the Mobile unit:

1) Onsite visit to be prior to deploying the unit

2) Follow up go live onsite support

b. Inservice on all Mobile equipment as part of startup

c. Equipment service to include preventive and corrective maintenance on all equipment and the Mobile unit itself

d. Biweekly (at a minimum) status calls during deployment

C. System Chassis:

1. Mobile SPS that is a 1 to 3 expandable

2. Approximately 53 feet long by 22 feet wide when deployed

3. 3 axles

4. Single point connections with manifolds and pressure regulators for hot and cold water

5. Single point connection for drain

6. Single point connection for fire sprinkler system

7. 8 anchor points (2 per corner) that meets 10,000 lb tensile strength for wind / seismic ratings

E. Sterilization Equipment:

1. 1 – 120 inch 3 Well Sink with compressed air and pure water guns

2. 2 – Passthrough Washers Electric with a 35 min cycle or less and

4 transfer carts and manifolds

3. 1 - Pass Thru Window with power open and close

4. 1 - Sonic Cleaner with Da Vinci capability and baskets

5. 1 – Sonic Cleaner as second unit if required by client

6. 1 – Rack return

7. 4 – Prep and Pack tables with bins, computer holder and light

8. 2 – 36 inch Passthrough sterilizers with 4 loading carts/carriages

9. 1 - Low Temperature VHP Sterilizer

11 71 01-4 - 4

10. 2 - Steam Generators

11. 1 - Hot blow down tank for the steam generators

12. 1 – Critical pure water system that meets TIR34

13. 1 – System for monitoring equipment and environmental conditions remotely by cellular service

2.3 GENERAL CONSTRUCTION AND DESIGN

A. Design:

1. Mobile unit should be a 3-stage design in a single unit utilizing passthrough sterilizers and has the following dedicated space for:

a. Decontamination Vestibule

b. Decontamination

c. Prep and pack

d. Sterilizer Load

e. Sterilizer unload and cooling

f. Sterile vestibule

g. Mechanical space

2. Should have a wind rating for 110 MPH sustained

B. Floor Construction:

1. Homogenous with pattern from top layer to bottom.

2. All floor seams welded

3. Tightly sealed transitions over hinges of expandable panels.

4. Cove molding that is tight to the floor and wall.

C. Wall Construction:

1. Fire rated

2. High impact

3. Antimicrobial

4. No gaps or holes

D. Ceiling Construction:

1. Surgical grade ceiling tiles that are washable and cleanable

2. Clipped in or provide enough pounds per square inch to meet FGI guidelines

F. Sinks/Eyewash:

1. Solid surface countertops

2. Sink made of stainless steel or other nonporous material.

3. Eyewash single movement that meets ANSI requirements for time and temperature

G. HVAC System:

11 71 01-4 - 5

1. Dedicated HVAC unit for Decontamination

a. Maintain negative pressure relating to prep and pack and sterilization

b. Use 2 stage filtration that meets or exceeds ASHRAE 170

1) 6 air exchanges per hour

2) 2 external air exchanges per hour

3) 60 to 73 degrees

4) 10 to 55 percent humidity.

2. Dedicated HVAC for Sterilizer room

a. Maintain negative relationship to clean and sterile rooms

3. In duct humidifier system

PART 3 - EXECUTION

3.1 INSTALLATION

A. Utility rough-in for the Mobile SPS unit shall be by the contractor.

The installation/setting of the Mobile SPS unit shall be by the equipment manufacturer or manufacturer’s approved installation sub-contractor. Final connections shall be by the contractor. Testing and calibration of all equipment shall be by the equipment manufacturer or the manufacturer’s approved sub-contractor.

B. Provide all required mechanical, plumbing and electrical utility rough-in for the Mobile SPS unit according to manufacturer's requirements.

C. Coordinate installation with related mechanical and electrical work.

Provide cutouts and openings for plumbing and electrical work as indicated or as required by trades involved.

3.2 TESTS

A. All testing and adjustments shall be by the equipment manufacturer or the manufacturer’s approved testing sub-contractor.

