Amendment 4 Questions and Answers and revised Specifications and Drawings.pdf

PDF 6 MB Posted

Attached to
Z2DA--Modernize Basement Kitchen and Morgue PN: 589A4-20-157
Solicitation number
36C25522R0092
Issued by

About this file

This document package includes specifications and drawings for a modernization project at a Veterans Affairs medical center. The project involves renovating the basement kitchen and morgue areas, including upgrades to HVAC, electrical, and plumbing systems. Detailed specifications are provided for various aspects of the work, such as demolition requirements, new equipment to be installed, and connection details. The solicitation requests bids for trade work on the project, with responses due on August 9th, 2022. The contract will be awarded by the Department of Veterans Affairs.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

21 Delta Engineers — 14216 Dayton Circle, Suite #5 — Omaha, NE 68137 — Ph (402) 496-4115 — Fax (402) 384-8900

(Page 1 of 1)

Amendment 4

August 9, 2022

Re: Addendum #4 Modernize Basement Kitchen and Morgue 36C25522R0092

The following MEP items should be included in the next addendum on the above referenced project:

Bid Advertisement Questions

Item 1: List of Bid questions submitted to VA:

These questions were asked at the meeting on July 26th, 2022 or submitted to the VA.

HVAC Items

Item 1: Refer to Drawing Sheet MD1.03, MH1.01, and MH1.02:

These drawings were revised and reissued per the Bid questions and meeting on July 26th, 2022.

Electrical Items

Item 1: Refer to Drawing Sheet EP1.01, EP1.02, and EP6.01:

These drawings were revised and reissued per the Bid questions and meeting on July 26th, 2022.

Plumbing Items

Item 1: Refer to Drawing Sheet PL1.02, PL2.02:

These drawings were revised and reissued per the Bid questions and meeting on July 26th, 2022.

Item 2: Refer to Drawing Sheet PL2.04:

This drawing was not in the initial issue. Issued to add this drawing.

Item 3: Refer to Specifications Section 22 05 11, 22 13 00, and 22 40 00:

Revised specifications to clarify the Bid questions and meeting questions on July 26th, 2022.

1. 11 73 00 – 04 states: “Lifting capacity: 1,000 lbs. (500 kg) for bariatric lifts” What is the lifting capacity for Non‐Bariatric Lifts?

Response: Lifting capacity: 1,000 lbs. (500 kg) for bariatric lifts” What is the lifting capacity for Non‐ Bariatric Lifts? According to the manufacturer, lifts are available in a range of lifting capacities from 385 lbs. to 1,100 lbs. Non‐bariatric lifts are those with a lift capacity less than 825 lbs.

2. Basis of Design or Preferred Manufacturer for 11.73.00?

Response: The preferred manufacturer is Guldmann.

3. Are built in Scales desired in the 11 73 00 lifts?

Response: The current lift is rated at 750 pounds and has a scale. The load rating is adequate for our needs. The lift in the autopsy room needs a scale so, if the existing one is moved, no new scale is required. It might make more sense for phasing to specify a scale and put the new one with the new scale in the new autopsy room so that the switch over from old to new is easier. Then there is no rush and the existing lift can be taken down and re‐installed in the new cooler.

4. Sheet PL2.04 is missing.

Response: Drawing PL2.04 will be added.

5. Each area is to be broken down into 3 phases, will both projects co‐inside together with timing and schedule with the phasing?

Response: The phasing was listed by each area, but needs to be coordinated with all work in the contract. For example, HVAC crosses into both spaces and the corridor is common to both areas. Both areas can be worked together if that is how you decided your schedule of work and approved by the

COR.

6. During the walk through we saw where the 9x9 tile was located which I'm sure it all comes out but I'm assuming all the fittings are located in the kitchen area?

Response: The asbestos environmental report is an attachment to specification section 02 82 11 Traditional Asbestos Abatement.

7. With the phasing in the kitchen area how is the depressed flooring that comes out going to work out?

Response: Please review Architectural and Structural drawings.

8. Will the sprinkler contractor be responsible for removal of the line in the Kitchen or will that be on the Demo contractor?

Response: Means and Method of the Contractor to whom they have do the work in accordance with contract requirements and building codes.

9. I know that the VA usually recycles most of the metal that comes out of demo jobs, with the coolers being stainless steel. Does the demo contractor have the rights to it?

Response: The VA has first rights to salvage per specifications and drawings. If the VA doesn’t want material, then Contractor is required to remove from site.

10. When we submit our bid do we need to have it broke out in the phasing or just one lump sum?

Response: Please follow instructions in announcement as to submission of bid.

11. During the site visit, there was existing med gas observed overhead in D031 (see pic 1). Please advise if this is to be demolished and to what extent.

Response: All connection will be removed and capped back at the main line.

12. Existing water connections were observed in D028 (see pic 2). Please advise if this is to be demolished.

Response: All connection will be removed and capped back at the main line.

13. Existing lab gas turrets were observed in D031 (see pic 3 & 4). Please advise if these are to be demolished and to what extent.

Response: All connection will be removed and capped back at the main line.

14. Numerous more faucets/etc. were observed in D031 than shown on drawings (see pic 3 & 4). Please advise on demolition and to what extent.

Response: All connection will be removed and capped back at the main line.

15. Numerous sink drains were observed in D031 and not shown on drawings (see pic 3 & 4). Please advise on demolition and to what extent.

Response: All connection will be removed and capped back at the main line.

16. The specifications list PVC for the sanitary piping. Drawing PL1.01 notes to install high‐temp CPVC.

Is this needed? If so, please provide specification.

Response: CPVC is needed yes for its higher temperature and chemical resistance. It will be added to the specification.

17. There is no sanitary vent piping shown for the new fixtures/drains in D027, D029, or D030 on drawing PL1.02. Please advise if this is acceptable, or with updated drawings showing venting.

Response: The new drains are being connected to the existing drain lines so no new vent line is needed.

18. Drawing PL1.01, note #3. Is this Floor Drain for P‐707 to be the same as the other FD’s shown on the drawing? Are all of them to be FD‐C’s per the specifications?

Response: Yes the floor drain is for P‐707 as the note states. All floor drains should be done per the VA specification.

19. Fixture P‐710 is not listed in the specifications. Please advise if additional information is needed that is not in the schedule.

Response: Will be added to the specification

20. P‐707 Emergency Shower & Eye & Face Wash specifications state to provide an emergency alarm horn and light and tie alarm into BAS. Is this needed?

Response: No horn is needed it will be removed from the specification.

21. Drawing PL2.01 shows 1‐1/2” HW & CW up to serve D028, D029, and fixture P‐707. However the line sizing on drawing PL2.02 only shows ½” to all fixtures. Please advise with correct main sizing.

Response: Drawing PL2.02 updated to show main line size.

22. Domestic hot water piping insulation sizing on the drawings notes a minimum of ½” thick, however the specifications list 1.5” and 2” thick depending on the line size. Please clarify what is needed.

Response: Note on drawing is a general note and the VA specification should be followed if there is a difference.

23. Where is the existing morgue cooler equipment and is there room adjacent to it for equipment servicing the new morgue cooler?

Response: The morgue cooler equipment is located in room D017 and there is space adjacent to the existing equipment for installation of the new morgue cooler equipment while at the same time maintaining the existing morgue cooler equipment.

24. The life safety plan does not show the kitchen as a hazardous use with a fire wall surrounding it. Do the walls around the kitchen have to be fire rated?

Response: The walls around the Kitchen do not need to be fire rated. The Kitchen is considered an accessory occupancy that is ancillary to the main occupancy of the building. No separation is required between accessory occupancies and the main occupancy per paragraph 508.2.4 of the 2018 International Building Code.

25. The wall between the kitchen and the corridor is shown as a rated wall but the doors are not shown as rated. Are doors C009K, B001I, and B011A required to be rated and to what level? The same should be answered for door CBD5 in the morgue even though it has not been asked yet.

Response: Life Safety Plan F1/G1.03 indicates the wall between the Kitchen and the Corridor is a smoke partition, not a rated wall. Doors in smoke partitions are not required be rated. The same applies to Door DBD5.

26. Does the fire sprinkler system need to be maintained for the existing kitchen space that is not being used as part of the new kitchen? This likely will need to be adjusted after the new walls are installed.

Response: The sprinkler installation in the existing kitchen space that is being returned to the facility (not used in new kitchen) needs to remain code compliant during and after the project. We would like the sprinklers not in the new kitchen to be connected to sprinkler zone 2, the zone serving the area immediately north of the kitchen.

27. During the site visit, there was steam piping observed in B002 (see pics). Please advise if this is to be demolished and to what extent.

Response: Remove unused steam piping back to main.

28. Numerous additional faucets/eye washes/equipment/fixtures/etc. were observed in the kitchen and not shown on the drawings. Please advise on demolition and to what extent.

Response: Remove unused piping back to main.

29. Numerous sink drains/equipment drains/etc. were observed in the kitchen and not shown on drawings. Please advise on demolition and to what extent.

Response: Remove unused piping back to main.

30. The specifications do not allow for PVC sanitary piping in Kitchen areas. Drawing PL1.03 notes to install PVC for under 140 degrees and CPVC for above 140 degrees. Typically the VA requests cast iron piping in kitchens. Please clarify.

Response: PVC piping is acceptable to us as long as temperature constraints are not exceeded. There will likely be cases where PVC temperatures will be exceeded. In those cases drain piping should be appropriately rated for the expected temperatures.

31. There is no sanitary vent piping shown for the new fixtures/floor drains/equipment in the kitchen and surrounding areas on drawing PL1.04. Please advise if this is acceptable, or with updated drawings showing venting.

Response: The new drains are being connected to the existing drain lines so no new vent line is needed.

32. The cover sheet lists drawing PL2.04, but it is not included in the bid set. Please provide.

Response: Sheet PL2.04 will be added.

33. Drawing PD1.08 ‐ To be able to coordinate scopes of work with the Kitchen Equipment Contractor, more information is needed. Please provide additional details on what is being demolished for bidding purposes. The drawing only shows water piping and not the fixture/equipment/etc. it serves.

Response: All the fixture will be demolished as the entire kitchen is being remodeled the equipment will be either reused or new as per the QF drawings.

34. Please provide typical pipe connection details ‐ natural gas, indirect drains, appliances, specialty kitchen items, etc. for bidding purposes.

Response: All pipe connections are to be per the VA specification.

35. There are no plumbing fixtures shown on the plumbing drawings for the Kitchen area. Are all fixtures/equipment/appliances by the KEC?

Response: All plumbing is to be per the VA specification.

36. Additional information is requested on Bid Item #2 items for the plumbing scope of work. Please provide details and/or a drawing showing alternate work.

Response: Bid item #2 only changes how the equipment is provided ie. By Government or by Contractor. The installation is the responsibility of the contractor.

37. Please advise if the designated SSHO and Competent Person role can be fulfilled by the site superintendent?

Response: Competent Person is an OSHA term with an OSHA definition. The site safety officer and site superintendent may be the same person.

38. Will the SSHO be full time separate person?

Response: See the solicitation documents for Factor 3. No one individual may perform more than 2 of the key roles and the site superintendent and project manager may not be the same person.

39. Is the project taxable?

Response: See solicitation package.

40. In Factor 4 there is a reference to Attachment 5 – PPQ but it was not included with the solicitation.

Please advise if there will be an Attachment 5.

Response: Addendum 2 as discussed in pre‐bid meeting has the Attachment 5 – PPQ.

41. Will the cost of submittal exchange be provided by VA or GC?

Response: Submittal exchange to be provided by the project A/E.

42. Drawing AD1.01, area south of B001B has walls that are dashed for demo but the lines are drawn at a lighter line weight. Are these wall to be demoed?

Response: Yes, these walls are to be demoed.

43. Drawing AD1.01 room B001A has a plan note 9 for temp wall but it is not pointing to anything. Is there supposed to be a temp wall there?

Response: Delete the two #9 plan notes which don’t point to anything. A temp wall is not required at their location.

44. Drawing AE1.03 note 9, dock equipment to be removed and reinstalled. What specific piece of dock equipment gets remove and reinstalled?

Response: Dock leveler and dock door power and controls

45. Drawing QF1.00 detail 13, stainless steel cladding by others? Is this stainless cladding by the VA or

GC?

Response: General Contractor (GC).

46. Drawing AI7.02 finish schedule, what does floor finish VB‐1 stand for?

Response: VB stands for “vapor barrier”, which is to be under the walk‐ins, it should be installed at the location of the red lines in the drawings as shown on Detail 5/QF1.02.

47. Drawing AI7.02 finish schedule, what does floor finish ETR stand for?

Response: ETR stands for “Existing to remain”

48. Drawing QFD1.1, the equipment that is being reused, where do we store this equipment?

Response: Equipment will remain in service until the new area is ready and will then all be moved.

Food preparation and serving must remain in operation throughout.

49. Is there a Basis of Design (specific manufacturer) for the Mortuary Equipment and Walk‐In Coolers and Freezers? If so, do you have manufacturers specified part #’s?

Response: The basis of design manufacturer is Mopec for both the mortuary equipment and walk‐in coolers and freezers. Specific manufacturer’s parts were not selected.

50. On page AE1.06, the door schedule lists the door type for opening CBD5 as “87”. There doesn’t appear to be a door type “87” with the door types included on the sheet. Could you please clarify what the intended door type is for opening CBD5?

Response: The door type should be D1 instead of 87. The frame type, which is blank, should be F2. The head detail, which is blank, should be “SIM. D6/AE1.06”. It should be noted that while frame type F2 has a 4” head which is standard for CMU walls, due to floor slab conditions, the door frame opening height may be less than 7’‐4”. The actual opening height needs to be field verified.

51. In specification 11 40 00 2.B it says “The Work of this Contract shall be bid and performed under contract with the owner.” But, in the solicitation item number 0002 in the Price/Cost Schedule is a deduct alternate asking for us to “Delete work associated with providing new kitchen equipment listed as bid alternate on the equipment schedule.” Please clarify that the GC is to provide the Kitchen Equipment and we are to follow the equipment schedule on QF1.03 for the GF/CI and CF/CI for the Kitchen Equipment.

Response: The bid item number 0002 deduct is for the cost of the equipment only that is marked on QF1.03. The work associated with installing this equipment is the responsibility contractor. Also see question 36.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

ADDENDUM 4Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

MODERNIZE BASEMENT

KITCHEN AND MORGUE

COLUMBIA, MO VAMC

589A4-20-157

Project Director

08/09/2022Revisions: Date:

1 - SCHEMATIC DOCUMENTS

2 - DESIGN DEVELOPMENT

3 - 60% CONSTRUCTION DOCUMENTS

01/10/2021 05/14/2021 07/23/2021

PROJECT NO.: 20-003

Omaha, Nebraska 68137-5566

PH: (402) 496-4115

14216 Dayton Cir - Suite #5 21 Delta Engineers, LLC

Fax: (402) 384-8900

#4

#5

#10

#9

#11

#6

#7

#8

DN

DN

UP

#14

#15

DN

DN

DN

#1#2#3

UP

UP

UP

DN DN

UP

UP

DN

UP

DN

4 - 90% CONSTRUCTION DOCUMENTS 09/17/2021

5 - 100% CONSTRUCTION DOCUMENTS 12/28/2021

6 - 100% BID SET DOCUMENTS 05/06/2022

7 - ADDENDUM 4 08/09/2022

#6

UP

K

J H

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

%%UKEY PLAN

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

%%UBASEMENT DEMOLITION - HVAC PIPING MORGUE

AutoCAD SHX Text Scale: 1/4" = 1'-0"

AutoCAD SHX Text

MD1.03

AutoCAD SHX Text

BASEMENT - DEMOLITION

AutoCAD SHX Text

HVAC PIPING MORGUE

AutoCAD SHX Text

AutoCAD SHX Text

DRD

AutoCAD SHX Text

PJM

AutoCAD SHX Text

HWR 4"

AutoCAD SHX Text

HWS 1"

AutoCAD SHX Text

HWS 4"

AutoCAD SHX Text

HWS 1"

AutoCAD SHX Text

HWS 3/4"

AutoCAD SHX Text

HWR 3/4"

AutoCAD SHX Text

HWR 1"

AutoCAD SHX Text

HWS 3/4"

AutoCAD SHX Text

HWR 3/4"

AutoCAD SHX Text

HWS 4"

AutoCAD SHX Text GENERAL MECHANICAL NOTES A. DO NOT DEMOLISH, DISCONNECT, OR REMOVE ANY PIPES, DO NOT DEMOLISH, DISCONNECT, OR REMOVE ANY PIPES, DUCTS, OR CONDUITS WITHOUT PRIOR APPROVAL BY OWNER. B. DEMOLISH ALL HATCHED ITEMS INCLUDING ALL SUBSYSTEMS NO DEMOLISH ALL HATCHED ITEMS INCLUDING ALL SUBSYSTEMS NO LONGER REQUIRED FOR OPERATION. C. PROVIDE WRITTEN OUTAGE NOTICE TO OWNER PRIOR TO PROVIDE WRITTEN OUTAGE NOTICE TO OWNER PRIOR TO DEMOLISHING ANY PIPING, DUCTS, OR SYSTEM. PROVIDE THE OWNER WITH 72 HOURS ADVANCED NOTICE OF ANY OUTAGE. OWNER RETAINS RIGHTS TO CANCEL ANY OUTAGE AND RESCHEDULE IT FOR ANOTHER TIME TO MINIMIZE DISRUPTIONS TO THE VAMC. D. CAP AND SEAL ALL DUCTS AND PIPES TO REMAIN IN CAP AND SEAL ALL DUCTS AND PIPES TO REMAIN IN OPERATION. E. REPAIR ALL EXISTING INSULATION AND VAPOR BARRIER TO NEW REPAIR ALL EXISTING INSULATION AND VAPOR BARRIER TO NEW CONDITION WHERE DISTURBED BY DEMOLITION. F. SEAL ALL EXISTING WALL AND FLOOR PENETRATIONS WITH SEAL ALL EXISTING WALL AND FLOOR PENETRATIONS WITH GROUT AND FIRE CAULK WHERE DUCTS, PIPES, AND CONDUITS ARE REMOVED. G. REVIEW ALTERNATES AND PHASING PLANS PRIOR TO ANY REVIEW ALTERNATES AND PHASING PLANS PRIOR TO ANY DEMOLITION AND NEW WORK. H. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO ANY WORK. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO ANY WORK. I. DO NOT SCALE THE PLANS. DO NOT SCALE THE PLANS. MECHANICAL POWER DEMOLITION FLAG NOTES: 1. DEMOLISH PIPING AND ASSOCIATED ITEMS AND FILL ANY HOLES DEMOLISH PIPING AND ASSOCIATED ITEMS AND FILL ANY HOLES IN FLOOR AFTER. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION. 2. PROVIDE A CAP ON THE DEMOLISHED CONNECTIONS OR PROVIDE A CAP ON THE DEMOLISHED CONNECTIONS OR PROVIDE AN APPROPRIATE INDUSTRY METHOD APPROVED BY THE VA.

AutoCAD SHX Text

CBD1

AutoCAD SHX Text D003

AutoCAD SHX Text

CBD4

AutoCAD SHX Text D026

AutoCAD SHX Text D003A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

AutoCAD SHX Text 2'

AutoCAD SHX Text 4'

AutoCAD SHX Text 8'

AutoCAD SHX Text N

AutoCAD SHX Text D028

AutoCAD SHX Text D027

AutoCAD SHX Text D025

AutoCAD SHX Text D030

AutoCAD SHX Text

CBD5

AutoCAD SHX Text D029

AutoCAD SHX Text D031

K

J H G EF.1 F Ea E.1B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

ADDENDUM 4Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

MODERNIZE BASEMENT

KITCHEN AND MORGUE

COLUMBIA, MO VAMC

589A4-20-157

Project Director

08/09/2022Revisions: Date:

1 - SCHEMATIC DOCUMENTS

2 - DESIGN DEVELOPMENT

3 - 60% CONSTRUCTION DOCUMENTS

01/10/2021 05/14/2021 07/23/2021

PROJECT NO.: 20-003

Omaha, Nebraska 68137-5566

PH: (402) 496-4115

14216 Dayton Cir - Suite #5 21 Delta Engineers, LLC

Fax: (402) 384-8900

#4

#5

#10

#9

#11

#6

#7

#8

DN

DN

UP

#14

#15

DN

DN

DN

#1#2#3

UP

UP

UP

DN DN

UP

UP

DN

UP

DN

4 - 90% CONSTRUCTION DOCUMENTS 09/17/2021

5 - 100% CONSTRUCTION DOCUMENTS 12/28/2021

6 - 100% BID SET DOCUMENTS 05/06/2022

7 - ADDENDUM 4 08/09/2022

AutoCAD SHX Text

%%UBASEMENT NEW HVAC - MORGUE

AutoCAD SHX Text

MH1.01

AutoCAD SHX Text

BASEMENT - NEW

AutoCAD SHX Text

HVAC MORGUE AREA

AutoCAD SHX Text

AutoCAD SHX Text

MPH

AutoCAD SHX Text

PJM

AutoCAD SHX Text D003

AutoCAD SHX Text

CBD4

AutoCAD SHX Text D026

AutoCAD SHX Text D003A

AutoCAD SHX Text N

AutoCAD SHX Text

BODY STORAGE

AutoCAD SHX Text D027

AutoCAD SHX Text

SUPPLY STOR

AutoCAD SHX Text D030A

AutoCAD SHX Text

AUTOPSY

AutoCAD SHX Text D030

AutoCAD SHX Text

TISSUE STORAGE

AutoCAD SHX Text D030B

AutoCAD SHX Text

HOUSE KEEPING

AutoCAD SHX Text D029

AutoCAD SHX Text

RR

AutoCAD SHX Text D028

AutoCAD SHX Text 14/14

AutoCAD SHX Text

MECHANICAL FLAGGED NOTES:

AutoCAD SHX Text GENERAL MECHANICAL NOTES A. DO NOT DEMOLISH, DISCONNECT, OR REMOVE ANY PIPES, DUCTS, OR CONDUITS WITHOUT PRIOR DO NOT DEMOLISH, DISCONNECT, OR REMOVE ANY PIPES, DUCTS, OR CONDUITS WITHOUT PRIOR APPROVAL BY OWNER. B. DEMOLISH ALL HATCHED ITEMS INCLUDING ALL SUBSYSTEMS NO LONGER REQUIRED FOR DEMOLISH ALL HATCHED ITEMS INCLUDING ALL SUBSYSTEMS NO LONGER REQUIRED FOR OPERATION. C. PROVIDE WRITTEN OUTAGE NOTICE TO OWNER PRIOR TO DEMOLISHING ANY PIPING, DUCTS, OR PROVIDE WRITTEN OUTAGE NOTICE TO OWNER PRIOR TO DEMOLISHING ANY PIPING, DUCTS, OR SYSTEM. PROVIDE THE OWNER WITH 72 HOURS ADVANCED NOTICE OF ANY OUTAGE. OWNER RETAINS RIGHTS TO CANCEL ANY OUTAGE AND RESCHEDULE IT FOR ANOTHER TIME TO MINIMIZE DISRUPTIONS TO THE VAMC. D. CAP AND SEAL ALL DUCTS AND PIPES TO REMAIN IN OPERATION. CAP AND SEAL ALL DUCTS AND PIPES TO REMAIN IN OPERATION. E. REPAIR ALL EXISTING INSULATION AND VAPOR BARRIER TO NEW CONDITION WHERE DISTURBED REPAIR ALL EXISTING INSULATION AND VAPOR BARRIER TO NEW CONDITION WHERE DISTURBED BY DEMOLITION. F. SEAL ALL EXISTING WALL AND FLOOR PENETRATIONS WITH GROUT AND FIRE CAULK WHERE SEAL ALL EXISTING WALL AND FLOOR PENETRATIONS WITH GROUT AND FIRE CAULK WHERE DUCTS, PIPES, AND CONDUITS ARE REMOVED. G. REVIEW ALTERNATES AND PHASING PLANS PRIOR TO ANY DEMOLITION AND NEW WORK. REVIEW ALTERNATES AND PHASING PLANS PRIOR TO ANY DEMOLITION AND NEW WORK. H. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO ANY WORK. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO ANY WORK. I. DO NOT SCALE THE PLANS. DO NOT SCALE THE PLANS. J. UNLESS SHOWN OTHERWISE, THE DIFFUSER NECK SIZE SHALL BE THE SIZE OF ITS CONNECTED UNLESS SHOWN OTHERWISE, THE DIFFUSER NECK SIZE SHALL BE THE SIZE OF ITS CONNECTED BRANCH DUCT. K. REQUIRED NET INSIDE CLEAR DIMENSIONS ARE SHOWN FOR DUCTWORK. INCREASE GROSS REQUIRED NET INSIDE CLEAR DIMENSIONS ARE SHOWN FOR DUCTWORK. INCREASE GROSS SHEETMETAL DIMENSIONS WHERE 1" DUCT LINER IS SPECIFIED. L. DUCT LAYOUT IS DIAGRAMMATIC. PROVIDE ADDITIONAL FITTINGS AND OFFSETS AS REQUIRED FOR DUCT LAYOUT IS DIAGRAMMATIC. PROVIDE ADDITIONAL FITTINGS AND OFFSETS AS REQUIRED FOR DUCT SYSTEM INSTALLATION. M. PROVIDE A MINIMUM 10" DEEP FULL SIZE PLENUM FOR THE DUCT CONNECTION FOR EVERY PROVIDE A MINIMUM 10" DEEP FULL SIZE PLENUM FOR THE DUCT CONNECTION FOR EVERY REGISTER, GRILLE AND LINEAR DIFFUSER.

AutoCAD SHX Text

1. FOR CONTINUATION, SEE SHEET MH1.02. FOR CONTINUATION, SEE SHEET MH1.02.

AutoCAD SHX Text 14/14

AutoCAD SHX Text

2. 16/14 GENERAL EXHAUST UP CONNECTING TO EXISTING 66/24 RISER SERVED BY E-16. 16/14 GENERAL EXHAUST UP CONNECTING TO EXISTING 66/24 RISER SERVED BY E-16. E-16.

AutoCAD SHX Text 8"x8" R-2 150

AutoCAD SHX Text 6"x22" G-1 75

AutoCAD SHX Text 6/6

AutoCAD SHX Text 18/14

AutoCAD SHX Text

3. 18/14 MORGUE EXHAUST UP CONNECTING TO EXISTING 20X15 RISER SERVED BY E-17. 18/14 MORGUE EXHAUST UP CONNECTING TO EXISTING 20X15 RISER SERVED BY E-17. E-17.

AutoCAD SHX Text 6"X6" R-1 75

AutoCAD SHX Text 12"%%C

AutoCAD SHX Text 8" D-1200

AutoCAD SHX Text

10"X10" R-3 295 (5 TYP.)

AutoCAD SHX Text

10"%%C (TYP.)

AutoCAD SHX Text

4. 18/14 MORGUE SUPPLY UP CONNECTING TO EXISTING SUPPLY RISER. 18/14 MORGUE SUPPLY UP CONNECTING TO EXISTING SUPPLY RISER.

AutoCAD SHX Text 8/8

AutoCAD SHX Text

18/14(BELOW)

AutoCAD SHX Text

AutoCAD SHX Text

5. ROUTE 18/14 EXHAUST DOWN IN CHASE TO LEVEL BELOW AND ROUTE TO UNDERSIDE OF ROUTE 18/14 EXHAUST DOWN IN CHASE TO LEVEL BELOW AND ROUTE TO UNDERSIDE OF AUTOPSY TABLES. PROVIDE A 12/12 BRANCH CONNECTION, WITH BALANCING DAMPER, TO EACH AUTOPSY TABLE. ROUTE 12/12 DUCTS UP THROUGH FLOOR TO CONNECT TO BOTTOM PLENUM OF AUTOPSY TABLES. SEAL ALL CONNECTIONS. BALANCE EACH AUTOPSY TABLE TO 800 CFM EXHAUST.

AutoCAD SHX Text S

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

CBD5

AutoCAD SHX Text

WORKSTATION

AutoCAD SHX Text

CBD5A

AutoCAD SHX Text

AutoCAD SHX Text 2'

AutoCAD SHX Text 4'

AutoCAD SHX Text 8'

AutoCAD SHX Text

SCALE: 1/4" = 1'-0"

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

%%UKEY PLAN

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text 18/14

AutoCAD SHX Text 8"x8" R-2 150

AutoCAD SHX Text 8"x8" R-2 150

AutoCAD SHX Text 8"x8" R-4 350

AutoCAD SHX Text S

AutoCAD SHX Text 18/14

AutoCAD SHX Text 16"

AutoCAD SHX Text 6"%%C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"X6" R-1 75

AutoCAD SHX Text

VAV-011

AutoCAD SHX Text

VAV-012

AutoCAD SHX Text 10/10

AutoCAD SHX Text

10"X10" R-4 400 (3 TYP.)

AutoCAD SHX Text 10/10

AutoCAD SHX Text

HWR 4"

AutoCAD SHX Text

HWS 4"

AutoCAD SHX Text

HWR 1"

AutoCAD SHX Text

HWS 4"

AutoCAD SHX Text

HWR 1"

AutoCAD SHX Text

HWS 3/4"

AutoCAD SHX Text

HWR 3/4"

AutoCAD SHX Text

HWR 3/4"

HWS 3/4"

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

ADDENDUM 4Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

MODERNIZE BASEMENT

KITCHEN AND MORGUE

COLUMBIA, MO VAMC

589A4-20-157

Project Director

08/09/2022Revisions: Date:

1 - SCHEMATIC DOCUMENTS

2 - DESIGN DEVELOPMENT

3 - 60% CONSTRUCTION DOCUMENTS

01/10/2021 05/14/2021 07/23/2021

PROJECT NO.: 20-003

Omaha, Nebraska 68137-5566

PH: (402) 496-4115

14216 Dayton Cir - Suite #5 21 Delta Engineers, LLC

Fax: (402) 384-8900

#4

#5

#10

#9

#11

#6

#7

#8

DN

DN

UP

#14

#15

DN

DN

DN

#1#2#3

UP

UP

UP

DN DN

UP

UP

DN

UP

DN

4 - 90% CONSTRUCTION DOCUMENTS 09/17/2021

5 - 100% CONSTRUCTION DOCUMENTS 12/28/2021

6 - 100% BID SET DOCUMENTS 05/06/2022

7 - ADDENDUM 4 08/09/2022

A

A

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

%%UKEY PLAN

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

MH1.02

AutoCAD SHX Text

BASEMENT NEW HVAC PLAN

AutoCAD SHX Text

KITCHEN AREA (PARTIAL)

AutoCAD SHX Text

AutoCAD SHX Text

DRD/MH

AutoCAD SHX Text

PJM

AutoCAD SHX Text

%%UBASEMENT NEW HVAC KITCHEN (PARTIAL)

AutoCAD SHX Text Scale: 1/4" = 1'-0"

AutoCAD SHX Text N

AutoCAD SHX Text

MOW

AutoCAD SHX Text C009B

AutoCAD SHX Text

WALK-IN FREEZER

AutoCAD SHX Text C009D

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C009

AutoCAD SHX Text

CANTEEN

AutoCAD SHX Text C009C

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

ROOM

AutoCAD SHX Text C010

AutoCAD SHX Text

MOW PREP

AutoCAD SHX Text C009A

AutoCAD SHX Text

WALK-IN COOLER

AutoCAD SHX Text C009E

AutoCAD SHX Text

DIRECTOR

AutoCAD SHX Text C009I

AutoCAD SHX Text

SUPERVISORS

AutoCAD SHX Text C009J

AutoCAD SHX Text

ORDERING

AutoCAD SHX Text C009H

AutoCAD SHX Text C009F

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

HWR

AutoCAD SHX Text

HWS

AutoCAD SHX Text

HWR

AutoCAD SHX Text

HWS

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text

MATCHLINE - SEE SHEET MH1.04 FOR CONTINUATION

AutoCAD SHX Text

MATCHLINE - SEE SHEET MH1.03 FOR CONTINUATION

AutoCAD SHX Text GENERAL MECHANICAL NOTES A. DO NOT DEMOLISH, DISCONNECT, OR REMOVE ANY PIPES, DO NOT DEMOLISH, DISCONNECT, OR REMOVE ANY PIPES, DUCTS, OR CONDUITS WITHOUT PRIOR APPROVAL BY OWNER. B. DEMOLISH ALL HATCHED ITEMS INCLUDING ALL SUBSYSTEMS NO DEMOLISH ALL HATCHED ITEMS INCLUDING ALL SUBSYSTEMS NO LONGER REQUIRED FOR OPERATION. C. PROVIDE WRITTEN OUTAGE NOTICE TO OWNER PRIOR TO PROVIDE WRITTEN OUTAGE NOTICE TO OWNER PRIOR TO DEMOLISHING ANY PIPING, DUCTS, OR SYSTEM. PROVIDE THE OWNER WITH 72 HOURS ADVANCED NOTICE OF ANY OUTAGE. OWNER RETAINS RIGHTS TO CANCEL ANY OUTAGE AND RESCHEDULE IT FOR ANOTHER TIME TO MINIMIZE DISRUPTIONS TO THE VAMC. D. CAP AND SEAL ALL DUCTS AND PIPES TO REMAIN IN CAP AND SEAL ALL DUCTS AND PIPES TO REMAIN IN OPERATION. E. REPAIR ALL EXISTING INSULATION AND VAPOR BARRIER TO NEW REPAIR ALL EXISTING INSULATION AND VAPOR BARRIER TO NEW CONDITION WHERE DISTURBED BY DEMOLITION. F. SEAL ALL EXISTING WALL AND FLOOR PENETRATIONS WITH SEAL ALL EXISTING WALL AND FLOOR PENETRATIONS WITH GROUT AND FIRE CAULK WHERE DUCTS, PIPES, AND CONDUITS ARE REMOVED. G. REVIEW ALTERNATES AND PHASING PLANS PRIOR TO ANY REVIEW ALTERNATES AND PHASING PLANS PRIOR TO ANY DEMOLITION AND NEW WORK. H. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO ANY WORK. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO ANY WORK. I. DO NOT SCALE THE PLANS. DO NOT SCALE THE PLANS. J. UNLESS SHOWN OTHERWISE, THE DIFFUSER NECK SIZE SHALL UNLESS SHOWN OTHERWISE, THE DIFFUSER NECK SIZE SHALL BE THE SIZE OF ITS CONNECTED BRANCH DUCT. K. REQUIRED NET INSIDE CLEAR DIMENSIONS ARE SHOWN FOR REQUIRED NET INSIDE CLEAR DIMENSIONS ARE SHOWN FOR DUCTWORK. INCREASE GROSS SHEETMETAL DIMENSIONS WHERE 1" DUCT LINER IS SPECIFIED. L. DUCT LAYOUT IS DIAGRAMMATIC. PROVIDE ADDITIONAL FITTINGS DUCT LAYOUT IS DIAGRAMMATIC. PROVIDE ADDITIONAL FITTINGS AND OFFSETS AS REQUIRED FOR DUCT SYSTEM INSTALLATION. M. PROVIDE A MINIMUM 10" DEEP FULL SIZE PLENUM FOR THE PROVIDE A MINIMUM 10" DEEP FULL SIZE PLENUM FOR THE DUCT CONNECTION FOR EVERY REGISTER, GRILLE AND LINEAR DIFFUSER. N. UNLESS SHOWN OTHERWISE, THE VAV BOX NECK SIZE SHALL UNLESS SHOWN OTHERWISE, THE VAV BOX NECK SIZE SHALL BE THE SIZE OF ITS CONNECTED BRANCH DUCT. O. UNLESS SHOWN OTHERWISE, HEATING HOT WATER SUPPLY AND UNLESS SHOWN OTHERWISE, HEATING HOT WATER SUPPLY AND RETURN PIPING CONNECTIONS TO VAV BOX REHEAT COILS SHALL BE 3/4" IN SIZE. P. CLEARANCE AND ACCESS TO VAV BOX CONTROLS, ACTUATORS, CLEARANCE AND ACCESS TO VAV BOX CONTROLS, ACTUATORS, VALVES, AND DAMPERS SHALL NOT BE OBSTRUCTED. ALL PIPING SHALL BE KEPT A MINIMUM OF 3 FT FROM CONTROL SIDE OF VAV BOX TO MAINTAIN ACCESSIBILITY. MECHANICAL FLAGNOTES 1. WELDED BLACK STEEL KITCHEN GREASE EXHAUST DUCT. WELDED BLACK STEEL KITCHEN GREASE EXHAUST DUCT. PROVIDE CONTINUOUS 1/4" PER FT SLOPE GREASE DUCT BACK TO HOOD. 2. RELOCATE EXISTING THERMOSTAT FROM HALLWAY TO NEW RELOCATE EXISTING THERMOSTAT FROM HALLWAY TO NEW LOCATION BY OFFICE DOOR. 3. CONNECT NEW DUCT TO THE EXISTING DUCT AT TRANSITION CONNECT NEW DUCT TO THE EXISTING DUCT AT TRANSITION POINT. PROVIDE ALL NECESSARY COMPONENTS AND ACCESSORIES TO CONNECT THE NEW TO EXISTING DUCTS. 4. PROVIDE A NEW 8" DIAMETER DUCT TAPPED FROM AN EXISTING PROVIDE A NEW 8" DIAMETER DUCT TAPPED FROM AN EXISTING DUCT AND CONNECT TO THE EXISTING DIFFUSER LOCATED IN THE OFFICE SPACE. 5. EXTEND THE EXISTING 12/6 EXHAUST DUCT TO THE NEW EXTEND THE EXISTING 12/6 EXHAUST DUCT TO THE NEW LOCATION SHOWN. 6. PROVIDE CONNECTIONS TO VAV AS DETAILED IN SPECIFICATIONS PROVIDE CONNECTIONS TO VAV AS DETAILED IN SPECIFICATIONS AND DRAWING MH5.01 DETAIL.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 2'

AutoCAD SHX Text 4'

AutoCAD SHX Text 8'

AutoCAD SHX Text 1/4" = 1'-0"

AutoCAD SHX Text

AHU-14 DUCT ABOVE CEILING SPACE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 14"

AutoCAD SHX Text 8"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

8" D-1140 (TYP.)

AutoCAD SHX Text

KH-2 HOOD HOOD 12' X 5', 3100 CFM

AutoCAD SHX Text

15" D-1850 (3 TYP.)

AutoCAD SHX Text 16"X12" R-2 850

AutoCAD SHX Text

22"X10" G-1 W/ 8/10 BOOT (TYP.)

AutoCAD SHX Text 18/8

AutoCAD SHX Text 18/8

AutoCAD SHX Text 18/8

AutoCAD SHX Text 18/8

AutoCAD SHX Text 20/18

AutoCAD SHX Text 22/16

AutoCAD SHX Text 12"

AutoCAD SHX Text 10"

AutoCAD SHX Text 10"

AutoCAD SHX Text 18/16

AutoCAD SHX Text 10" D-1290

AutoCAD SHX Text 1"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 16/16

AutoCAD SHX Text 3/4"

AutoCAD SHX Text

VAV-008

AutoCAD SHX Text

VAV-009

AutoCAD SHX Text

VAV-006

AutoCAD SHX Text 6" D-195

AutoCAD SHX Text 1-1/4"

AutoCAD SHX Text 1"

AutoCAD SHX Text

AutoCAD SHX Text

%%UVAV-010

AutoCAD SHX Text 12/6

AutoCAD SHX Text

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text 26/18

AutoCAD SHX Text 12" D-1550

AutoCAD SHX Text 8"

8/8

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

ADDENDUM 4Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

MODERNIZE BASEMENT

KITCHEN AND MORGUE

COLUMBIA, MO VAMC

589A4-20-157

Project Director

08/09/2022Revisions: Date:

1 - SCHEMATIC DOCUMENTS

2 - DESIGN DEVELOPMENT

3 - 60% CONSTRUCTION DOCUMENTS

01/10/2021 05/14/2021 07/23/2021

PROJECT NO.: 20-003

Omaha, Nebraska 68137-5566

PH: (402) 496-4115

14216 Dayton Cir - Suite #5 21 Delta Engineers, LLC

Fax: (402) 384-8900

4 - 90% CONSTRUCTION DOCUMENTS 09/17/2021

5 - 100% CONSTRUCTION DOCUMENTS 12/28/2021

6 - 100% BID SET DOCUMENTS 05/06/2022

7 - ADDENDUM 4 08/09/2022

K

J H G EF.1 F Ea E.1B

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

%%UKEY PLAN

AutoCAD SHX Text

%%UBASEMENT - MORGUE POWER

AutoCAD SHX Text

TO LPB-H12-120 VC

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EP1.01

AutoCAD SHX Text

BASEMENT -

AutoCAD SHX Text

MORGUE POWER

AutoCAD SHX Text

AutoCAD SHX Text

DRD

AutoCAD SHX Text

PJM

AutoCAD SHX Text

TO LPB-H12-120VC LIFT POWER

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

TO LPB-H12-120 VC

AutoCAD SHX Text

TO COOLER COMPRESSOR LPB-G12E-208V

AutoCAD SHX Text

TO LPB-H12-120 VC AUTOPSY TABLE

AutoCAD SHX Text

AutoCAD SHX Text

TO LPB-H12-120 VC

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text

BODY STORAGE

AutoCAD SHX Text D027

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

CBD5

AutoCAD SHX Text

SUPPLY STORAGE

AutoCAD SHX Text D030A

AutoCAD SHX Text

AUTOSPY RM

AutoCAD SHX Text D030

AutoCAD SHX Text

TISSUE

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text D030B

AutoCAD SHX Text

HOUSE KEEPING

AutoCAD SHX Text D029

AutoCAD SHX Text

RR

AutoCAD SHX Text D028

AutoCAD SHX Text D025

AutoCAD SHX Text

STAIRWELL

AutoCAD SHX Text #9

AutoCAD SHX Text D003A

AutoCAD SHX Text D003

AutoCAD SHX Text D026

AutoCAD SHX Text

WORK STATION

AutoCAD SHX Text

CBD5A

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

CBD4

AutoCAD SHX Text

AutoCAD SHX Text 2'

AutoCAD SHX Text 4'

AutoCAD SHX Text 8'

AutoCAD SHX Text 1/4" = 1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text GENERAL ELECTRICAL POWER & LIGHTING NOTES: A. THE CONTRACTOR SHALL PROVIDE A GREEN INSULATED THE CONTRACTOR SHALL PROVIDE A GREEN INSULATED EQUIPMENT GROUNDING CONDUCTOR WITHIN ALL NEW POWER & LIGHTING CONDUITS ON THIS PROJECT. SIZE THIS CONDUCTOR AS NOTED OR PER NEC WHERE NOT NOTED. THIS GROUNDING CONDUCTOR SHALL BE PROVIDED REGARDLESS OF THE TYPE OF CONDUIT BEING USED. B. ANY SUBSTITUTIONS OF THE SCHEDULED LIGHTING FIXTURES ANY SUBSTITUTIONS OF THE SCHEDULED LIGHTING FIXTURES MUST BE REVIEWED BY THE ENGINEER PRIOR TO BID. PROVIDE CUT SHEETS ALONG WITH PHOTOMETRICS AT LEAST (10) DAYS PRIOR TO BID FOR THIS REVIEW. THE SUBSTITUTING PARTY MUST FOR THIS REVIEW. THE SUBSTITUTING PARTY MUST FOR THIS REVIEW. THE SUBSTITUTING PARTY MUST GUARANTEE THAT THE SUBSTITUTION MEETS THE PERFORMANCE & QUALITY SPECIFIED IN THE ORIGINAL FIXTURE. IF THE SUBSTITUTED FIXTURE DOES NOT PERFORM AS GUARANTEED, ALL REPLACEMENT COSTS MUST BE BORNE BY THE CONTRACTOR/MANUFACTURER. C. ALL RECEPTACLES PROTECTED BY GFCI BREAKERS MUST BE ALL RECEPTACLES PROTECTED BY GFCI BREAKERS MUST BE ENGRAVED WITH CODE REQUIRED IDENTIFICATION. D. CONTRACTOR TO MAINTAIN COVERAGE IN AREAS NOT IN PHASE CONTRACTOR TO MAINTAIN COVERAGE IN AREAS NOT IN PHASE TO MAINTAIN OPERATIONS IN AREAS NOT UNDER CURRENT CONSTRUCTION PHASE. . ELECTRICAL POWER & LIGHTING FLAG NOTES: 1. USE NEW GFCI 20A BREAKERS FOR NEW 20A OUTLET CIRCUITS USE NEW GFCI 20A BREAKERS FOR NEW 20A OUTLET CIRCUITS IN LPB-H12-120 VC PANEL. 2. PROVIDE 3-#12 AND 1-#12 GND IN 1/2" C. PROVIDE 3-#12 AND 1-#12 GND IN 1/2" C. 3. POWER FOR COOLER EQUIPMENT. LOCATION TO ROOM D017. POWER FOR COOLER EQUIPMENT. LOCATION TO ROOM D017. PLACE NEW EQUIPMENT NEXT TO OLD EQUIPMENT AS OLD COOLER WILL BE IN OPERATION UNTIL NEW COOLER IS INSTALLED. 4. OUTLET FOR AUTOPSY LIFT POWER. LOCATE 18" BELOW OUTLET FOR AUTOPSY LIFT POWER. LOCATE 18" BELOW CEILING.

AutoCAD SHX Text

AutoCAD SHX Text

CBD3

AutoCAD SHX Text

CBD3

AutoCAD SHX Text D017

AutoCAD SHX Text D004K

D003D

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

ADDENDUM 4Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

MODERNIZE BASEMENT

KITCHEN AND MORGUE

COLUMBIA, MO VAMC

589A4-20-157

Project Director

08/09/2022Revisions: Date:

1 - SCHEMATIC DOCUMENTS

2 - DESIGN DEVELOPMENT

3 - 60% CONSTRUCTION DOCUMENTS

01/10/2021 05/14/2021 07/23/2021

PROJECT NO.: 20-003

Omaha, Nebraska 68137-5566

PH: (402) 496-4115

14216 Dayton Cir - Suite #5 21 Delta Engineers, LLC

Fax: (402) 384-8900

#4

#5

#10

#9

#11

#6

#7

#8

DN

DN

UP

#14

#15

DN

DN

DN

#1#2#3

UP

UP

UP

DN DN

UP

UP

DN

UP

DN

4 - 90% CONSTRUCTION DOCUMENTS 09/17/2021

5 - 100% CONSTRUCTION DOCUMENTS 12/28/2021

6 - 100% BID SET DOCUMENTS 05/06/2022

7 - ADDENDUM 4 08/09/2022

R Q P N.2B Na N M.2 M La L K

6.2

6.7

326E

300E

327E

508E

108E

108E

331 809

100A

101A

101B

101B

100B

100B

114E

316E

322E

400E

321E

320E

318E

216E

212E

213E

103E

110E

216E

317E315E

314E

505E

508E

512E

312E 510E 403E

818E

605804

113E

109E

509E

503E504E

506E 112E

323E

327E

327E

805 807

819E

501E

107E

811E

601 805

817E817E 806807807

208207

105E

315E

818E

818E

818E818E

510E

505E

812E

812E

812E

812E812E812E

501E

501E

501E 501E

501E501E

206A

801801

507E

507E

812E

812E

511E511E511E

812E

510E

818E

510E510E510E

510E510E

827334E

320E

823E

214 223

317E

809809809

211A

319E

325E

818E

217E

217E

220E

204E

202E

201E

203E

205E

401E 310401E

104E

402E

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

%%UKEY PLAN

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

EP1.02

AutoCAD SHX Text

BASEMENT -

AutoCAD SHX Text

KITCHEN POWER

AutoCAD SHX Text

AutoCAD SHX Text

DRD

AutoCAD SHX Text

PJM

AutoCAD SHX Text

%%UBASEMENT - KITCHEN POWER

AutoCAD SHX Text

LPB-R10-120VC-F

AutoCAD SHX Text

DS-TB-R10-277VC

AutoCAD SHX Text

6" PNEUMATIC TUBE SYSTEM, 4 TUBES TOTAL.

AutoCAD SHX Text

LPB-R10-120VC SECTION 2

AutoCAD SHX Text

LPB-R10-120VC SECTION 1

AutoCAD SHX Text GENERAL ELECTRICAL POWER & LIGHTING NOTES: A. THE CONTRACTOR SHALL PROVIDE A GREEN INSULATED THE CONTRACTOR SHALL PROVIDE A GREEN INSULATED EQUIPMENT GROUNDING CONDUCTOR WITHIN ALL NEW POWER & LIGHTING CONDUITS ON THIS PROJECT. SIZE THIS CONDUCTOR AS NOTED OR PER NEC WHERE NOT NOTED. THIS GROUNDING CONDUCTOR SHALL BE PROVIDED REGARDLESS OF THE TYPE OF CONDUIT BEING USED. B. ANY SUBSTITUTIONS OF THE SCHEDULED LIGHTING FIXTURES ANY SUBSTITUTIONS OF THE SCHEDULED LIGHTING FIXTURES MUST BE REVIEWED BY THE ENGINEER PRIOR TO BID. PROVIDE CUT SHEETS ALONG WITH PHOTOMETRICS AT LEAST (10) DAYS PRIOR TO BID FOR THIS REVIEW. THE SUBSTITUTING PARTY MUST FOR THIS REVIEW. THE SUBSTITUTING PARTY MUST FOR THIS REVIEW. THE SUBSTITUTING PARTY MUST GUARANTEE THAT THE SUBSTITUTION MEETS THE PERFORMANCE & QUALITY SPECIFIED IN THE ORIGINAL FIXTURE. IF THE SUBSTITUTED FIXTURE DOES NOT PERFORM AS GUARANTEED, ALL REPLACEMENT COSTS MUST BE BORNE BY THE CONTRACTOR/MANUFACTURER. C. ALL RECEPTACLES PROTECTED BY GFCI BREAKERS MUST BE ALL RECEPTACLES PROTECTED BY GFCI BREAKERS MUST BE ENGRAVED WITH CODE REQUIRED IDENTIFICATION. . D. CONTRACTOR TO MAINTAIN COVERAGE IN AREAS NOT IN PHASE CONTRACTOR TO MAINTAIN COVERAGE IN AREAS NOT IN PHASE TO MAINTAIN OPERATIONS IN AREAS NOT UNDER CURRENT CONSTRUCTION PHASE. ELECTRICAL POWER & LIGHTING FLAG NOTES: 1. MOVE ALTRON, LENEL, AND SECURITY PANELS TO INSIDE OF MOVE ALTRON, LENEL, AND SECURITY PANELS TO INSIDE OF ROOM B011J. LOCATION IN ROOM TO BE DETERMINED BY OWNER. 2. POWER WILL BE HARD WIRED TO EQUIPMENT. BREAKERS TO BE POWER WILL BE HARD WIRED TO EQUIPMENT. BREAKERS TO BE GFCI RATED. 3. PROVIDE NEW DUPLEX OUTLETS. PROVIDE 2-#12 & 1-#12 PROVIDE NEW DUPLEX OUTLETS. PROVIDE 2-#12 & 1-#12 GND IN 3/4" C. BREAKERS TO BE GFCI RATED. 4. PROVIDE STAINLESS STEEL TELE-POWER POLE. FINAL LOCATION PROVIDE STAINLESS STEEL TELE-POWER POLE. FINAL LOCATION TO BE DETERMINED AND COORDINATED WITH EQUIPMENT LOCATION. 5. PANELS TO BE INSTALLED IN FIRST PART OF PHASE 1 BEFORE PANELS TO BE INSTALLED IN FIRST PART OF PHASE 1 BEFORE OLD PANELS ARE DEMOLISHED. 6. TRANSFORMER AND DISCONNECT TO BE RELOCATED FROM TRANSFORMER AND DISCONNECT TO BE RELOCATED FROM ROOM COO1C. 7. PROVIDE NEW DUPLEX OUTLETS THAT COORDINATES WITH PROVIDE NEW DUPLEX OUTLETS THAT COORDINATES WITH PLUGGED EQUIPMENT FROM EQUIPMENT SCHEDULE. BREAKERS TO BE GFCI RATED. 8. DISCONNECT SWITCHES FOR COOLER AND FREEZER DISCONNECT SWITCHES FOR COOLER AND FREEZER CONDENSING UNITS WILL REUSE EXISTING DISCONNECT SWITCH. 9. POWER FOR AIR CURTAIN AND DOOR OPERATOR. POWER WILL POWER FOR AIR CURTAIN AND DOOR OPERATOR. POWER WILL BE HARD WIRED TO EQUIPMENT. PROVIDE 2-#12 & 1&12 GND IN 3/4" C. BREAKERS TO BE GFCI RATED. 10. POWER FOR DOOR OPERATOR. POWER WILL BE HARD WIRED TO POWER FOR DOOR OPERATOR. POWER WILL BE HARD WIRED TO EQUIPMENT. PROVIDE 2-#12 & 1&12 GND IN 3/4" C. BOTH ENTER AND EXIT DOOR POWERED BY LPB-R10-12VC-1, 22. BREAKERS TO BE GFCI RATED. 11. POWER TO WAREWASHER MEIKO IS FROM PPB-R10-277VC. POWER TO WAREWASHER MEIKO IS FROM PPB-R10-277VC. T1-T4 WILL LAND ON FOUR DIFFERENT TERMINAL BLOCKS PER MANUFACTURES DESIGN. WIRE SIZE TO BE MAINTAINED THE SAME ON BOTH SIDES OF THE DISCONNECTS.

AutoCAD SHX Text

AutoCAD SHX Text 110E

AutoCAD SHX Text 107E

AutoCAD SHX Text

AutoCAD SHX Text

XFMR CL75 TB-R10 75 KVA

AutoCAD SHX Text

PPB-R10-120VC

AutoCAD SHX Text

LPB-R10-120VC

AutoCAD SHX Text

PPB-R10-277VC

AutoCAD SHX Text

PLB-R10-277VC

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text 4'

AutoCAD SHX Text 8'

AutoCAD SHX Text 16'

AutoCAD SHX Text 1/8" = 1'-0"

AutoCAD SHX Text 216E,322E

AutoCAD SHX Text 511E

AutoCAD SHX Text 511E

AutoCAD SHX Text 511E

AutoCAD SHX Text

TO FREEZER

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 204E

AutoCAD SHX Text 203E

AutoCAD SHX Text 114E

AutoCAD SHX Text

AutoCAD SHX Text 105E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 216E

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

CBC1

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

CBD7

AutoCAD SHX Text C002A

AutoCAD SHX Text C002B

AutoCAD SHX Text

BIO MED

AutoCAD SHX Text C002

AutoCAD SHX Text

IT

AutoCAD SHX Text C001

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

CBD4

AutoCAD SHX Text B001D

AutoCAD SHX Text B001A

AutoCAD SHX Text B011G

AutoCAD SHX Text B011F

AutoCAD SHX Text B011E

AutoCAD SHX Text B011D

AutoCAD SHX Text B011C

AutoCAD SHX Text B013A

AutoCAD SHX Text B002G

AutoCAD SHX Text B002D

AutoCAD SHX Text B002A

AutoCAD SHX Text

MOW

AutoCAD SHX Text C009B

AutoCAD SHX Text

MOW PREP

AutoCAD SHX Text C009A

AutoCAD SHX Text

MECH.

AutoCAD SHX Text

RM

AutoCAD SHX Text C010

AutoCAD SHX Text

CANTEEN

AutoCAD SHX Text C009C

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C009

AutoCAD SHX Text

COOLER

AutoCAD SHX Text C009E

AutoCAD SHX Text

FREEZER

AutoCAD SHX Text C009D

AutoCAD SHX Text

DIRECTOR

AutoCAD SHX Text C009I

AutoCAD SHX Text

SUPERVISORS

AutoCAD SHX Text C009J

AutoCAD SHX Text

WASHWARE

AutoCAD SHX Text C009K

AutoCAD SHX Text

COOKLINE

AutoCAD SHX Text C009L

AutoCAD SHX Text

TRAY MAKE LINE

AutoCAD SHX Text B001I

AutoCAD SHX Text

CART WASH

AutoCAD SHX Text C009M

AutoCAD SHX Text

FOOD PREP

AutoCAD SHX Text B001

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text C009F

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text B001H

AutoCAD SHX Text

TRAINING

AutoCAD SHX Text B001G

AutoCAD SHX Text

HOUSE KEEPING

AutoCAD SHX Text B001F

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text B001B

AutoCAD SHX Text

WOMEN'S

AutoCAD SHX Text B001D

AutoCAD SHX Text

MEN'S

AutoCAD SHX Text B001C

AutoCAD SHX Text

LOCKER ROOM

AutoCAD SHX Text B001E

AutoCAD SHX Text

CHEM. CLST.

