36C25619R0073-004.pdf
PDF Posted
- Attached to
- 580-320 Construct Spinal Cord Injury Expansion Federal contract opportunity
- Solicitation number
- 36C25619R0073
About this file
36C25619R0073 ATTACHMENT C - Project Specifications Volume 2 - Dated 6-8-18 - 912 pages.pdf
View the file
Other files for this federal contract opportunity
Show all 50
580-320 Construct Spinal Cord Injury Expansion has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF VETERANS AFFAIRS
SPINAL CORD INJURY BED EXPANSION
at
Michael E. DeBakey VA Medical Center Houston, Texas
Project 580-320
PROJECT MANUAL
Volume 2 of 2
ISSUED FOR CONSTRUCTION
June 8, 2018
ATRIAX PLLC
Prime Contractor
Architecture: GLMV Architecture, Inc.
Structural Engineering: Matrix Structural Engineers, Inc.
Mechanical, Plumbing and Electrical Engineering: Garner-Fritsche Engineering, Inc.
580-320 Construct Spinal Cord Injury Expansion
ATTACHMENT C
Department of Veterans Affairs, 580-320: Spinal Cord Injury Bed Expansion at Michael E. DeBakey VA Medical Center, Houston, Texas
Issued for Construction
Issue Date: June 8, 2018
TOC Page 1 of 2 PROJECT TABLE OF CONTENTS
Department of Veterans Affairs
580-320 Spinal Cord Injury Bed Expansion
Michael E. DeBakey VA Medical Center
Houston, Texas
PROJECT MANUAL TABLE OF CONTENTS
Construction Documents Submission
See Cover for Issuance Date
*Asterisks denote unedited documents or documents prepared by the Government.
Note that all applicable documents are not necessarily included herein; a document’s presence in, or absence from, the Project
Manual is not evidence of its applicability or inapplicability.
Project Manual (PM) Cover
PM Title Sheet (Seals Page)
PM Table of Contents
DIVISION 00 – BIDDING AND CONTRACT REQUIREMENTS (VA)
DIVISIONS 01–13 – SEE VOLUME 1 OF 2
DIVISION 21 – FIRE SUPPRESSION
21 05 11 Common Work Results for Fire Suppression
21 10 00 Water-Based Fire-Suppression Systems
21 13 13 Wet-Pipe Sprinkler Systems
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing
22 05 23 General-Duty Valves for Plumbing Piping
22 07 11 Plumbing Insulation
22 11 00 Facility Water Distribution
22 13 00 Facility Sanitary and Vent Piping
22 40 00 Plumbing Fixtures
22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities
22 63 00 Gas Systems for Laboratory and Healthcare Facilities
Issued for Construction
Issue Date: June 8, 2018
TOC Page 2 of 2 PROJECT TABLE OF CONTENTS
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC
23 05 12 General Motor Requirements for HVAC and Steam Generation
Equipment
23 05 41 Noise and Vibration Control for HVAC Piping and Equipment
23 05 93 Testing, Adjusting, and Balancing for HVAC
23 07 11 HVAC and Boiler Plant Insulation
23 09 23 Direct-Digital Control System for HVAC
23 21 13 Hydronic Piping
23 31 00 HVAC Ducts and Casings
23 34 00 HVAC Fans
23 36 00 Air Terminal Units
23 37 00 Air Outlets and Inlets
23 40 00 HVAC Air Cleaning Devices
23 73 00 Indoor Central-Station Air-Handling Units
23 82 16 Air Coils
DIVISION 25 – INTEGRATED AUTOMATION
(Not Used)
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations
26 05 19 Low-Voltage Electrical Power Conductors and Cables
26 05 26 Grounding and Bonding for Electrical Systems
26 05 33 Raceways and Boxes for Electrical Systems
26 09 23 Lighting Controls
26 27 26 Wiring Devices
26 29 21 Enclosed Switches and Circuit Breakers
26 51 00 Interior Lighting
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations
27 05 26 Grounding and Bonding for Communications Systems
27 05 33 Raceways and Boxes for Communications Systems
27 15 00 Communications Horizontal Cabling
27 41 31 Master Antenna Television Equipment and Systems
27 51 16 Public Address and Mass Notification Systems
27 52 23 Nurse Call and Code Blue Systems
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security
28 05 13 Conductors and Cables for Electronic Safety and Security
28 05 26 Grounding and Bonding for Electronic Safety and Security
28 13 00 Physical Access Control System
28 23 00 Video Surveillance
28 26 00 Electronic Personal Protection System
28 31 00 Fire Detection and Alarm
— — — END — — —
Issued for Construction
Issue Date: June 8, 2018
21 05 11 - 1
SECTION 21 05 11 - COMMON WORK RESULTS FOR FIRE SUPPRESSION
PART 1 - GENERAL
1.01 DESCRIPTION
A. The requirements of this Section apply to all sections of Division 21.
B. Definitions:
1. Exposed: Piping and equipment exposed to view in finished rooms.
2. Option or optional: Contractor's choice of an alternate material or method.
1.02 RELATED WORK
A. Section 01 00 00, GENERAL REQUIREMENTS.
B. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
C. Excavation and Backfill: Section 31 20 00, EARTH MOVING.
D. Concrete and Grout: Section 03 30 00, CAST-IN-PLACE CONCRETE.
E. Building Components for Attachment of Hangers: Section 05 31 00, STEEL
DECKING. Section 05 36 00, COMPOSITE METAL DECKING.
F. Section 05 50 00, METAL FABRICATIONS.
G. Section 07 84 00, FIRESTOPPING.
H. Flashing for Wall and Roof Penetrations: Section 07 60 00, FLASHING AND
SHEET METAL.
I. Section 07 92 00, JOINT SEALANTS.
J. Section 09 91 00, PAINTING.
K. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL
COMPONENTS
L. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
1.03 QUALITY ASSURANCE
A. Products Criteria:
1. Standard Products: Material and equipment shall be the standard products of a manufacturer regularly engaged in the manufacture of the products for at least 3 years. See other specification sections for any exceptions.