B. Field test installed equipment after water and steam systems are pressurized for proper operation.

1. Operate each unit for six hours through repeated full cycles.

During and after testing, there shall be no evidence of leaks, overheating, electrical failure, or other symptoms of failure.

2. For units that fail testing, make adjustments and corrections to installation, or replace equipment, and repeat tests until equipment complies with requirements.

C. During the duration of the installation of the Mobile SPS unit, the manufacturer will provide all required maintenance and testing to

11 71 01-4 - 6 ensure equipment is functioning correctly. All maintenance and testing will be scheduled so as not to interfere with the required operations of the Mobile SPS unit. Required testing will be as documented by the manufacturer, but will include:

1. At start-up/commissioning:

a. Hardness, Total

b. Chloride

c. Copper, Dissolved

d. Iron, Dissolved

e. LAL/Endotoxin

f. Manganese

g. Heterotrophic Plate Count (Spread Plate)

h. Total Organic Carbon

i. pH

j. Conductivity

k. Color

l. Turbidity

m. Total Dissolved Solids

n. Temperature (Field)

o. Chlorine (Field)

p. Hardness (Field, Colorimetric Test Strip)

q. pH(Field, Colorimetric Test Strip)

2. Quarterly, following start-up/commissioning:

a. Heterotrophic Plate Count (Spread Plate)

b. Total Organic Carbon

c. pH

d. Conductivity

e. Color

f. Turbidity

g. Total Dissolved Solids

h. Temperature (Field)

i. Chlorine (Field)

j. Hardness (Field, Colorimetric Test Strip)

k. pH(Field, Colorimetric Test Strip)

3. Annually, following start-up/commissioning:

a. Hardness, Total

b. Chloride

c. Copper, Dissolved

11 71 01-4 - 7

d. Iron, Dissolved

e. LAL/Endotoxin

f. Manganese

3.3 PROTECTING AND CLEANING

A. Protect equipment from dirt, water, and chemical or mechanical injury during the remainder of the construction period.

B. At the completion of work, clean equipment as required to produce ready-for-use condition.

3.4 INSTRUCTIONS

A. Instruct personnel and transmit operating instructions in accordance with requirements in specification Section 01 00 00, GENERAL

REQUIREMENTS.

B. Training must be provided by the manufacturer or installer.

- - - E N D - - -

STERIS Mobile SPD Site Planning and Utility Connections Guide

800-548-4873 www.STERIS.com

VA Ja cks on MS

STERIS MOBILE SPD

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Introduction and Disclaimer

The purpose of this document is to provide the basic information needed for site planning. Please note that some STERIS Mobile SPD units have slight variations in dimensions, equipment layout, product portfolio, ancillary cooling packages and means of egress.

For specific unit information not contained in this document, please contact STERIS Corporation.

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Special Notes: 1. Prior to deployment, STERIS will perform a site visit and/or teleconference to review mechanical, electrical and plumbing (MEP) requirements with all parties involved to ensure a successful project.

2. Customer is responsible for all licenses, permits and any government approvals. Time spent to meet these requirements should be built into your master project schedule.

3. Customer is responsible to make all utility connections.

4. Power must be with 50’ of the front/nose of the unit, readily available upon unit arrival and all utilities must be stubbed out to the deployment location.

5. In the event power cannot be provided due to an emergency, STERIS will discuss alternative power options with generator support on a case by case basis.

6. STERIS can provide steps for entrance and exit, however, it is strongly recommended that the facility provides a deck or connecting corridor to transport instruments into and out of the unit. IMPORTANT – any connecting structure must be constructed AFTER the Mobile SPD arrives on site.

7. It is recommended that anchor tie downs are not placed until the Mobile SPD arrives. Although STERIS does not penetrate the ground, STERIS Installation Specialists will be on site and can provide guidance regarding tie down locations.

