36C25518R0522-020.pdf

PDF 18 MB Posted

Attached to
Renovate Wards for Patient Privacy P/N 589A7-17-203
Solicitation number
36C25518R0522
Issued by

About this file

36C25518R0522 07 Mechanical Drawings Vol 2.pdf

View the file

Other files

File Type Posted
36C25518R0522-011.docx DOCX document
36C25518R0522-019.pdf PDF
36C25518R0522-015.pdf PDF
36C25518R0522-012.pdf PDF
36C25518R0522-021.pdf PDF
36C25518R0522-013.pdf PDF
36C25518R0522-014.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1-E

1-51-31-21-1

1-H

1-J

1A-A

1-M

1-N

1-Q

1A-D

1A-C

1A-B

1-T

1-V

1-W

1-U

1-3A

1-6 1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G x3

36x36 34"ø 34"ø

"ø

1-AHU1

1-RF1

NOT IN SCOPE

AFMS-RA AFMS-SA

"ø

40x70

(EX)60x24 x4

(EX)108x30

36x36

"ø

(EX) 10'-0" X 3'-0" RELIEF LOUVER

(EX) 12'-0" X 3'-0" INTAKE LOUVER

1-FD2

1-FD1

BACK INLET FOR OUTSIDE

AIR CONNECTION

SIDE INLET FOR RETURN

AIR CONNECTION

UP IN CHASE TO SERVE SECOND AND THIRD FLOORS

PHASE 1

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MH101

HVAC PLAN - BASEMENT

BOH AR04/26/2018

1/4" = 1'-0"

HVAC PLAN - BASEMENT

2' 4' 8'0'

1/4" = 1'-0"

N

No. Description Date

INTERLOCK END SWITCH TO

1-AHU1 & 1-RF1 OPERATION

1-H

1-J

1A-A

1-M

1-N

1-Q

1A-D

1A-C

1A-B

1-T

1-V

1-W

1-U

1-3A

1-6 1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

NOT IN SCOPE

(EX)60x24

(EX)108x30

(EX) 10'-0" X 3'-0" RELIEF LOUVER

(EX) 12'-0" X 3'-0" INTAKE LOUVER

(EX)1-AHU1

(EX)60x24

(EX)1-RF1

(EX)36x36

(E X

)1 x3

(E X

)3 0" ø

(EX)24"ø

(EX)30"ø

(EX) 1-AFMS1

(EX) HUMIDIFIER

(EX) 1-AFMS2

(EX) AIR HANDLER TO REMAIN IN

BID ITEM #4. NO DEMOLITION WORK

REQUIRED IN BASEMENT.

PHASE 1 BID ITEM #4

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MH101.4

HVAC PLAN - BASEMENT - BID ITEM #4

BOH RMH04/26/2018

1/4" = 1'-0"

HVAC PLAN - BASEMENT - BID ITEM 4

2' 4' 8'0'

1/4" = 1'-0"

N

No. Description Date

1-H

1-J

1-M

1-N

1-Q

1-T

1-V

1-W

1-U

1-3A

1-6 1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

NOT IN SCOPE

NOT IN SCOPE

36x36 34"ø

36x36 RA & 36" SA UP AND DOWN

PHASE 1

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MH111

HVAC PLAN - FIRST FLOOR

BOH AR04/26/2018

1/4" = 1'-0"

HVAC PLAN - FIRST FLOOR

2' 4' 8'0'

1/4" = 1'-0"

1-H

1-J

1-M

1-N

1-Q

1-T

1-V

1-W

1-U

1-3A

1-6 1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

PATIENT ROOM

221-1

AIRBORNE INFECTION ISO.

PATIENT ROOM

214-1

TOILET

209-1

PATIENT ROOM

208-1

PATIENT ROOM

204-1

PATIENT ROOM

233-1

TOILET

238-1

EXIST. STAIRS

2-STAIR-W

CORR

200-1

CORR

225-1

CORR

207-1

STAFF TOILET

222-1

HSKPG

240-1

PATIENT ROOM

221-1

TOILET

220-1

SOILED UTILITY

218-1TOILET

217-1

PATIENT ROOM

216-1

TOILET

213-1

PATIENT ROOM

211-1

TOILET

209-1

PATIENT ROOM

208-1

PATIENT ROOM

204-1

BARIATRIC PATIENT ROOM

202-1

MEDICATION

230-1

PATIENT ROOM

233-1

PATIENT ROOM

234-1

PATIENT ROOM

236-1

TOILET

232-1

ANTE RM

215-1

CHARTING

206-1

TOILET

238-1

RECEPTION

241-1

NURSE STATION

224-1

EXIST. STAIRS

2-STAIR-W

TOILET

210-1

TOILET

203-1

TOILET

205-1

CORR

200-1

CORR

201-1

CORR

225-1

CORR

212-1

CORR

219-1

CORR

207-1

12x10 UP TO

THIRD FLOOR.

1-T2.2 (350)

1-T2.1 (450)

1-T2.13 (800)

1-T2.12 (350)

1-T2.14 (750)

1-T2.7 (450)

1-T2.3 (550)

1-T2.5 (550)

1-T2.11 (1575)

1-T2.8 (350)

1-T2.9 (400)

1-T2.10 (325)

(EX)TU

(EX)TU

1-T2.4 (475)

30x16

"ø

28x14 x1

"ø

12"ø 10"ø

22x14

NOURISH.

227-1

ELECT.

228-1

16x14 x1 x1

22x14 UP

14x10

36x36 x1

NOT IN SCOPE

SD-21 - 6"ø

SD-21 - 6"ø

SD-13 - 10"ø

"ø

6" ø

10"ø

6" ø

SD-23 - 10"ø

10"ø

10"ø

"ø

12x12

SD-14 - 12"ø 375

SD-14 - 12"ø

12"ø

12"ø

10x14

SD-13 - 10"ø

SD-22 - 8"ø

8x12

SD-13 - 10"ø

SD-22 - 6"ø

10"ø

6" ø

12"ø

"ø

SD-13 - 10"ø

SD-21 - 6"ø

6" ø

10"ø

10"ø

SD-13 - 10"ø

SD-22 - 10"ø

10"ø

8x12

"ø

SD-12 - 8"ø

SD-11 - 6"ø

SD-13 - 10"ø

SD-13 - 10"ø

SD-21 - 8x8

SD-11 - 6"ø

10"ø

12x12 12x6

6" ø

8x10

6"ø

8x

6x6

SD-13 - 10"ø

1-T2.6 (250)

10"ø

SD-21 - 6"ø

SD-21 - 6"ø

SD-13 - 10"ø

SD-13 - 10"ø

6"ø

10"ø

"ø

"ø

6" ø

SD-13 - 10"ø x8

10"ø x8

SD-21 - 6"ø

6" ø

SD-11 - 6"ø

8"ø

SD-13 - 10"ø

SD-11 - 6"ø

SD-21 - 6"ø

SD-21 - 6"ø

20x6 x6

6"ø

"ø x1 x1

14"ø

12"ø x1 x1

20x12

SD-13 - 10"ø

10"ø

20x10

8"ø

10"ø

SD-12 - 8"ø

8" ø

20x10 20x8

10"ø12 x6

SD-13 - 10"ø

SD-13 - 10"ø

SD-13 - 10"ø

SD-13 - 10"ø

14x8 14x8

14x8 12x10

10"ø

10"ø

6" ø x4 x4

RR-54 - 14x14

RR-51 - 8x8

RG-23 - 10"ø

RG-23 - 10"ø

"ø x6

"ø

14x6

14x6

14x6

RG-23 - 10"ø 175

RG-23 - 10"ø

RG-22 - 6"ø

10"ø

8"ø

"ø x6

10"ø

22x8 x1

22x8

RG-23 - 10"ø

10"ø x1 x1 x1

16x12 x1

RG-25 - 14"ø

10x1022 x1

14"ø

RG-25 - 14"ø

22x14

10x10

14"ø x1

RG-25 - 14"ø

14"ø

10x1024 x1

RG-27 - 22x14

22x14 x1 x1

"ø

8" ø

RG-23 - 10"ø

10"ø

RG-23 - 10"ø

RG-23 - 10"ø10"ø

8x

10x6

RR-51 - 8x8

RR-51 - 8x8

6x6

6x6 8x8

RR-52 - 10x8

12x10 x8

12x10

RR-51 - 8x8

6x x1

RR-51 - 8x8

RR-51 - 8x8

RR-51 - 8x8

6x

6x 66x

8x x8 x8

RR-51 - 8x8

8x

10x10 10x8

RR-51 - 8x8

14x10 x1

RR-53 - 12x12

10x8 x8 x8

RR-51 - 8x8

6x

12x8

RR-51 - 8x8

6x

RR-52 - 10x10

8x8 10x8 x8

14x6 x8

18x8 x8 x8

10"ø

10"ø

8x8

A

26x26 UP

1-ACV1

EQUIP. STOR.

229-1

CLEAN UTILITY

231-1

6x

"ø

8"ø

RR-51 - 8x8

8x8

SD-15 - 8"ø

8"ø

8" ø

8x6

8x6 x8 x8 x1

1-FSD1 1-FSD2

1-FSD3

1-FSD4

B

1-FD3

PHASE 1

A. PROVIDE DAMPER AT TAP OFF BOTTOM

OF DUCT.

B. CONTRACTOR TO TEMPORARILY

ROUTE EXHAUST 22x14 RISER UP THRU

EXISTING CHASE ON THIRD FLOOR, TIE

IN EXISTING THIRD FLOOR EXHAUST

MAIN, LOCATED IN THE SAME CHASE,

AND ROUTE THE EXHAUST MAIN UP TO

THE ATTIC FOR CONNECTION TO

EXHAUST FAN. DURING THIRD FLOOR

WORK, CONTRACTOR TO RE-ROUTE

EXHAUST AS SHOWN ON PLAN.

