36C25618R0574-0004000.docx
DOCX document 32 KB Posted
- Attached to
- CLC MODIFICATIONS Federal contract opportunity
- Solicitation number
- 36C25618R0574
About this file
36C25618R0574 0004 36C25618R0574 0004.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25618R0574-0004001.pdf | ||
| 36C25618R0574-0003000.docx | DOCX document | |
| 36C25618R0574-0002000.docx | DOCX document | |
| 36C25618R0574-0001001.pdf | ||
| 36C25618R0574-0001000.docx | DOCX document | |
| 36C25618R0574-016.pdf | ||
| 36C25618R0574-010.pdf | ||
| 36C25618R0574-007.docx | DOCX document | |
| 36C25618R0574-005.docx | DOCX document | |
| 36C25618R0574-002.pdf | ||
| 36C25618R0574-014.pdf | ||
| 36C25618R0574-006.docx | DOCX document | |
| 36C25618R0574-008.docx | DOCX document | |
| 36C25618R0574-004.xlsx | XLSX spreadsheet | |
| 36C25618R0574-001.docx | DOCX document | |
| 36C25618R0574-012.pdf | ||
| 36C25618R0574-009.pdf | ||
| 36C25618R0574-003.pdf | ||
| 36C25618R0574-011.pdf | ||
| 36C25618R0574-013.pdf | ||
| 36C25618R0574-015.pdf | ||
| 36C25618R0574-000.docx | DOCX document |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25618R0574 0003
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2.
AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF
CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV.
11/2016) is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR
43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS
ENTERED INTO
PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14.
DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME
AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS
OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 09-11-2018 629-18-1-639-0004 629-17-104 Department of Veterans Affairs Gulf Coast Veterans Health Care System Network Contracting Office 16 400 Veterans Avenue Biloxi MS 39531 Department of Veterans Affairs Gulf Coast Veterans Health Care System Network Contracting Office 16 400 Veterans Avenue Biloxi MS 39531 To all Offerors/Bidders
36C25618R0574 08-08-2018
X X X
PLEASE SEE PAGE 2 OF 2 FOR A SUMMARY OF THE CHANGES.
WILLIAM A. GEARY
Contracting Officer
NCO1615L3-0926
A. The purpose of this Amendment is to provide answers to the RFIs received in response to the solicitation (to include providing a new drawing).
B. The following is a list of the RFIs received and the answers thereto:
1. We would like to request a site plan highlighting the exact locations for the anti-climb fence? in addition could you also highlight the area of the “existing wire system” that is to be removed?
Response: The location of the fence is shown on drawing A001. The details of the existing and modified conditions are shown on drawing A002 and A003.
2. From the drawings it appears that we are to remove part of the existing wire system to REPLACE it with the 11’-0” anti-climbing fence, is that correct?
Response: Yes, the wire system will be removed and the anti-climb fence installed as shown on drawing A003.
3. The performance period is shows 45 days from NTP; however, fabrication time is currently at 10- 12 weeks for the anti-climb fence? Does this refer to only installation time? Could that please be clarified
Response: The 45-calendar days is for the entire project from start to finish. If the anti-climb fence’s lead time is such that it cannot be obtained and installed within the contract’s period of performance, the period of performance can be adjusted accordingly based upon documentation received from the fencing supplier and/or manufacturer concerning lead-times, etc.
4. In the SOW 8/6/2018 it states “constructing a new anti-climb fence barrier, and modifying and extending the existing plexiglass-glass barrier as shown on the attached drawings”. Can you please clarify as to where the plexiglass is at in reference to the anti-climb fence?
Response: These are two separate items. The plexiglass barrier is located at the 3rd floor patio balconies. It is one wall that is shown on A004.
5. The drawings also mention wind-uplift pavers to be installed that could also be clarified as to location and overall dimension as to where that will be added?
Response: There are no new pavers needed unless new steel is added. In that case, the possibility exists to where the existing pavers may have to be modified or new pavers added to get the new steel in place.
6. In regards to lighting protection, can you please show or provide a distance from the closest ground or other lightning protection system so we can get an idea regarding LF?
Response: Please see attached Drawing.
C. The date/time set for receipt of proposals remains unchanged (please see Amendment 0003).
D. All other Terms and Conditions remain unchanged.
See attached document: DRAWING 03507-6EP106.
File details come from the government source that posted it.