2. Equipment Service: Products shall be supported by a service organization which maintains a complete inventory of repair parts and is located reasonably close to the site.
3. Multiple Units: When two or more units of materials or equipment of the same type or class are required, these units shall be products of one manufacturer.
Issued for Construction
Issue Date: June 8, 2018
21 05 11 - 2
4. Assembled Units: Manufacturers of equipment assemblies, which use components made by others, assume complete responsibility for the final assembled product.
5. Nameplates: Nameplate bearing manufacturer's name or identifiable trademark shall be securely affixed in a conspicuous place on equipment, or name or trademark cast integrally with equipment, stamped or otherwise permanently marked on each item of equipment.
6. Asbestos products or equipment or materials containing asbestos shall not be used.
B. Manufacturer's Recommendations: Where installation procedures or any part thereof are required to be in accordance with the recommendations of the manufacturer of the material being installed, printed copies of these recommendations shall be furnished to the Resident Engineer prior to installation. Installation of the item will not be allowed to proceed until the recommendations are received. Failure to furnish these recommendations can be cause for rejection of the material.
C. Guaranty: In GENERAL CONDITIONS.
D. Extended Guarantee Period Services:
1. Qualifications: All service technicians assigned to perform work under this contract shall be qualified and factory trained by the
Original Equipment Manufacturer (O.E.M.). Each technician shall have at least three years experience of working on comparable systems and shall be a full time employee of the contractor. The contractor shall furnish, for the Department of Veterans Affairs (VA) review and approval, resumes of all service technicians scheduled to service the equipment and systems. The resume shall include details of experience, training, and educational qualifications and performance evaluations.
2. Replacement Parts: The contractor shall be equipped with all replacement parts of all equipment and systems to be serviced and the manufacturer's standard service and repair procedures. All replacement parts shall be brand new and of current design. The replacement parts shall be O.E.M. items. Obsolete or refurbished parts are unacceptable. "Approved Equal" parts must have prior approval of the Contracting Officer. Contractor shall furnish evidence of guaranteed supply of parts for the life of the system.
3. Service Supplies: The services shall include, without any additional cost to the government, all replacement parts, special tools and equipment, and consumable materials, that is, lubrication oil, Issued for Construction
Issue Date: June 8, 2018
21 05 11 - 3 grease, and cleaning materials, as required. The requirement of UL listing, where applicable, shall not be voided by any replacement parts, components, software, or modifications provided by the contractor.
4. Scheduled and Emergency Call Service: The service shall include a scheduled monthly visit to perform systematic examination of equipment and/or systems and a 7 day, 24 hours call back service for emergency service. The emergency service is defined as a situation created by a breakdown or malfunction of any equipment or system warranting urgent attention. A qualified service representative shall respond to the VA request for emergency service within two hours and assess the problem either by telephone or remote diagnostic capability. If the emergency situation cannot be rectified by the VA personnel, on site emergency service shall be provided by sending a qualified service representative within 24 hours. For the rural locations of the VA medical centers, situated over 200 miles from the contractor's established service depot, the maximum response time of
48 hours shall be acceptable. The emergency service shall be limited to adjustments and repairs specifically required to protect the safety of the equipment for which the emergency service was required to be performed.
5. Licensing: The contractor shall be licensed to perform the contracted services. The contractor shall furnish details of all applicable local and state licensing requirements to VA as a part of the qualification requirements. The licenses shall be current, valid through the term of the contract and in the name of the contractor.
6. Documentation Requirements: The contractor shall maintain a separate log for each item of equipment and each system covered under the extended guarantee period service contract with the VA Medical Center
(VAMC) Engineering Service. The log shall list dates and times of all scheduled and emergency calls. Each emergency call shall be described with details of the nature and causes of emergency, steps taken to rectify the situations, and specific recommendations to avoid such conditions in the future.
7. Reports: The contractor shall provide a quarterly report for the first year and twice a year for the remainder of the guarantee period for all equipment and systems serviced under the extended guarantee period contract. The report shall clearly and concisely describe the services rendered, parts replaced, and repairs performed. The report
Issued for Construction
Issue Date: June 8, 2018
21 05 11 - 4 shall prescribe anticipated future needs of the equipment and systems for preventive and predictive maintenance.
8. Quality Program: The contractor shall provide a description of the quality management and control program. The description shall include a tangible proof the existence of such program, names of at least three customers who have participated in the program, and specific information showing the applicability of program to the project.
9. Training: During each scheduled service visit, the contractor shall actively involve the VAMC maintenance personnel in performing scheduled service and associated activities. The practical training during the scheduled service visits shall include parting oral and written instructions, for each specific task of the servicing contract, to the VAMC maintenance personnel who shall operate the hardware and software in accordance with the intent of the design and under direct supervision of the service contractor's qualified service technician. At the end of the first year of the service contract, the contractor shall obtain a certificate from the VAMC
Engineering Service confirming completion of training to the authorized VA representatives.
10. Classroom Training: Provide list and costs of available classroom training courses offered by contractor or O.E.M.
E. Supports for sprinkler piping shall be in conformance with NFPA 13.
F. Supports for standpipe shall be in conformance with NFPA 14.
1.04 SUBMITTALS
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Manufacturer's Literature and Data: Submit under the pertinent section rather than under this section.
1. Equipment and materials identification.
2. Fire-stopping materials.
3. Hangers, inserts, supports and bracing. Provide load calculations for variable spring and constant support hangers.
4. Wall, floor, and ceiling plates.
C. Coordination Drawings: Provide details of the following.
1. Interstitial space.
2. Hangers, inserts, supports, and bracing.
3. Pipe sleeves.
4. Equipment penetrations of floors, walls, ceilings, or roofs.
D. Maintenance Data and Operating Instructions:
Issued for Construction
Issue Date: June 8, 2018
21 05 11 - 5
1. Maintenance and operating manuals in accordance with Section 01 00
00, GENERAL REQUIREMENTS, Article, INSTRUCTIONS, for systems and equipment.
