36C25518R0522-020.pdf
PDF 18 MB Posted
- Solicitation number
- 36C25518R0522
About this file
36C25518R0522 07 Mechanical Drawings Vol 2.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25518R0522-011.docx | DOCX document | |
| 36C25518R0522-019.pdf | ||
| 36C25518R0522-015.pdf | ||
| 36C25518R0522-012.pdf | ||
| 36C25518R0522-021.pdf | ||
| 36C25518R0522-013.pdf | ||
| 36C25518R0522-014.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1-E
1-51-31-21-1
1-H
1-J
1A-A
1-M
1-N
1-Q
1A-D
1A-C
1A-B
1-T
1-V
1-W
1-U
1-3A
1-6 1-9
1-11
1-13
1-X
1-R
1-I
1-D
1-20 1-211-16
1-121-101-7
1-G x3
36x36 34"ø 34"ø
"ø
1-AHU1
1-RF1
NOT IN SCOPE
AFMS-RA AFMS-SA
"ø
40x70
(EX)60x24 x4
(EX)108x30
36x36
"ø
(EX) 10'-0" X 3'-0" RELIEF LOUVER
(EX) 12'-0" X 3'-0" INTAKE LOUVER
1-FD2
1-FD1
BACK INLET FOR OUTSIDE
AIR CONNECTION
SIDE INLET FOR RETURN
AIR CONNECTION
UP IN CHASE TO SERVE SECOND AND THIRD FLOORS
PHASE 1
Drawing Title Project Title
Date
Location
Checked
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
589A7-17-203
Robert J. Dole VA Medical Center
RENOVATE WARDS FOR PATIENT
PRIVACY PHASE 1, B1
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA
142 N. MOSELY ST
WICHITA, KANSAS
MH101
HVAC PLAN - BASEMENT
BOH AR04/26/2018
1/4" = 1'-0"
HVAC PLAN - BASEMENT
2' 4' 8'0'
1/4" = 1'-0"
N
No. Description Date
INTERLOCK END SWITCH TO
1-AHU1 & 1-RF1 OPERATION
1-H
1-J
1A-A
1-M
1-N
1-Q
1A-D
1A-C
1A-B
1-T
1-V
1-W
1-U
1-3A
1-6 1-9
1-11
1-13
1-X
1-R
1-I
1-D
1-20 1-211-16
1-121-101-7
1-G
NOT IN SCOPE
(EX)60x24
(EX)108x30
(EX) 10'-0" X 3'-0" RELIEF LOUVER
(EX) 12'-0" X 3'-0" INTAKE LOUVER
(EX)1-AHU1
(EX)60x24
(EX)1-RF1
(EX)36x36
(E X
)1 x3
(E X
)3 0" ø
(EX)24"ø
(EX)30"ø
(EX) 1-AFMS1
(EX) HUMIDIFIER
(EX) 1-AFMS2
(EX) AIR HANDLER TO REMAIN IN
BID ITEM #4. NO DEMOLITION WORK
REQUIRED IN BASEMENT.
PHASE 1 BID ITEM #4
Drawing Title Project Title
Date
Location
Checked
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
589A7-17-203
Robert J. Dole VA Medical Center
RENOVATE WARDS FOR PATIENT
PRIVACY PHASE 1, B1
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA
142 N. MOSELY ST
WICHITA, KANSAS
MH101.4
HVAC PLAN - BASEMENT - BID ITEM #4
BOH RMH04/26/2018
1/4" = 1'-0"
HVAC PLAN - BASEMENT - BID ITEM 4
2' 4' 8'0'
1/4" = 1'-0"
N
No. Description Date
1-H
1-J
1-M
1-N
1-Q
1-T
1-V
1-W
1-U
1-3A
1-6 1-9
1-11
1-13
1-X
1-R
1-I
1-D
1-20 1-211-16
1-121-101-7
1-G
NOT IN SCOPE
NOT IN SCOPE
36x36 34"ø
36x36 RA & 36" SA UP AND DOWN
PHASE 1
Drawing Title Project Title
Date
Location
Checked
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
589A7-17-203
Robert J. Dole VA Medical Center
RENOVATE WARDS FOR PATIENT
PRIVACY PHASE 1, B1
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA
142 N. MOSELY ST
WICHITA, KANSAS
MH111
HVAC PLAN - FIRST FLOOR
BOH AR04/26/2018
1/4" = 1'-0"
HVAC PLAN - FIRST FLOOR
2' 4' 8'0'
1/4" = 1'-0"
1-H
1-J
1-M
1-N
1-Q
1-T
1-V
1-W
1-U
1-3A
1-6 1-9
1-11
1-13
1-X
1-R
1-I
1-D
1-20 1-211-16
1-121-101-7
1-G
PATIENT ROOM
221-1
AIRBORNE INFECTION ISO.
