This federal solicitation seeks proposals for a construction project to renovate space for domiciliary providers in Building 2 at the Jefferson Barracks Division of the VA Saint Louis Health Care System in St. Louis, Missouri. The project involves renovating areas on the second floor north and all of the first floor of Building 2, with work phased to complete the second floor followed by the first floor. The construction work is estimated to cost between $2,000,000 to $5,000,000 and last approximately 457 calendar days once a notice to proceed is issued. The project is set aside for Service-Disabled Veteran-Owned Small Businesses and will be awarded using the Best Value Tradeoff Source Selection Process. Proposals are due by March 23, 2022 and must be submitted electronically to the points of contact listed in the solicitation.

View the file

Other files

File Type Posted
657-19-127JB_spec section 27 51 16.pdf PDF
36C25522R0033 0007.docx DOCX document
657-19-127JB_Electrical plan changes.pdf PDF
657-19-127JB-2022.03.17_ADD-2.pdf PDF
1801901 Asbestos Mold Survey - Jefferson Building 2 (final).pdf PDF
JB-2-Report.pdf PDF
36C25522R0033 0005.docx DOCX document
36C25522R0033 0004.docx DOCX document
36C25522R0033 0003.docx DOCX document
UpdatedSpecs_Vol1_revised 20211215.pdf PDF
UpdatedSpecs_Vol2.pdf PDF
36C25522R0033.docx DOCX document
PastPerformanceQuestionnaire36C25522R0033Project657-19-127JB.docx DOCX document
Bid Docs_Arch.pdf PDF
Bid Docs_MEP DRAWINGS.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

657-19-127JB

36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth

KS

66048 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth

KS

66048 To all Offerors/Bidders

36C25522R0033 12-21-2021

X X X

The above cited solicitation is hereby amended as shown below:

Additional critical questions & answers are attached.

Verbiage of Factor 1 and Factor 3 are changed below.

The due date for proposals remains 23 March 2022.

Electronic submission of proposals is required. No physical copies will be accepted.

Proposals must be submitted electronically by emailing to all of the following addresses:

kevin.knight2@va.gov; david.holden@va.gov; james.petrik@va.gov Each email with attachments must be less than 10 megabytes. Copies of Bid Bonds shall be included.

Original physical copies of Bid Bonds must still be received at the contracting office before the closing time.

Except as stated herein, any and all terms of the Original Solicitation are still in effect and not changed.

Kevin D. Knight Questions & Answers 2

657-19-127JB

1. Since most subcontractors are not known at the time of bid, will the contractors that do not submit resumes for subcontractors be ranked lower than those that do provide subcontractor resumes?

1. Can a contractor submit multiple subcontractor resumes for the same positions (e.g., three electricians) since the contractor may not be able to determine which subcontractor will be used at the time of bid document preparation?

1. In accordance with 13 C.F.R. § 125.8(e), please confirm that the government will accept the experience from either member of an SBA approved Joint Venture with a mentor-protégé agreement to meet the requirements of the solicitation?

1. BOH Areas (Storage, Mech, Elec, OIT, Jan): LVT-2 for floor is indicated in room finish schedule, but finish plans marks SCF-1, whereas hatch also resembles with SCF-1. Furthermore, location of SCF-1 is also marked as "BOH" in the material schedule. Please Verify.

· Provide SCF-1 for OIT 125, Elect 126, OIT 213, Elect 212, OIT G04,

· Provide LVT-2 for Jan 117, Mech 124, Mech 201, HAC 210,

· Provide LVT-1 for Storage 132,

a) Specs of transitions (TS-1, TS-2 & T S-3) do not match with room finish notes (note L & M).

a. Drawings are to control the transition strips.

b) CT-1 Tile Base estimated in Floor 01 Restrooms referring Room Finish & Typ. Elevations 3-8/02-AI-211 indicates CT-2 Base

a. Provide CT-1 for flooring and CT-2 for base in restrooms

c) Room G04 & G09 in Floor 00, Finish not indicated. Do these room get materials?

a. OIT G04 to get SCF-1 flooring and paint existing walls PT-1.

d) Offices 218-222 indicates Not in Scope Area referring Key Plan. Room finish indicates finishes in these rooms.

a. There is not scope in rooms 218-222.

4) Plan page 02-GI-002 includes two notes under the heading Phasing General Notes, which are reproduced below:

1. Project shall be completed during night shifts, 5:00pm to 5:00am. Coordinate with COR. All work to be completed and open for public use at the end of each night’s work.

0. COR to confirm. But the intent is the building will be occupied during construction and the work should be conducted during regular working hours. Items of the work that must take place in occupied areas to coordinate the complete of the work are to coordinated with the COR for off hours work. Regular working hours should be considered 5:00 am to 5:00 pm.

1. Construction work behind temporary construction partitions shall be completed during night shifts, 5:00pm to 5:00am.

1. The Past experience requirements state that a relevant project is “replacement of boilers, completed within a functioning hospital or VA hospital setting” however the scope of work is not consistent with this requirement. Will the VA change the description of a relevant project to an “interior renovation at an active VA hospital”?

4. VA Cor to respond. Yes. See change to Factor 1 below.

1. The solicitation asks for resumes from the Project Manager, On-Site Superintendent, Quality Control Manager, Safety Officer, and subcontractors. Does the VA require a full time on site Quality control Manager and Safety Officer?

5. VA Cor to respond. Yes

1. Can the Superintendent be the Safety officer (competent person) and Quality Control manager (triple hatted)?

6. VA Cor to respond. Yes, as long as they meet the requirements for all positions. It is preferred though that the Safety Officer is not also responsible for production deadlines or meeting the daily/weekly schedule (Project Manager/On-Site Superintendent).

1. Since most subcontractors are not known at the time of bid, will the contractors that do not submit resumes for subcontractors be ranked lower than those that do provide subcontractor resumes?

7. VA Cor to respond. No. You are rated on the Prime Contractor information provided. See change to Factor 3 below.

1. Can a contractor submit multiple subcontractor resumes for the same positions (e.g., three electricians) since the contractor may not be able to determine which subcontractor will be used at the time of bid document preparation?

8. VA Cor to respond. No. You are rated on the Prime Contractor information provided. See change to Factor 3 below.

1. In accordance with 13 C.F.R. § 125.8(e), please confirm that the government will accept the experience from either member of an SBA approved Joint Venture with a mentor-protégé agreement to meet the requirements of the solicitation?

9. VA Cor to respond. Yes

11) After reviewing Addendum #2, I noticed Question #28 was not answered within the Hazardous Material Report provided. Also, mold was not stated in the original bid documents, yet a Fungal Investigation Report is provided with the Addendum #2 Hazardous Material Report (Question #2 below):

a. (Question #28) Specifications call out locations for lead base paint removal. However, the Addendum #2 Hazardous Material Report only provides information on Asbestos and Mold. There are no quantities listed for lead anywhere in the bid documents. – The lead specifications were prepared using the 2018 Asbestos and Lead-Reinspection at Building 2, by Riverfront Safety and Health, LC., dated May 31, 2019 provided to TTL by Guidon and VA. The quantities were not present in the provided report. The survey and sampling of asbestos was conducted to confirm the presence and quantity of asbestos materials but Lead paint quantities were not calculated as the provided report had inspected Building 2 from June 2018 through May 2019 and had inspected paint for presence of Lead in all areas.

b. Please provide quantities of LBP removal in each listed location?

i. • White Plaster Walls – 1st and 2nd floor

ii. • Grey Plaster Walls – Room 207, 208

iii. • White Drywall – Room 203, 210, 212E

iv. • White Wood Wall – Room 104, 109,111, 120, Lobby

v. • White Metal Door – Room 110

vi. • Green and Light Green Wall Tile – Room 117

12) Drawings/Specs do not state any removal of mold on this project. However, Addendum #2 provides an Asbestos Mold Survey (Fungal Investigation Report).

c. Will there be any mold removal required in this project? If so, please provide locations/quantities as well as removal methods and specifications. – Mold air sampling was performed at the time of asbestos survey to identify if there was any mold issues in Building 2. The mold testing was used to identify the indoor air quality at the time of the survey to determine if the building had significant mold issues. The report identified some issues only in the stairwells (SE and NE) and in Room 120 due to a broken pipe. Further investigative and sampling actions were recommended for the stairwells in the report and no mold specifications were provided.

End of Q & A Evaluation Factor 1 is changed to read as follows:

FACTOR 1: PRIME CONTRACTOR CONSTRUCTION EXPERIENCE

To be Technically Acceptable, Offerors should submit a minimum of three (3) construction projects for the Offeror that best demonstrates your experience on relevant projects that are similar in size, scope, and complexity to the RFP. The projects must demonstrate an Offeror’s construction experience as a prime construction contractor directly responsible to the owner and managing multiple subcontractors. For the purposes of this evaluation, a relevant project is further defined as “interior renovation completed within a functioning hospital or VA hospital setting.”

Project(s) should have a minimum value of $2,000,000.00 and be 100% complete. Projects submitted for the Offeror shall be completed within the past five (5) years of the date of issuance of this RFP. If the contract/work is incomplete or was completed more than five years prior to the date of submitting this proposal, it will not be deemed relevant and will not be considered.

A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project.

Offeror’s submission should include at a minimum:

· Provide the Project Title and Description, Project Location (Physical Address); Contract Type (Example: Design Build, Design Bid Build).

· Provide the project owner name and telephone number of the owner’s contact person.

· Provide a description of the scope of work, to include the work performed by the prime contractor.

· Provide project statistics including start and completion dates (original vs actual) and project cost (original vs actual. If original vs actual completion dates and project cost differ, please explanation as to why they differ.

If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects shall be submitted for each Joint Venture partner. Offerors who fail to submit experience for all Joint Venture partners may be rated lower.

(Note: If submitting as a Prime/Sub teaming arrangement under FAR 9.601(2), the designated prime must meet the specific requirements of Factor 1 “Prime Contractor Construction Experience” in order for the teaming arrangement to be deemed acceptable. Subcontractor experience will not be considered.)

Sub-contractors will not be evaluated for this requirement. Evaluation Factor 3 is changed to read as follows:

FACTOR 3: KEY PERSONNEL EXPERIENCE

To be Technically Acceptable, the Offeror shall provide a resume for each of the following key personnel members, to include the Project Manager, On-Site Superintendent, Quality Control Manager, Safety Officer (designated Competent Person as defined by OSHA). For each resume, include name of company, name of individual, relevant listing of experience, qualifications for each person such as specialized training, education, experience, etc. Please delineate the approximate % of work the prime contractor will perform on this job and the approximate % of work the subcontractors (collectively) will perform on this job (as provided for in Section 1.2, Page 14).

Note: Only submit information for personnel that will perform on a resulting contract. Any substitutions after award must be determined equally or more qualified by the Contracting Officer to avoid Termination for Default.

A.1 List of Attachments

See attached document: 1801901 Asbestos Mold Survey - Jefferson Building 2 (final).

See attached document: JB-2-Report.