2. Provide a listing of recommended replacement parts for keeping in stock supply, including sources of supply, for equipment. Include in the listing belts for equipment.
1.05 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. National Fire Protection Association (NFPA):
13-16...................Installation of Sprinkler System (2016)
25-17 ..................Inspection, Testing, and Maintenance of Water
Based Fire Protection Systems (2017)
101-17..................Life Safety Code (2017)
C. Underwriters Laboratories, Inc (UL):
Fire Protection Equipment Directory (2017)
D. Factory Mutual Engineering Corporation (FM):
Approval Guide (2017)
PART 2 - PRODUCTS
2.01 LIFTING ATTACHMENTS
Provide equipment with suitable lifting attachments to enable equipment to be lifted in its normal position. Lifting attachments shall withstand any handling conditions that might be encountered, without bending or distortion of shape, such as rapid lowering and braking of load.
2.02 FIRESTOPPING
Section 07 84 00, FIRESTOPPING specifies an effective barrier against the spread of fire, smoke and gases where penetrations occur for piping.
2.03 GALVANIZED REPAIR COMPOUND
Mil. Spec. DOD-P-21035B, paint form.
2.04 PIPE PENETRATIONS
A. Install sleeves during construction for other than blocked out floor openings for risers in mechanical bays.
B. To prevent accidental liquid spills from passing to a lower level, provide the following:
1. For sleeves: Extend sleeve 25 mm (one inch) above finished floor and provide sealant for watertight joint.
2. For blocked out floor openings: Provide 40 mm (1-1/2 inch) angle set in silicone adhesive around opening.
Issued for Construction
Issue Date: June 8, 2018
21 05 11 - 6
3. For drilled penetrations: Provide 40 mm (1-1/2 inch) angle ring or square set in silicone adhesive around penetration.
C. Penetrations are not allowed through beams or ribs but may be installed in concrete beam flanges. Any deviation from this requirement must receive prior approval of Resident Engineer.
D. Sheet Metal, Plastic, or Moisture-resistant Fiber Sleeves: Provide for pipe passing through floors, interior walls, and partitions, unless brass or steel pipe sleeves are specifically called for below.
E. Cast Iron or Zinc Coated Pipe Sleeves: Provide for pipe passing through exterior walls below grade. Make space between sleeve and pipe watertight with a modular or link rubber seal. Seal shall be applied at both ends of sleeve.
F. Galvanized Steel or an alternate Black Iron Pipe with asphalt coating
Sleeves: Provide for pipe passing through concrete beam flanges, except where brass pipe sleeves are called for. Provide sleeve for pipe passing through floor of mechanical rooms, laundry work rooms, and animal rooms above basement. Except in mechanical rooms, connect sleeve with floor plate.
G. Brass Pipe Sleeves: Provide for pipe passing through quarry tile, terrazzo or ceramic tile floors. Connect sleeve with floor plate.
H. Sleeves are not required for wall hydrants for fire department connections or in drywall construction.
I. Sleeve Clearance: Sleeve through floors, walls, partitions, and beam flanges shall be one inch greater in diameter than external diameter of pipe. Sleeve for pipe with insulation shall be large enough to accommodate the insulation. Interior openings shall be caulked tight with fire stopping material and sealant to prevent the spread of fire, smoke, and gases.
J. Sealant and Adhesives: Shall be as specified in Section 07 92 00, JOINT
SEALANTS.
2.05 TOOLS AND LUBRICANTS
A. Furnish, and turn over to the Resident Engineer, special tools not readily available commercially, that are required for disassembly or adjustment of equipment and machinery furnished.
B. Grease Guns with Attachments for Applicable Fittings: One for each type of grease required for each motor or other equipment.
C. Tool Containers: Hardwood or metal, permanently identified for in tended service and mounted, or located, where directed by the Resident
Engineer.
Issued for Construction
Issue Date: June 8, 2018
21 05 11 - 7
D. Lubricants: A minimum of 0.95 L (one quart) of oil, and 0.45 kg (one pound) of grease, of equipment manufacturer's recommended grade and type, in unopened containers and properly identified as to use for each different application.
2.06 WALL, FLOOR AND CEILING PLATES
A. Material and Type: Chrome plated brass or chrome plated steel, one piece or split type with concealed hinge, with set screw for fastening to pipe, or sleeve. Use plates that fit tight around pipes, cover openings around pipes and cover the entire pipe sleeve projection.
B. Thickness: Not less than 2.4 mm (3/32-inch) for floor plates. For wall and ceiling plates, not less than 0.64 mm (0.025-inch) for up to 80 mm
(3-inch pipe), 0.89 mm (0.035-inch) for larger pipe.
C. Locations: Use where pipe penetrates floors, walls and ceilings in exposed locations, in finished areas only. Use also where insulation ends on exposed water supply pipe drop from overhead. Provide a watertight joint in spaces where brass or steel pipe sleeves are specified.
PART 3 - EXECUTION
3.01 INSTALLATION
A. Coordinate location of piping, sleeves, inserts, hangers, and equipment.
Locate piping, sleeves, inserts, hangers, and equipment clear of windows, doors, openings, light outlets, and other services and utilities. Follow manufacturer's published recommendations for installation methods not otherwise specified.
B. Protection and Cleaning:
1. Equipment and materials shall be carefully handled, properly stored, and adequately protected to prevent damage before and during installation, in accordance with the manufacturer's recommendations and as approved by the Resident Engineer. Damaged or defective items in the opinion of the Resident Engineer, shall be replaced.
2. Protect all finished parts of equipment, such as shafts and bearings where accessible, from rust prior to operation by means of protective grease coating and wrapping. Close pipe openings with caps or plugs during installation. Tightly cover and protect equipment against dirt, water chemical, or mechanical injury. At completion of all work thoroughly exposed materials and equipment.
