About this file

36C25519R0057 0004 Amendment 4 Drawing-5th Floor.pdf

View the file

Other files

File Type Posted
36C25519R0057-0004000.docx DOCX document
36C25519R0057-0003001.pdf PDF
36C25519R0057-0003000.docx DOCX document
36C25519R0057-0002002.pdf PDF
36C25519R0057-0002001.pdf PDF
36C25519R0057-0002003.pdf PDF
36C25519R0057-0002000.docx DOCX document
36C25519R0057-0001005.pdf PDF
36C25519R0057-0001007.pdf PDF
36C25519R0057-0001004.pdf PDF
36C25519R0057-0001003.pdf PDF
36C25519R0057-0001002.pdf PDF
36C25519R0057-0001006.pdf PDF
36C25519R0057-0001000.docx DOCX document
36C25519R0057-0001001.pdf PDF
36C25519R0057-009.pdf PDF
36C25519R0057-003.pdf PDF
36C25519R0057-008.pdf PDF
36C25519R0057-010.pdf PDF
36C25519R0057-011.pdf PDF
36C25519R0057-002.pdf PDF
36C25519R0057-006.pdf PDF
36C25519R0057-012.pdf PDF
36C25519R0057-004.pdf PDF
36C25519R0057-005.pdf PDF
36C25519R0057-007.pdf PDF
36C25519R0057-001.docx DOCX document
36C25519R0057-000.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(EX)2"V DN

2"

4"

4"

(EX)2"V DN

4" 2

(EX)4"W DN

4 3 2 1

2 1

2 1 21

2 1

2 1

2 1

2"W UP

TO FD-S

4"W DN FROM

5TH FLOOR

(EX)4"W DN

(EX)4"W DN

(EX)2"W DN

4"V UP

4"

2 1

CO

CO

2"W UP

TO FD-C

2"W UP

TO FD-C

CO

CO

1 1/2"W

CO

4"

1 2

1 2

1 2

4"W UP

4"V4"V

2"V DN

2"V UP

4"W

4"W

3"W UP TO

MOP BASIN

CONNECT TO (EX)4"W RISER

SERVING (EX)LAVATORY

2"V UP

2"W UP TO P-532

(EX)2"

2"W

2"W

(EX)4" WASTE STACK

CO

1. CONNECT 2"V TO EXISTING 4"W STACK TO

REMAIN.

2. CONNECT TO EXISTING 2"V AND ROUTE

TO NEW 4"V ABOVE CEILING.

3. 4"V UP.

4. CONNECT NEW WASTE SERVING 5TH

FLOOR FIXTURES TO EXISTING WASTE

STACK.

5. 4"W DOWN FROM 5TH FLOOR FIXTURES.

NOTE: NOT ALL PLAN NOTES MAY APPLY TO

THIS SHEET.

PLAN NOTES

PLUMBING GENERAL NOTES

1. FIELD VERIFY ALL EXISTING CONDITIONS

PRIOR TO BEGINNING WORK. BRING ANY

DISCREPANCIES FROM THE DRAWINGS

AND NOTES TO THE OWNER’S

REPRESENTATIVE IMMEDIATELY. MINOR

CHANGES IN THE SCOPE OF THE

DEMOLITION WORK SHALL NOT JUSTIFY

AN ADDITIONAL COST.

2. CONTRACTOR SHALL PROVIDE

PROTECTIVE PLASTIC DROP CLOTHS TO

PROTECT THE EXISTING OCCUPIED

AREAS AND EQUIPMENT FROM DUST AND

DEBRIS DURING THE CONSTRUCTION

WORK AND SHALL CLEAN THE AREAS OF

ALL CONSTRUCTION DIRT DAILY, AND

UPON COMPLETION OF THE WORK.

3. ALL DRAINED PIPING RISERS AND MAINS

SHALL BE REFILLED WITH FLUID AND

PROPERLY VENTED BY THIS

CONTRACTOR, ONCE NEW WORK HAS

BEEN INSTALLED.

4. COORDINATE WITH THE OWNER THE

REMOVAL AND REPLACEMENT OF ALL

EXISTING CEILINGS, WALL, ETC. AS

REQUIRED FOR PLUMBING DEMOLITION

WORK.

5. ALL CUTTING AND CHANNELING OF

EXISTING NON-STRUCTURAL ELEMENTS

SHALL BE ACCOMPLISHED IN A NEAT AND

WORKMANLIKE MANNER WITHOUT

REMOVAL OF EXCESS MATERIALS. THIS

CONTRACTOR SHALL PATCH AND

REPLACE WITH MATERIAL SIMILAR TO

ADJACENT CONSTRUCTION.

6. CUTTING OF STRUCTURAL MEMBERS IS

NOT ALLOWED.

7. THIS CONTRACTOR SHALL GIVE FULL

COOPERATION TO THE OWNER IN THE

SCHEDULING AND PROCEDURE OF WORK

AND SHALL TAKE EVERY PRECAUTION TO

PREVENT DAMAGE FROM FREEZING TO

EXISTING SYSTEMS.

8. RELOCATE EXISTING DUCTWORK, PIPING,

ELECTRICAL CONDUITS, AND CABLING AS

NECESSARY TO ACCOMPLISH FINAL

INSTALLATION AS SHOWN.

9. COORDINATE ROUTING OF PLUMBING

AND HVAC PIPING WITH DUCTWORK,

LIGHTS, ARCHITECTURAL CEILING AND

STRUCTURAL ELEMENTS. PIPING SHALL

RISE AND DROP, JOG OR OFFSET, AS

REQUIRED TO AVOID CONFLICTS.

DUCTWORK SHALL TAKE PRECEDENCE

OVER ALL PIPING, EXCEPT WHERE GRADE

MUST BE MAINTAINED FOR DRAINAGE.

10. ANY EXPENSES RISING FROM LACK OF

COORDINATION SHALL BE AT

CONTRACTOR’S EXPENSE. ALL DUCT AND

PIPE ELEVATIONS SHOWN IN

PARENTHESES ARE BOTTOM OF DUCT OR

PIPE UNLESS INDICATED OTHERWISE ON

PLANS.

11. COMPLETE COORDINATION OF

DRAWINGS SHALL BE REQUIRED BY

PARAGRAPH "SUBMITTAL" IN

SPECIFICATION SECTION 220511.

CONSTRUCTION SHALL NOT START ON

ANY SYSTEM UNITL THE COORDINATION

DRAWINGS HAVE BEEN APPROVED BY

THE VA.

NOTE: NOT ALL NOTES MAY APPLY TO THIS

SHEET.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved

VA FORM 08 -

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

Atriax, pllc 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 Phone 828-315-9962 www.atriaxgroup.com

GLMV Architecture 1525 E. Douglas Wichita, KS 67211 Phone 316-265-9367

PEC Professional Engineering Consultants, PA 303 S. Topeka Wichita, KS 67202 Phone 316-262-2691

589A4-18-187REMODEL 5TH FLOOR

COLUMBIA, MO

JANUARY 28, 2019

BID DOCUMENTS

C U s e rs \k y le

.p fa n n e n s ti e l\ D o c u m e n ts \1

-0

-M A

S T

E R

M E

C H

-R

K y le

.P fa n n e n s ti e l@ p e c

.c o m .r v t

/2

/2

:3

:2

A

M

PL100

OVERALL PLUMBING PLAN -

FOURTH FLOOR

BWC KWP

NORTH

0' 4' 8' 12' 1/8" = 1'-0"

OVERALL PLUMBING PLAN - FOURTH FLOOR

NOTES:

WITH THE EXCEPTION OF THE RECENTLY INSTALLED CENTRAL WATER

RISERS, EXISTING WATER RISERS ARE NOT SHOWN. ALL WATER LINES

HAVE BEEN DEMOLISHED IN THEIR RESPECTIVE PHASES FROM THE

FIFTH FLOOR PLENUM DOWN INTO THE FOURTH FLOOR PLENUM. CAP

ALL CW RISERS IN FOURTH FLOOR PLENUM. CONNECT ALL HW RISERS

TO ADJACENT HWR RISERS IN FOURTH FLOOR PLENUM TO MAINTAIN

RECIRCULATION. PROVIDE COMBINATION BALL VALVE/STRAINER AND

CIRCUIT SETTER. SEE DETAIL 5/P-601.

ALL WORK, BOTH DEMOLITION AND NEW, TAKING PLACE ON THE

FOURTH FLOOR MUST BE DONE SIMULTANEOUSLY TO AVOID SHUTTING

DOWN FLOOR MULTIPLE TIMES. THIS WILL REQUIRE LAYOUT OF NEW

PENETRATIONS PRIOR TO FOURTH FLOOR DEMOLITION.

ALL PENETRATIONS AT DEMOLISHED PIPING SHALL BE PATCHED WITH

MATCHING RATING.