VA Ja

Pre-Deployment Activities

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Pre-Deployment Checklist

❑ Coordinate a site walk with STERIS and responsible parties

❑ Execute the STERIS rental agreement and provide a purchase order to reserve the unit

❑ Submit deployment plans/drawings to STERIS for final review

❑ Communicate with applicable state and local agencies regarding approvals and inspections

❑ Review mechanical, electrical and plumbing requirements with state and local agencies

It is important to ensure the following has occurred prior to the delivery of the Mobile SPD:

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Sample Mobile SPD Commission Schedule Provided by STERIS

VA Ja

Equipment Layout, Operational Flow and Facility Requirements

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Equipment Layout

NOTE: STERIS can provide steps for entrance and exit, however, it is strongly recommended that the facility provides a deck or connecting corridor to transport instruments into and out of the unit. IMPORTANT

– any connecting structure must be constructed AFTER the Mobile SPD arrives on site.

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Facility Requirements and Optional Packages

NOTE: See page 62 for information and power requirements pertaining to the

Cold Weather Insulation Package

NOTE: See page 63 for information and power requirements pertaining to the Ancillary Cooling PackageVA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Mobile SPD Operational Flow

Decontamination

Prep and Pack

Sterile Unload

Sterile loadVA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Mobile SPD Operational Flow Continued

Surgery case is completed

Place Instruments back in container and spray with transport gel such as PRE-

KLENZ™

Place dirty sets on dirty staging cart

Quick Turn?

Call SPD Manager and place dirty set on priority cart

Yes

No Pull instruments for cases

Transport dirty sets on dedicated dirty cart to SPD following LEAN delivery

Transport dirty sets to dirty holding

Enter vestibule and close outer door. Open inner door and unload dirty sets. Close inner door and wipe down cart per policy and standards.

Return cart to dirty side of surgery

Process instrument sets per Manufacturer IFU’s and policy

Wipe out containers per policy and work instructions and pass through the pass-through window.

Assemble the containers with appropriate sets. Inspect, assemble and wrap according to work instructions and procedures.

Sterilize instruments in either high or low temp sterilizer per manufacturers instructions.

Su rg e ry

Tr an sp o rt

SP

D Soiled Sterile

Transport sterile sets to Sterile Storage

Enter vestibule and close outer door. Open inner door and load cool sterile instrument sets in clean case cart. Close inner door and cover cart per policy and standards.

VA Ja

Site Preparation

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Operational Envelope

NOTE: The Mobile SPD requires a 70’L x30’W foot print for deployment and service access70’

30’

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Operational Envelope Driver Side View

NOTE: The Mobile SPD requires a 70’L x15’H foot print for deployment and service access

70’

15’

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Operational Envelope Passenger Side View

NOTE: The Mobile SPD requires a 70’L x15’H foot print for deployment and service access

70’

15’

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Operational Envelope Rear View

Measurements are based on expandable at 42" standard height

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

NOTE: 4’ x 8’ by 1” steel road plates are needed to support and distribute weight accordingly. STERIS can advise if these plates are NOT needed once a formal site visit is performed

Mobile SPD Weight Distribution

21,700 LBS TOTAL AT

REAR LEVELING GEAR

21,700 LBS TOTAL AT

FRONT LEVELING

FOOT

18,150 LBS TOTAL AT

REAR SUPPORTING

GEAR

Road Plates

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Touch Points and Weight Distribution PhotosNOTE: Total unit weight is approximately 70,000 lbs.

NOTE: If necessary, and based on individual site conditions, two 4’ x 8’ by 1” steel road plates may be needed. Plates provided by others.

Front Unit Stabilizers Rear Unit Stabilizers Rear Axle Stabilizers

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Unit Tie-Down Images and Requirements

Unit Anchoring / Tie Downs

- (8) at 5,000 lb. tensile capacity (2 each per corner)

- Locations are field specific

- Anchor points to be located on the ground at 30-45 degrees from the unit tiedown points

- STERIS will provide straps needed to secure the unit.

NOTE: STERIS does not penetrate the ground. The STERIS Mobile SPD Installation Specialist can provide guidance regarding the tie down locations once the unit arrives on site.

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Mobile SPD Anchor Point Locations

Side Tie Down

Location

Rear Tie Down

Location

Rear Tie Down

Location

Side Tie Down

Location

Side Tie Down

Location

Side Tie Down

Location

Front Tie Down

Location

Front Tie Down

Location

NOTE: It is recommended that anchor tie downs are placed after the Mobile SPD arrives. Although STERIS does not penetrate the ground, Installation Specialists will be on site and can provide guidance regarding tie down locations.

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Support Pad Recommendations

1) Minimum Support Pad Requirements:

A minimum support pad measuring 11’W x 47’L is recommended. The cross hatching shown on the following pages depicts the recommended support pad.

2) Support Pad Depth:

Recommendations for the width and length of the pad are given on the following pages. Based upon the weight distribution of the Mobile SPD and existing site conditions, the depth should be determined by a contractor.

3) Support Pad Levelness:

In order to ensure proper operation of the system, the support pad(s) must be level and the deviation shall not exceed ¼” in 10’.

4) Recommended Service Pad:

A full service pad measuring 25’W x 62’L is recommended. This will allow full service access to the Mobile SPD. The recommended service pad is illustrated on the following pages.

5) Vehicle Access:

A firm, level surface is recommended around the Mobile SPD in order to provide access to the site, access to the Mobile SPD and access to service the unit.

NOTE: When applicable, the Customer is responsible for providing a pad. If a pad is needed, the Customer is also responsible for performing calculations based on unit weight to determine the depth of the pad. VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Support Pad Recommendations Continued

NOTE: When applicable, the Customer is responsible for providing a pad. If a pad is needed, the Customer is also responsible for performing calculations based on unit weight to determine the depth of the pad.

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

NOTE: When applicable, the Customer is responsible for providing a pad. If a pad is needed, the Customer is also responsible for performing calculations based on unit weight to determine the depth of the pad.

Support Pad Recommendations Continued

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Maximum Pitch and Slope for Delivery

NOTE: The Customer is responsible for providing an appropriate delivery path and ramp to accommodate the Mobile SPD. VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Mobile SPD Height Thresholds

161 3/4

NOTE: Assuming level ground, minimum ground to trailer floor height is 42”, max ground to trailer floor height is 57”

Any increase in elevation above 51” will require the use of dunnage to raise the unit beyond the maximum height provided by hydraulic power.

STERIS will provide a maximum of 6” of dunnage to support a deployment max height of 57”

Standard ride height 42”

Standard Height with air ride 42” – 46”

Mobile SPD Deployment Accommodations

Standard ride height 42” (ground to interior floor)

Standard unit height with air ride system 42”- 46” (from ground)

Standard unit adjustment with hydraulics 42”- 51” (from ground)

STERIS provided dunnage (6”) 51” - 57” (from ground)

Deployments with a ground to door height greater than 57”

To be determined after initial site visit performed by STERIS

Shoring Blocks + 4”

+ 5”

+ 6”

VA Ja

I

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Connecting Corridor and Unit Delivery Protocol

Step 1:

STERIS Site Walk

Step 2:

Document Sharing (Customer to provide elevation drawings)

Step 3:

Unit Arrival

Step 4:

Connecting Corridor Construction Begins

Step 5:

Connecting Corridor

Construction Completes

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Sample Deck, Ramp and Connecting Corridor Photos

NOTE: The facility is responsible for engineering and constructing ramps, decks and connecting corridors that will connect to the unit.

Construction of these structures can begin prior to unit arrival, however, these structures are not to be completed until after the unit is on site.

During the design phase, please pay special attention to the door locations to ensure there is enough clearance for the SPD doors to align with the connecting structure.

NOTE: When designing a connecting corridor, the facility is responsible for constructing an extension over the unit and sealing the structure to ensure that water/snow does not penetrate this connecting area.

VA Ja

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Proper Site Preparation Procedure

NOTE: Deck elevations are required to be sent to STERIS for approval prior to unit arrival. Customer should not build the deck until after the unit arrives on site.

The Mobile SPD has the capability to raise and lower to meet various height challenges, however, the connecting structure must be built after unit arrival as there are limitations to the maximum height of the unit.

The connecting corridor should be constructed AFTER the Mobile SPD arrives on site as there must be enough room to expand the unit and ensure an exact alignment to the connecting structure. The structure must be built to the unit (STERIS will not manipulate the unit to align with a pre-existing structure).

VA Ja

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Connecting Corridor Bumper Protection

NOTE: Customer is responsible for ensuring the protection of the exterior of the SPD unit. When installing a deck/connecting structure, please incorporate a bumper or protective rail/barrier to prevent the unit from being damaged by transfer carts.

VA Ja

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Connecting Corridor and Weather Sealing

NOTE: It is the responsibility of the Customer/contractor to ensure that all connecting corridors are installed with a sealer/expansion foam. Installing this material will prevent leaks from enter the transition space between the corridor and the Mobile SPD.

Example of Proper Weather Seal

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Connecting Corridor Roof Extension

NOTE: When designing a connecting corridor, the facility is responsible for constructing an extension over the unit and sealing the structure to ensure that water/snow does not penetrate this connecting area.

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Mobile SPD Door Dimensions

NOTE: STERIS will provide information regarding which specific unit will be deployed for scheduled projects.

VA Ja

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

STERIS Storage Container

NOTE: A STERIS storage container travels with every Mobile SPD. This container is used to help transport the roll-around equipment while the unit is in transit.

This unit also holds various supplies that are used to support the unit throughout the deployment. It is important that this unit resides within close proximity to the Mobile SPD. STERIS will assess location areas for this container during the site visit.

92” Wide

99” Tall

240” Deep

VA Ja

Utility Connection Drawings and Connection Points

NOTE: Customer/contractor is responsible for all utility connections. STERIS Mobile Installation Specialists will be on site to provide guidance as needed.

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Plan View - Utility Connection Points

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Driver Side Utility Connection Points

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Passenger Side Utility Connection Points

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Front and Rear Utility Connection Points

Front Rear

Power Connections Sprinkler ConnectionVA Ja

Utility Connections Detail and Images

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Utility Connection Locations

6 7

Data Connections

HVAC Condensate Locations

Tie-Down Locations

Ground Point Connection

Power

Cold Water Connection

Hot Water Connection

Waste Water Connection

Fire Sprinkler Connection

Fire Alarm Connection

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

NOTE:

Facility/Contractor is responsible for making the final power connection from the Mobile

SPD to the disconnect.

Shoreline Cable: (2) 75’ lengths (provided)

Power Connection Images and Requirements Power 1

480VAC, 3-Phase, (2) 250 AMP

Configuration 4 wire (L1,L2,L3,G)

Frequency: 60hz

Facility end hard wired (Customer Connection Point)

Strain ReliefMale Connection (unit) Female Connection (shoreline)

NOTE: A Neutral is NOT needed in this configuration.VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Power Connection Images and Requirements Power 1

NOTE: Disconnect must be within 50’ of the front/nose of the unit.

Main 480V 3PH (2) 250 Amp Connection

- 2 75’ cables provided by STERIS

- Facility to provide disconnect

4 wire configuration (L1, L2, L3, G) No Neutral Required

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Power Load Calculations Power 1

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Power Load Calculations Continued Power 1

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Power Load Calculations Continued Power 1

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Power Connection Images and Requirements Power 1

Product Construction:

• Conductor:

• 8 AWG through 500 kcmil fully annealed stranded bare copper

• Insulation:

• Premium-grade, color-coded 90 C

EPDM

• Color code: see chart

• Jacket:

• Super Vu-Tron 90 C, black

• Temperature range: -40 C to + 90 C

• Jacket Marketing:

• Sizes smaller than 2-1/4” Carol

Super VU-Tron (size) Type W portable power cable (UL) 2000V dry 90 C wet 75 C sun res CSA (-40 C) FT-

5 P-7K-123049 MSHA

• Sizes 2-14” and larger – (size) type W Carol Super Vu-Tron 90 C dry and water resistant 75 C 2000V sun res (UL) P-7k-123049 MSHA LR27161

(Super Vu-Tron Multi-Conductor Type W Round)

90 C (UL) Type W 2000 Volt Portable Power Cable)

NOTE: Specifications may vary by unit. (Units 104-107 are 2/0 and units 108+ are 3/0

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Hot and Cold Water Supply Images and Requirements

Hot Water Supply Requirements

- 1 ¼ inch connection

- 300 GPH minimum at 40-60 psi

- Temperature: 140°F nominal

- Total hardness as CaCO3 120 PPM or less

- External lines must be facility protected.

Hot and Cold Water Supply Images and Requirements Cold Water Supply

Hot Water Supply

Cold Water Supply Requirements

- 1 ¼ inch connection

- 1,000 GPH minimum at 40-60 psi

- Total hardness as CaCO3 120 PPM or less

- Cold Weather Protection: Internal lines are weather protected.

- External lines must be facility protected

MCSSD Belly Boxes (Hot/Cold Water Access Point)

Water Manifolds (Customer Connection Point) 1 ¼ MPT Fresh - Water Fill Port - Hot and Cold

NOTE: The Customer is responsible for installing backflow preventers on the water lines coming into the Mobile SPD as required by local jurisdiction.

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Belly Box Waste Water Access Point

Waste Water Supply4

4” Waste Water Connection (Customer Connection Point)

Waste Water Images and Requirements

NOTE: Waste connection can be connected through the side of the belly box door or the bottom of the floor.

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Belly Box (Waste Water Exit Point) Waste Water Line to Drain (under unit)

Waste Water Line to Drain Location (External lines must be facility protected)

The maximum waste peak flow (with all equipment running at the same time) is equal to 631 gallons per hour (excluding water from the sinks which vary by rate of use.

Waste Water Supply4

Waste Water Images and Requirements

NOTE: Waste flow will vary depending on the frequency of equipment operation in the unit.

NOTE: It is highly recommended that a P-Trap be installed on the waste line to minimize the potential for foul odors.

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Driver Side View - Waste Drain Heights

Waste Water Supply4

(10”) FLOOR TO

CENTER OF DRAIN

(17 ¾”) FLOOR TO

CENTER OF DRAIN

NOTE: Two waste water connections are offered to accommodate for site specific slope and elevation.

NOTE: It is important to review the slope at specific site locations to ensure gravity can drive waste water removal.

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Fire Sprinkler Images and Requirements Fire Sprinkler5

Fire Sprinkler Requirements

- External lines must be facility protected

- Supply required:

Static 60 PSI Minimum Residual Pressure 50 PSI

2 inch Victaulic coupling

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Fire Alarm6

Fire Alarm System Drawing

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Fire Evacuation Plan

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Fire Extinguisher Locations

Fire extinguisher location

NOTE: There are three fire extinguishers provide with the Mobile SPD. There is one extinguisher in each vestibule, as well as a third “loose shipped” extinguished which is stored under the eye was sink the decontamination room.

ABC Type Dry ChemicalVA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Fire Alarm System Drawing Fire Alarm6

Fire Alarm Panel

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Fire Alarm Matrix

Facility Remote

Activation

Manual Pull Stations

Area Smoke/Heat

Detectors

Sprinkler Waterflow

Switch

Sprinkler Shut Off Tamper

Switch

Unit Power

Alarm Battery Back-Up

General Alarm System Errors

Alarm X X X X

Supervisory X

Trouble X X X

Activate Audio/Visual Alarm Signals Throughout Unit

X X X X

Unit Alarm Panel Tone and Signal X X X X

Export To Alarm Contact X X X X

Export To Supervisory Contact X

Export to Trouble Contact X X X

Fire Alarm6

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Fire Alarm Images and Requirements Fire Alarm

Fire Alarm Connection Customer Connection Point

RJ45 Fire Alarm Remote Dry Contacts

- Conventional analog fire alarm system with local audible-visual, horn-strobe alarm devices for occupant warning.

- Unit alarm system configured with:

- 2 zones with detection and pull stations

- 1 zone with supervisory tamper switch on sprinkler water control valve

- 1 zone for water flow switch on sprinkler system

- System exports trouble, supervisory and alarm conditions to three dry contacts available at the rear of the unit.

NOTE: The fire alarm system has no capability to repeat or react to external alarms or external PA systems.

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Data Images and Requirements Data Connections7

Data Connection Box Customer Connection Point

(Rear of Unit) Data Connection Box (Interior) Two RJ45 Connection Points

RJ45 Connections Provided Throughout the Unit

NOTE: Customer must extend their IT network to the Mobile SPD for their IT provided equipment.

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Data Connections Drawing Data Connections7

NOTE: RJ45 data connections are available at several locations throughout the unit to support network, voice and POTS (phone).

RJ45 Connection Locations

IT Switch Interior Connection

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

HVAC Condensate Images and Connections HVAC Condensate (4)8

Front of Unit

Heating and Cooling Connections/ HVAC Condensate Drain Terminations

- Nominal ¾” drain at front and rear of unit

Rear of Unit

NOTE: If condensate from the HVAC units is not captured, the condensate will drain to ground.

VA Ja

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Ground Point Images and Requirements Ground Point10

- Earth ground provided; installation per NEC Article 250

- (1) single point ground stud

- (1) 20’ ground cable with (2) clamps provided

VA Ja

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Cold Weather Package

Power Requirements

- Electrical Service: 240VAC, 2 pole, total of 80 amps, 60 HZ, Single Phase

- STERIS will supply (4) 4,000 watt 240V heaters with NEMA 6-30 plugs

- Customer is responsible to provide one 240V single phase 60 Hz 80 amp feed (hard wired to lugs in panel) to STERIS provided panel.

NOTE: When deploying the Mobile SPD in climates where the ambient temperature routinely drops and stays below 40 degrees Fahrenheit, the cold weather insulation package is a requirement.

NEMA 6-30 plug

STERIS Provided Heaters Customer Provided Power

Utility Connection Inside the Mobile SPD

VA Ja

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Ancillary Cooling Package

NOTE: The ancillary cooling package is required in locations where the heat index consistently exceeds 100 degrees.

Power Requirements

- Electrical Service: 480 VAC, 3-phase, 60hz

- (1) 30 AMP breakers

Unit Information STERIS will supply HVAC pre-cooling capability

- HVAC Pre-cool unit dimensions and weight:

- Width = 32”

- Length = 48”

- Height = 52”

- Weight = 685 lbs

VA Ja

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Sample Deployment Photos

VA Ja

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Sample Deployment Photos Continued

VA Ja

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 7 7-9-2019

Sample Deployment Photos Continued

VA Ja

F

3"x4" I BEAM

FRONT ELEVATION GATE (SIDE) ELEVATION

N OTTO SCAL E N OTTO SCAL E

A B C D

CAPACITY M OTOR GEAR CA BL ES CAGE

DRIVE WELDM ENT

1000# 1 HP 100:1 DUAL 1/4" 6061 AL

RATI O DIA. SS EXTRUSI ON

WELDM ENT

* ALL BOLTS ARE�" SS WITH WAS HERS AND NUTS (ALL HARDWARE IS 316 SS)

* F OR CARGO US E ONL Y. N OT F OR HUMAN TRANSP ORT

MAST

MAST

1/4"x8"x34" ALUMINUM

BAS E PLATE , LAG

BOLTED INTO C ONCRETE

3/8" SS BOLTS AND NUTS

3"x3" ANGL E BRACK ET

BOLTED TO MAST,

WELDED TO PLATE

MAST CONNECTION PLATE DETAILS

N OTTO SCAL E

© Copyright 2017 by Richard Peter Ramirez, LLC, Ua Ramirez Engineering. All rights reserved.

Federal copyright law prohibits unauthorized reproduction by any means and imposes significant fines for each violation.

E F G

MAST CAGE GUIDE

ROLL ERS PLATES

1/4"x3"x4" 3" DELRIN 1/4"x8"x44"

ALUMINUM ROLL ERS ALUMINUM

I- BEAM 4 P ER UNIT

GEARBOX & M OTOR ""

.. .. I

LIMIT SWITC H

Li (CAN BE

REL OCATED TO

OTHER S IDE OF

HEAD IF -

ADDITI ONAL

CL EARANC E IS -

N E EDED)

11 11

�----,.,5,4.25"�--�

STANDARD WIDTH BASKET

N OTTO SCAL E

c� f 8

'---F--.......,..,__

M INIMUM 2.5"

CL EARANC E FROM

STRUCTURE

4"x3"x1/4"

ALUMINUM MAST

16"x38"x18"

[;:;,V C ONCRETE

DROP PIT

1/4"x8"x34" ALUMI NUM � - BAS E PLATE

CARGO LIFT ELEVATION

N OTTO SCAL E

A

B

C

D

E

F

G

H

GALAXY UNLIMITED, LLC

DIMENSIONS

HAND RAIL HEIGHT 46"

OUTSIDE SIDE TO SIDE 54.25"

BACK OF BEAMS TO CAGE

FRONT ( OUTSIDE) 60.5"

BACK OF CAGE TO FRONT

OF CAGE ( OUTSIDE) 54.25"

BACK TO FRONT (INS IDE) 48.25"

BEAM WIDTH ( OUTSIDE) 32"

(C ENTER TO C ENTER) 29"

BACK OF P OWER HEAD TO

CAGE FRONT ( OUTSIDE)

FL O OR THICKN ESS

63.5"

4"

1/4"x8"x34" ALUM INUM BAS E

PLATE, LAG BOLTED INTO

C ONCRETE w/1/2"x4" SS

DROP WEDGE ANC HORS

AL TERNA TE BASE

N OTTO SCAL E

DUAL MAST 1000 LB.

CARGO LIFT

ARROW BRACE

N OTTO SCAL E

ANGLE BRACE

N OTTO SCAL E

STRUCTURAL ENGINEERING CERTIFICATION:

THE WIND LOAD FOR THIS FABRICATED LIFT AT GROUND LEVEL WILL

WITHSTAND A WIND LOAD OF 200 MPH, 3 SECOND WIND GUST PER IRC 2015

AND IBC 2015.

CARGO LIFT PLAN

A A

B B

Designer:

BS

Date:

5/13/2019

Project:

STD Basket Footprint

Voyager II

54.25

Basket Width

58.25

Minimum Centered Shaft Clearance with

Limit Switch Relocation Bracket

64.00

Standard Clearance in Centered Shaft

61.25

Standard NOT Centered Shaft Clearance

68.50

Front to

Back of

Motor

Protrusion

66.75

Front to

Back of

Footplate

62.75

Front to

Back of

Travel

Beams

54.25

Basket

Depth

* Motor, Gearbox and Limit switch may be "Clocked" or mirrored to the other side depending on the application. Based on a 54.25" x

54.25" Nominal

Basket Size.

DIYDIY

Installation GuideInstallation Guide

Galaxy Unlimited, LLCGalaxy Unlimited, LLC 6470 State Highway 1986470 State Highway 198

Mabank, TX 75156Mabank, TX 75156

(888) 317-7203(888) 317-7203 www.galaxylifts.comwww.galaxylifts.com

GALAXYGALAXY

Vertical Solutions in MotionVertical Solutions in Motion

Welcome to the Galaxy Unlimited family! We have created Welcome to the Galaxy Unlimited family! We have created this comprehensive user guide to assist you in the installation this comprehensive user guide to assist you in the installation of your new cargo lift. This guide is divided into sections to of your new cargo lift. This guide is divided into sections to help you find information quickly. Be sure to read all of the help you find information quickly. Be sure to read all of the included instructions before beginning the installation process. included instructions before beginning the installation process.

If at any time you do not feel comfortable in performing any If at any time you do not feel comfortable in performing any of the installation steps yourself, please contact your dealer to of the installation steps yourself, please contact your dealer to schedule a professional installation. Now, let’s get started!schedule a professional installation. Now, let’s get started!

READ and FOLLOW all…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .