36C25521R0007 0004.docx
DOCX document 273 KB Posted
- Solicitation number
- 36C25521R0007
About this file
This amendment provides clarification to the solicitation for replacing air handlers AC-S3 and AC-S4 at the Harry S Truman Medical Center in Columbia, Missouri. The scope of work includes demolishing the existing units, installing new fan wall-type air handlers with specified coils and fans, making temporary and permanent ductwork connections, and commissioning the new units. Clarification is provided regarding submittal responsibilities, mechanical equipment details, and fire life safety drawings. The estimated price range for the project is $1 to $2 million. As a total SDVOSB set-aside, the solicitation will be available on November 20, 2020 with a proposal due date of December 21, 2020. The contract duration is up to 270 calendar days from notice to proceed.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 1-08-2021 589A4-18-186 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth
KS
66048 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth
KS
66048 To all Offerors/Bidders
36C25521R0007 11-23-2020
X X X
January 14, 2021 Central Time Replace Air Hadler AC-S3 and AC-S4, Project 589A4-18-186 This amendment Povides the following:
a. Provides answers to additional questions starting on page 2.
b. Provides Fire, Life Safety Deficiency Drawings for Reference.
c.The closing date has not changed, Jaunary 14, 2021 Central Standard Time
d. All other terms and conditions remain unchaged.
CONTINUATION PAGE
FCA Replace Air Handlers (AC-S3, AC-S4)
589A4-18-186
Amendment 04 January 8, 2021
SSC # 2018-202
SPECIFICATION:
1. Per 12/7/2020 pre-proposal conference call, it was mentioned that Submittal Exchange will be handled and paid for by the AE. Please confirm the cost of the submittal software will in fact be handled outside of GC contract.
Answer:
Submittal specification (Section 01 33 23 -1) clearly states the AE is responsible for setup of submittal exchange. GC will work with AE for proper levels of access.
GENERAL INFORATION:
1. Per drawing sheet G0.1, note 20: Paint all exposed new and existing piping, conduit, wire mold, electrical panels, access panels, etc., to match wall finish unless otherwise noted.
Answer:
Not required in penthouse mechanical room.
2. Can the VA please provide the life safety drawings and code information sheets?
The Truman VA is currently under a different contract to correct Fire Life Safety Deficiencies. The attached drawings are for your reference and will reflect the most accurate changes.
MECHANICAL:
1. For AHU-S4, the static pressures listed look like a copy paste of AHU-S3 and there are no pressures listed for the return fan. The motors are also not NEMA standard motor sizes, 10HP and 5HP would need to be used. When I try a selection for the supply fan, the only selection I get would need 20HP per fan, so I doubt the numbers for AHU-S4 are good.
The specification is also requiring the fans to have a N+1 redundancy. Given the airflow and pressure for AHU-S3, a 15HP motor will not be sufficient for redundancy. See selection below:
AHUs are “fan wall” type. Redundancy is the remaining operating fan(s).
AHU-4
SF total sp is 9.5” RF total sp is 3.0”
2. Can you confirm if VIFB are required for both units? Looks like AHU-S4 only has regular heating coils.
Also, for AHU-S3, please confirm it would be acceptable to use only 1 VIFB coil (as shown on the specification layout).
| Answer: |
| Plan and elevations details of AC-S3 & AC-S4 are correct on M0.2. |
Clarification:
AC-S3
· (2) CW coils
· (1) IFB heating coil
· (2) Heat recovery coils
AC-S4
· (1) CW coil
· (2) Heating coils
· (1) Heat recovery coil
A.1 List of Attachments
See attached document: Amendment 4-Drawings-Correct Fire Life Safety Deficiencies for reference.
Page 1 of
Page 1 of image1.png image2.png image3.jpeg image4.png image5.png
File details come from the government source that posted it. Updated .