AutoCAD SHX Text B001A

AutoCAD SHX Text

ORDERING

AutoCAD SHX Text C009H

AutoCAD SHX Text C008

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 507E

AutoCAD SHX Text 202E

AutoCAD SHX Text

AutoCAD SHX Text 201E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 508E

AutoCAD SHX Text 112E

AutoCAD SHX Text 315E

AutoCAD SHX Text

AutoCAD SHX Text 209,210

AutoCAD SHX Text 400E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B011J

AutoCAD SHX Text B011

AutoCAD SHX Text B009

AutoCAD SHX Text B009A

AutoCAD SHX Text B011H

AutoCAD SHX Text B007

AutoCAD SHX Text B011A

AutoCAD SHX Text B011B

AutoCAD SHX Text B013

AutoCAD SHX Text B019

AutoCAD SHX Text

AutoCAD SHX Text 100A

AutoCAD SHX Text 101A

AutoCAD SHX Text 100B

AutoCAD SHX Text 100B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

TO COOLER

AutoCAD SHX Text

AutoCAD SHX Text 101B

AutoCAD SHX Text

AutoCAD SHX Text 101B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

LPB-R10-120VC SECTION 4

AutoCAD SHX Text

LPB-R10-120VC SECTION 3

AutoCAD SHX Text

DOOR

AutoCAD SHX Text

DOOR

AutoCAD SHX Text

DOOR

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 211A

AutoCAD SHX Text 402E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

WALK-IN COOLER

AutoCAD SHX Text 120V

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

HW

AutoCAD SHX Text 20/1

AutoCAD SHX Text

LPB-R10-120VC-1, 4

AutoCAD SHX Text

2-#12 & 1-#12 GND, 3/4" C

AutoCAD SHX Text 100A

AutoCAD SHX Text

AutoCAD SHX Text

WALK-IN COOLER

AutoCAD SHX Text

CONDENSING UNIT

AutoCAD SHX Text 208V

AutoCAD SHX Text

AutoCAD SHX Text 16.3

AutoCAD SHX Text 2.5

AutoCAD SHX Text

HW

AutoCAD SHX Text 20/3

AutoCAD SHX Text

LPB-R10-120VC-1, 18,19,20

AutoCAD SHX Text

3-#12 & 1-#12 GND, 3/4" C

AutoCAD SHX Text 100B

AutoCAD SHX Text

AutoCAD SHX Text

WALK-IN COOLER

AutoCAD SHX Text

EVAPORATOR

AutoCAD SHX Text 120V

AutoCAD SHX Text

AutoCAD SHX Text 1.6

AutoCAD SHX Text

AutoCAD SHX Text

HW

AutoCAD SHX Text 20/1

AutoCAD SHX Text

LPB-R10-120VC-1, 17,38

AutoCAD SHX Text

2-#12 & 1-#12 GND, 3/4" C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

WALK-IN FREEZER

AutoCAD SHX Text 120V

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

HW

AutoCAD SHX Text 20/1

AutoCAD SHX Text

LPB-R10-120VC-1, 5

AutoCAD SHX Text

2-#12 & 1-#12 GND, 3/4" C

AutoCAD SHX Text 101A

AutoCAD SHX Text

AutoCAD SHX Text

WALK-IN FREEZER

AutoCAD SHX Text

CONDENSING UNIT

AutoCAD SHX Text 208V

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

HW

AutoCAD SHX Text 30/3

AutoCAD SHX Text

LPB-R10-120VC-1, 25,26,27

AutoCAD SHX Text

3-#10 & 1-#10 GND, 3/4" C

AutoCAD SHX Text 101B

AutoCAD SHX Text

AutoCAD SHX Text

WALK-IN FREEZER

AutoCAD SHX Text

EVAPORATOR

AutoCAD SHX Text 208V

AutoCAD SHX Text

AutoCAD SHX Text 9.8

AutoCAD SHX Text

AutoCAD SHX Text

HW

AutoCAD SHX Text 20/2

AutoCAD SHX Text

LPB-R10-120VC-3, 19,20,32,33

AutoCAD SHX Text

3-#12 & 1-#1 GND, 3/4" C

AutoCAD SHX Text 103E

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING REACH-IN

AutoCAD SHX Text

REFRIGERATOR

AutoCAD SHX Text 120V

AutoCAD SHX Text

AutoCAD SHX Text 5.9

AutoCAD SHX Text 1/2

AutoCAD SHX Text 5-15P

AutoCAD SHX Text 20/1

AutoCAD SHX Text

LPB-R10-120VC-1, 13

AutoCAD SHX Text

2-#12 & 1-#12 GND, 3/4" C

AutoCAD SHX Text 104E

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING REACH-IN

AutoCAD SHX Text

FREEZER

AutoCAD SHX Text 120V

AutoCAD SHX Text

AutoCAD SHX Text 6.2

AutoCAD SHX Text 3/4

AutoCAD SHX Text 5-15P

AutoCAD SHX Text 20/1

AutoCAD SHX Text

LPB-R10-120VC, 4

AutoCAD SHX Text

2-#12 & 1-#12 GND, 3/4" C

AutoCAD SHX Text 105E

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING REACH-IN

AutoCAD SHX Text

REFRIGERATOR

AutoCAD SHX Text 120V

AutoCAD SHX Text

AutoCAD SHX Text 10.4

AutoCAD SHX Text 1/2

AutoCAD SHX Text 5-15P

AutoCAD SHX Text 20/1

AutoCAD SHX Text

LPB-R10-120VC, 2

AutoCAD SHX Text

2-#12 & 1-#12 GND, 3/4" C

AutoCAD SHX Text 107E

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING REACH-IN

AutoCAD SHX Text

FREEZER

AutoCAD SHX Text 120V

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1/2

AutoCAD SHX Text 5-20P

AutoCAD SHX Text 20/1

AutoCAD SHX Text

LPB-R10-120VC-1, 14

AutoCAD SHX Text

2-#12 & 1-#12 GND, 3/4" C

AutoCAD SHX Text 108E

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING ROLL-IN

AutoCAD SHX Text

REFRIGERATOR (CANTEEN)

AutoCAD SHX Text 120V

AutoCAD SHX Text

AutoCAD SHX Text 8.9

AutoCAD SHX Text 1/3

AutoCAD SHX Text 5-15P

AutoCAD SHX Text 20/1

AutoCAD SHX Text

LPB-R10-120VC-2, 36,37

AutoCAD SHX Text

2-#12 & 1-#12 GND, 3/4" C

AutoCAD SHX Text 109E

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING REFRIGERATOR

AutoCAD SHX Text

(BREAKROOM)

AutoCAD SHX Text 120V

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C&P

AutoCAD SHX Text 20/1

AutoCAD SHX Text

LPB-R10-120VC-2, 11

AutoCAD SHX Text

2-#12 & 1-#12 GND, 3/4" C

AutoCAD SHX Text 110E

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING ROLL-IN

AutoCAD SHX Text

REFRIGERATOR

AutoCAD SHX Text 115V

AutoCAD SHX Text

AutoCAD SHX Text 10.6

AutoCAD SHX Text 1/3

AutoCAD SHX Text 5-15P

AutoCAD SHX Text 20/1

AutoCAD SHX Text

LPB-R10-120VC-2, 28

AutoCAD SHX Text

2-#12 & 1-#12 GND, 3/4" C

AutoCAD SHX Text 112E

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING AIR CURTAIN

AutoCAD SHX Text

REFRIGERATOR

AutoCAD SHX Text 120V

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 5-5-20P

AutoCAD SHX Text 20/1

AutoCAD SHX Text

LPB-R10-120VC-2, 24

AutoCAD SHX Text

2-#12 & 1-#12 GND, 3/4" C

AutoCAD SHX Text 202E

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING ELECTRIC RANGE

AutoCAD SHX Text

(CANTEEN)

AutoCAD SHX Text 208V

AutoCAD SHX Text

AutoCAD SHX Text 45-62

AutoCAD SHX Text

AutoCAD SHX Text

HW

AutoCAD SHX Text 70/3

AutoCAD SHX…

This is the start of the file's text. The full file is on GovTribe.