C. Concrete and Grout: Use concrete and shrink compensating grout 25 MPa
(3000 psi) minimum, specified in Section 03 30 00, CAST-IN-PLACE
CONCRETE.
Issued for Construction
Issue Date: June 8, 2018
21 05 11 - 8
D. Install gauges, valves, and other devices with due regard for ease in reading or operating and maintaining said devices. Locate and position gauges to be easily read by operator or staff standing on floor or walkway provided. Servicing shall not require dismantling adjacent equipment or pipe work.
E. Work in Existing Building:
1. Perform as specified in Article, OPERATIONS AND STORAGE AREAS, Article, ALTERATIONS, and Article, RESTORATION of the Section 01 00
00, GENERAL REQUIREMENTS for relocation of existing equipment, alterations and restoration of existing building(s).
2. As specified in Section 01 00 00, GENERAL REQUIREMENTS, Article, OPERATIONS AND STORAGE AREAS, make alterations to existing service piping at times that will least interfere with normal operation of the facility.
3. Cut required openings through existing masonry and reinforced concrete using diamond core drills. Use of pneumatic hammer type drills, impact type electric drills, and hand or manual hammer type drills, will be permitted only with approval of the Resident
Engineer. Locate openings that will least effect structural slabs, columns, ribs or beams. Refer to the Resident Engineer for determination of proper design for openings through structural sections and opening layouts approval, prior to cutting or drilling into structure. After Resident Engineer's approval, carefully cut opening through construction no larger than absolutely necessary for the required installation.
G. Switchgear Drip Protection: Every effort shall be made to eliminate the installation of pipe above electrical and telephone switchgear. If this is not possible, encase pipe in a second pipe with a minimum of joints.
H. Inaccessible Equipment:
1. Where the Government determines that the Contractor has installed equipment not conveniently accessible for operation and maintenance, equipment shall be removed, and reinstalled or remedial action performed as directed at no additional cost to the Government.
2. The term "conveniently accessible" is defined as capable of being reached without the use of ladders, or without climbing or crawling under or over obstacles such as motors, fans, pumps, belt guards, transformers, high voltage lines, piping, and ductwork.
Issued for Construction
Issue Date: June 8, 2018
21 05 11 - 9
3.02 OPERATING AND PERFORMANCE TESTS
A. Prior to the final inspection, perform required tests as specified in
Section 01 00 00, GENERAL REQUIREMENTS, Article, TESTS and submit the test reports and records to the Resident Engineer.
B. Should evidence of malfunction in any tested system, or piece of equipment or component part thereof, occur during or as a result of tests, make proper corrections, repairs or replacements, and repeat tests at no additional cost to the Government.
C. When completion of certain work or system occurs at a time when final control settings and adjustments cannot be properly made to make performance tests, then make performance tests for heating systems and for cooling systems respectively during first actual seasonal use of respective systems following completion of work.
3.03 INSTRUCTIONS TO VA PERSONNEL
Provide in accordance with Article, INSTRUCTIONS, of Section 01 00 00, GENERAL REQUIREMENTS.
END OF SECTION
Issued for Construction
Issue Date: June 8, 2018
21 10 00 - 1
SECTION 21 10 00 - WATER-BASED FIRE-SUPPRESSION SYSTEMS
PART 1 - GENERAL
1.01 DESCRIPTION
A. The design and installation of a hydraulically calculated automatic fire sprinkler system complete and ready for operation, for the area to be renovated and the building addition.
B. The design and installation of a standpipe system combined with the sprinkler system.
C. Modification of the existing sprinkler systems as indicated on the drawings.
D. Existing piping to be reused, replaced or removed as indicated on the drawings. Removal of piping to include all valves, flow switches, supervisory devices, hangers, supports, and associated fire alarm system conduit and wire.
E. Provide access doors or panels where control or drain valves are located behind plaster or gypsum walls or ceilings as necessary to install piping above suspended plaster or gypsum ceilings.
F. Painting of exposed piping and supports to follow Section 09 91 00, PAINTING.
1.02 RELATED WORK
A. Treatment of penetrations through rated enclosures: Section 07 84 00, FIRESTOPPING.
B. Access panels for plaster ceilings: Section 08 31 13, ACCESS DOORS AND
FRAMES.
C. Painting of exposed pipe: Section 09 91 00, PAINTING.
D. Section 21 05 11, COMMON WORK RESULTS FOR FIRE SUPPRESSION.
E. Alarm Supervision: Section 28 31 00, FIRE DETECTION AND ALARM.
F. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
1.03 DESIGN CRITERIA
A. The design, materials, equipment, installation, inspection, and testing of the automatic sprinkler system shall be in accordance with the required advisory provisions of the latest editions of NFPA 13, 14, 20, 25, 75, 82, Exception to NFPA Fire Codes are as follows:
1. Sprinklers are not required in interstitial areas, except along AGV track systems if the vehicle is combustible.
Issued for Construction
Issue Date: June 8, 2018
21 10 00 - 2
B. Base system design hydraulic calculations using the area/density method on the following criteria and in accordance with NFPA 13 latest edition.
1. Sprinkler Protection:
a. All patient care, sleeping, treatment, office, waiting areas, educational areas, dining areas, corridors and attics: Light hazard, (0.10 gpm/sq. ft.) over the hydraulically most remote
140 m2 (1500 sq. ft.).
b. Patient Sleeping Rooms/Areas: Sprinklers with a residential listing shall be installed in accordance with their listed flows and pressures.
2. Add water allowance of 15 L/s (250 gpm) for inside and outside hose streams to the sprinkler requirements at the connection to the distribution main.
3. Hydraulic Calculations: The calculated demand including hose stream requirements shall fall no less than 10 percent below the available supply curve. The fire sprinkler contractor shall conduct a pressure and flow test on existing Building 100. The fire sprinkler hydraulic calculations shall be based on the existing conditions.
4. Existing Water Supply:
a. Static pressure:95 psi
b. Flow: 2262 gpm
c. Date: 5/16/2016
C. For each sprinkler zone provide a control valve, flow switch, self-contained test, drain assembly and pressure gauge.
D. Provide a separate sprinkler valve for each traction elevator machine room and other areas as required by NFPA 13 latest edition.
E. Provide a guard for each sprinkler in the janitors’ closets, the elevator machine room and sprinklers within 2100 mm (7 ft.) of the floor and other areas as required by NFPA 13.
F. Locate sprinklers in patient bedrooms assuming all privacy curtains have 13 mm (1/2 in.) openings in mesh extending 450 mm (18 in.) from ceiling.
1.04 QUALIFICATIONS:
A. Designer's Qualifications: Design work and shop drawings shall be prepared by a licensed engineer practicing in the field of Fire
Issued for Construction
Issue Date: June 8, 2018
21 10 00 - 3
Protection Engineering or a NICET (National Institute for Certification in Engineering Technologies) Level III sprinkler technician.
B. Installer's Qualifications: The installer shall possess a valid State fire protection contractor’s license. The installer shall provide documentation of having successfully completed three projects of similar size and scope.
C. On-site emergency service within four hours notification.
1.05 SUBMITTALS
A. Submit as one package in accordance with Section 01 33 23, SHOP
DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Sprinkler design shall be done by a certified professional. All plans shall be stamped by qualified P.E.
C. Emergency service point of contact name and 24 hour emergency telephone number.
D. Manufacturer’s Literature and Data:
1. Pipe and fittings.
2. Valves
3. Drips
4. Sprinklers-each type, temperature and model
5. Inspectors Test Alarm Modules
6. Sprinkler Cabinets
7. Sprinkler Plugs
8. Pressure Gauges
9. Pressure Switches
10. Pipe Hangers and Supports
11. Water Flow Switches
12. Valve Tamper Switches
E. Detailed drawings in accordance with NFPA 13. NFPA 25 latest editions.
Drawings shall be prepared using CADD software stamped by fire protection professional engineer and include all new and existing sprinklers and piping. Use format in use at the VA medical center.
Drawings are subject to change during the bidding and construction periods. Any wall and ceiling changes occurring prior to the submittal of contractor’s shop drawings shall be incorporated into the contractors detailed design at no additional contract cost.
Issued for Construction
Issue Date: June 8, 2018
21 10 00 - 4
F. Hydraulic calculations for each sprinkler system in accordance with
NFPA 13 latest edition.
G. Operation and Maintenance Data:
1. Water Flow and valve tamper switches
2. Alarm Valves
H. Recommended preventive maintenance schedule.
1.06 AS-BUILT DOCUMENTATION
A. A Mylar as-built drawing and two blueline copies shall be provided for each drawing. One copy of final CADD drawing files shall also be provided on 89 mm (3 1/2 in.), 1.44 mb diskette, for each drawing.
B. Four sets of manufacturer’s literature and data updated to include submittal review comments and any equipment substitutions.
C. Four sets of hydraulic calculations for each sprinkler system updated to include submittal review comments and any changes to the installation which affect the calculations including one electronic set in PDF format.
D. Four copies of the hydrostatic report and NFPA 13 material and test certificate for each sprinkler system.
E. Four sets of operation and maintenance data updated to include submittal review comments and any equipment substitutions including one copy of NFPA 25.
F. Manufacturers literature, hydraulic calculations, reports and operation and maintenance data shall be in a labeled 3-ring binder.
1.07 WARRANTY
A. All work performed, and materials and equipment furnished under this contract shall be free from defects for a period of one year from date of acceptance by the government.
B. All new piping and equipment incorporated into the new system shall be hydrostatically tested and warranted as new.
1.08 APPLICABLE PUBLICATIONS
A. Publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. National Fire Protection Association (NFPA)
13-2017 ................Installation of Sprinkler Systems
Issued for Construction
Issue Date: June 8, 2018
21 10 00 - 5
25-2017 ................Inspection, Testing and Maintenance of water
Based Fire Protection Systems
70-2017 ................National Electrical Code
72-2017 ................National Fire Alarm Code
170-2017 ...............Standards for Fire Safety Symbols
291-2017 ...............Fire Flow Testing and Marking of Hydrants
C. Underwriters Laboratories Inc. (UL)
2017 ...................Fire Protection Equipment Directory
D. Factory Mutual Engineering Corporation (FM)
2017 ...................Approval Guide
E. American Society for Testing and Materials (ASTM)
F442-17 ................Chlorinated Poly (Vinyl Chloride) (CPVC)
Plastic Pipe
F. Complete maintenance and inspection service for the sprinkler systems shall be provided by a factory trained authorized representative of the manufacturer of the major equipment for a period of one year after acceptance of the entire installation by the government.
G. Contractor shall provide all necessary test equipment, parts and labor to perform required maintenance.
H. All inspections, testing and maintenance work required by NFPA 25, NFPA
13 and recommended by the equipment manufacturer shall be provided.
Work shall include operation of sprinkler system alarm and supervisory devices.
I. Maintenance and testing shall be performed on a quarterly basis. A computerized preventive maintenance schedule shall be provided and shall describe the protocol for preventive maintenance of equipment.
The schedule shall include a systematic examination, adjustment, and cleaning of all equipment.
J. Non-included Work: Maintenance service shall not include the performance of any work due to improper use, accidents or negligence for what the contractor is not responsible.
K. Service and emergency personnel shall report to the Engineering Office or their authorized representative upon arrival at the hospital and again upon the completion of the required work. A copy of the work ticket containing a complete description of work performed and parts replaced shall be provided.
Issued for Construction
Issue Date: June 8, 2018
21 10 00 - 6
L. Emergency Service:
1. Normal and overtime emergency call-back service shall consist of an on-site response to calls within four hours of notification.
2. Overtime emergency call-back service shall be limited to minor adjustments and repairs to affect the integrity of the system.
3. The fire pump and all but a single sprinkler system must be operational before the responding service person leaves the facility.
M. The contractor shall maintain a log at the fire pump controller. The log shall list the date and time of all examinations and trouble calls, condition of the system, and name of technician. Each trouble call shall be fully described, including the nature of the trouble, necessary correction performed, and parts replaced.
PART 2 - PRODUCTS
2.01 GENERAL
All devices and equipment shall be Underwriters Laboratories Inc.
listed for their intended purpose. All sprinklers shall be Factory
Mutual approved.
2.02 PIPING AND FITTINGS
A. Pipe and fittings from inside face of building 300 mm (12 in.) above finished floor to a distance of approximately 1500 mm (5 ft.) outside building: Ductile Iron, flanged fittings and 316 stainless steel bolting.
B. Fire Protection water supply within the building up to sprinkler system isolation valves shall be per NFPA 13, black steel, schedule 10 minimum.
C. Sprinkler piping downstream of the isolation valve on wet-pipe systems shall be per NFPA 13, black steel, schedule 10 minimum.
D. Threaded or flanged fittings shall be ANSIB1 6.3 cast iron, class 125 minimum. Threaded fittings are not permitted on pipe with wall thickness less than schedule 40.
E. All fittings on galvanized piping shall be galvanized in accordance with ASTM A53.
F. Slip type or clamp-on type rubber gasketed fittings shall be listed for each piping application.
G. Piping Materials Standards:
Issued for Construction
Issue Date: June 8, 2018
21 10 00 - 7
1. Ferrous piping – follow ASTM A 795 Standard
2. Welded and seamless steel pipe – follow ANSI/ASTM A 53
3. Wrought steel pipe – follow ANSI/ASME B36.10M
4. Electric resistance welded steel pipe – follow ASTM A 135
5. older metal, 95-5 - follow ASTM B 32
6. Alloy material - follow ASTM B 446
7. Non-metallic piping CPVC pipe - follow ASTM F 442
H. Fitting Materials Standards:
1. Cast iron threaded fitting, Class 125 and 250 - follow ASME B16.4
2. Cast iron pipe flanges and flanged fittings - follow ASME B16.1
3. Malleable iron threaded fittings, Class 150 and 300 steel - follow
ASME B16.3
4. Factory made wrought steel buttweld fittings - follow ASME B16.9
5. Buttwelding ends for pipe, valves, flanges, and fitting - follow
ASME B16.25
I. Pipe Identification – All pipe, including specially listed pipe allowed by NFPA 13, shall be marked continuously along its length by the manufacturer in such a way as to properly identify the type of pipe.
Pipe identification shall include the manufacturer’s name, model designation, or schedule.
2.03 VALVES
A. Listed Indicating Valves:
1. Gate: OS&Y, 2400 kPa (350 psi) Water Working Pressure (WWP).
2. Ball (inspectors test and drain only): iron body, stainless steel trim, for 2050 kPa (300 psi) service, indicating type.
B. Check Valves: Swing type, rubber faced, or wafer type spring loaded butterfly check valve, 2400 kPa (350 lb.) water working pressure (WWP).
C. Alarm Check: Iron body, bronze mounted, variable pressure type with retarding chamber. Provide basic trimmings for alarm test by pass, gauges, drain connections, mounting supports for retarding chamber, and drip funnel. Provide pressure sensitive alarm switch to actuate the fire alarm system.
D. Drain Valves: Threaded bronze angle, globe, ball or butterfly, 4100 kPa
(600 psi), Water or gas (WOG) equipped with reducer and hose connection with cap or connected to a drain line.
E. Self-contained Test and Drain Valve:
Issued for Construction
Issue Date: June 8, 2018
21 10 00 - 8
1. Ductile iron body with bronze “Drain” and “Test” bonnets. Acrylic sight glass for viewing test flow. Various sized orifice inserts to simulate flow through 14 mm (17/32 in.), 13 mm (1/2 in.), 12 mm
(7/16 in.), and 10 mm (3/8 in.) diameter sprinklers, 32 mm
(1 1/4 in.) female threaded outlets or 32 mm (1 1/4 in.) one-quarter turn locking lug outlets for plain end pipe (end preparation to be in accordance with manufacturer’s recommendation).
2. Bronze body, with chrome plated bronze ball, brass stem, steel handle, Teflon seat and sight glasses. Provide valve with three position indicator plate (off, test, and drain), 6 mm (1/4 in.)
tapping for pressure gauge and various other orifice inserts to simulate flow through 10 mm (3/8 in.), 12 mm (7/16 in.), 13 mm
(1/2 in.), and 14 mm (17/32 in.) diameter sprinklers.
2.04 SPRINKLERS
A. Quick response sprinklers shall be standard type except as noted below.
The maximum distance from the deflector to finished ceiling shall be
50 mm (2 in.) for pendent sprinklers. Pendent sprinklers in finished areas shall be provided with semi-recessed adjustable screwed escutcheons and installed within the center one-third of their adjustment. The sprinkler shall be installed in the flush position with the element exposed below the ceiling line. At the specified locations, provide the following type of sprinklers. All sprinklers except
“institutional” type sprinklers shall be FM approved. Provide quick response sprinklers in all areas, except where specifically prohibited by their listing or approval, and the following:
Issued for Construction
Issue Date: June 8, 2018
21 10 00 - 9
LOCATION TYPE
Mechanical Equipment Rooms, Electrical & Electrical Switch Gear Rooms
Quick Response, Upright or Telephone Closets, Transformer Vaults Pendent Brass [93 °C (200 °F)]
Elevator Shafts, Dumbwaiter Shafts, Elevator Machine Rooms, Elevator Pits
Standard Upright or Sidewall Brass [93 °C (200 °F)]
Gravity Type Linen & Trash Chutes Standard Upright or Pendent Brass [66-74 °C (150-165 °F)]
Warehouse [Storage under 3600 mm (12 ft.)]
Quick Response, Pendent or Upright, Brass [77-74 °C (150- 165 °F)]
Warehouse [Storage over 3600 mm (12 ft.)]
See NFPA 13
Cold rooms, Freezers, Controlled Temperature Rooms and Unheated Areas
Standard Pendent, Dry Type [66- 74 °C (150-165 °F)]
Kitchen Hoods, Exhaust Ducts & Duct Collars
Standard Pendent or Upright (Extra High Temperature [163-191 °C (325- 375 °F.)]
Generator Rooms Standard Pendent or Upright [141 °C (286 °F)]
Mental Health and Behavioral Unit:
Nursing Bedroom, Toilets and all areas with plaster/ dry wall ceilings within the area
Institutional Quick Response;
Chrome plated with 85 lb.
breakaway, Pendent, Horizontal Sidewall [66-74 °C (150-165 °F)]
Patient Sleeping, Patient Bathrooms, and Corridors within a Patient Ward
Residential, Quick Response, Recessed Pendent, Chrome Plated, [66-74 °C (150-165 °F)]
All Patient Treatment, Elevator Lobbies and Corridors
Quick Response, Recessed Pendent, Chrome Plated [66-74 °C [150- 165 °F)]
Operating Rooms, Radiology Rooms, Nuclear Medicine Rooms
Quick Response, Recessed Pendent, Chrome Plated, Sidewall [66-74 °C (150-165 °F)]
All Areas Not Listed Above Quick Response, Recessed Pendent, Sidewall, Chrome Plated [66-74 °C (150-165 °F)]
B. Do not use quick response sprinklers in the same sprinkler zone with other sprinklers types. In sprinklered light hazard patient zones that
Issued for Construction
Issue Date: June 8, 2018
21 10 00 - 10 are expanded into fully sprinklered zones, revise the existing system to contain quick response sprinklers.
C. Sprinklers to be installed as per NFPA 13.
2.05 TOOLS AND REPLACEMENT PARTS
A. Sprinkler Cabinet:
1. Provide a minimum 5 percent spare sprinkler with escutcheons with a minimum of two of each type/or as required by NFPA-13, whichever is more demanding.
2. Provide a minimum of two of each type sprinkler wrenches used.
3. Install cabinets in each building where directed by the Resident
Engineer.
4. Spare sprinklers shall be kept in a cabinet where ambient temperatures do not exceed 100 Deg F.
B. Sprinkler system water flow switch: one of each size provided.
C. Sprinkler system valve tamper switch: one of each type provided.
D. Sprinkler system pressure switch: one of each type provided.
E. Provide two sprinkler plugs attached to multi-section extension poles
2400 mm (8 ft.) minimum.
2.06 IDENTIFICATION SIGNS
Provide for all new and existing sectional valves, riser control valves, system control valves, drain valves, test and drain connections and alarm devices with securely attached identification signs (enamel on metal) in accordance with NFPA 13.
2.07 HANGERS AND EARTHQUAKE BRACING
In accordance with NFPA 13 and 14. Comply with seismic requirements as per 15050 for seismic zone locations.
2.08 WATERFLOW SWITCHES
A. Integral, mechanical, non-coded, non-accumulative retard type, with two sets of SPDT auxiliary contacts and adjustable from 0 to 90 seconds.
Set flow switches at an initial setting between 20 and 30 seconds.
B. All conduit and wiring connected thereto shall be provided in Section
28 31 00, FIRE DETECTION AND ALARM.
2.09 VALVE SUPERVISORY SWITCHES
A. Provide each indicating sprinkler, standpipe and fire pump control valve with adequate means for mounting a valve supervisory switch.
Issued for Construction
Issue Date: June 8, 2018
21 10 00 - 11
B. Mount switch so as not to interfere with normal operation of the valve and adjust to operate within two revolutions toward the closed position of the valve control, or when the stem is moved no more than one fifth of the distance from its normal position.
C. The mechanism shall be contained in a weatherproof die cast aluminum housing, which shall provide a 20 mm (3/4 in.) tapped conduit entrance and incorporate the necessary facilities for attachment to the valves.
D. Switch housing to be finished in red baked enamel.
E. Supervisory switches for ball and butterfly valves may be integral with the valve.
F. All conduit and wiring connected thereto shall be provided in Section
28 31 00, FIRE DETECTION AND ALARM.
2.10 PRESSURE SWITCHES
A. Provide with 15 mm (1/2 in.) NPT male pressure connection.
B. Alarm switch shall be activated by any flow of water equal to or in excess of the discharge from one sprinkler.
C. Supervisory switch shall be activated by either high or low air pressure condition.
D. Furnish switch in a red baked enamel, weatherproof, oil resistant housing with tamper resistant screws.
2.11 WALL, FLOOR AND CEILING PLATES
A. Exposed piping passing through walls, floors or ceilings shall be provided with chrome colored escutcheon plates.
B. Comply with NFPA 101 Fire Barrier Penetration codes.
2.12 PRESSURE GAUGE
A. Provide a 1280 kPa (200 psi) pressure gauge at each flow alarm switch location, at the top of each sprinkler or standpipe riser, at each main drain connection, and on the suction and discharge of the fire pump.
2.23 HANGERS
A. Hangers shall be designed to support five times the weight of the water filled pipe plus 250 Lb (114Kg) at each point of piping support.
B. These points of support shall be adequate to support the system.
C. The spacing between hangers shall not exceed the value given for the type of pipe as indicated in NFPA 13 tables.
D. Hanger components shall be ferrous.
Issued for Construction
Issue Date: June 8, 2018
21 10 00 - 12
E. Detailed calculations shall be submitted, when required by the reviewing
Authority, showing stress developed in hangers, piping, fittings and safety factors allowed.
PART 3 - EXECUTION
3.01 INSTALLATION
A. Supervisory Switches: For each indicating sprinkler zone control valve, provide a supervisory switch that is connected to the fire alarm system. Standpipe hose valves and test and drain valves shall not be provided with supervisory switches.
B. Waterflow Switches: For each sprinkler zone and where indicated on drawings, provide a waterflow switch. Install waterflow switch and adjacent valves in easily accessible locations.
C. Sprinkler Zone: Each sprinkler zone shall coincide with each smoke zone and fire alarm zone.
D. Piping connections:
1. Sprinkler System Only: Start at flanged outlet within the building at exterior wall.
E. Drains, Test Pipes and Accessories:
1. Provide a drain at base of risers, drain connection on valved sections, and drains at other locations for complete drainage of the system. Provide valve in drain lines and connect to the central drain riser. Discharge riser outside over splash block, indirectly over standpipe drain connected to storm sewer, or as indicated. The main drain shall be capable of full discharge test without allowing water to flow onto the floor.
2. Provide test pipes in accordance with NFPA 13. Test pipes shall be valved and piped to discharge through proper orifice as specified above for drains.
F. Provide a 1280 kPa (200 psi) pressure gauge at each flow alarm switch location, at the top of each sprinkler or standpipe riser, at each main drain connection, and on the suction and discharge of the fire pump.
G. Conceal all piping, except in pipe basements, stairwells and rooms without ceilings.
H. Install new piping and sprinklers aligned with natural building and other sprinklers lines.
Issued for Construction
Issue Date: June 8, 2018
21 10 00 - 13
I. Locate piping in stairways as near ceiling as possible to prevent tampering by unauthorized personnel. Provide a minimum headroom of
2250 mm (7 ft.-6 in.) for all piping.
J. Piping arrangement shall avoid contact with other piping and equipment and allow clear access to other equipment or devices requiring access or maintenance.
K. Cutout disks, which are created by cutting holes in the walls of pipe for flow switches and non-threaded pipe connections, shall be affixed near to the pipe where the originated. They shall be displayed until final inspection and then removed.
L. Firestopping shall comply with Section 07 84 00, FIRESTOPPING. All holes through stairways, smoke barrier walls, and fire walls shall be sealed on a daily basis.
M. Provide hydraulic design information signage as required by NFPA 13 and
14.
N. Install access doors in ceilings of rooms where above ceiling access is required.
3.02 TEST
A. Automatic Sprinkler System: NFPA 13 and 25.
3.03 INSTRUCTIONS
Furnish the services of a competent instructor for not less than two four-hour periods for instructing personnel in the operation and maintenance of the fire pump and sprinkler system, on the dates requested by the COTR.
END OF SECTION
Issued for Construction
Issue Date: June 8, 2018
21 13 13 - 1
SECTION 21 13 13 - WET-PIPE SPRINKLER SYSTEMS
PART 1 - GENERAL
1.01 SCOPE OF WORK
A. Design, installation and testing shall be in accordance with
NFPA 13 except for specified exceptions.
B. The design and installation of a hydraulically calculated automatic wet system complete and ready for operation for all portions of Building being renovated, including mechanical equipment rooms.
C. Modification of the existing sprinkler system as indicated on the drawings and as further required by these specifications.
1.02 RELATED WORK
A. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Section 07 84 00, FIRESTOPPING, Treatment of penetrations through rated enclosures.
C. Section 09 91 00, PAINTING.
D. Section 21 10 00, WATER-BASED FIRE-SUPPRESSION SYSTEMS, Dry sprinklers, fire pumps, etc.
E. Section 28 31 00, FIRE DETECTION AND ALARM, Connection to fire alarm of flow switches, pressure switches and valve supervisory switches.
F. Section 21 05 11 COMMON WORK RESULTS FOR FIRE SUPPRESSION
1.03 QUALITY ASSURANCE
A. Installer Reliability: The installer shall possess a valid State of
Texas fire sprinkler contractor's license. The installer shall have been actively and successfully engaged in the installation of commercial automatic sprinkler systems for the past ten years.
B. Materials and Equipment: All equipment and devices shall be of a make and type listed by UL and approved by FM, or other nationally recognized testing laboratory for the specific purpose for which it is used. All materials, devices, and equipment shall be approved by the VA.
C. Submittals: Submit as one package in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. Prepare detailed working drawings that are signed by a NICET Level III or Level IV Sprinkler
Technician or stamped by a Registered Professional Engineer practicing in the field of Fire Protection Engineering. As Government review is for technical adequacy only, the installer remains responsible for correcting any conflicts with other trades and building construction that arise during installation. Partial submittals will not be accepted. Material submittals shall be approved prior to the purchase
Issued for Construction
Issue Date: June 8, 2018
21 13 13 - 2 or delivery to the job site. Suitably bind submittals in notebooks or binders and provide index referencing the appropriate specification section. Submittals shall include, but not be limited to, the following:
1. Qualifications:
a. Provide a copy of the installing contractors fire sprinkler and state contractor’s license.
b. Provide a copy of the NICET certification for the NICET Level III or Level IV Sprinkler Technician who prepared and signed the detailed working drawings unless the drawings are stamped by a
Registered Professional Engineer practicing in the field of Fire
Protection Engineering.
2. Drawings: Submit detailed 1:100 (1/8 inch) scale (minimum) working drawings conforming to NFPA 13. Include a site plan showing the piping to the water supply test location.
3. Manufacturers Data Sheets:
a. For backflow preventers, provide flow test curves from UL, FM, or the Foundation for Hydraulic Research and Cross-Connection Control to verify pressure loss calculations.
b. Provide for materials and equipment proposed for use on the system. Include listing information and installation instructions in data sheets. Where data sheet describes items in addition to that item being submitted, clearly identify proposed item on the sheet.
4. Calculation Sheets: Submit hydraulic calculation sheets in tabular form conforming to the requirements and recommendations of NFPA 13.
5. Final Document Submittals: Provide as-built drawings, testing and maintenance instructions in accordance with the requirements in
Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
Submittals shall include, but not be limited to, the following:
a. One…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .