36C25519R0057-002.pdf
PDF 18 MB Posted
- Attached to
- Renovate 5 th Floor, Project No. 589A4-18-187 Renovate Vacated Dental Space, Project NO 589A4-18-102
- Solicitation number
- 36C25519R0057
About this file
36C25519R0057 Drawings- Remodel 5th Floor-Vol 1-38 Pages.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25519R0057-0004001.pdf | ||
| 36C25519R0057-0004000.docx | DOCX document | |
| 36C25519R0057-0003001.pdf | ||
| 36C25519R0057-0003000.docx | DOCX document | |
| 36C25519R0057-0002002.pdf | ||
| 36C25519R0057-0002001.pdf | ||
| 36C25519R0057-0002003.pdf | ||
| 36C25519R0057-0002000.docx | DOCX document | |
| 36C25519R0057-0001005.pdf | ||
| 36C25519R0057-0001007.pdf | ||
| 36C25519R0057-0001004.pdf | ||
| 36C25519R0057-0001003.pdf | ||
| 36C25519R0057-0001002.pdf | ||
| 36C25519R0057-0001006.pdf | ||
| 36C25519R0057-0001000.docx | DOCX document | |
| 36C25519R0057-0001001.pdf | ||
| 36C25519R0057-009.pdf | ||
| 36C25519R0057-003.pdf | ||
| 36C25519R0057-008.pdf | ||
| 36C25519R0057-010.pdf | ||
| 36C25519R0057-011.pdf | ||
| 36C25519R0057-006.pdf | ||
| 36C25519R0057-012.pdf | ||
| 36C25519R0057-004.pdf | ||
| 36C25519R0057-005.pdf | ||
| 36C25519R0057-007.pdf | ||
| 36C25519R0057-001.docx | DOCX document | |
| 36C25519R0057-000.docx | DOCX document |
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET INDEX
ED101 PHASE 1 - DEMOLITION FLOOR PLAN
ED102 PHASE 2 - DEMOLITION FLOOR PLAN
ED103 PHASE 3 - DEMOLITION FLOOR PLAN
EL101 PHASE 1 - LIGHTING FLOOR PLAN
EL102 PHASE 2 - LIGHTING FLOOR PLAN
EL103 PHASE 3 - LIGHTING FLOOR PLAN
EL501 ELECTRICAL LIGHTING DETAILS
EP101 PHASE 1 - POWER FLOOR PLAN
EP102 PHASE 2 - POWER FLOOR PLAN
EP103 PHASE 3 - POWER FLOOR PLAN
EP501 ELECTRICAL POWER DETAILS
EY101 PHASE 1 - SYSTEMS FLOOR PLAN
EY102 PHASE 2 - SYSTEMS FLOOR PLAN
EY103 PHASE 3 - SYSTEMS FLOOR PLAN
EY501 ELECTRICAL SYSTEMS DETAILS
MD101 PHASE 1 - HVAC DEMOLITION PLAN
SHEET INDEX
SHEET
NO.
SHEET NAME
GENERAL
G-001 COVER SHEET AND SHEET INDEX
G-100 OVERALL CODE REVIEW PLAN
G-101 PHASE 1 - CODE REVIEW PLAN
G-102 PHASE 2 - CODE REVIEW PLAN
G-103 PHASE 3 - CODE REVIEW PLAN
FIRE PROTECTION
FP100 FIRE PROTECTION PLAN
ARCHITECTURAL DEMOLITION
AD101 PHASE 1 - DEMOLITION PLAN
AD102 PHASE 2 - DEMOLITION PLAN
AD103 PHASE 3 - DEMOLITION PLAN
ARCHITECTURAL
AE001 ABBREVIATIONS AND SYMBOLS LEGEND
AE100 OVERALL FLOOR PLAN WITH PHASING
AE101 PHASE 1 - FLOOR PLAN
AE102 PHASE 2 - FLOOR PLAN
AE103 PHASE 3 - FLOOR PLAN
AE111 PHASE 1 - REFLECTED CEILING PLAN
AE112 PHASE 2 - REFLECTED CEILING PLAN
AE113 PHASE 3 - REFLECTED CEILING PLAN
AE401 ENLARGED PLANS, SCHEDULES AND MOUNTING HEIGHTS
AE501 COLUMN AND PARTITION DETAILS
AE511 CEILING DETAILS
AE512 MISCELLANEOUS DETAILS
AE601 PARTITION TYPES
AE611 DOOR/WINDOW SCHEDULES AND ELEVATIONS
INTERIOR
IF100
IN100 OVERALL FINISH PLAN
IN110 OVERALL WALL PROTECTION PLAN
IN120 OVERALL SIGNAGE PLAN & SCHEDULE
IN201 INTERIOR ELEVATIONS
IN301 CASEWORK SECTIONS
IN121 SIGNAGE DETAILS
IN101 FINISH SCHEDULE, LEGEND & NOTES
PLUMBING
PP001 PLUMBING COVER SHEET
PD101 PHASE 1 - PLUMBING DEMOLITION PLAN - FIFTH FLOOR
PD102 PHASE 2 - PLUMBING DEMOLITION PLAN - FIFTH FLOOR
PD103 PHASE 3 - PLUMBING DEMOLITION PLAN - FIFTH FLOOR
PL101
PL102
PL103
P-501 PLUMBING DETAILS
P-601 PLUMBING SCHEDULES
MD102 PHASE 2 - HVAC DEMOLITION PLAN
MD103 PHASE 3 - HVAC DEMOLITION PLAN
MD201 PHASE 1 - HYDRONICS DEMOLITION PLAN
MD202 PHASE 2 - HYDRONICS DEMOLITION PLAN
MD203 PHASE 3 - HYDRONICS DEMOLITION PLAN
MH100 OVERALL HVAC FLOOR PLAN
MH101 PHASE 1 - HVAC FLOOR PLAN
MH102 PHASE 2 - HVAC FLOOR PLAN
MH103 PHASE 3 - HVAC FLOOR PLAN
MP100 OVERALL HYDRONICS FLOOR PLAN
MP101 PHASE 1 - HYDRONICS FLOOR PLAN
MP102 PHASE 2 - HYDRONICS FLOOR PLAN
MP103 PHASE 3 - HYDRONICS FLOOR PLAN
M-502 MECHANICAL DETAILS
M-503 MECHANICAL CONTROL DIAGRAMS
M-601 MECHANICAL SCHEDULES
M-701 MECHANICAL AIR FLOW BALANCE FLOOR PLAN
MECHANICAL
M-501 MECHANICAL DETAILS
ELECTRICAL
E-001 ELECTRICAL NOTES AND SYMBOLS
MM001 MECHANICAL COVER SHEET
MM002 MECHANICAL COVER SHEET
PL100 OVERALL PLUMBING PLAN - FOURTH FLOOR
PL104
PHASE 1 - PLUMBING PLAN - FIFTH FLOOR
PL105
PHASE 2 - PLUMBING PLAN - FIFTH FLOOR
PHASE 3 - PLUMBING PLAN - FIFTH FLOOR
EP601 ELECTRICAL SCHEDULES
EL601 LIGHT FIXTURE SCHEDULE
PD100 PLUMBING DEMO PLAN - FOURTH FLOOR
OVERALL PLUMBING PLAN - FIFTH FLOOR
OVERALL PLUMBING PLAN - SIXTH FLOOR
OVERALL FURNITURE, FIXTURES, & EQUIPMENT PLAN
IN202 INTERIOR ELEVATIONS
STRUCTURAL NOTES AND DETAILSS-101
STRUCTURAL
SHEET
REFERENCE NO.
SHEET
NO.
SHEET NAMESHEET
REFERENCE NO.
INTERGRATED PROJECT TEAM
APPROVAL SIGNATURES
MEDICAL CENTER DIRECTOR:
ASSISTANT DIRECTOR:
ASSOCIATE DIRECTOR:
CHIEF OF STAFF:
DIRECTOR OF PATIENT SERVICES:
CHIEF OF FACILITIES MANAGEMENT:
INFECTION CONTROL PRACTITIONER:
SAFETY OFFICER:
DEPARTMENT OF VETERANS AFFAIRS
HARRY S. TRUMAN VAMC
COLUMBIA, MISSOURI
PROJECT # 589A4-18-187
REMODEL 5TH FLOOR
BID DOCUMENTS
DATE: JANUARY 28, 2019
PROJECT LOCATION
5TH FLOOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved
VA FORM 08 -
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Atriax, pllc 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 Phone 828-315-9962 www.atriaxgroup.com
GLMV Architecture 1525 E. Douglas Wichita, KS 67211 Phone 316-265-9367
PEC Professional Engineering Consultants, PA 303 S. Topeka Wichita, KS 67202 Phone 316-262-2691
589A4-18-187REMODEL 5TH FLOOR
COLUMBIA, MO
JANUARY 28, 2019
NOT FOR
CONSTRUCTION
BID DOCUMENTS
C U s e rs \G
L W a lt o n .G
L M
V \D o c u m e n ts
\5
A
-1
-1
C e n tr a l_ g lw a lt o n .r v t
/3
/2
:3
:0
P
M
G-001
COVER SHEET AND SHEET INDEX
KEY PLAN
NORTH
Revisions: Date: Page 1 of 85
R E
F
V E
N D
FEC
F E
C
FEC
FEC
F E
C
REF.
V E
N D
NUMBER OF OCCUPANTS
REQUIRED EGRESS WIDTH
PROVIDED EGRESS WIDTH
EXIT DOOR WIDTH REQUIREMENTS
X X
X
FIRE EXTINGUISHER CABINET (FEC)
(75' MAX. TRAVEL DISTANCE)
1 HOUR FIRE RATED PARTITION
1 HOUR SMOKE BARRIER
TRAVELING DISTANCE TO AN EXIT
PROJECT BOUNDARY
XX'
CODE PLAN LEGEND
LIMITS OF PHASED AREA IN SCOPE OF WORK
AREA NOT IN CONTRACT
2 HOUR FIRE RATED PARTITION
SMOKE PARTITION
FEC
CODE REVIEW
PROJECT INFORMATION: REMODEL 5TH FLOOR
HARRY S. TRUMAN VA MEDICAL CENTER
COLUMBIA, MO
VA PROJECT NUMBER 589A4-18-187
GLMV PROJECT NUMBER 13043.18001
BUILDING INFORMATION:
TYPE OF CONSTRUCTION: REMODEL
OWNER: DEPARTMENT OF VETERANS AFFAIRS
FACILITY NAME: HARRY S. TRUMAN VAMC
CITY: COLUMBIA, MO
ARCHITECT: GLMV ARCHITECTURE
9229 WARD PARKWAY, SUITE 210
KANSAS CITY, MO 64114
ENGINEER: MECH./ PLUMB./ ELECT.:
PEC PROFESSIONAL ENGINEERING CONSULTANTS, PA
303 S. TOPEKA
WICHITA, KS 67202
CODES UTILIZED: 2015 INTERNATIONAL BUILDING CODE
2015 INTERNATIONAL FIRE CODE
2015 INTERNALTIONAL PLUMBING CODE
2015 INTERNATIONAL MECHANICAL CODE
2015 NATIONAL ELECTRIC CODE
2015 NFPA 101 LIFE SAFETY CODE
2010 AMERICANS WITH DISABILITY ACT (ADA) - ICC/ANSI
117.1-20092000 VA SEISMIC DESIGN REQUIREMENTS H-18-8
JURISDICTION DEPARTMENT OF VETERANS AFFAIRS (VA)
JOINT COMMISSION ON THE ACCREDITATION OF
HEALTHCARE ORGANIZATIONS (JCAHO)
US DEPARTMENT OF HEALTH AND HUMAN SERVICES
BUILDING DATA
FACILITY ADDRESS: 800 HOSPITAL DRIVE
COLUMBIA, MO 65201
PROJECT INFORMATION:
OCCUPANCY CLASSIFICATION BUSINESS GROUP B
CONSTRUCTION TYPE IIB - AUTO FIRE SUPPRESSION
FIRE PROTECTION SPRINKLERED
BUILDING ELEMENTS TYPE IIB: EXISTING CONSTRUCTION - TABLE 601 ALL
BUILDING ELEMENTS ARE OF NON-COMBUSTIBLE
MATERIALS
NFPA TYPE II (222)
FIRE SEPARATION 2 HOUR FLOOR
2 HOUR EGRESS STAIRWELL
2 HOUR VERTICAL SHAFTS
MEANS OF EGRESS - CHAPTER 10
OCCUPANT LOAD: (SECTION 1004)
AREA OF 5TH: 22,826 SF
TABLE 1004.1.1, MAXIMUM FLOOR AREA ALLOWANCES PER OCCUPANT:
ADMINISTRATIVE AREAS (22,826 SF @ 100) = 228
FIRE PROTECTION SYSTEMS (CHAPTER 9)
AUTOMATIC SPRINKLER PROVIDED THROUGHOUT
PORTABLE EXTINGUISHING PROVIDED PER INTERNATIONAL FIRE CODE
FIRE ALARM AND DETECTION SYSTEMS
TABLE 1005 - MEANS OF EGRESS SIZING
1005.3.1 STAIRWAYS = 0.3 INCHES PER OCCUPANT X 228 OCCUPANTS = 68.4
(EXISTING EXIT WIDTH = 84")
TABLE 1017.2 - EXIT ACCESS TRAVEL DISTANCE
"B" OCCUPANCY - W/ SPRINKLER SYSTEM 300'
1020.4 - DEAD END CORRIDOR
AUTOMATIC SPRINKLER SYSTEM NOT TO EXCEED 50'
PLUMBING FIXTURES - CHAPTER 29
TABLE 2902.1 - FIXTURE COUNTS - "B" OCCUPANCY
FEMALE WATER CLOSETS 5 - TOTAL PROVIDED 5
FEMALE LAVATORIES 4 - TOTAL PROVIDED 4
MALE WATER CLOSETS 5 - TOTAL PROVIDED 5 (2 URINALS, 3 WATER CLOSETS)
MALE LAVATORIES 4 - TOTAL PROVIDED 4
OTHER SERVICE SINK 1 - TOTAL PROVIDED 1
DRINKING FOUNTAINS 4 - TOTAL PROVIDED 2
FFaGHJKLMMbN La Ja Hb Ga
4.1
5.4
6.2
6.7
Jb
OFFICE
OFFICE
CORRIDOR
C56
OFFICE
WOMEN
NOT IN CONTRACT
NIC NIC
CONFERENCE
ROOM
CONFERENCE
ROOM
STAFF
BREAKROOM
OFFICE
LACTATION
ROOM
WOMEN
MEN
CORRIDOR
C53
OFFICE
CONFERENCE
ROOM
OFFICE
OFFICE
OPEN OFFICE
OPEN OFFICE
STORAGE
OFFICE
OPEN OFFICE
OPEN OFFICE
CORRIDOR
C51
OFFICE
CORRIDOR
C54
CORRIDOR
C55
ELEC
514A
ELEC
512C
ELEC
512B
COMPUTER
TRAINING ROOM
VAM TRAINING
ROOM
SIMULATION
TRAINING ROOM
CLASSROOM
CLASSROOM
MEDICAL MEDIA
ROOM
OPEN OFFICE
IT CLOSET
STORAGE
547A
STAIR 1
CLASSROOM
STORAGE
CORRIDOR
C57
CORRIDOR
C58
ELEVATOR
LOBBY
FREIGHT
ELEVATOR
LOBBY
HOUSEKEEPING
CLOSET
501A
COPY ALCOVE
520A
STAIR 2
OPEN OFFICE
COPY ALCOVE
OPEN OFFICE
CONTROL
ROOM
554A
ELEC
545A
SCHEDULER
TRAINING ROOM
MEN
542OFFICE
OPEN OFFICE
COPY ALCOVE
OPEN OFFICE
OPEN OFFICE
TD = 82'-2"TD = 135'-9"
TD = 222'-9"
TD = 82'-2"
TD =
TD = 236'-9"
42" 34.2"
42" 34.2"
PROJECT BOUNDARY
PROJECT BOUNDARY
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved
VA FORM 08 -
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Atriax, pllc 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 Phone 828-315-9962 www.atriaxgroup.com
GLMV Architecture 1525 E. Douglas Wichita, KS 67211 Phone 316-265-9367
PEC Professional Engineering Consultants, PA 303 S. Topeka Wichita, KS 67202 Phone 316-262-2691
589A4-18-187REMODEL 5TH FLOOR
COLUMBIA, MO
JANUARY 28, 2019
BID DOCUMENTS
C U s e rs
\L iz
.C h ri s ti a n
\D e s k to p \5
A
-1
-1
C e n tr a l_ liz .c h ri s ti a n
.r v t
/2
/2
:4
:3
A
M
G-100
OVERALL CODE REVIEW PLAN
NORTH
0' 8' 12'4' 1/8" = 1'-0"
OVERALL CODE REVIEW PLAN
Revisions: Date: Page 2 of 85
LIMITS OF PHASE 1
LIMITS OF PHASE 1
TD = 196'-0"
FFaGHJKLMMbN La Ja Hb Ga
4.1
5.4
6.2
6.7
LIMITS OF PHASE 1
TD = 197'-2"
TD = 223'-2"
PROJECT BOUNDARY
PROJECT BOUNDARY
NOT IN CONTRACT
Jb
NIC NIC
511513518522526528
512C 512B
514A526A 524 519 513A 511A
516517520521523
523A
525527
531A
534A
537A
536A
530C 530A
530B
564A
541A
542A
543A 545A
546 550
554 555
553A
553B
553C
553D
553E
557556
551549547545
570B
570A
567566
540 544
501A501
WORK IN THESE
AREAS TO BE DONE AT
NIGHT/ON WEEKENDS
(T
YP
4'
-0 " M
IN
DOOR IS TO BE
CLOSED AND
SEALED DURING
CONSTRUCTION.
LOCKERS ARE TO
BE CLOSED AND
SEALED DURING
CONSTRUCTION.
NUMBER OF OCCUPANTS
REQUIRED EGRESS WIDTH
PROVIDED EGRESS WIDTH
EXIT DOOR WIDTH REQUIREMENTS
X X
X
FIRE EXTINGUISHER CABINET (FEC)
(75' MAX. TRAVEL DISTANCE)
1 HOUR FIRE RATED PARTITION
1 HOUR SMOKE BARRIER
TRAVELING DISTANCE TO AN EXIT
PROJECT BOUNDARY
XX'
CODE PLAN LEGEND
LIMITS OF PHASED AREA IN SCOPE OF WORK
AREA NOT IN CONTRACT
2 HOUR FIRE RATED PARTITION
SMOKE PARTITION
FEC
EXISTING ITEMS TO BE REMOVED
EXISTING ITEMS TO REMAIN
EXISTING ITEMS TO REMAIN
NEW GYPSUM BOARD METAL STUD WALLS
TEMPORARY 1-HOUR RATED WALLS AND
DOORS
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved
VA FORM 08 -
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Atriax, pllc 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 Phone 828-315-9962 www.atriaxgroup.com
GLMV Architecture 1525 E. Douglas Wichita, KS 67211 Phone 316-265-9367
PEC Professional Engineering Consultants, PA 303 S. Topeka Wichita, KS 67202 Phone 316-262-2691
589A4-18-187REMODEL 5TH FLOOR
COLUMBIA, MO
JANUARY 28, 2019
BID DOCUMENTS
C U s e rs
\L iz
.C h ri s ti a n
\D e s k to p \5
A
-1
-1
C e n tr a l_ liz .c h ri s ti a n
.r v t
/2
/2
:4
:3
A
M
G-101
PHASE 1 - CODE REVIEW PLAN
0' 4' 8' 12' 1/8" = 1'-0"
PHASE 1 - CODE REVIEW PLAN
Revisions: Date: Page 3 of 85
FEC
FFaGHJKLMMbN La Ja Hb Ga
4.1
5.4
6.2
6.7
NOT IN CONTRACT
TD = 111'-0"
TD = 143'-10"
TD = 112'-1"
Jb
PROJECT BOUNDARY
PROJECT BOUNDARY
LIMITS OF PHASE 2
LIMITS OF PHASE 2
NIC NIC
LIMITS OF PHASE 2
534A
537A
536 536A
511513518522526528
512C 512B
514A526A 524 519 513A 511A
516517520521523
523A
525527
531A
530C 530A
530B
564A
HOUSEKEEPING
CLOSET
501A
STORAGE
STAIR 1
STAIR 2
IT CLOSET
SIMULATION
TRAINING ROOM
CLASSROOM
CLASSROOM
VAM TRAINING
ROOM
MEDICAL MEDIA
ROOM
COMPUTER
TRAINING ROOM
SCHEDULER
TRAINING ROOM
OPEN OFFICE
OPEN OFFICE
CORRIDOR
C58
CLASSROOM
ELEVATOR
LOBBY
MEN
OFFICE
CORRIDOR
C57
FREIGHT
ELEVATOR
LOBBY
CONTROL
ROOM
554A
ELEC
545A
OPEN OFFICE
COPY ALCOVE
STORAGE
547A
CORRIDOR
C55
CORRIDOR
C51
WORK IN THIS AREA
TO BE DONE AT
NIGHT/ON WEEKENDS
M
IN
4'
0"
4' -0
" M
IN
4'-0" MIN.
4' -0
" M
IN
NUMBER OF OCCUPANTS
REQUIRED EGRESS WIDTH
PROVIDED EGRESS WIDTH
EXIT DOOR WIDTH REQUIREMENTS
X X
X
FIRE EXTINGUISHER CABINET (FEC)
(75' MAX. TRAVEL DISTANCE)
1 HOUR FIRE RATED PARTITION
1 HOUR SMOKE BARRIER
TRAVELING DISTANCE TO AN EXIT
PROJECT BOUNDARY
XX'
CODE PLAN LEGEND
LIMITS OF PHASED AREA IN SCOPE OF WORK
AREA NOT IN CONTRACT
2 HOUR FIRE RATED PARTITION
SMOKE PARTITION
FEC
EXISTING ITEMS TO BE REMOVED
EXISTING ITEMS TO REMAIN
EXISTING ITEMS TO REMAIN
NEW GYPSUM BOARD METAL STUD WALLS
TEMPORARY 1-HOUR RATED WALLS AND
DOORS
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved
VA FORM 08 -
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Atriax, pllc 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 Phone 828-315-9962 www.atriaxgroup.com
GLMV Architecture 1525 E. Douglas Wichita, KS 67211 Phone 316-265-9367
PEC Professional Engineering Consultants, PA 303 S. Topeka Wichita, KS 67202 Phone 316-262-2691
589A4-18-187REMODEL 5TH FLOOR
COLUMBIA, MO
JANUARY 28, 2019
BID DOCUMENTS
C U s e rs
\L iz
.C h ri s ti a n
\D e s k to p \5
A
-1
-1
C e n tr a l_ liz .c h ri s ti a n
.r v t
/2
/2
:4
:3
A
M
G-102
PHASE 2 - CODE REVIEW PLAN
0' 8' 12'4' 1/8" = 1'-0"
PHASE 2 - CODE REVIEW PLAN
Revisions: Date: Page 4 of 85
F
V E
N D
FEC
F E
C
FEC
FEC
F E
C
REF.
V E
N D
FFaGHJKLMMbN La Ja Hb Ga
4.1
5.4
6.2
6.7
NOT IN CONTRACT
TD = 90'-9"
TD = 126'-8"
TD = 200'-8"
TD = 111'-5"
Jb
PROJECT BOUNDARY
PROJECT BOUNDARY
LIMITS OF PHASE 3
NIC NIC
534A
537A
536 536A
HOUSEKEEPING
CLOSET
501A
STORAGE
STAIR 1
STAIR 2
IT CLOSET
SIMULATION
TRAINING ROOM
CLASSROOM
CLASSROOM
VAM TRAINING
ROOM
MEDICAL MEDIA
ROOM
COMPUTER
TRAINING ROOM
SCHEDULER
TRAINING ROOM
OPEN OFFICE
OPEN OFFICE
CORRIDOR
C58
CLASSROOM
ELEVATOR
LOBBY
MEN
OFFICE
CORRIDOR
C57
FREIGHT
ELEVATOR
LOBBY
CONTROL
ROOM
554AELEC
545A
OPEN OFFICE
COPY ALCOVE
STORAGE
547A
CORRIDOR
C51
CONFERENCE
ROOM
CONFERENCE
ROOM
STAFF
BREAKROOM
OFFICE
LACTATION
ROOM
WOMEN
MEN
CORRIDOR
C53
OFFICE
CONFERENCE
ROOM
OFFICE
OFFICE
OPEN OFFICE
OPEN OFFICE
STORAGE
OFFICE
OPEN OFFICE
OPEN OFFICE
OFFICE
CORRIDOR
C54
ELEC
514A
ELEC
512C
ELEC
512B
COPY ALCOVE
520A
OPEN OFFICE
COPY ALCOVE
OPEN OFFICE
CORRIDOR
C55
COPY ALCOVE
(T
YP
4'
-0 " M
IN
(TYP.)
4'-0" MIN.
LIMITS OF
PHASE 3
NUMBER OF OCCUPANTS
REQUIRED EGRESS WIDTH
PROVIDED EGRESS WIDTH
EXIT DOOR WIDTH REQUIREMENTS
X X
X
FIRE EXTINGUISHER CABINET (FEC)
(75' MAX. TRAVEL DISTANCE)
1 HOUR FIRE RATED PARTITION
1 HOUR SMOKE BARRIER
TRAVELING DISTANCE TO AN EXIT
PROJECT BOUNDARY
XX'
CODE PLAN LEGEND
LIMITS OF PHASED AREA IN SCOPE OF WORK
AREA NOT IN CONTRACT
2 HOUR FIRE RATED PARTITION
SMOKE PARTITION
FEC
EXISTING ITEMS TO BE REMOVED
EXISTING ITEMS TO REMAIN
EXISTING ITEMS TO REMAIN
NEW GYPSUM BOARD METAL STUD WALLS
TEMPORARY 1-HOUR RATED WALLS AND
DOORS
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved
VA FORM 08 -
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Atriax, pllc 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 Phone 828-315-9962 www.atriaxgroup.com
GLMV Architecture 1525 E. Douglas Wichita, KS 67211 Phone 316-265-9367
PEC Professional Engineering Consultants, PA 303 S. Topeka Wichita, KS 67202 Phone 316-262-2691
589A4-18-187REMODEL 5TH FLOOR
COLUMBIA, MO
JANUARY 28, 2019
BID DOCUMENTS
C U s e rs
\L iz
.C h ri s ti a n
\D e s k to p \5
A
-1
-1
C e n tr a l_ liz .c h ri s ti a n
.r v t
/2
/2
:4
:4
A
M
G-103
PHASE 3 - CODE REVIEW PLAN
0' 8' 12'4' 1/8" = 1'-0"
PHASE 3 - CODE REVIEW PLAN
Revisions: Date: Page 5 of 85
G-103
FFaGHJKLMMbN La Ja Hb Ga
4.1
5.4
6.2
6.7
NOT IN CONTRACT
Jb
WORK IN THESE
AREAS TO BE DONE AT
NIGHT/ON WEEKENDS
DOOR IS TO BE
CLOSED AND
SEALED DURING
CONSTRUCTION.
P2
D1 D1 D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1 D1
P2 P2
P2
P2 P2
W1
P2
M1
A1
M1 A2
C1
F1
C1
F1
C1
F1
C1
F1
C1
F1
C1
F1
C1
F1
C1
F1
C1
F1
A2 M1
A1
M1
A1
A2
M1 M1A1 A1
C1
F1
C1 F1
C1
F1
C1
F1
C1
F1
C1
F1C1 F1
C1 F1
C1
F1C1F1
C1
F1
C1
F1
C1 F1
C1
F1
C1
F1
C1 F1
C1 F1C1 F1
C1
F1 M1
M1
A2
A5
P2
P2
P2
P2
P2
P2
P2
P2
P2
P2
P2 P2
(T
YP
4'
-0 " M
IN
P0
P0
A5
A5
A5
P3
P0
NIC NIC
P0
C1
F1
A1
C1
F1
C1F1
C1
F1 C1
P1
F1
F1 F1
F1
P3 P3
P3
P2
P2
A8
A8
A7
511513518522526528
512C 512B
514A526A 524 519 513A 511A
512516517520521523
523A
525527
531A
534A
537A
536A
530C 530A
530B
564A
C1
P3
D1
P3
P3
P1
P3
542 543
545A
546 550 553A
553B
553C
553D
553E
557556
551549547545
570B
570A
567566
540 544
501A501
LOCKERS ARE TO
BE CLOSED AND
SEALED DURING
CONSTRUCTION.
F2
NOTE:
REFERENCE THE PHASING PLANS FOR ADDITIONAL INFORMATION FOR PROJECT
PHASING AND COORDINATION OF DEMOLITION AND NEW CONSTRUCTION FOR THE
PROJECT.
ALL DEMOLISHED MECHANICAL AND ELECTRICAL ITEMS SHALL BE REMOVED
INCLUDING MAIN RUNS AND SERVICE LINES TO SOURCE. ALL SYSTEM LINES ARE
NOT SHOWN ON CONSTRUCTION DOCUMENTS. ADJACENT SPACES TO REMAIN
OPERATIONAL.
REPAIR ANY DAMAGE TO ITEMS INDICATED TO REMAIN AS A RESULT OF
DEMOLITION AND/OR CONSTRUCTION ACTIVITIES. SEE STRUCTURAL, MECHANICAL
AND ELECTRICAL DRAWINGS FOR ADDITIONAL DEMOLITION REQUIREMENTS.
DEMOLITION NOTES INDICATED ON DRAWINGS MAY NOT BE ALL INCLUSIVE.
REMOVE ALL ITEMS REQUIRED FOR RECONSTRUCTION ACTIVITIES AND TO
ACCOMMODATE NEW WORK.
VERIFY EXTENT OF ALL CONDITIONS OF DEMOLITION WITH FLOOR PLANS AND
SCHEDULED CONSTRUCTION PRIOR TO DEMOLITION. DISCREPANCIES BETWEEN
DESIGN CONDITIONS AND EXISTING CONDITIONS SHALL BE BROUGHT TO THE
ATTENTION OF THE COR.
ALL WALLS, SUBSTRUCTURAL FRAMES, PARTITIONS, EQUIPMENT, ETC. INDICATED
BY DASHED LINES (----) SHALL BE REMOVED. ALL MECHANICAL, ELECTRICAL,
PLUMBING AND OTHER SERVICES WHICH ARE CONTAINED IN THE AREA TO BE
REMOVED SHALL ALSO BE REMOVED OR REROUTED. CONTRACTOR SHALL
COORDINATE ALL DEMOLITION WITH NEW CONSTRUCTION BEFORE STARTING
DEMOLITION.
AFTER REMOVAL OF EXISTING FLOOR FINISH, CONCRETE SLAB SHALL BE
PATCHED, GROUND SMOOTH AND LEVELED BEFORE INSTALLATION OF NEW FINISH
PER ROOM FINISH SCHEDULE. AT DISSIMILAR FLOOR ELEVATIONS, FEATHER SELF-
LEVELING UNDER-LAYMENT COMPOUND TO EACH FLOOR ELEVATION AND GRIND
SMOOTH. AT DISSIMILAR FLOOR MATERIALS, AND/OR AT JUNCTIONS BETWEEN
NEW AND EXISTING FLOORS, PROVIDE APPROPRIATE TRANSITION STRIP.
WHERE EXISTING DOORS, DOOR FRAMES, EQUIPMENT, PORTIONS OF WALLS AND
PARTITIONS ARE REQUIRED TO BE REMOVED FOR THE COMPLETION OF THE
WORK, EXERCISE CAUTION TO AVOID DISRUPTING SURROUNDING MATERIALS.
SALVAGE EXISTING MATERIALS AS MUCH AS POSSIBLE FOR REUSE IN PATCHING
SURROUNDING FINISHES WHEN APPROVED BY THE COR OR INDICATED ON
CONSTRUCTION DRAWINGS.
WHERE REMOVAL OF EXISTING WALLS, PARTITIONS, EQUIPMENT, ETC. DISRUPTS
EXISTING ELECTRICAL, MECHANICAL AND PLUMBING SERVICES, MAKE PERMANENT
(OR IF NECESSARY, PROPER TEMPORARY) CONNECTIONS TO RESTORE AFFECTED
SERVICES TO ORIGINAL CONDITION IN AREAS NOT SCHEDULED FOR DEMOLITION
AND REMODELING.
PATCH TO MATCH ADJACENT SURFACES OF EXISTING WALLS AND FLOORS IN ALL
AREAS REQUIRED DUE TO THE REMOVAL OF MECHANICAL, ELECTRICAL AND
PLUMBING EQUIPMENT OR FIXTURES.
WHERE EXISTING WALLS OR CEILINGS ARE DISTURBED FOR ACCESS TO
SERVICES, PATCH TO MATCH DISTURBED MATERIALS AND FINISHES TO ORIGINAL
CONDITION. WHERE REPAINTING IS REQUIRED, THE ENTIRE WALL OR CEILING
SURFACE SHALL BE REPAINTED TO THE NEAREST CORNER.
CEILINGS WHICH ARE IN CONFLICT WITH NEW WORK SHALL BE REMOVED OR
RELOCATED ALONG WITH ALL MECHANICAL, ELECTRICAL AND PLUMBING
SYSTEMS.
ALL EXISTING UNUSED WALL PENETRATIONS IN INTERIOR AND EXTERIOR WALLS
ALONG WITH PENETRATIONS LEFT AFTER SELECTIVE DEMOLITION ACTIVITIES
SHALL BE INFILLED TO MATCH ADJACENT WALL FINISHES, THICKNESS, AND
SMOKE/FIRE RATING AS DIRECTED.
MAINTAIN CLEAR EXIT PATHS DURING DEMOLITION AND CONSTRUCTION
ACTIVITIES.
UTILITY / MEDICAL SYSTEM SHUTDOWNS (INCLUDING MEDICAL GASES) SHALL BE
COORDINATED WITH THE COR, PER THE SPECIFICATIONS.
ERECT AND MAINTAIN TEMPORARY CONSTRUCTION BARRIERS. COORDINATE
LOCATIONS WITH CONSTRUCTION DOCUMENTS, PROJECT PHASING AND COR. SEE
PARTITION TYPE P0 ON SHEET AE601 FOR DETAIL.
ANY ASBESTOS OR OTHER HAZARDOUS MATERIALS FOUND DURING DEMOLITION
SHALL BE BROUGHT TO THE ATTENTION OF THE COR AND ARCHITECT.
CONTRACTOR SHALL ENCAPSULATE AND ABATE THE AFFECTED AREA IN
ACCORDANCE WITH MDNR/EPA/OSHA REGULATIONS AS PER THE DIRECTION OF A
LICENSED PROFESSIONAL ENVIRONMENTAL CONTRACTOR. CONSULT ASBESTOS
SURVEY AND REPORT, REF. SPECIFICATIONS.
ALL STRUCTURAL ELEMENTS SHALL BE PROTECTED DURING DEMOLITION.
CONTRACTOR SHALL REPAIR ALL SURFACES TO LIKE NEW AFTER TEMPORARY
WALLS AND DOORS HAVE BEEN REMOVED.
ENSURE ADJACENT AREAS ARE FULLY OPERATIONAL DURING CONSTRUCTION.
ALL LIGHT FIXTURES SHALL BE SALVAGED FOR REUSE.
CONTRACTOR TO INSPECT AND PATCH ALL CONSTRUCTION BOUNDARY WALLS TO
MAINTAIN 1-HOUR RATING OF CONSTRUCTION AREA PRIOR TO DEMO.
CONTRACTOR IS TO MAINTAIN A 1 HOUR SEPARATION DURING ALL CONSTRUCTION
PHASES.
GENERAL DEMOLITION NOTES
ALL INFECTION CONTROL CRITERIA AS SPECIFIED IN SECTION 01 00 00 SHALL
BE ADHERED TO DURING ALL PHASES OF THE PROJECT.
TEMPORARY WALL, DOOR AND FRAME SHALL HAVE A 1-HOUR FIRE RATING.
GENERAL NOTES
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
R.
S.
T.
U.1.
2.
GENERAL: CONTRACTOR SHALL PROTECT ALL EXISTING CONSTRUCTION TO
REMAIN AS REQUIRED TO PREVENT DAMAGE. ALL EXISTING MATERIALS,
SURFACES, EQUIPMENT, ETC. DAMAGED DURING THE WORK SHALL BE
REPAIRED TO THE SATISFACTION OF THE COR OR REPLACED WITH NEW AT NO
ADDITIONAL COST TO THE GOVERNMENT. PROTECTION DEVICES SHALL BE
INSTALLED PRIOR TO THE START OF ALL DEMOLITION, AND MAINTAINED
THROUGHOUT CONSTRUCTION AS NEEDED.
COORDINATE LOCATION AND TYPE OF ALL PROTECTION BARRIERS WITH THE
COR PRIOR TO INSTALLATION.
PROVIDE FLOOR PROTECTION COVERINGS AS REQUIRED TO PREVENT
DAMAGE TO EXISTING FLOOR COVERINGS AND FINISHES TO REMAIN .
EXISTING EMERGENCY EXITS MUST BE MAINTAINED ACCESSIBLE DURING THE
PERIOD OF CONSTRUCTION.
CONTRACTOR SHALL SEAL ALL DOOR OPENINGS AND HVAC OPENINGS IN ALL
AREAS OF DEMOLITION AND CONSTRUCTION PRIOR TO CUTTING, SANDING,
ETC. TO PREVENT DUST MIGRATION TO ADJACENT ROOMS.
PROTECTION NOTES
1.
2.
3.
4.
5.
DEMOLITION KEYNOTES
ACCESSORIES/ MISCELLANEOUS
REMOVE AND DISPOSE OF ALL EXISTING TOILET ACCESSORIES.
REMOVE AND DISPOSE OF EXISTING COUNTERTOP AND SHELVING.
REMOVE SINK, PAPER TOWEL HOLDER, DISPENSERS AND ALL
ACCESSORIES AND RETURN TO OWNER. REMOVE CABINETRY.
REMOVE AND SALVAGE EYEWASH FOR REUSE.
REMOVE AND DISPOSE OF ALL EXISTING LOCKERS AND LOCKER
ACCESSORIES.
REMOVE DUMB WAITER CONTROLS.
REMOVE AND SALVAGE DIRECTIONAL AND ELEVATOR LOBBY SIGNAGE
FOR REUSE.
REMOVE AND SALVAGE SMARTBOARDS TO BE REUSED, PROJECTORS
AND PROJECTOR SCREENS. RETURN PROJECTORS AND PROJECTOR
SCREENS TO OWNER.
NOTE: ALL KEYNOTES LISTED BELOW MAY NOT BE APPLICABLE TO THIS
SHEET.
CEILING
REMOVE EXISTING ACOUSTICAL CEILING TILE SYSTEM.
REMOVE EXISTING BARIATRIC LIFT AND RAIL SYSTEM AND RETURN TO
OWNER.
PARTITIONS
REMOVE AND DISPOSE OF EXISTING MASONRY PARTITION AND RELATED
ITEMS.
REMOVE AND DISPOSE OF EXISTING STUD PARTITION AND RELATED ITEMS.
REMOVE EXISTING CERAMIC WALL TILE.
DOORS/ FRAMES
REMOVE AND DISPOSE OF EXISTING DOOR, FRAME AND HARDWARE.
REMOVE AND DISPOSE OF EXISTING FOLDING PARTITION, TRACK, AND
RELATED ITEMS.
FLOOR
REMOVE AND DISPOSE OF EXISTING FLOOR COVERING TO SLAB. PATCH,
LEVEL/PREPARE FOR NEW FINISH.
REMOVE EXISTING CONCRETE PAD TO FLOOR SLAB, PATCH AND REPAIR
AS REQUIRED.
MECHANICAL/ PLUMBING
REMOVE AND DISPOSE OF EXISTING PLUMBING FIXTURE (SINK, FLOOR
DRAIN, WATER CLOSET, URINAL, DRINKING FOUNTAIN, SHOWER AND/OR
LAVATORY), RE: MEP.
A1
A2
A3
C1
C2
D1
D2
F1
M1
P1
P2
P3
WINDOWS
REMOVE EXISTING WINDOW AND DISPOSE OF EXISTING FRAME AND
HARDWARE.
W1
A4
A5
A6
A7
A8
F2
EXISTING ITEMS TO BE REMOVED
EXISTING ITEMS TO REMAIN
EXISTING ITEMS TO REMAIN
NEW GYPSUM BOARD METAL STUD WALLS
TEMPORARY 1-HOUR RATED WALLS AND
DOORS
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved
VA FORM 08 -
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Atriax, pllc 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 Phone 828-315-9962 www.atriaxgroup.com
GLMV Architecture 1525 E. Douglas Wichita, KS 67211 Phone 316-265-9367
PEC Professional Engineering Consultants, PA 303 S. Topeka Wichita, KS 67202 Phone 316-262-2691
589A4-18-187REMODEL 5TH FLOOR
COLUMBIA, MO
JANUARY 28, 2019
BID DOCUMENTS
C U s e rs
\L iz
.C h ri s ti a n
\D e s k to p \5
A
-1
-1
C e n tr a l_ liz .c h ri s ti a n
.r v t
/2
/2
:4
:2
A
M
AD101
PHASE 1 - DEMOLITION PLAN
0' 4' 8' 12' 1/8" = 1'-0"
PHASE 1 - DEMOLITION PLAN
Revisions: Date: Page 8 of 85
FFaGHJKLMMbN La Ja Hb Ga
4.1
5.4
6.2
6.7
NOT IN CONTRACT
Jb
D1
F1
C1F1
C1
F1
C1
F1
C1
F1
C1
F1
C1 F1
C1F1 C1F1
C1
F1
C1F1
C1
F1
C1
F1
C1
F1
C1 F1
C1
F1 C1 F1
C1 F1C1 F1
C1
F1
C1
F1
C1 F1
D1
D1
D1
D1
D1 D1
D1D1
D1
D1
D1
D1
D1
C1
D1
W1
P2
P2
P2
P2
P2 P2
P2
P2
P2
P2 P2
P2
P2
P2
P2
P2
P2
P2
M1
M1 M1
M1
M1 A1 A1 A1
A2 A2
A1
A2
A1
A2
A1
A4
M1
M1
A3
P0
P0
P0
P0
A5
A5
A5
A5
NIC NIC
D1
D1
P0
P0
A5
C2
D2
F1
F1
F1
F1
C1
F1 C1 F1
C1
F1
C1
F1
C1 F1
WORK IN THIS AREA
TO BE DONE AT
NIGHT/ON WEEKENDS
P2
P3
P2 P2
A6
A7
A8 A8
A8
537A
536 536A
STAIR 2
A2
A2
COMPUTER
TRAINING ROOM
VAM TRAINING
ROOM
SIMULATION
TRAINING ROOM
554CLASSROOM
CLASSROOM
SCHEDULER
TRAINING ROOM
OPEN OFFICE
OPEN OFFICE
OFFICE
MEN
CORRIDOR
C55
COPY ALCOVE
CORRIDOR
C57
CORRIDOR
C58
CONTROL
ROOM
554A
ELEC
545A
CLASSROOM
STORAGE
MEDICAL MEDIA
ROOM
OPEN OFFICE
ELEVATOR
LOBBY
CORRIDOR
C51
HOUSEKEEPING
CLOSET
501A
FREIGHT
ELEVATOR
LOBBY
STORAGE
547A
STAIR 1
IT CLOSET
P0 P0
P2
P3
(T
YP
4'
-0 " M
IN
511513518522526528
512C 512B
514A526A 524
516517520521523525
534A
530C
530B
564A
4' -0
" M
IN
4'-0" MIN.
4'
-0 " M
IN
M
IN
4'
0"
NOTE:
REFERENCE THE PHASING PLANS FOR ADDITIONAL INFORMATION FOR PROJECT
PHASING AND COORDINATION OF DEMOLITION AND NEW CONSTRUCTION FOR THE
PROJECT.
ALL DEMOLISHED MECHANICAL AND ELECTRICAL ITEMS SHALL BE REMOVED
INCLUDING MAIN RUNS AND SERVICE LINES TO SOURCE. ALL SYSTEM LINES ARE
NOT SHOWN ON CONSTRUCTION DOCUMENTS. ADJACENT SPACES TO REMAIN
OPERATIONAL.
REPAIR ANY DAMAGE TO ITEMS INDICATED TO REMAIN AS A RESULT OF
DEMOLITION AND/OR CONSTRUCTION ACTIVITIES. SEE STRUCTURAL, MECHANICAL
AND ELECTRICAL DRAWINGS FOR ADDITIONAL DEMOLITION REQUIREMENTS.
DEMOLITION NOTES INDICATED ON DRAWINGS MAY NOT BE ALL INCLUSIVE.
REMOVE ALL ITEMS REQUIRED FOR RECONSTRUCTION ACTIVITIES AND TO
ACCOMMODATE NEW WORK.
VERIFY EXTENT OF ALL CONDITIONS OF DEMOLITION WITH FLOOR PLANS AND
SCHEDULED CONSTRUCTION PRIOR TO DEMOLITION. DISCREPANCIES BETWEEN
DESIGN CONDITIONS AND EXISTING CONDITIONS SHALL BE BROUGHT TO THE
ATTENTION OF THE COR.
ALL WALLS, SUBSTRUCTURAL FRAMES, PARTITIONS, EQUIPMENT, ETC. INDICATED
BY DASHED LINES (----) SHALL BE REMOVED. ALL MECHANICAL, ELECTRICAL,
PLUMBING AND OTHER SERVICES WHICH ARE CONTAINED IN THE AREA TO BE
REMOVED SHALL ALSO BE REMOVED OR REROUTED. CONTRACTOR SHALL
COORDINATE ALL DEMOLITION WITH NEW CONSTRUCTION BEFORE STARTING
DEMOLITION.
AFTER REMOVAL OF EXISTING FLOOR FINISH, CONCRETE SLAB SHALL BE
PATCHED, GROUND SMOOTH AND LEVELED BEFORE INSTALLATION OF NEW FINISH
PER ROOM FINISH SCHEDULE. AT DISSIMILAR FLOOR ELEVATIONS, FEATHER SELF-
LEVELING UNDER-LAYMENT COMPOUND TO EACH FLOOR ELEVATION AND GRIND
SMOOTH. AT DISSIMILAR FLOOR MATERIALS, AND/OR AT JUNCTIONS BETWEEN
NEW AND EXISTING FLOORS, PROVIDE APPROPRIATE TRANSITION STRIP.
WHERE EXISTING DOORS, DOOR FRAMES, EQUIPMENT, PORTIONS OF WALLS AND
PARTITIONS ARE REQUIRED TO BE REMOVED FOR THE COMPLETION OF THE
WORK, EXERCISE CAUTION TO AVOID DISRUPTING SURROUNDING MATERIALS.
SALVAGE EXISTING MATERIALS AS MUCH AS POSSIBLE FOR REUSE IN PATCHING
SURROUNDING FINISHES WHEN APPROVED BY THE COR OR INDICATED ON
CONSTRUCTION DRAWINGS.
WHERE REMOVAL OF EXISTING WALLS, PARTITIONS, EQUIPMENT, ETC. DISRUPTS
EXISTING ELECTRICAL, MECHANICAL AND PLUMBING SERVICES, MAKE PERMANENT
(OR IF NECESSARY, PROPER TEMPORARY) CONNECTIONS TO RESTORE AFFECTED
SERVICES TO ORIGINAL CONDITION IN AREAS NOT SCHEDULED FOR DEMOLITION
AND REMODELING.
PATCH TO MATCH ADJACENT SURFACES OF EXISTING WALLS AND FLOORS IN ALL
AREAS REQUIRED DUE TO THE REMOVAL OF MECHANICAL, ELECTRICAL AND
PLUMBING EQUIPMENT OR FIXTURES.
WHERE EXISTING WALLS OR CEILINGS ARE DISTURBED FOR ACCESS TO
SERVICES, PATCH TO MATCH DISTURBED MATERIALS AND FINISHES TO ORIGINAL
CONDITION. WHERE REPAINTING IS REQUIRED, THE ENTIRE WALL OR CEILING
SURFACE SHALL BE REPAINTED TO THE NEAREST CORNER.
CEILINGS WHICH ARE IN CONFLICT WITH NEW WORK SHALL BE REMOVED OR
RELOCATED ALONG WITH ALL MECHANICAL, ELECTRICAL AND PLUMBING
SYSTEMS.
ALL EXISTING UNUSED WALL PENETRATIONS IN INTERIOR AND EXTERIOR WALLS
ALONG WITH PENETRATIONS LEFT AFTER SELECTIVE DEMOLITION ACTIVITIES
SHALL BE INFILLED TO MATCH ADJACENT WALL FINISHES, THICKNESS, AND
SMOKE/FIRE RATING AS DIRECTED.
MAINTAIN CLEAR EXIT PATHS DURING DEMOLITION AND CONSTRUCTION
ACTIVITIES.
UTILITY / MEDICAL SYSTEM SHUTDOWNS (INCLUDING MEDICAL GASES) SHALL BE
COORDINATED WITH THE COR, PER THE SPECIFICATIONS.
ERECT AND MAINTAIN TEMPORARY CONSTRUCTION BARRIERS. COORDINATE
LOCATIONS WITH CONSTRUCTION DOCUMENTS, PROJECT PHASING AND COR. SEE
PARTITION TYPE P0 ON SHEET AE601 FOR DETAIL.
ANY ASBESTOS OR OTHER HAZARDOUS MATERIALS FOUND DURING DEMOLITION
SHALL BE BROUGHT TO THE ATTENTION OF THE COR AND ARCHITECT.
CONTRACTOR SHALL ENCAPSULATE AND ABATE THE AFFECTED AREA IN
ACCORDANCE WITH MDNR/EPA/OSHA REGULATIONS AS PER THE DIRECTION OF A
LICENSED PROFESSIONAL ENVIRONMENTAL CONTRACTOR. CONSULT ASBESTOS
SURVEY AND REPORT, REF. SPECIFICATIONS.
ALL STRUCTURAL ELEMENTS SHALL BE PROTECTED DURING DEMOLITION.
CONTRACTOR SHALL REPAIR ALL SURFACES TO LIKE NEW AFTER TEMPORARY
WALLS AND DOORS HAVE BEEN REMOVED.
ENSURE ADJACENT AREAS ARE FULLY OPERATIONAL DURING CONSTRUCTION.
ALL LIGHT FIXTURES SHALL BE SALVAGED FOR REUSE.
CONTRACTOR TO INSPECT AND PATCH ALL CONSTRUCTION BOUNDARY WALLS TO
MAINTAIN 1-HOUR RATING OF CONSTRUCTION AREA PRIOR TO DEMO.
CONTRACTOR IS TO MAINTAIN A 1 HOUR SEPARATION DURING ALL CONSTRUCTION
PHASES.
GENERAL DEMOLITION NOTES
ALL INFECTION CONTROL CRITERIA AS SPECIFIED IN SECTION 01 00 00 SHALL
BE ADHERED TO DURING ALL PHASES OF THE PROJECT.
TEMPORARY WALL, DOOR AND FRAME SHALL HAVE A 1-HOUR FIRE RATING.
GENERAL NOTES
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
R.
S.
T.
U.1.
2.
GENERAL: CONTRACTOR SHALL PROTECT ALL EXISTING CONSTRUCTION TO
REMAIN AS REQUIRED TO PREVENT DAMAGE. ALL EXISTING MATERIALS,
SURFACES, EQUIPMENT, ETC. DAMAGED DURING THE WORK SHALL BE
REPAIRED TO THE SATISFACTION OF THE COR OR REPLACED WITH NEW AT NO
ADDITIONAL COST TO THE GOVERNMENT. PROTECTION DEVICES SHALL BE
INSTALLED PRIOR TO THE START OF ALL DEMOLITION, AND MAINTAINED
THROUGHOUT CONSTRUCTION AS NEEDED.
COORDINATE LOCATION AND TYPE OF ALL PROTECTION BARRIERS WITH THE
COR PRIOR TO INSTALLATION.
PROVIDE FLOOR PROTECTION COVERINGS AS REQUIRED TO PREVENT
DAMAGE TO EXISTING FLOOR COVERINGS AND FINISHES TO REMAIN .
EXISTING EMERGENCY EXITS MUST BE MAINTAINED ACCESSIBLE DURING THE
PERIOD OF CONSTRUCTION.
CONTRACTOR SHALL SEAL ALL DOOR OPENINGS AND HVAC OPENINGS IN ALL
AREAS OF DEMOLITION AND CONSTRUCTION PRIOR TO CUTTING, SANDING,
ETC. TO PREVENT DUST MIGRATION TO ADJACENT ROOMS.
PROTECTION NOTES
1.
2.
3.
4.
5.
DEMOLITION KEYNOTES
ACCESSORIES/ MISCELLANEOUS
REMOVE AND DISPOSE OF ALL EXISTING TOILET ACCESSORIES.
REMOVE AND DISPOSE OF EXISTING COUNTERTOP AND SHELVING.
REMOVE SINK, PAPER TOWEL HOLDER, DISPENSERS AND ALL
ACCESSORIES AND RETURN TO OWNER. REMOVE CABINETRY.
REMOVE AND SALVAGE EYEWASH FOR REUSE.
REMOVE AND DISPOSE OF ALL EXISTING LOCKERS AND LOCKER
ACCESSORIES.
REMOVE DUMB WAITER CONTROLS.
REMOVE AND SALVAGE DIRECTIONAL AND ELEVATOR LOBBY SIGNAGE
FOR REUSE.
REMOVE AND SALVAGE SMARTBOARDS TO BE REUSED, PROJECTORS
AND PROJECTOR SCREENS. RETURN PROJECTORS AND PROJECTOR
SCREENS TO OWNER.
NOTE: ALL KEYNOTES LISTED BELOW MAY NOT BE APPLICABLE TO THIS
SHEET.
CEILING
REMOVE EXISTING ACOUSTICAL CEILING TILE SYSTEM.
REMOVE EXISTING BARIATRIC LIFT AND RAIL SYSTEM AND RETURN TO
OWNER.
PARTITIONS
REMOVE AND DISPOSE OF EXISTING MASONRY PARTITION AND RELATED
ITEMS.
REMOVE AND DISPOSE OF EXISTING STUD PARTITION AND RELATED ITEMS.
REMOVE EXISTING CERAMIC WALL TILE.
DOORS/ FRAMES
REMOVE AND DISPOSE OF EXISTING DOOR, FRAME AND HARDWARE.
REMOVE AND DISPOSE OF EXISTING FOLDING PARTITION, TRACK, AND
RELATED ITEMS.
FLOOR
REMOVE AND DISPOSE OF EXISTING FLOOR COVERING TO SLAB. PATCH,
LEVEL/PREPARE FOR NEW FINISH.
REMOVE EXISTING CONCRETE PAD TO FLOOR SLAB, PATCH AND REPAIR
AS REQUIRED.
MECHANICAL/ PLUMBING
REMOVE AND DISPOSE OF EXISTING PLUMBING FIXTURE (SINK, FLOOR
DRAIN, WATER CLOSET, URINAL, DRINKING FOUNTAIN, SHOWER AND/OR
LAVATORY), RE: MEP.
A1
A2
A3
C1
C2
D1
D2
F1
M1
P1
P2
P3
WINDOWS
REMOVE EXISTING WINDOW AND DISPOSE OF EXISTING FRAME AND
HARDWARE.
W1
A4
A5
A6
A7
A8
F2
EXISTING ITEMS TO BE REMOVED
EXISTING ITEMS TO REMAIN
EXISTING ITEMS TO REMAIN
NEW GYPSUM BOARD METAL STUD WALLS
TEMPORARY 1-HOUR RATED WALLS AND
DOORS
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved
VA FORM 08 -
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Atriax, pllc 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 Phone 828-315-9962 www.atriaxgroup.com
GLMV Architecture 1525 E. Douglas Wichita, KS 67211 Phone 316-265-9367
PEC Professional Engineering Consultants, PA 303 S. Topeka Wichita, KS 67202 Phone 316-262-2691
589A4-18-187REMODEL 5TH FLOOR
COLUMBIA, MO
JANUARY 28, 2019
BID DOCUMENTS
C U s e rs
\L iz
.C h ri s ti a n
\D e s k to p \5
A
-1
-1
C e n tr a l_ liz .c h ri s ti a n
.r v t
/2
/2
:4
:2
A
M
AD102
PHASE 2 - DEMOLITION PLAN
0' 4' 8' 12' 1/8" = 1'-0"
PHASE 2 - DEMOLITION PLAN
Revisions: Date: Page 9 of 85
F
V E
N D
FEC
F E
C
FEC
FEC
F E
C
REF.
V E
N D
FFaGHJKLMMbN La Ja Hb Ga
4.1
5.4
6.2
6.7
NOT IN CONTRACT
Jb
M1
A1
A2
D1
D1
D1
D1
P2
P2
P2
P2
P2
P2
C1
F1
C1F1
C1
F1
C1 F1
C1 F1
C1 F1
P2
(TYP.)
4'-0" MIN.
(T
YP
4'
-0 " M
IN
P0
P0 P0
P0
A5
A5
A5
NIC NIC
P0
P0
P0
A5
A5
F1
A1
C1 F1
A2
M1
A1
A2
COMPUTER
TRAINING ROOM
VAM TRAINING
ROOM
SIMULATION
TRAINING ROOM
CLASSROOM
CLASSROOM
CONTROL
ROOM
554A
ELEC
545A
CORRIDOR
C58
STORAGE
CLASSROOM
MEDICAL MEDIA
ROOM
STORAGE
547A
IT CLOSET
STAIR 1
CORRIDOR
C57
OPEN OFFICE
SCHEDULER
TRAINING ROOM
OPEN OFFICE
OFFICE
MEN
COPY ALCOVE
OPEN OFFICE
ELEVATOR
LOBBY
500CORRIDOR
C51
FREIGHT
ELEVATOR
LOBBY
HOUSEKEEPING
CLOSET
501A
WOMEN
CORRIDOR
C55
OPEN OFFICE
CONFERENCE
ROOM
OPEN OFFICE
MEN
OPEN OFFICE
OFFICE
LACTATION
ROOM
513 STAIR 2
ELEC
512C
ELEC
512B
CORRIDOR
C53
CONFERENCE
ROOM
ELEC
514A
CONFERENCE
ROOM
STAFF
BREAKROOM
CORRIDOR
C54
COPY ALCOVE
520A
OFFICE
OFFICE
OFFICE
OFFICE
COPY ALCOVE
STORAGE
OFFICE
OPEN OFFICE
OPEN OFFICE
OPEN OFFICE
536A
NOTE:
REFERENCE THE PHASING PLANS FOR ADDITIONAL INFORMATION FOR PROJECT
PHASING AND COORDINATION OF DEMOLITION AND NEW CONSTRUCTION FOR THE
PROJECT.
ALL DEMOLISHED MECHANICAL AND ELECTRICAL ITEMS SHALL BE REMOVED
INCLUDING MAIN RUNS AND SERVICE LINES TO SOURCE. ALL SYSTEM LINES ARE
NOT SHOWN ON CONSTRUCTION DOCUMENTS. ADJACENT SPACES TO REMAIN
OPERATIONAL.
REPAIR ANY DAMAGE TO ITEMS INDICATED TO REMAIN AS A RESULT OF
DEMOLITION AND/OR CONSTRUCTION ACTIVITIES. SEE STRUCTURAL, MECHANICAL
AND ELECTRICAL DRAWINGS FOR ADDITIONAL DEMOLITION REQUIREMENTS.
DEMOLITION NOTES INDICATED ON DRAWINGS MAY NOT BE ALL INCLUSIVE.
REMOVE ALL ITEMS REQUIRED FOR RECONSTRUCTION ACTIVITIES AND TO
ACCOMMODATE NEW WORK.
VERIFY EXTENT OF ALL CONDITIONS OF DEMOLITION WITH FLOOR PLANS AND
SCHEDULED CONSTRUCTION PRIOR TO DEMOLITION. DISCREPANCIES BETWEEN
DESIGN CONDITIONS AND EXISTING CONDITIONS SHALL BE BROUGHT TO THE
ATTENTION OF THE COR.
ALL WALLS, SUBSTRUCTURAL FRAMES, PARTITIONS, EQUIPMENT, ETC. INDICATED
BY DASHED LINES (----) SHALL BE REMOVED. ALL MECHANICAL, ELECTRICAL,
PLUMBING AND OTHER SERVICES WHICH ARE CONTAINED IN THE AREA TO BE
REMOVED SHALL ALSO BE REMOVED OR REROUTED. CONTRACTOR SHALL
COORDINATE ALL DEMOLITION WITH NEW CONSTRUCTION BEFORE STARTING
DEMOLITION.
AFTER REMOVAL OF EXISTING FLOOR FINISH, CONCRETE SLAB SHALL BE
PATCHED, GROUND SMOOTH AND LEVELED BEFORE INSTALLATION OF NEW FINISH
PER ROOM FINISH SCHEDULE. AT DISSIMILAR FLOOR ELEVATIONS, FEATHER SELF-
LEVELING UNDER-LAYMENT COMPOUND TO EACH FLOOR ELEVATION AND GRIND
SMOOTH. AT DISSIMILAR FLOOR MATERIALS, AND/OR AT JUNCTIONS BETWEEN
NEW AND EXISTING FLOORS, PROVIDE APPROPRIATE TRANSITION STRIP.
WHERE EXISTING DOORS, DOOR FRAMES, EQUIPMENT, PORTIONS OF WALLS AND
PARTITIONS ARE REQUIRED TO BE REMOVED FOR THE COMPLETION OF THE
WORK, EXERCISE CAUTION TO AVOID DISRUPTING SURROUNDING MATERIALS.
SALVAGE EXISTING MATERIALS AS MUCH AS POSSIBLE FOR REUSE IN PATCHING
SURROUNDING FINISHES WHEN APPROVED BY THE COR OR INDICATED ON
CONSTRUCTION DRAWINGS.
WHERE REMOVAL OF EXISTING WALLS, PARTITIONS, EQUIPMENT, ETC. DISRUPTS
EXISTING ELECTRICAL, MECHANICAL AND PLUMBING SERVICES, MAKE PERMANENT
(OR IF NECESSARY, PROPER TEMPORARY) CONNECTIONS TO RESTORE AFFECTED
SERVICES TO ORIGINAL CONDITION IN AREAS NOT SCHEDULED FOR DEMOLITION
AND REMODELING.
PATCH TO MATCH ADJACENT SURFACES OF EXISTING WALLS AND FLOORS IN ALL
AREAS REQUIRED DUE TO THE REMOVAL OF MECHANICAL, ELECTRICAL AND
PLUMBING EQUIPMENT OR FIXTURES.
WHERE EXISTING WALLS OR CEILINGS ARE DISTURBED FOR ACCESS TO
SERVICES, PATCH TO MATCH DISTURBED MATERIALS AND FINISHES TO ORIGINAL
CONDITION. WHERE REPAINTING IS REQUIRED, THE ENTIRE WALL OR CEILING
SURFACE SHALL BE REPAINTED TO THE NEAREST CORNER.
CEILINGS WHICH ARE IN CONFLICT WITH NEW WORK SHALL BE REMOVED OR
RELOCATED ALONG WITH ALL MECHANICAL, ELECTRICAL AND PLUMBING
SYSTEMS.
ALL EXISTING UNUSED WALL PENETRATIONS IN INTERIOR AND EXTERIOR WALLS
ALONG WITH PENETRATIONS LEFT AFTER SELECTIVE DEMOLITION ACTIVITIES
SHALL BE INFILLED TO MATCH ADJACENT WALL FINISHES, THICKNESS, AND
SMOKE/FIRE RATING AS DIRECTED.
MAINTAIN CLEAR EXIT PATHS DURING DEMOLITION AND CONSTRUCTION
ACTIVITIES.
UTILITY / MEDICAL SYSTEM SHUTDOWNS (INCLUDING MEDICAL GASES) SHALL BE
COORDINATED WITH THE COR, PER THE SPECIFICATIONS.
ERECT AND MAINTAIN TEMPORARY CONSTRUCTION BARRIERS. COORDINATE
LOCATIONS WITH CONSTRUCTION DOCUMENTS, PROJECT PHASING AND COR. SEE
PARTITION TYPE P0 ON SHEET AE601 FOR DETAIL.
ANY ASBESTOS OR OTHER HAZARDOUS MATERIALS FOUND DURING DEMOLITION
SHALL BE BROUGHT TO THE ATTENTION OF THE COR AND ARCHITECT.
CONTRACTOR SHALL ENCAPSULATE AND ABATE THE AFFECTED AREA IN
ACCORDANCE WITH MDNR/EPA/OSHA REGULATIONS AS PER THE DIRECTION OF A
LICENSED PROFESSIONAL ENVIRONMENTAL CONTRACTOR. CONSULT ASBESTOS
SURVEY AND REPORT, REF. SPECIFICATIONS.
ALL STRUCTURAL ELEMENTS SHALL BE PROTECTED DURING DEMOLITION.
CONTRACTOR SHALL REPAIR ALL SURFACES TO LIKE NEW AFTER TEMPORARY
WALLS AND DOORS HAVE BEEN REMOVED.
ENSURE ADJACENT AREAS ARE FULLY OPERATIONAL DURING CONSTRUCTION.
ALL LIGHT FIXTURES SHALL BE SALVAGED FOR REUSE.
CONTRACTOR TO INSPECT AND PATCH ALL CONSTRUCTION BOUNDARY WALLS TO
MAINTAIN 1-HOUR RATING OF CONSTRUCTION AREA PRIOR TO DEMO.
CONTRACTOR IS TO MAINTAIN A 1 HOUR SEPARATION DURING ALL CONSTRUCTION
PHASES.
GENERAL DEMOLITION NOTES
ALL INFECTION CONTROL CRITERIA AS SPECIFIED IN SECTION 01 00 00 SHALL
BE ADHERED TO DURING ALL PHASES OF THE PROJECT.
TEMPORARY WALL, DOOR AND FRAME SHALL HAVE A 1-HOUR FIRE RATING.
GENERAL NOTES
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
R.
S.
T.
U.1.
2.
GENERAL: CONTRACTOR SHALL PROTECT ALL EXISTING CONSTRUCTION TO
REMAIN AS REQUIRED TO PREVENT DAMAGE. ALL EXISTING MATERIALS,
SURFACES, EQUIPMENT, ETC. DAMAGED DURING THE WORK SHALL BE
REPAIRED TO THE SATISFACTION OF THE COR OR REPLACED WITH NEW AT NO
ADDITIONAL COST TO THE GOVERNMENT. PROTECTION DEVICES SHALL BE
INSTALLED PRIOR TO THE START OF ALL DEMOLITION, AND MAINTAINED
THROUGHOUT CONSTRUCTION AS NEEDED.
COORDINATE LOCATION AND TYPE OF ALL PROTECTION BARRIERS WITH THE
COR PRIOR TO INSTALLATION.
PROVIDE FLOOR PROTECTION COVERINGS AS REQUIRED TO PREVENT
DAMAGE TO EXISTING FLOOR COVERINGS AND FINISHES TO REMAIN .
EXISTING EMERGENCY EXITS MUST BE MAINTAINED ACCESSIBLE DURING THE
PERIOD OF CONSTRUCTION.
CONTRACTOR SHALL SEAL ALL DOOR OPENINGS AND HVAC OPENINGS IN ALL
AREAS OF DEMOLITION AND CONSTRUCTION PRIOR TO CUTTING, SANDING,
ETC. TO PREVENT DUST MIGRATION TO ADJACENT ROOMS.
PROTECTION NOTES
1.
2.
3.
4.
5.
DEMOLITION KEYNOTES
ACCESSORIES/ MISCELLANEOUS
REMOVE AND DISPOSE OF ALL EXISTING TOILET ACCESSORIES.
REMOVE AND DISPOSE OF EXISTING COUNTERTOP AND SHELVING.
REMOVE SINK, PAPER TOWEL HOLDER, DISPENSERS AND ALL
ACCESSORIES AND RETURN TO OWNER. REMOVE CABINETRY.
REMOVE AND SALVAGE EYEWASH FOR REUSE.
REMOVE AND DISPOSE OF ALL EXISTING LOCKERS AND LOCKER
ACCESSORIES.
REMOVE DUMB WAITER CONTROLS.
REMOVE AND SALVAGE DIRECTIONAL AND ELEVATOR LOBBY SIGNAGE
FOR REUSE.
REMOVE AND SALVAGE SMARTBOARDS TO BE REUSED, PROJECTORS
AND PROJECTOR SCREENS. RETURN PROJECTORS AND PROJECTOR
SCREENS TO OWNER.
NOTE: ALL KEYNOTES LISTED BELOW MAY NOT BE APPLICABLE TO THIS
SHEET.
CEILING
REMOVE EXISTING ACOUSTICAL CEILING TILE SYSTEM.
REMOVE EXISTING BARIATRIC LIFT AND RAIL SYSTEM AND RETURN TO
OWNER.
PARTITIONS
REMOVE AND DISPOSE OF EXISTING MASONRY PARTITION AND RELATED
ITEMS.
REMOVE AND DISPOSE OF EXISTING STUD PARTITION AND RELATED ITEMS.
REMOVE EXISTING CERAMIC WALL TILE.
DOORS/ FRAMES
REMOVE AND DISPOSE OF EXISTING DOOR, FRAME AND HARDWARE.
REMOVE AND DISPOSE OF EXISTING FOLDING PARTITION, TRACK, AND
RELATED ITEMS.
FLOOR
REMOVE AND DISPOSE OF EXISTING FLOOR COVERING TO SLAB. PATCH,
LEVEL/PREPARE FOR NEW FINISH.
REMOVE EXISTING CONCRETE PAD TO FLOOR SLAB, PATCH AND REPAIR
AS REQUIRED.
MECHANICAL/ PLUMBING
REMOVE AND DISPOSE OF EXISTING PLUMBING FIXTURE (SINK, FLOOR
DRAIN, WATER CLOSET, URINAL, DRINKING FOUNTAIN, SHOWER AND/OR
LAVATORY), RE: MEP.
A1
A2
A3
C1
C2
D1
D2
F1
M1
P1
P2
P3
WINDOWS
REMOVE EXISTING WINDOW AND DISPOSE OF EXISTING FRAME AND
HARDWARE.
W1
A4
A5
A6
A7
A8
F2
EXISTING ITEMS TO BE REMOVED
EXISTING ITEMS TO REMAIN
EXISTING ITEMS TO REMAIN
NEW GYPSUM BOARD METAL STUD WALLS
TEMPORARY 1-HOUR RATED WALLS AND
DOORS
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved
VA FORM 08 -
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Atriax, pllc 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 Phone 828-315-9962 www.atriaxgroup.com
GLMV Architecture 1525 E. Douglas Wichita, KS 67211 Phone 316-265-9367
PEC Professional Engineering Consultants, PA 303 S. Topeka Wichita, KS 67202 Phone 316-262-2691
589A4-18-187REMODEL 5TH FLOOR
COLUMBIA, MO
JANUARY 28, 2019
BID DOCUMENTS
C U s e rs
\L iz
.C h ri s ti a n
\D e s k to p \5
A
-1
-1
C e n tr a l_ liz .c h ri s ti a n
.r v t
/2
/2
:4
:3
A
M
AD103
PHASE 3 - DEMOLITION PLAN
0' 4' 8' 12' 1/8" = 1'-0"
PHASE 3 - DEMOLITION PLAN
Revisions: Date: Page 10 of 85
ADDITIONAL FILL
CONCRETE
GRAVEL/POROUS BACKFILL
CONCRETE MASONRY UNITS
(PLAN) AND (SECTION)
WOOD (ROUGH)
WOOD (FINISH)
BATT INSULATION
GYPSUM WALLBOARD
RIGID INSULATION
GLASS
STEEL/ METAL
PLYWOOD
EARTH
SOD
PARTITION TYPE
DOOR NUMBER
ROOM
NAME
& NUMBER
WINDOW/LOUVER
DOOR NUMBER
BUILDING AND WALL SECTION IDENTIFICATION
SECTION
SHEET
DETAIL IDENTIFICATION
DETAIL
SHEET
INTERIOR ELEVATION OR VIEWPOINT IDENTIFICATION
ELEVATION
SHEET
OR
ELEVATION
SHEET
P1
FLOOR PLAN
A
AE301
AE521
MISC. ARCHITECTURAL SYMBOLSMATERIALS LEGEND
ABBREVIATIONS
A.B. ANCHOR BOLT
ABV ABOVE
AC ACOUSTICAL
A/C AIR CONDITIONING
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADH ADHESIVE
ADJ ADJUSTABLE
AFF ABOVE FINISH FLOOR
ALUM ALUMINUM
ALT ALTERNATE
ANCH ANCHOR
ANOD ANODIZED
AP ACCESS PANEL
APPROX APPROXIMATE
ARCH ARCHITECT(URAL)
ASPH ASPHALT
AUTO AUTOMATIC
AVG AVERAGE
AGG AGGREGATE
BD BOARD
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BLW BELOW
BM BEAM
B.M. BENCH MARK
B.O. BOTTOM OF
BRG BEARING
BSMT BASEMENT
BTM BOTTOM
BTWN BETWEEN
B.U. BUILT-UP
C., CHANNEL
CAB CABINET
CALK CAULK(ING)
C.B. CATCH BASIN
CBT CABINET
C/C CENTER TO CENTER
CEM CEMENT
C.F. CUBIC FEET
CHBD CHALKBOARD
CI CAST IRON
CIP CAST IRON PIPE/
CAST IN PLACE
CJ CONSTRUCTION JOINT
CONTROL JOINT
CL, CENTER LINE
CLG CEILING
CL CLOSET
CLR CLEAR(ANCE)
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
COL COLUMN
CONC CONCRETE
COND CONDITION/CONDENSER
CONT CONTINUE (CONTINUOUS)
CONTR CONTRACT(OR)
CONSTR CONSTRUCTION
CORR CORRUGATED
COR CORRIDOR
CT CERAMIC TILE
CTR COUNTER
CU FT CUBIC FEET
CY CUBIC YARD
COMP COMPUTER
CPT CARPET
CSCI CONTRACTOR SUPPLIED
CONTRACTOR INSTALLED
DBL DOUBLE
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DISP DISPENSER
DIV DIVISION/DIVIDER
DL DEAD LOAD
DN DOWN
DOC DOCUMENTS
DP DEEP
DPR DAMPER
DR DOOR
DWG DRAWING
DTL DETAIL
DS DOWNSPOUT
EA EAST
EA EACH
EB EXPANSION BOLT
EC ELECTRICAL CONDUIT
OR CONTRACTOR
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
ENC ENCLOSURE/ENCLOSE
ENT ENTRANCE
EP ELECTRICAL PANEL
EQ EQUAL
EQUIP EQUIPMENT
EW EACH WAY
EXH EXHAUST
EXIST EXISTING
EXPD EXPOSED
EXP EXPANSION
EXT EXTERIOR
E.I.F.S. EXTERIOR INSULATION
FINISH SYSTEM
FAB FABRICATE/FABRICATION
FBD FIBERBOARD
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FH FIRE HYDRANT
FIN FINISH
FIN FLR FINISH FLOOR
FLR, FL FLOOR
FL FLOW LINE
FLUOR FLUORESCENT
FLX FLEXIBLE
FND FOUNDATION
F.O.W. FACE OF WALL
FR FRAME(ED)(ING)/FIRE RATED
FT (') FOOT
FTG FOOTING
FUR FURRED/FURRING
FURN FURNACE
FUTURE FUTURE
FV FIELD VERIFY
G GAS
GA GAGE, GAUGE
GALV. GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GI GALVANIZED IRON
GL GLASS, GLAZING
GYP BD GYPSUM BOARD
H HIGH
HC HOLLOW CORE
HDBD HARD BOARD
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HEAT PUMP
HR HOUR
HT HEIGHT
HTG HEATING
HTR HEATER
HVAC HEATING, VENTILATING,
AND AIR CONDITIONING
HW HOT WATER
HYD HYDRANT
ID INSIDE DIAMETER
IN (") INCH
INCL INCLUDE
INSUL INSULATION
INT INTERIOR
JC JANITOR'S CLOSET
JST JOIST
JT JOINT
K KIP (1000 LBS.)
KW KILOWATT
L LONG; LENGTH
LAM LAMINATE
LAV LAVATORY
lb. # POUND
LF LINEAR FOOT
LH LEFT HAND
LKR LOCKER
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LOC LOCATION
LT LIGHT
MANUF MANUFACTURER(S)(ING)
MAS MASONRY
MAT MATERIAL
MAX MAXIMUM
M.B. MARKER BOARD
MC MECHANICAL CONTRACTOR
MECH MECHANICAL
MFD MANUFACTURED
MFR MANUFACTURER
M.O. MANHOLE
MIN MINIMUM
MIRROR MIRROR
MIR MIRROR
MISC MISCELLANEOUS
MH MASONRY OPENING
MOD MODULAR
MOV MOVABLE
MTD MOUNTED
MTL METAL
MUL MULLION
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NRC NOISE REDUCTION COEFFICIENT
NTS NOT TO SCALE
OA OVERALL
O.C. ON CENTER (S)
OD OUTSIDE DIAMETER
OH DR OVERHEAD DOOR
OPNG OPENING
OPP OPPOSITE
OH OVERHEAD
OS OVERFLOW SCUPPER
OSOI OWNER SUPPLIED
OWNER INSTALLED
PART BD PARTICLE BOARD
PC PIECE
PCF POUNDS PER CUBIC FOOT
PER PERIMETER
PERF PERFORATED
PH PHASE
PJ PANEL JOINT
PL PLATE
P.L. PROPERTY LINE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLF POUNDS PER LINEAR FOOT
PLYWD PLYWOOD
PT PAINT(ED)
PR PAIR
PREFIN PREFINSHED
PROJ PROJECT
P.S. PROJECTION SCREEN
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PTN PARTITION
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
QT QUARRY TILE
R RADIUS, RISER
RA RETURN AIR
RCP REINFORCED CONCRETE PIPE
RD ROOF DRAIN
RECP RECEPTACLE
REF REFERENCE/REFRIGERATOR
REG REGISTER
REINF REINFORCE(MENT)(ING)
REQ'D REQUIRE(D)
REV REVISE(D); REVISION; REVERSE
RM ROOM
R.O. ROUGH OPENING
R.O.W. RIGHT OF WAY
RPM REVOLUTIONS PER MINUTE
RS ROUGH SAWN
R.T.U. ROOF TOP UNIT
RB RESILIENT BASE
S SOUTH
SAN SANITARY
SB SPLASH BLOCK
SC SOLID CORE
SCH SCHEDULE
SD STORM DRAIN
SEAL SEALANT
SECT SECTION
SF SQUARE FOOT
SHT SHEET
SIM SIMILAR
SPEC SPECIFICATION
SPK SPEAKER
SQ SQUARE
SERV SERVICE
SS SANITARY SEWER
SST STAINLESS STEEL
ST STREET
STC SOUND TRANSMISSION CLASS
STD STANDARD
STL STEEL
STO STORAGE
STS STORM SEWER
STRUCT STRUCTURAL; STRUCTURE
SUP SUPPLY
SUSP SUSPEND(ED)
S&V STAIN & VARNISH
SW SWITCH
SY SQUARE YARD
SYM SYMMETRY; SYMMETRICAL
SYN SYNTHETIC
SYS SYSTEM
SWS STORM WATER SEWER
T TREAD
T.B. TACK BOARD
T.O.C. TOP OF CURB
TELE TELEPHONE
TEMP TEMPORARY
THR THRESHOLD
T&G TONGUE & GROOVE
THRU THROUGH
T.O. TOP OF
TLT TOILET
TV TELEVISION
T.O.W. TOP OF WALL
TYP TYPICAL
UG UNDERGROUND
UH UNIT HEATER
U.N.O. UNLESS NOTED OTHERWISE
UR URNIAL
V VOLT
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
W WEST
W WATER
W WIDE
W/ WITH
WD WOOD
WNDW WINDOW
WH WATER HEATER
W/O WITHOUT
WSCT WAINSCOT
WT WEIGHT
W.W.F. WELDED WIRE FABRIC
W.W.M. WELDED WIRE MESH
WB WINDOW BLIND
YD YARD
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q,R
S
T
U, V, W, Y
HPR HORSE POWER
FS FLOOR SINK (REF PLUMBING)
AE201
AE201
2 3
1' - 6" min
5' m in
4' m in
1' - 0" min 4' m in
4' m in
1' - 10" min
4' m in
2' - 0" min
4' m in
2' - 0" min
4' - 0" min
2' m inø 5' - 0"
4' m in
5' - 0" min
4' m in
2' - 6" min
4' m in 17
2' - 6" min
4' m in
2' - 6" min
(a) front approach, pull side
(b) front approach, push side
(c) front approach, push side, door provided with both closer and latch
(g) hinge approach, push side, door provided with both closer and latch
(h) latch approach, pull side
(i) latch approach, pull side, door provided with closer
304.3.1 Circular Space
Figure 305.3 Clear Floor or Ground
Figure 604.3.1 Size of Clearance at Water Closets
Floor Clearance at Urinal
Floor Clearance at Wall Mounted Lavatory Floor Clearance at Drinking Fountain
404.3 Automatic and Power-Assisted Doors and Gates
ADA CLEARANCE LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved
VA FORM 08 -
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Atriax, pllc 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 Phone 828-315-9962 www.atriaxgroup.com
GLMV Architecture 1525 E. Douglas Wichita, KS 67211 Phone 316-265-9367
PEC Professional Engineering Consultants, PA 303 S. Topeka Wichita, KS 67202 Phone 316-262-2691
589A4-18-187REMODEL 5TH FLOOR
COLUMBIA, MO
JANUARY 28, 2019
BID DOCUMENTS
C U s e rs
\L iz
.C h ri s ti a n
\D e s k to p \5
A
-1
-1
C e n tr a l_ liz .c h ri s ti a n
.r v t
/2
/2
:4
:3
A
M
AE001
ABBREVATIONS AND SYMBOLS
LEGEND
Revisions: Date: Page 11 of 85
F
V E
N D
FEC
F E
C
FEC
FEC
F E
C
REF.
V E
N D
PHASE 1 AREA
LEGEND
PHASE 2 AREA
PHASE 3 AREA
AREA NOT IN CONTRACT
PHASE 2
PHASE 3
PHASE 1
NOT IN CONTRACT
NIC NIC
511513518522526528
512C 512B
514A526A 524 519 513A 511A
512516517520521523
523A
525527
531A
534A
537 536
536A
530C 530A
530B
564A
537A
541A
542A
543A 545A
546 550
554 555
553A
553B
553C
553D
553E
557556
551549547545
570B
570A
567566
540 544
501A501
FFaGHJKLMMbN La Ja Hb Ga
4.1
5.4
6.2
6.7
Jb
OFFICE
OFFICE
CORRIDOR
C56
OFFICE
WOMEN
NOT IN CONTRACT
NIC NIC
CONFERENCE
ROOM
CONFERENCE
ROOM
STAFF
BREAKROOM
OFFICE
LACTATION
ROOM
WOMEN
MEN
CORRIDOR
C53
OFFICE
CONFERENCE
ROOM
OFFICE
OFFICE
OPEN OFFICE
OPEN OFFICE
STORAGE
OFFICE
OPEN OFFICE
OPEN OFFICE
CORRIDOR
C51
OFFICE
CORRIDOR
C54
CORRIDOR
C55
ELEC
514A
ELEC
512C
ELEC
512B
COMPUTER
TRAINING ROOM
VAM TRAINING
ROOM
SIMULATION
TRAINING ROOM
CLASSROOM
CLASSROOM
MEDICAL MEDIA
ROOM
OPEN OFFICE
IT CLOSET
STORAGE
547A
STAIR 1
CLASSROOM
STORAGE
CORRIDOR
C57
CORRIDOR
C58
ELEVATOR
LOBBY
FREIGHT
ELEVATOR
LOBBY
HOUSEKEEPING
CLOSET
501A
COPY ALCOVE
520A
STAIR 2
OPEN OFFICE
COPY ALCOVE
OPEN OFFICE
CONTROL
ROOM
554A
ELEC
545A
SCHEDULER
TRAINING ROOM
MEN
542OFFICE
OPEN OFFICE
COPY ALCOVE
OPEN OFFICE
OPEN OFFICE
PHASE 2
PHASE 3
PHASE 1
WORK IN THESE
AREAS TO BE DONE AT
NIGHT/ON WEEKENDS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved
VA FORM 08 -
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Atriax, pllc 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 Phone 828-315-9962 www.atriaxgroup.com
GLMV Architecture 1525 E. Douglas Wichita, KS 67211 Phone 316-265-9367
PEC Professional Engineering Consultants, PA 303 S. Topeka Wichita, KS 67202 Phone 316-262-2691
589A4-…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.