PLAN NOTES

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MH121

HVAC PLAN - SECOND FLOOR

BOH AR04/26/2018

1/4" = 1'-0"

HVAC PLAN - SECOND FLOOR

2' 4' 8'0'

1/4" = 1'-0"

1-H

1-J

1-M

1-N

1-Q

1-T

1-V

1-W

1-U

1-3A

1-6 1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

PATIENT ROOM

221-1

PATIENT ROOM

216-1

AIRBORNE INFECTION ISO.

PATIENT ROOM

214-1

TOILET

209-1

PATIENT ROOM

208-1

PATIENT ROOM

204-1

PATIENT ROOM

233-1

PATIENT ROOM

236-1

TOILET

238-1

EXIST. STAIRS

2-STAIR-W

CORR

200-1

CORR

225-1

CORR

207-1

STAFF TOILET

222-1

HSKPG

240-1

PATIENT ROOM

221-1

TOILET

220-1

SOILED UTILITY

218-1TOILET

217-1

PATIENT ROOM

216-1

TOILET

213-1

PATIENT ROOM

211-1

TOILET

209-1

PATIENT ROOM

208-1

PATIENT ROOM

204-1

BARIATRIC PATIENT ROOM

202-1

MEDICATION

230-1

PATIENT ROOM

233-1

PATIENT ROOM

234-1

PATIENT ROOM

236-1

TOILET

232-1

ANTE RM

215-1

CHARTING

206-1

TOILET

238-1

RECEPTION

241-1

NURSE STATION

224-1

EXIST. STAIRS

2-STAIR-W

TOILET

210-1

TOILET

203-1

TOILET

205-1

CORR

200-1

CORR

201-1

CORR

225-1

CORR

212-1

CORR

219-1

CORR

207-1

12x10 UP TO

THIRD FLOOR.

1-T2.2 (350)

1-T2.1 (450)

1-T2.13 (800)

1-T2.12 (350)

1-T2.14 (750)

1-T2.7 (450)

1-T2.3 (550)

1-T2.5 (550)

1-T2.11 (1575)

1-T2.8 (350)

1-T2.9 (400)

1-T2.10 (325)

(EX)TU

(EX)TU

1-T2.4 (475)

30x16

"ø

28x14 x1

"ø

12"ø 10"ø

NOURISH.

227-1

ELECT.

228-1 x1 x1

22x14 UP

14x10 x1

NOT IN SCOPE

SD-21 - 6"ø

SD-21 - 6"ø

SD-13 - 10"ø

"ø

6" ø

10"ø

6" ø

SD-23 - 10"ø

10"ø

10"ø

"ø

12x12

SD-14 - 12"ø 375

SD-14 - 12"ø

12"ø

12"ø

10x14

SD-13 - 10"ø

SD-22 - 8"ø

8x12

SD-13 - 10"ø

SD-22 - 6"ø

10"ø

6" ø

12"ø

"ø

SD-13 - 10"ø

SD-21 - 6"ø

6" ø

10"ø

10"ø

SD-13 - 10"ø

SD-22 - 10"ø

10"ø

8x12

"ø

SD-12 - 8"ø

SD-11 - 6"ø

SD-13 - 10"ø

SD-13 - 10"ø

SD-21 - 8x8

SD-11 - 6"ø

10"ø

12x12 12x6

6" ø

8x10

6"ø

8x

6x6

SD-13 - 10"ø

1-T2.6 (250)

10"ø

SD-21 - 6"ø

SD-21 - 6"ø

SD-13 - 10"ø

SD-13 - 10"ø

6"ø

10"ø

"ø

"ø

6" ø

SD-13 - 10"ø x8

10"ø x8

SD-21 - 6"ø

6" ø

SD-11 - 6"ø

8"ø

SD-13 - 10"ø

SD-11 - 6"ø

SD-21 - 6"ø

SD-21 - 6"ø

20x6 x6

6"ø

"ø x1 x1

14"ø

12"ø x1 x1

20x12

SD-13 - 10"ø

10"ø

20x10

8"ø

10"ø

SD-12 - 8"ø

8" ø

20x10 20x8

10"ø12 x6

SD-13 - 10"ø

SD-13 - 10"ø

SD-13 - 10"ø

SD-13 - 10"ø

14x8 14x8

14x8 12x10

10"ø

10"ø

6" ø x4 x4

RR-54 - 14x14

RR-51 - 8x8

RG-23 - 10"ø

RG-23 - 10"ø

"ø x6

"ø

14x6

14x6

14x6

RG-23 - 10"ø 175

RG-23 - 10"ø

RG-22 - 6"ø

10"ø

8"ø

"ø x6

10"ø

22x8 x1

22x8

RG-23 - 10"ø

10"ø x1 x1 x1

16x12 x1

RG-25 - 14"ø

10x1022 x1

14"ø

RG-25 - 14"ø

22x14

10x10

14"ø x1

RG-25 - 14"ø

14"ø

10x1024 x1

RG-27 - 22x14

22x14 x1 x1

"ø

8" ø

RG-23 - 10"ø

10"ø

RG-23 - 10"ø

RG-23 - 10"ø10"ø

8x

10x6

RR-51 - 8x8

RR-51 - 8x8

6x6

6x6 8x8

RR-52 - 10x8

12x10 x8

12x10

RR-51 - 8x8

6x x1

RR-51 - 8x8

RR-51 - 8x8

RR-51 - 8x8

6x

6x 66x

8x x8 x8

RR-51 - 8x8

8x

10x10 10x8

RR-51 - 8x8

14x10 x1

RR-53 - 12x12

10x8 x8 x8

RR-51 - 8x8

6x

12x8

RR-51 - 8x8

6x

RR-52 - 10x10

8x8 10x8 x8

14x6 x8

18x8 x8 x8

10"ø

10"ø

8x8

A

26x26 UP

1-ACV1

1-FD1

1-FD2

1-FD3

EQUIP. STOR.

229-1

CLEAN UTILITY

231-1

6x

"ø

8"ø

RR-51 - 8x8

8x8

SD-15 - 8"ø

8"ø

8" ø

8x6

8x6 x8 x8 x1

B

1-FD3

22x14

1-FSD1 1-FSD2

1-FSD3

1-FSD4

A. PROVIDE DAMPER AT TAP OFF BOTTOM

OF DUCT.

B. CONTRACTOR TO TEMPORARILY

ROUTE EXHAUST 22x14 RISER UP THRU

EXISTING CHASE ON THIRD FLOOR, TIE

IN EXISTING THIRD FLOOR EXHAUST

MAIN, LOCATED IN THE SAME CHASE,

AND ROUTE THE EXHAUST MAIN UP TO

THE ATTIC FOR CONNECTION TO

EXHAUST FAN. DURING THIRD FLOOR

WORK, CONTRACTOR TO RE-ROUTE

EXHAUST AS SHOWN ON PLAN.

PLAN NOTES

PHASE 1 BID ITEM #3

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MH121.3

HVAC PLAN - SECOND FLOOR - BID ITEM

#3

BOH RMH04/26/2018

1/4" = 1'-0"

HVAC PLAN - SECOND FLOOR - BID ITEM 3

N 2' 4' 8'0'

1/4" = 1'-0"

1-H

1-J

1-M

1-N

1-Q

1-T

1-V

1-W

1-U

1-3A

1-6 1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

PATIENT ROOM

221-1

PATIENT ROOM

216-1

AIRBORNE INFECTION ISO.

PATIENT ROOM

214-1

TOILET

209-1

PATIENT ROOM

208-1

PATIENT ROOM

204-1

PATIENT ROOM

233-1

PATIENT ROOM

236-1

TOILET

238-1

EXIST. STAIRS

2-STAIR-W

CORR

200-1

CORR

225-1

CORR

207-1

STAFF TOILET

222-1

HSKPG

240-1

PATIENT ROOM

221-1

TOILET

220-1

SOILED UTILITY

218-1TOILET

217-1

PATIENT ROOM

216-1

TOILET

213-1

PATIENT ROOM

211-1

TOILET

209-1

PATIENT ROOM

208-1

PATIENT ROOM

204-1

BARIATRIC PATIENT ROOM

202-1

MEDICATION

230-1

PATIENT ROOM

233-1

PATIENT ROOM

234-1

PATIENT ROOM

236-1

TOILET

232-1

ANTE RM

215-1

CHARTING

206-1

TOILET

238-1

RECEPTION

241-1

NURSE STATION

224-1

EXIST. STAIRS

2-STAIR-W

TOILET

210-1

TOILET

203-1

TOILET

205-1

CORR

200-1

CORR

201-1

CORR

225-1

CORR

212-1

CORR

219-1

CORR

207-1

12x10 UP TO

THIRD FLOOR.

1-T2.2 (350)

1-T2.1 (450)

1-T2.13 (800)

1-T2.12 (350)

1-T2.14 (750)

1-T2.7 (450)

1-T2.3 (550)

1-T2.5 (550)

1-T2.11 (1575)

1-T2.8 (350)

1-T2.9 (400)

1-T2.10 (325)

(EX)TU

(EX)TU

1-T2.4 (475)

30x16

"ø

28x14 x1

"ø

12"ø 10"ø

NOURISH.

227-1

ELECT.

228-1 x1 x1

22x14 UP

14x10 x1

NOT IN SCOPE

SD-21 - 6"ø

SD-21 - 6"ø

SD-13 - 10"ø

"ø

6" ø

10"ø

6" ø

SD-23 - 10"ø

10"ø

10"ø

"ø

12x12

SD-14 - 12"ø 375

SD-14 - 12"ø

12"ø

12"ø

10x14

SD-13 - 10"ø

SD-22 - 8"ø

8x12

SD-13 - 10"ø

SD-22 - 6"ø

10"ø

6" ø

12"ø

"ø

SD-13 - 10"ø

SD-21 - 6"ø

6" ø

10"ø

10"ø

SD-13 - 10"ø

SD-22 - 10"ø

10"ø

8x12

"ø

SD-12 - 8"ø

SD-11 - 6"ø

SD-13 - 10"ø

SD-13 - 10"ø

SD-21 - 8x8

SD-11 - 6"ø

10"ø

12x12 12x6

6" ø

8x10

6"ø

8x

6x6

SD-13 - 10"ø

1-T2.6 (250)

10"ø

SD-21 - 6"ø

SD-21 - 6"ø

SD-13 - 10"ø

SD-13 - 10"ø

6"ø

10"ø

"ø

"ø

6" ø

SD-13 - 10"ø x8

10"ø x8

SD-21 - 6"ø

6" ø

SD-11 - 6"ø

8"ø

SD-13 - 10"ø

SD-11 - 6"ø

SD-21 - 6"ø

SD-21 - 6"ø

20x6 x6

6"ø

"ø x1 x1

14"ø

12"ø x1 x1

20x12

SD-13 - 10"ø

10"ø

20x10

8"ø

10"ø

SD-12 - 8"ø

8" ø

20x10 20x8

10"ø12 x6

SD-13 - 10"ø

SD-13 - 10"ø

SD-13 - 10"ø

SD-13 - 10"ø

14x8 14x8

14x8 12x10

10"ø

10"ø

6" ø x4 x4

RR-54 - 14x14

RR-51 - 8x8

RG-23 - 10"ø

RG-23 - 10"ø

"ø x6

"ø

14x6

14x6

14x6

RG-23 - 10"ø 175

RG-23 - 10"ø

RG-22 - 6"ø

10"ø

8"ø

"ø x6

10"ø

22x8 x1

22x8

RG-23 - 10"ø

10"ø x1 x1 x1

16x12 x1

RG-25 - 14"ø

10x1022 x1

14"ø

RG-25 - 14"ø

22x14

10x10

14"ø x1

RG-25 - 14"ø

14"ø

10x1024 x1

RG-27 - 22x14

22x14 x1 x1

"ø

8" ø

RG-23 - 10"ø

10"ø

RG-23 - 10"ø

RG-23 - 10"ø10"ø

8x

10x6

RR-51 - 8x8

RR-51 - 8x8

6x6

6x6 8x8

RR-52 - 10x8

12x10 x8

12x10

RR-51 - 8x8

6x x1

RR-51 - 8x8

RR-51 - 8x8

RR-51 - 8x8

6x

6x 66x

8x x8 x8

RR-51 - 8x8

8x

10x10 10x8

RR-51 - 8x8

14x10 x1

RR-53 - 12x12

10x8 x8 x8

RR-51 - 8x8

6x

12x8

RR-51 - 8x8

6x

RR-52 - 10x10

8x8 10x8 x8

14x6 x8

18x8 x8 x8

10"ø

10"ø

8x8

A

26x26 UP

1-ACV1

EQUIP. STOR.

229-1

CLEAN UTILITY

231-1

6x

"ø

8"ø

RR-51 - 8x8

8x8

SD-15 - 8"ø

8"ø

8" ø

8x6

8x6 x8 x8 x1

14x1016x14 x1

1-FSD1 1-FSD2

1-FSD3

1-FSD4

1-FD4

PHASE 1 BID ITEM #4

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MH121.4

HVAC PLAN - SECOND FLOOR - BID ITEM

#4

BOH RMH04/26/2018

1/4" = 1'-0"

HVAC PLAN - SECOND FLOOR - BID ITEM 4

2' 4' 8'0'

1/4" = 1'-0"

1-H

1-J

1-M

1-N

1-Q

1-T

1-V

1-W

1-U

1-3A

1-6 1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

12x10 DOWN TO

SECOND FLOOR.

16x14 UP TO 1-EF2.

1-T3.2 (500)

1-T3.1 (300)

1-T3.4 (475)

1-T3.3 (200)

1-T3.5 (450)

1-T3.16 (500)

1-T3.15 (750)

1-T3.14 (800)

1-T3.13 (475)

1-T3.6 (250)

1-T3.12 (1600)

1-T3.7 (450)

1-T3.8 (225)

1-T3.11 (200)

1-T3.10 (325)

1-T3.9 (325)

"ø

"ø

12"ø x1

16"ø x1

2 10x10 8"ø10x10

8"ø x8

22x14 DN

22x14

10x10 x1 x8 x1

32x16

12x12

12x12

26x26

SD-13 - 10"ø

SD-22 - 8"ø

SD-21 - 6"ø

SD-13 - 10"ø

SD-13 - 10"ø

SD-23 - 10"ø

10"ø

SD-14 - 12"ø

SD-14 - 12"ø

12"ø

"ø x1

10x14

SD-13 - 10"ø

SD-22 - 8"ø

10x12

10"ø

8"ø

SD-13 - 10"ø

10"ø

SD-13 - 10"ø

SD-21 - 6"ø

SD-22 - 6"ø

10"ø

SD-21 - 6"ø

SD-11 - 6"ø

8x

6"ø

6" ø

SD-13 - 10"ø

SD-22 - 10"ø

8x

8x12

"ø

10"ø

SD-13 - 10"ø

"ø

SD-11 - 6"ø

SD-13 - 10"ø

SD-11 - 6"ø

SD-21 - 8x8

10x10

6"ø

6x

SD-13 - 10"ø

"ø

10"ø

SD-13 - 10"ø

SD-21 - 6"ø

8x12

8x

10"ø

6"ø

SD-13 - 10"ø

SD-21 - 6"ø

6" ø x1

SD-12 - 8"ø

8" ø

SD-14 - 12"ø

SD-13 - 10"ø

SD-13 - 10"ø

SD-13 - 10"ø

SD-13 - 10"ø

18x14

10"ø

22x10 18x10

10"ø

14x10

8"ø

10"ø

14x10 12x8

12"ø12x8

6"ø

SD-13 - 10"ø

SD-11 - 6"ø

SD-21 - 6"ø

"ø

8x x4 x4

"ø

12x12

10"ø

8x

6" ø

12x6 x812x4 x4

RG-23 - 10"ø

RG-26 - 16"ø

RG-25 - 14"ø

RG-25 - 14"ø

RG-22 - 8"ø

RG-23 - 10"ø

RG-22 - 8"ø

RG-23 - 10"ø

RG-23 - 10"ø

RG-22 - 8"ø

RG-21 - 6"ø

RG-23 - 10"ø

RG-23 - 10"ø

RG-23 - 10"ø

20x12 x1

8x6 x1

10x10

8x8 x1

6"ø

14x6

16x8

22x822x8 x1

8"ø

16x12 x1

10x1020 x1

22x14 x1 x1 x1

RG-27 - 22x22 x1

10"ø x1 x2

8" ø

"ø

10"ø

10"ø x1

12x12 x8 x8

RR-54 - 14x14

14x8

RR-51 - 8x6

8x6

RR-51 - 8x6 8x6

RR-52 - 10x10

10x10

RR-51 - 8x8

6x

RR-51 - 8x8

6x6

6x6

RR-51 - 8x6

8x6

RR-51 - 8x6

6x6 8x6

10x8

8x x8

RR-51 - 8x8

6x

RR-52 - 10x10

RR-51 - 8x8

6x

10x8

RR-53 - 12x12

10x8

RR-52 - 10x10

8x8 x8

14x8

14x8 x8 x8

14x

16x10 x1 x1

12x10

PATIENT ROOM

336-1

EQUIP. STOR.

338-1

EQUIP. ALCOVE

300-1

HALL

301-1

HALL

326-1

HALL

339-1

EXIST. STAIRS

3-STAIR-W

ELECT.

328-1

CLEAN UTILITY

330-1

TOILET

337-1

PATIENT ROOM

334-1

TOILET

335-1

SOILED UTILITY

319-1

PATIENT RM

316-1

TOILET

317-1

STORAGE

320-1

TOILET

321-1

ANTE RM

318-1

PATIENT RM

322-1

PATIENT RM

314-1

HSKPG

324-1

NURSE STATION

325-1

STAFF TOILET

323-1

TOILET

313-1

CHASE

NOURISH.

327-1

PATIENT RM

311-1

TOILET

310-1

TOILET

309-1

PATIENT RM

308-1

BARIATRIC PATIENT ROOM

302-1

PATIENT RM

304-1

TOILET

305-1

HALL

307-1

HALL

312-1

CHARTING

306-1

ALCOVE

301-1A

CLOSET

307A-1

MEDICATION

331-1

EQUIP. STOR.

329-1

"ø

1-ACV2

10"ø

"ø

22x2022x20

22x22 UP x8

1-FSD5

1-FSD6

1-FSD8

1-FSD7

8x

12"ø

8x

10"ø

6" ø

8"ø x1

1-FSD9

PHASE 1

A. PROVIDE DAMPER AT TAP OFF BOTTOM

OF DUCT.

PLAN NOTES

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MH131

HVAC PLAN - THIRD FLOOR

BOH AR04/26/2018

1/4" = 1'-0"

HVAC PLAN - THIRD FLOOR

2' 4' 8'0'

1/4" = 1'-0"

1-H

1-J

1-M

1-N

1-Q

1-T

1-V

1-W

1-U

1-3A

1-6 1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

12x10 DOWN TO

SECOND FLOOR.

16x14 UP TO 1-EF2.

1-T3.11 (200)

1-T3.10 (325)

8"ø

22x14 DN 26x26

SD-13 - 10"ø

SD-21 - 6"ø

6" ø x1

SD-12 - 8"ø

8" ø

8"ø

6"ø

RG-23 - 10"ø

RG-23 - 10"ø

RR-51 - 8x6

PATIENT ROOM

336-1

EQUIP. STOR.

338-1

EQUIP. ALCOVE

300-1

HALL

301-1

HALL

326-1

HALL

339-1

EXIST. STAIRS

3-STAIR-W

ELECT.

328-1

CLEAN UTILITY

330-1

TOILET

337-1

PATIENT ROOM

334-1

TOILET

335-1

SOILED UTILITY

319-1

PATIENT RM

316-1

TOILET

317-1

STORAGE

320-1

TOILET

321-1

ANTE RM

318-1

PATIENT RM

322-1

PATIENT RM

314-1

HSKPG

324-1

NURSE STATION

325-1

STAFF TOILET

323-1

TOILET

313-1

CHASE

NOURISH.

327-1

PATIENT RM

311-1

TOILET

310-1

TOILET

309-1

PATIENT RM

308-1

BARIATRIC PATIENT ROOM

302-1

PATIENT RM

304-1

TOILET

305-1

HALL

307-1

HALL

312-1

CHARTING

306-1

ALCOVE

301-1A

CLOSET

307A-1

MEDICATION

331-1

EQUIP. STOR.

329-1

"ø

22x22 UP

1-FSD5

1-FSD6

1-FSD8

1-FSD7

RG-27 - 22x22

20x12

(E)-230 (E)-230

(EX)8"ø (EX)11"ø

(E X

)6 "ø

(E X

)6 "ø

(EX)TU-460

(EX)5"ø

(E)-90 (E)-90

(EX)TU-180

(EX)8"ø

(E X

)5 "ø

(EX)5"ø

(EX)4"ø

(EX)10x4

(EX) EG-50

(EX) EG-50

5" ø

10"ø12 x1

10"ø

"ø

8"ø

"ø x8 x8

14x8 x1

12x12

10"ø

10x10

6" ø

8" ø

10"ø

"ø

8x 8 6"ø

6x6 x1

10x10

8x6

10x10

6x6

10"ø

8x

"ø

"ø

"ø

12"ø

6"ø x4

8x

6" ø x8

12x6

12x4 x4

"ø

8x

12"ø

6" ø 8" ø

10x10 10 x8

8x8 x8

14x

16x10 x8 x1

10"ø

12x12 10"ø

10"ø

18x14

10"ø 10"ø

22x10

10"ø

18x10 14x10

10"ø

12x8 12"ø

8x

12"ø

10"ø

6" ø

10x1014x622x8 x1

16x12 x1

22x14 x1 x1 x1 x1

8"ø

8"ø

6"ø

10"ø

10"ø x1

8x8 x1

16x8

"ø

8x6

8"ø

10x10

10"ø

8x

6"ø

6" ø

10"ø 10"ø

6"ø

6x6

6x

10x10

10x10

8x

8x6 x8

6x

22x1422x20

32x16 x1 x1

12x12 12x12

16"ø

14"ø x1

8x6

26x20

6"ø

6" ø

RG-23 - 10"ø

RG-23 - 10"ø

RG-23 - 8"ø

RR-54 - 14x14

RR-51 - 8x6

SD-13 - 10"ø

SD-13 - 10"ø

SD-21 - 6"ø

SD-22 - 6"ø

SD-21 - 6"ø

SD-11 - 6"ø

RR-51 - 8x8

RR-51 - 8x6

RR-52 - 10x10

RR-51 - 8x8

SD-13 - 10"ø

SD-22 - 10"ø

SD-13 - 10"ø

SD-11 - 6"ø

SD-21 - 6"ø

SD-13 - 10"ø

SD-13 - 10"ø

SD-22 - 8"ø

SD-21 - 6"ø

RG-25 - 14"ø

RR-53 - 12x12

RR-52 - 10x10

SD-13 - 10"ø

SD-13 - 10"ø

SD-23 - 10"ø

SD-14 - 12"ø

SD-13 - 10"ø

SD-13 - 10"ø

SD-13 - 10"ø

SD-13 - 10"ø

RG-25 - 14"ø

RG-22 - 8"ø

RG-23 - 10"ø

RG-21 - 6"ø

RG-22 - 8"ø

RG-23 - 10"ø

SD-13 - 10"ø

SD-21 - 6"ø

SD-13 - 10"ø75

SD-11 - 6"ø

SD-13 - 10"ø

SD-11 - 6"ø

SD-21 - 8x8

RR-140 - 8x6

RR-51 - 8x8

1-ACV2

(300)

1-T3.2 (500)

1-T3.3 (200)

1-T3.1 (300)

1-T3.4 (475)

1-T3.9 (325)

1-T3.8 (225)

1-T3.7 (450)

1-T3.14 (800)

1-T3.13 (475)

1-T3.6 (250)

1-T3.12 (1600)

1-T3.5 (450)

14x8

10"ø x1

1-FSD9

PHASE 1 BID ITEM #3

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MH131.3

HVAC PLAN - THIRD FLOOR - BID ITEM #3

BOH RMH04/26/2018

1/4" = 1'-0"

HVAC PLAN - THIRD FLOOR - BID ITEM 3

N 2' 4' 8'0'

1-H

1-J

1-M

1-N

1-Q

1-T

1-V

1-W

1-U

1-3A

1-6 1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

12x10 DOWN TO

SECOND FLOOR.

16x14 UP TO 1-EF2.

1-T3.11 (200)

1-T3.10 (325)

8"ø

26x26

SD-13 - 10"ø

SD-21 - 6"ø

6" ø x1

SD-12 - 8"ø

8" ø

8"ø

6"ø

RG-23 - 10"ø

RG-23 - 10"ø

RR-51 - 8x6

"ø

TOILET

337-1

PATIENT ROOM

336-1

8x6

8x

10x10

"ø

"ø

"ø

(EX)8"ø

(E X

)6 "ø

(EX)11"ø

(E X

)6 "ø

(EX)5"ø

(EX)8"ø

(E X

)5 "ø

(EX)5"ø

(E X

)1 2x

(E

X )8 x8

(E X

)8 x4

(EX)10"ø(EX)8"ø

(E X

)6 "ø

(E X

)6 "ø

(E X

)6 "ø

(EX)10x8

(E X

)8 x8

(EX)6"ø

(EX)6"ø(EX)6"ø

(E X

)6 "ø

(EX)5"ø

(E X

)9 "ø

(EX)9"ø

(E X

)8 x6

(E X

)1 8x

(E

X )1

6x

(EX)12x10

(EX)9"ø

(E X

)6 "ø

(E X

)1 0" ø

(E X

)1 0x

(EX)8x4

(E X

)8 "ø

(E X

)6 "ø

(EX)5"ø(EX)5"ø

(EX)16"ø

(EX)12x16

(E X

)1 4x

(EX)14x10

(E X

)1 2x

(EX)12x8

(EX)6"ø

(E X

)6 "ø

(EX)6"ø

(E X

)6 "ø

(E X

)6 "ø

(E X

)9 "ø

(E X

)8 "ø

(EX)10x4

(E X

)1 0" ø

(EX)9"ø

(EX)9"ø

(EX)8x6

(EX)12x8

(EX)12x8

(E X

)1 0x

(EX)6"ø

(EX)6"ø

(EX)6"ø

(EX)8"ø

(EX)6"ø

(EX)6"ø

(EX)8x6(EX)8x8

(E X

)8 x4

(EX)6"ø

(E X

)1 4x

(E X

)6 "ø

(EX)5"ø

(E X

)6 "ø

(EX)TU-460

(EX)TU-180

(EX)TU-150

(EX)TU-300

(EX)TU-380

(EX)TU-150 (EX)TU-90

(EX)TU-280

(EX)TU-300

(EX)TU-350

(EX)TU-300

(EX)TU-150

(EX)TU-110

(EX)TU-100

(EX)TU-180

(EX)TU-160

(E X

)6 "ø

(E)-50 (E)-50

(E)-60(E)-60

(E)-90

(E)-100

(E)-90(E)-100

(E)-100

(E)-100

(E)-100

(E)-50

(E)-100

(E)-150

(E)-90

(E)-50

(E)-50

(E)-180

(E)-130

(E)-100(E)-100

(E)-100

(E)-110

(E)-60

(E)-300

(E)-50

(E)-100

(E)-110

(E)-100

(E)-90

(E)-0

(E)-50 (E)-110

22x22 UP

TO ATTIC.

(EX) RG-90(EX) RG-90

(EX) RG-150

(EX) RG-150

(EX) RG-100(EX) RG-100(EX) RG-50(EX) RG-100

(EX) RG-110

(EX) RG-120

(EX) RG-120(EX) RG-150

(EX) RG-150

(EX) RG-150

(EX) RG-150

(EX) RG-180

(EX) RG-50

(EX) RG-190

(EX) RG-190

(EX) EG-50

(EX) EG-50

(EX) EG-50

(EX) EG-40

(EX) EG-40

(EX) EG-210

(EX) EG-90

(EX) EG-100

1-FSD10

8x6

14x10

PHASE 1 BID ITEM #4

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MH131.4

HVAC PLAN - THIRD FLOOR - BID ITEM #4

BOH RMH04/26/2018

1/4" = 1'-0"

HVAC PLAN - THIRD FLOOR - BID ITEM 4

2' 4' 8'0'

1/4" = 1'-0"

1-H

1-J

1-M

1-N

1-Q

1-T

1-V

1-W

1-U

1-3A

1-6

1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

1-EF1

(3485)

22x22 DOWN TO THIRD FLOOR.

UP TO 1-EF2

16x14 x2 x2

CAP

PHASE 1

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MH141

HVAC PLAN - ATTIC

BOH RMH04/26/2018

1/4" = 1'-0"

HVAC PLAN - ATTIC

2' 4' 8'0'

1/4" = 1'-0"

1-H

1-J

1-M

1-N

1-Q

1-T

1-V

1-W

1-U

1-3A

1-6

1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

1-EF1

(3485)

UP TO 1-EF2

16x14 x2 x2

22x22 DOWN TO THIRD FLOOR.

22x22 x2

(E X

)1 8x

(EX)16x12

(E X

)1 6x

(EX) EXHAUST FAN

(EX) 16x12 UP

FROM THIRD

FLOOR.

(EX) 16x12 UP

FROM THIRD

FLOOR.

PHASE 1 BID ITEM #4

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MH141.4

HVAC PLAN - ATTIC - BID ITEM #4

BOH RMH04/26/2018

1/4" = 1'-0"

HVAC PLAN - ATTIC - BID ITEM 4

N 2' 4' 8'0'

PHASE 1

1-51-31-21-1

1-H

1-J1A-A

1-M

1-N

1-Q1A-D

1A-C

1A-B

1-T

1-V

1-W

1-U

1-3A

1-6

1-9

1-R

1-I

1-101-7

1-G

1-EF2

MIN. 10'-0"

MAINTAIN 25'-0" CLEARANCE BETWEEN FAN EXHAUST AND ALL AIR INTAKES

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MH151

HVAC PLAN - ROOF

BOH AR04/26/2018

1/4" = 1'-0"

HVAC PLAN - ROOF

2' 4' 8'0'

1/4" = 1'-0"

PHASE 1

1-51-31-21-1

1-H

1-J1A-A

1-M

1-N

1-Q1A-D

1A-C

1A-B

1-T

1-V

1-W

1-U

1-3A

1-6

1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

1-AHU1

AFMS-SAAFMS-RA

(EX) 1-P3

(EX) 1-P4 (EX) 1-C2

(EX) 1-C1

(EX) ET

(EX)HWS

(EX)HWR

(EX)HWR

(EX)HWS

(EX)HWS

(EX)HWR

(EX)3" (EX)3" (EX)1" (EX)1"

(EX)3"(EX)3"

(EX)3"

(EX)3"

(EX)3"(EX)2"

(EX)2"(EX)2"

(EX)HWS

(EX)HWR

(EX) EXIST PIPING TO

1ST FLOOR MAIN

ENTRY UNITS

1-C31-P5

3"

3"

1-RF1

REF. MP102 FOR WEST

BASEMENT HYDRONICS

(E X

)3

(EX)3"

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MP101

HYDRONICS PLAN - OVERALL BASEMENT

BOH AR04/26/2018

4' 8' 16'

1/8" = 1'-0"

0'

N

1/8" = 1'-0"

HYDRONICS PLAN - OVERALL BASEMENT

1-H

1-J1A-A

1-M

1-N

1-Q1A-D

1A-C

1A-B

1-T

1-V

1-W

1-U

1-3A

1-6

1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

(EX) 1-P3

(EX) 1-P4 (EX) 1-C2

(EX) 1-C1

(EX) ET

(EX)HWS

(EX)HWR

(EX)HWR

(EX)HWS

(EX)HWS

(EX)HWR

(EX)3" (EX)3" (EX)1" (EX)1"

(EX)3"(EX)3"

(EX)3"

(EX)3"

(EX)3"(EX)2"

(EX)2"(EX)2"

(EX)HWS

(EX)HWR

(EX) EXIST PIPING TO

1ST FLOOR MAIN

ENTRY UNITS

1-C31-P5

3"

3"

REF. MP102 FOR WEST

BASEMENT HYDRONICS

(E X

)3

(EX)3"

(EX)1-AHU1

(EX)3"CWS

(EX)3"CWR

PHASE 1 BID ITEM #4

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MP101.4

HYDRONICS PLAN - OVERALL BASEMENT -

BID ITEM #4

BOH RMH04/26/2018

1/8" = 1'-0"

HYDRONICS PLAN - OVERALL BASEMENT - BID ITEM 4

4' 8' 16'

1/8" = 1'-0"

0'

1-H

1-J

1-M

1-N

1-Q

1-T

1-V

1-W

1-U

1-3A

1-6

1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

1-AHU1

AFMS-SA

AFMS-RA

(EX)HWS

(EX)HWR

(EX) 2-1/2" HWS

AND HWR UP IN

CHASE.

(EX) 3" CWS

AND CWR UP

IN CHASE.

(EX)HWS

(EX)HWR

(EX)2 1/2"(EX)2 1/2"

(EX)3"

(EX)3"

(EX)3" (EX)3"

(EX)1"

(EX)1"

(EX)HWR

(EX)HWS

(EX) EXIST PIPING TO

1ST FLOOR MAIN

ENTRY UNITS

(EX)HWR

(EX)HWS

1-RF1

(E X

)1

/4

M P

S

M P

R M

P R

M P

S

CWR

CWS

(E X

)3

(E X

)3

M P

R

1-TP1

1-TP2

AAA

A

AA

A

A

A

A A

A AA

1-TP3

(E X

)1

/4

(E X

)3 /4

B

3" 3"

3" 3"

1 1/4"

1"3/ 4"

PHASE 1

A. EXISTING STEAM SUPPLY AND RETURN

RISERS UP TO SERVE ALL FLOORS

ABOVE.

B. RELOCATE EXISTING PIPING AROUND/

ABOVE NEW AIR HANDLER AS NEEDED

FOR NEW UNIT INSTALLATION AND

CLEARANCE.

PLAN NOTES

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MP102

HYDRONICS PLAN - WEST BASEMENT

Checker Author04/26/2018

1/4" = 1'-0"

HYDRONICS PLAN - WEST BASEMENT

2' 4' 8'0'

1/4" = 1'-0"

1-H

1-J

1-M

1-N

1-Q

1-T

1-V

1-W

1-U

1-3A

1-6

1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

(EX)HWS

(EX)HWR

(EX) 2-1/2" HWS

AND HWR UP IN

CHASE.

(EX) 3" CWS

AND CWR UP

IN CHASE.

(EX)HWS

(EX)HWR

(EX)2 1/2"(EX)2 1/2"

(EX)3"

(EX)3"

(EX)3" (EX)3"

(EX)1"

(EX)1"

(EX)HWR

(EX)HWS

(EX) EXIST PIPING TO

1ST FLOOR MAIN

ENTRY UNITS

(EX)HWR

(EX)HWS

(E X

)1

/4

M P

S

M P

R

(E X

)3

(E X

)3

AAA

A

AA

A

A

A

A A

A AA

(E X

)1

/4

(E X

)3 /4

(EX)1-AHU1

PHASE 1 BID ITEM #4

A. EXISTING STEAM SUPPLY AND RETURN

RISERS UP TO SERVE ALL FLOORS

ABOVE.

B. RELOCATE EXISTING PIPING AROUND/

ABOVE NEW AIR HANDLER AS NEEDED

FOR NEW UNIT INSTALLATION AND

CLEARANCE.

PLAN NOTES

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MP102.4

HYDRONICS PLAN - WEST BASEMENT - BID

ITEM #4

BOH RMH04/26/2018

1/4" = 1'-0"

HYDRONICS PLAN - WEST BASEMENT - BID ITEM 4

N 2' 4' 8'0'

1-H

1-J

1-M

1-N

1-Q

1-T

1-V

1-W

1-U

1-3A

1-6 1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

1-T2.10 (0.9)

1-T2.9 (0.6)

1-T2.8 (0.6)

1-T2.5 (0.7)

1-T2.11 (2.1)

1-T2.12 (0.5)

1-T2.14 (1.1)

1-T2.13 (1.1)

1-T2.7 (0.8)

1-T2.3 (0.8)

1-T2.1 (0.7)

1-T2.4 (0.9)

1-T2.2 (0.4)

PATIENT ROOM

221-1

TOILET

220-1

SOILED UTILITY

218-1

TOILET

217-1

PATIENT ROOM

216-1

AIRBORNE INFECTION ISO.

PATIENT ROOM

214-1

TOILET

213-1

PATIENT ROOM

211-1

TOILET

209-1

PATIENT ROOM

208-1

PATIENT ROOM

204-1

BARIATRIC PATIENT ROOM

202-1

MEDICATION

230-1

EQUIP. STOR.

229-1

PATIENT ROOM

233-1

PATIENT ROOM

234-1 PATIENT ROOM

236-1

TOILET

232-1

ANTE RM

215-1

CHARTING

206-1

CLEAN UTILITY

231-1

TOILET

238-1

RECEPTION

241-1

NURSE STATION

224-1

EXIST. STAIRS

2-STAIR-W

TOILET

210-1

TOILET

203-1

TOILET

205-1

CORR

200-1

CORR

201-1

CORR

225-1

CORR

212-1

CORR

219-1

CORR

207-1

STAFF TOILET

222-1

HSKPG

240-1

CHASE

ELECT.

228-1

NOURISH.

227-1

ALCOVE

201A-1

CLEAN LINEN

201B-1

TOILET

235-1

TOILET

237-1

CLOSET

207A-1

1-T2.6 (0.3)

(E X

)2

(E X

)1

/2

3/ 4"

3/ 4"

3/ 4" 3/ 4"

3/ 4"

3/ 4"

3/ 4"

3/ 4"

3/ 4"

3/ 4" 1"

1" 1" 1"1" 1"

1/

4" 1 1/

4"

1/

4"

1/

4"

1 1/2"

1 1/2" 1 1/2"

1 1/2"

(E X

)3 /4

"H W

R

(E X

)1 "H

W S

(EX)3"CWS

(EX)3"CWR

HWS

HWR

H W

R H

W S

H W

R H

W S

HWS

HWR

HWS

HWR

HWS

HWR

(EX)TU

(EX)TU

(0.25)

(0.15)

1.5

3/ 4"

3/ 4"

3/ 4"

3/4"3/4"1"

1" 3/4" 3/4"

3/ 4"

3/ 4"

7 GPM FUTURE

CAPACITY

PHASE 1

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MP121

HYDRONICS PLAN - SECOND FLOOR

BOH AR04/26/2018

1/4" = 1'-0"

HYDRONICS PLAN - SECOND FLOOR

2' 4' 8'0'

1/4" = 1'-0"

1-H

1-J

1-M

1-N

1-Q

1-T

1-V

1-W

1-U

1-3A

1-6 1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

1-T3.1 (0.4)

1-T3.4 (0.9)

1-T3.2 (0.7)

1-T3.3 (0.4)

1-T3.5 (0.4)

1-T3.6 (0.3)

1-T3.7 (0.7)

1-T3.8 (0.3)

1-T3.9 (0.6)

1-T3.10 (1.1)

1-T3.11 (0.4)

1-T3.13 (0.9)

1-T3.15 (1.1)

1-T3.14 (1.1)

1-T3.16 (0.6) 1-T3.12

(1.4)

(E X

)3 /4

(E X

)3 /4

(EX)1"

(EX)1 1/4"(EX)1"

(EX)1"

(E X

)2

(E X

)2

20 GPM FOR FUTURE PHASE

2"

2"

2"

2"

2" 2"

1"

1"

3/ 4"

3/ 4"

3/ 4"

3/ 4"

3/ 4"

3/ 4"

3/ 4"

3/ 4"

3/ 4"3/ 4"

PATIENT ROOM

336-1

EQUIP. STOR.

338-1

EQUIP. ALCOVE

300-1

HALL

301-1

HALL

326-1

HALL

339-1

EXIST. STAIRS

3-STAIR-W

ELECT.

328-1

CLEAN UTILITY

330-1

TOILET

337-1

PATIENT ROOM

334-1

TOILET

335-1

SOILED UTILITY

319-1

PATIENT RM

316-1

TOILET

317-1

STORAGE

320-1 TOILET

321-1

ANTE RM

318-1

PATIENT RM

322-1

PATIENT RM

314-1

HSKPG

324-1

NURSE STATION

325-1

STAFF TOILET

323-1

TOILET

313-1

CHASE

NOURISH.

327-1

PATIENT RM

311-1

TOILET

310-1

TOILET

309-1

PATIENT RM

308-1

BARIATRIC PATIENT ROOM

302-1

PATIENT RM

304-1

TOILET

305-1

HALL

307-1

HALL

312-1

CHARTING

306-1

ALCOVE

301-1A

CLOSET

307A-1

MEDICATION

331-1

EQUIP. STOR.

329-1

(EX)3"CWR

(EX)3"CWS

HWS

HWR

H W

S H

W R

H W

S

HWR

H W

S H

W R

H W

R H

W S

HWR

HWS

H W

S H

W R

H W

R H

W S

HWS

HWR

HWS

HWR

1 1/4"

1/

4"

3/4"

3/4"

PHASE 1

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MP131

HYDRONICS PLAN - THIRD FLOOR

BOH AR04/26/2018

1/4" = 1'-0"

HYDRONICS PLAN - THIRD FLOOR

2' 4' 8'0'

1/4" = 1'-0"

1-H

1-J

1-M

1-N

1-Q

1-T

1-V

1-W

1-U

1-3A

1-6 1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

1-T3.10 (1.1)

1-T3.11 (0.4)

(E X

)3 /4

(E X

)3 /4

(EX)1"

(EX)1 1/4"(EX)1"

(EX)1"

(E X

)2

(E X

)2

20 GPM FOR FUTURE PHASE

PATIENT ROOM

336-1

EQUIP. STOR.

338-1

EQUIP. ALCOVE

300-1

HALL

301-1

HALL

326-1

HALL

339-1

EXIST. STAIRS

3-STAIR-W

ELECT.

328-1

CLEAN UTILITY

330-1

TOILET

337-1

PATIENT ROOM

334-1

TOILET

335-1

SOILED UTILITY

319-1

PATIENT RM

316-1

TOILET

317-1

STORAGE

320-1 TOILET

321-1

ANTE RM

318-1

PATIENT RM

322-1

PATIENT RM

314-1

HSKPG

324-1

NURSE STATION

325-1

STAFF TOILET

323-1

TOILET

313-1

CHASE

NOURISH.

327-1

PATIENT RM

311-1

TOILET

310-1

TOILET

309-1

PATIENT RM

308-1

BARIATRIC PATIENT ROOM

302-1

PATIENT RM

304-1

TOILET

305-1

HALL

307-1

HALL

312-1

CHARTING

306-1

ALCOVE

301-1A

CLOSET

307A-1

MEDICATION

331-1

EQUIP. STOR.

329-1

(EX)3"CWR

(EX)3"CWS

HWS

3/4"

1-T3.9 (0.6)

1-T3.8 (0.3)

1-T3.12 (1.4)

1-T3.6 (0.3)

1-T3.7 (0.7)

1-T3.5 (0.4)

1-T3.4 (0.9)

1-T3.1 (0.4)

1-ACV2

(0.0)

1-T3.2 (0.7)

1-T3.3 (0.4)

1-T3.13 (0.9)

1-T3.14 (1.1)

(EX) TU

(EX) TU

HWR

HWS

HWR

HWS

HWR

H W

S H

W R

(EX) PERIMETER HEAT RADIATOR

(EX) PERIMETER HEAT RADIATOR

3/ 4"

3/ 4"

1"

1"

3/ 4"

3/ 4"

3/ 4"

3/ 4"

2"2"

1/

4" 3/

4"

1 1/4"

2" 2"

3/4"

3/4"

3/4"

3/4"

PHASE 1 BID ITEM #3

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MP131.3

HYDRONICS PLAN - THIRD FLOOR - BID

ITEM #3

BOH RMH04/26/2018

1/4" = 1'-0"

HYDRONICS PLAN - THIRD FLOOR - BID ITEM 3

2' 4' 8'0'

1/4" = 1'-0"

1-H

1-J

1-M

1-N

1-Q

1-T

1-V

1-W

1-U

1-3A

1-6 1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

1-T3.10 (1.1)

1-T3.11 (0.4)

(E X

)3 /4

(E X

)3 /4

(EX)1"

(EX)1 1/4"(EX)1"

(EX)1"

(E X

)2

(E X

)2

PATIENT ROOM

336-1

EQUIP. STOR.

338-1

EQUIP. ALCOVE

300-1

HALL

301-1

HALL

326-1

HALL

339-1

EXIST. STAIRS

3-STAIR-W

ELECT.

328-1

CLEAN UTILITY

330-1

TOILET

337-1

PATIENT ROOM

334-1

TOILET

335-1

SOILED UTILITY

319-1

PATIENT RM

316-1

TOILET

317-1

STORAGE

320-1 TOILET

321-1

ANTE RM

318-1

PATIENT RM

322-1

PATIENT RM

314-1

HSKPG

324-1

NURSE STATION

325-1

STAFF TOILET

323-1

TOILET

313-1

CHASE

NOURISH.

327-1

PATIENT RM

311-1

TOILET

310-1

TOILET

309-1

PATIENT RM

308-1

BARIATRIC PATIENT ROOM

302-1

PATIENT RM

304-1

TOILET

305-1

HALL

307-1

HALL

312-1

CHARTING

306-1

ALCOVE

301-1A

CLOSET

307A-1

MEDICATION

331-1

EQUIP. STOR.

329-1

(EX)3"CWR

(EX)3"CWS

HWS

3/4"

3/ 4"

3/ 4"

(EX) TU

(EX) TU

(EX) TU

(EX) TU

(EX) TU (EX) TU

(EX) TU

(EX) TU

(EX) TU (EX) TU

(EX) TU

(EX) TU

(EX) TU

(EX) TU

(EX) TU

(EX) TU

(EX) PERIMETER HEAT RADIATOR

(EX) PERIMETER HEAT RADIATOR

(EX) PERIMETER

HEAT RADIATOR

(EX) PERIMETER

HEAT RADIATOR

(EX) PERIMETER

HEAT RADIATOR

(EX) PERIMETER HEAT RADIATOR

(EX) PERIMETER

HEAT RADIATOR

(EX) PERIMETER

HEAT RADIATOR

(EX) PERIMETER

HEAT RADIATOR

(EX) PERIMETER

HEAT RADIATOR

(EX) PERIMETER

HEAT RADIATOR

(EX) PERIMETER

HEAT RADIATOR

(EX) PERIMETER

HEAT RADIATOR

(EX) PERIMETER

HEAT RADIATOR

(EX) PERIMETER

HEAT RADIATOR

(EX) PERIMETER

HEAT RADIATOR

(EX) PERIMETER

HEAT RADIATOR

(EX) PERIMETER

HEAT RADIATOR

(EX) PERIMETER

HEAT RADIATOR

(EX) PERIMETER

HEAT RADIATOR

(EX) PERIMETER

HEAT RADIATOR

(EX) PERIMETER

HEAT RADIATOR

(EX) PERIMETER

HEAT RADIATOR

(E X

)3 /4

(E

X )3

/4

(E X

)3 /4

(EX)3/4"

(EX)1 1/4" (EX)1 1/2"

(EX)1"

(EX)1 1/4"

(EX)1 1/4"

(EX)1"

(EX)1"

(EX)1"

(EX)1 1/4"

(E X

)3 /4

(E X

)3 /4

(E X

)3 /4

(E X

)3 /4

PHASE 1 BID ITEM #4

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MP131.4

HYDRONICS PLAN - THIRD FLOOR - BID

ITEM #4

BOH RMH04/26/2018

1/4" = 1'-0"

HYDRONICS PLAN - THIRD FLOOR - BID ITEM 4

N 2' 4' 8'0'

5 FT

THRU [20]

6 8 10

[32][25] [40]

[65]

[50]

[75]

-1312 14 -16 -

[125][100]

[150]

[250]

[200]

[300]

[400]

[350]

[450]

[600]

[500]

20 241814 16128 1064 532 2 1/21 1/21 1 1/4

[9100] [9600][8500][7600] [8200][7000][5800] [6700][5200][4100] [4900][3700][3000] [3400][2700][2100]

--- --[4900] -[4100][3700] [4000] -[3000][2400][1800][1500]

THRU 3/4

[2100] [2100]

[2100]

[2700]

[2400]

SIDE VIEW TRAPEZE HANGER FOR UP

TO 1000 LB. [453KG] UNIFORM LOAD

MAXIMUM PIPE/TUBING SUPPORT SPACING

NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.

NOM. SIZE

PIPE

TUBING

IN.

[mm]

FT.

[mm]

FT.

[mm]

[2 5m m

1" M

A X

PROVIDE INSULATION SHIELD

& INSERT FOR ALL PIPING

(8" [200mm] MIN.)

BAND

1-5/8" [43mm] 12 GAUGE CHANNEL OR 2"x2"x1/4" [50x50x6.4mm] ANGLE

1/2" [15mm] DIA.

HANGER RODS WITH

36" [900mm] MAX.

SPACING ON EACH

CHANNEL

WELD

SADDLE

INSULATION SHIELD

AT HANGER

PROVIDE HIGH

COMPRESSIVE STRENGTH

INSULATION (9 PSF MIN.

DENSITY) UNDER

INSULATION SHIELD

INSULATION (VAPOR

BARRIER TYPE IS

REQUIRED FOR LOW

TEMPERATURE PIPE)

HANGER ROD

NOTES:

SEE SPECIFER FOR DETAILED

HANGER REQUIREMENTS

ADJUSTABLE CLEVIS HANGER

TYPE 1 - SEE SPECIFICATIONS ADJUSTABLE CLEVIS HANGER

TYPE 1 - SEE SPECIFICATIONS

NOTES:

1.

2.

PROVIDE ANCHORS ONLY

WHERE SHOWN ON

DRAWINGS.

EXTEND SLEEVE ABOVE

FLOOR WHERE

SPECIFIED.

INSULATION BOLT

(TYPICAL)

FLOOR

SLAB

FIRE-STOPPING

MATERIAL

BOLT

PIPEPIPE SLEEVE

WHERE SPECIFIED

RISER

CLAMP

RISER

PIPE SLEEVE

WHERE

SPECIFIED

RISER CLAMP.

BOTTOM CLAMP

REQUIRED AT

ANCHOR POINTS

ONLY.ELEVATION

PLAN

RISER

CLAMP

FAN SECTION

TYPE "THR"

NOTES:

1. ATTACH THRUST RESTRAINTS SYMMETRICALLY ON BOTH SIDES OF THE

FAN DISCHARGE.

2. ADJUST RESTRAINT TO ALLOW 1/4" [6 mm] MOVEMENT OF FAN AT

START AND STOP.

FLEXIBLE DUCT

CONNECTIONS

FAN

DISCHARGE

FLEXIBLE DUCT

CONNECTIONS

FAN INLET

VIBRATORS ISOLATORS

AS SCHEDULED OR

SPECIFIED

THRUST

RESTRAINT

COIL SECTION

OR DISCHARGE

DUCT

A

A

BB

SECTION A-A (BASE NOT POURED WITH SLAB)

SECTION A-A (BASE POURED WITH FLOOR SLAB)

PLAN

TYPICAL ANCHOR

BOLT NUT & WASHER

SECTION B-B

EQUIPMENT BASE PLATE

PROVIDE #3 BARS 12"

[300mm] O.C. EACH WAY IN

THE BASE & DOWEL BASE TO FLOOR

EQUIPMENT BASE PLATE

PROVIDE DOUBLE SLAB

REINFORCING IN BASE AREA

WELD HEAD TO PLATE

OR BEND OVER END 5D

FLOOR

PIPE SLEEVE (5D, 3"

[75mm] MIN.)

ANCHOR

BOLT (TYP)

CONCRETE BASE

NOTE:

L & W DIMENSIONS

SHALL BE 6" [150mm]

GREATER THAN THE

EQUIPMENT BASE PLATE.

[400mm]

5" M

IN

[1 m m

5"

M

IN

[1 m m

TYPICAL ANCHOR

BOLT NUT & WASHER

[2 5m m

L /1

L

/1

5D

16"

2D

L

W

D

5D

NOTE:

NOT REQUIRED FOR

AIR TERMINAL UNITS.

EQUIPMENT WEIGHT

250 LBS. [114KG]

OR LESS

SEISMIC BRACING FOR LIGHT

SUSPENDED EQUIPMENT

FLOOR MOUNT EQUIPMENT

RESTRAINED BY RESILIENT PADS

(TYPE DS)

FLOOR

EQUIPMENT

BASE

ANCHOR

BOLT

NEOPRENE

WASHER & SLEEVE

BONDED STEEL

PLATE

RESILIENT

PAD

HANGER

ROD

(TYP)

CROSS BRACING

RODS ALL FOUR

SIDES

LOCK

NUTS

(TYP)

CLAMP

STEEL EXPANSION SHIELD FOR

EXISTING CONSTRUCTION AND

INSERTS FOR NEW CONSTRICTION

THIS TYPE SHALL BE USED ONLY IN

SLABS OR BEAMS OF 4" [100mm]

MIN DEPTH

3/8" [10mm] MIN DIA EXPANSION

BOLTS FOR EXISTING CONSTRUCTION

AND INSERTS FOR NEW CONSTRUCTION

CONCRETE

FLOOR SLAB

CLIP

ANGLE

NUTS & WASHERS

3/8" [10mm] MIN

DIA HANGER RODS

FOR PIPES UNDER 2" [50mm] IN SIZE USE 1 1/2"x1 1/2"x1/4" [40x40x6.4mm] ANGLE. ALL PIPES 2" [50mm] & LARGER USE 3"x3"x1/4" [75x75x6.4mm] ANGLE

TURNBUCKLE

3/8" [10mm] MIN

DIA HANGER RODS

3/8" [10mm] MIN

DIA INSERTS NEW

CONSTRUCTION

ONLY.

STEAM TRAP

ASSEMBLY

STEAM LINE DRIP POCKET

[1 m m

M

IN

[3 m m

M

IN

[1 m m

M

IN

[3 m m

M

IN

DRIP LEG (TYP.)

3/4" [20mm] DRAIN

(ALTERNATE LOCATIONS)

(TYPICAL)

STEAM LINE

(TYPICAL)

CAP (TYPICAL)

PIPE T0 STEAM TRAP

(TYPICAL)

NOTE:

DRIP POCKET PIPE SIZE

SAME AS STEAM MAIN

UNLESS OTHERWISE NOTED.

3/4" [20mm] MIN.

FROM DRIP

CONNECTION

DRIP

RETURN

3/8" [10mm] TEST

CONNECTION

6"

2"

6"

2"

SMACNA FIGURE 4-6

45° LEED IN

RIGID DUCT TO AIR

TERMINAL UNIT.

MAIN SUPPLY

PLAN VIEW

FLOW

F

LO

W

MAIN EXHAUST OR RETURN

PLAN VIEW

AIR

FLOW AIR

FLOW

PROVIDE VOLUME DAMPER

AT EACH BRANCH DUCT

1/4W OR 4"

[100mm] MIN.

BRANCH DUCT

VD

W

FLEXIBLE DUCT SIZE

SAME AS DIFFUSER

INLET: 5'-0" MAX LENGTH.

CEILING

SUPPORT SADDLE

FROM STRUCTURE

VOLUME DAMPER W/

LOCKING QUAD

SHEET METAL

SADDLE

CONICAL OUTLET

BRANCH DUCT

USE RIGID ELBOWS

FOR CHANGE OF

DIRECTION GREATER

THAN 45°

[300mm]

SEE SPECIFICATIONS FOR

CLAMPS AND SEALANT (TYP.)

NOTE:

THE USE OF FLEXIBLE AIR DUCT CONNECTORS ARE NOT PERMITTED

FOR THE DEDICATED AHU SERVING THE SURGICAL SUITE.

TYPICAL

DIFFUSER OR

REGISTER IN

LAY-IN CLG.

THERMAL INSULATION

SEE SPECIFICATIONS

12"

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

M-501

MECHANICAL DETAILS

BOH AR04/26/2018

NO SCALE

PIPE HANGERS

NO SCALE

SUPPORT/ANCHOR FOR PIPE RISERS

NO SCALE

THRUST RESTRAINT FOR FANS

NO SCALE

CONCRETE EQUIPMENT BASES

NO SCALE

SEISMIC BRACING FOR EQUIPMENT

NO SCALE

SECURING HANGER RODS IN CONCRETE

NO SCALE

STEAM LINE DRIP POCKET STEAM TRAP ASSEMBLY

NO SCALE

ALTERNATE SUPPLY DUCT TAKEOFF - AIR TERMINAL UNITS

NO SCALE

EXHAUST OR RETURN BRANCH DUCTWORK

NO SCALE

FLEXIBLE AIR DUCT CONNECTOR

NOTE:

1.

2.

DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.

DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR FOR MULTI-BLADE DAMPERS & ROUND DAMPERS.

INSULATION SEE

SPECIFICATION

DAMPER

BLADE

1/8" [6mm]

CLEARANCE

ALL AROUND

OUTSIDE END

BEARING

INSIDE END

BEARING

HANDLE WITH

LOCKING

QUADRANT

INSULATION

STAND-OFF

1/2" [15mm]

ROUND ROD PINDUCT

STIFFEN BLADE AS REQUIRED

SIDE ELEVATION SECTION

SECTION "A-A"

"B" "B"

NOTES:

1. LATCHES SHALL BE OF THE WEDGE TYPE TO CLOSE DOORS TIGHTLY.

2. HINGES ON THE ACCESS DOORS SHALL HAVE NON-CORROSIVE PINS.

3. SEE SMACNA 2005, FIGURE 9-15

ACCESS PANEL

ACCESS DOOR

CASING

GASKET

HANDLE INSIDE

FLEXIBLE

WASHER

FACTORY

FABRICATED

LATCH

SECTION "B-B"

INSULATION

DUCT

GASKET

INSULATION

INSULATION

"A"

"A"

HOUSING WELDED TO

DUCT SECTION

ROUND OR

FLAT OVAL

DUCT SECTION

COVER WITH HANDLE AND

CHAIN RETAINER

GASKETED AND

PRESSURE SEALED

ROUND FLEXIBLE CONNECTION

RECTANGULAR FLEXIBLE CONNECTION

FLANGED

CONNECTION ON

FAN SIDE

WASHER 1-1/2" [40mm] MIN. TO 3" [75mm] MAX. INSTALLED. 6" [150mm] NOMINAL WITH MATERIAL

TAUT

FLEXIBLE

MATERIAL AS

SPECIFIED

1"x1/8" [25x3mm] DRAW BAND

1"x1/8" [25x3mm] BAND IRON

BOLT ON 4" [100mm] CENTERS 5/16" [8mm] FLANGE

DUCT

SHEET METAL SCREWS

ON 12" [300mm] CENTERS

RIVET ON 4"

[100mm]

CENTERS

SHEET METAL AS

SPECIFIED FOR

DUCTWORK.

1"x1/8" [25x3mm] BAND IRON

BOLT ON 4" [100mm] CENTERS

1" [25mm] FLANGE & HEM

ALTERNATE POSITION

OF BOLT 1 1/2" [40mm]

POCKET SLIP

DUCT

SHEET METAL AS

SPECIFIED FOR

DUCTWORK.

[15mm] [15mm] [40mm]

1 1/2" [40mm] MIN. TO 3" [75mm] MAX. INSTALLED. 6" [150mm] NOMINAL WITH

MATERIAL TAUT

FLANGED

CONNECTION

ON FAN SIDE

WASHER

FLEXIBLE MATERIAL

AS SPECIFIED

1/2" 1/2" 1 1/2"

NOTE:

1.

2.

3.

4.

5.

6.

7.

A VERTICAL DAMPER IS SHOWN. HORIZONTAL DAMPER INSTALLATION, 1S SIMILAR.

FOLLOW DAMPER MANUFACTUER'S INSTRUCTIONS, INCLUDING FASTENER OPTIONS AND

GAGES FOR SLEEVE AND PERIMETER ANGLES. FIRE DAMPERS MUST BE INSTALLED IN THE

PARTITION OR FLOOR AND NOT OUTSIDE THE PENETRATION.

GALVANIZED SLEEVE: GAGE NOT LESS THAN CONNECTING DUCT. FASTEN SLEEVE TO

DAMPER FRAME AND TO PERIMETER ANGLES.

PERIMETER ANGLES: GALVANIZED STEEL, NOT LESS THAN 1 1/2"x1 1/2" [40x40mm], 14 GAGE, TO PROVIDE 1" [25mm] MINIMUM OVERLAP OF OPENING ON ALL 4 SIDES.

BREAKAWAY DUCT CONNECTION: CONTRACTOR'S OPTION OF TYPES SHOWN IN SMACNA.

ACCESS PANELS: SIZE AND LOCATION TO PERMIT SERVICING THE FUSIBLE LINK OR LINKS.

PROVIDE 1/4" [6mm] PER FOOT OF DUCT HEIGHT/WIDTH CLEARANCE ON HEIGHT AND WIDTH.

FILL OPEN SPACE.

ALL DUCT WORK RISERS WHICH ARE RUN EXPOSED, SUCH AS THRU ATTIC FLOORS

AND MECHANICAL ROOM FLOORS, SHALL BE PROVIDED WITH 3" [75mm] HIGH

CONCRETE CURB AROUND OPENING FOR DUCT.

SLEEVE, NOTE 2

DUCT

CONNECTION

NOTE 4

DAMPER,

NOTE 1

DAMPER COLLAR

EXTENSION INTEGRAL

PART OF SLEEVE

SLEEVE, NOTE 2

NOTE 6

FIRE BARRIER

PARTITION OR CHASE

TYPICAL DUCT

INSULATION

PERIMETER ANGLE, NOTE 3

(NOT FASTENED TO PARTITION)

ACCESS

PANEL

NOTE 5

[2 5m m

2500 [1133]

1320 [598]

420 [190]ONE 1 [25] x 18 GA STRAP36 [900]

TWO 1/2 [13]Ø RODS

TWO 3/8 [10]Ø RODS

ONE 1 [25] x 16 GA STRAP

84 [2100]

60 [1500] 50 [1250] 700 [317]

ONE 1 [25] x 22 GA STRAP

QUANTITY/SIZE

IN. [mm]

MAX. DUCT

Ø IN. [mm]

26 [650]

HANGER STRAPS OR RODS

MAX. LOAD

LBS [kg]

260 [119]

MAX.

SPACING

IN. [mm]

144 [3600]

144 [3600]

144 [3600]

144 [3600]

144 [3600]

NOTE:

TABULATED DATA FROM SMACNA

ALLOWS FOR DUCT REINFORCING AND

INSULATION, BUT NO EXTERNAL LOAD.BAND

OVER 50"

[1250mm]Ø

HANGER RODS

BAND OF

SAME SIZE AS

HANGER STRAP

LOAD RATED

FASTENERS

50" [1250mm]Ø

& UNDER

NOTE:

ALL DUCT WORK RISERS WHICH ARE RUN EXPOSED, SUCH AS THRU ATTIC FLOORS

AND FAN ROOM FLOORS SHALL BE PROVIDED WITH A 3" [75mm] HIGH CONCRETE

CURB AROUND OPENING FOR DUCT.

SEAL HOLE WITH FIREPROOFING

MATERIAL AFTER DUCT INSTALLATION

2"x2"x1/4" [50x50x6mm]

ANGLE INSTALL ON BOTH LONG

DIMENSION SIDES OF DUCT.

DUCT RISER - SEE FLOOR

PLANS FOR DETAILS

SEAL HOLE WITH FIREPROOFING

MATERIAL AFTER DUCT INSTALLATION

FLOOR

EXTEND ANGLE 3"

[75mm] BEYOND DUCT

DUCT RISER - SEE FLOOR

PLANS FOR SIZES SHEET METAL SCREWS 4"

[100mm] ON CENTER

1 1/2"x1 1/2"x1/8" [40x40x3mm] ANGLE

INSTALL ON BOTH LONG DIMENSION

SIDES OF DUCT. FOR DUCTS OVER

60"1500mm] USE 2"x2"x1/8" 50x50x3mm]

ANGLE.

HOLE IN STRUCTURAL FLOOR

DUCT RISER

0.5 INCH WG [125Pa] TO 2 INCHES WG [500Pa] DUCT RISER SUPPORT

ARRANGE RISER SO

REINFORCER TRANSVERSE JOINT

IS AT RISER SUPPORT POINT

FLOOR

2 INCHES WG [500Pa] TO 4 INCHES WG [1000Pa] DUCT RISER SUPPORT

HOLE IN STRUCTURAL FLOOR

DUCT RISER

NOTE:

1.

2.

3.

4.

5.

6.

RIGID STRAIGHT TERMINAL UNIT INLET LENGTH SHALL BE A

MINIMUM OF 3 TIMES THE DIAMETER OF INLET

A FLEXIBLE AIR DUCT CONNECTOR IS NOT MANDATORY FOR INLET TO

THIS BOX, BUT ALLOWED TO ACCOMMODATE MINOR OFFSETS. MAXIMUM

LENGTH 3'-0" [900mm].

A BRANCH DUCT SERVING AN INDIVIDUAL BOX MAY BE THE SAME SIZE

AS THE BOX INLET, PROVIDED THE EQUIVALENT LENGTH OF THE

BRANCH DUCT, AS SHOWN, DOES NOT EXCEED 10 FEET (3 METERS).

FOR LONGER LENGTHS, INCREASE THE DUCT SIZE AND PROVIDE A

DUCT TRANSITION TO MAINTAIN THE DUCT STATIC PRESSURE DROP AT OR BELOW

0.2"/100' [1.65Pa/m].

FLEXIBLE AIR DUCT CONNECTORS, WHEN USED FROM TERMINAL UNIT

SUPPLY AIR DUCT TO DIFFUSER, SHALL NOT EXCEED 5'-0" [1500mm].

USE RIGID ELBOWS FOR CHANGE OF DIRECTION GREATER THAN 45°.

COMPONENT ARRANGEMENT MAY VARY BY MANUFACTURER. PROVIDE

INSULATION W/VAPOR BARRIER FOR CONNECTING DUCT SECTIONS.

USE OF THE FLEXIBLE AIR DUCT CONNECTORS ARE NOT PERMITTED

FOR THE DEDICATED AHU SERVING THE SURGICAL SUITE.

AIR TERMINAL

UNIT (CV OR VAV)

REHEAT COIL SOUND ATTENUATOR SEE

EQUIPMENT SCHEDULE

FLEXIBLE AIR DUCT

C…