PATIENT ROOM
214-1
TOILET
209-1
PATIENT ROOM
208-1
PATIENT ROOM
204-1
PATIENT ROOM
233-1
TOILET
238-1
EXIST. STAIRS
2-STAIR-W
CORR
200-1
CORR
225-1
CORR
207-1
STAFF TOILET
222-1
HSKPG
240-1
PATIENT ROOM
221-1
TOILET
220-1
SOILED UTILITY
218-1TOILET
217-1
PATIENT ROOM
216-1
TOILET
213-1
PATIENT ROOM
211-1
TOILET
209-1
PATIENT ROOM
208-1
PATIENT ROOM
204-1
BARIATRIC PATIENT ROOM
202-1
MEDICATION
230-1
PATIENT ROOM
233-1
PATIENT ROOM
234-1
PATIENT ROOM
236-1
TOILET
232-1
ANTE RM
215-1
CHARTING
206-1
TOILET
238-1
RECEPTION
241-1
NURSE STATION
224-1
EXIST. STAIRS
2-STAIR-W
TOILET
210-1
TOILET
203-1
TOILET
205-1
CORR
200-1
CORR
201-1
CORR
225-1
CORR
212-1
CORR
219-1
CORR
207-1
12x10 UP TO
THIRD FLOOR.
1-T2.2 (350)
1-T2.1 (450)
1-T2.13 (800)
1-T2.12 (350)
1-T2.14 (750)
1-T2.7 (450)
1-T2.3 (550)
1-T2.5 (550)
1-T2.11 (1575)
1-T2.8 (350)
1-T2.9 (400)
1-T2.10 (325)
(EX)TU
(EX)TU
1-T2.4 (475)
30x16
"ø
28x14 x1
"ø
12"ø 10"ø
22x14
NOURISH.
227-1
ELECT.
228-1
16x14 x1 x1
22x14 UP
14x10
36x36 x1
NOT IN SCOPE
SD-21 - 6"ø
SD-21 - 6"ø
SD-13 - 10"ø
"ø
6" ø
10"ø
6" ø
SD-23 - 10"ø
10"ø
10"ø
"ø
12x12
SD-14 - 12"ø 375
SD-14 - 12"ø
12"ø
12"ø
10x14
SD-13 - 10"ø
SD-22 - 8"ø
8x12
SD-13 - 10"ø
SD-22 - 6"ø
10"ø
6" ø
12"ø
"ø
SD-13 - 10"ø
SD-21 - 6"ø
6" ø
10"ø
10"ø
SD-13 - 10"ø
SD-22 - 10"ø
10"ø
8x12
"ø
SD-12 - 8"ø
SD-11 - 6"ø
SD-13 - 10"ø
SD-13 - 10"ø
SD-21 - 8x8
SD-11 - 6"ø
10"ø
12x12 12x6
6" ø
8x10
6"ø
8x
6x6
SD-13 - 10"ø
1-T2.6 (250)
10"ø
SD-21 - 6"ø
SD-21 - 6"ø
SD-13 - 10"ø
SD-13 - 10"ø
6"ø
10"ø
"ø
"ø
6" ø
SD-13 - 10"ø x8
10"ø x8
SD-21 - 6"ø
6" ø
SD-11 - 6"ø
8"ø
SD-13 - 10"ø
SD-11 - 6"ø
SD-21 - 6"ø
SD-21 - 6"ø
20x6 x6
6"ø
"ø x1 x1
14"ø
12"ø x1 x1
20x12
SD-13 - 10"ø
10"ø
20x10
8"ø
10"ø
SD-12 - 8"ø
8" ø
20x10 20x8
10"ø12 x6
SD-13 - 10"ø
SD-13 - 10"ø
SD-13 - 10"ø
SD-13 - 10"ø
14x8 14x8
14x8 12x10
10"ø
10"ø
6" ø x4 x4
RR-54 - 14x14
RR-51 - 8x8
RG-23 - 10"ø
RG-23 - 10"ø
"ø x6
"ø
14x6
14x6
14x6
RG-23 - 10"ø 175
RG-23 - 10"ø
RG-22 - 6"ø
10"ø
8"ø
"ø x6
10"ø
22x8 x1
22x8
RG-23 - 10"ø
10"ø x1 x1 x1
16x12 x1
RG-25 - 14"ø
10x1022 x1
14"ø
RG-25 - 14"ø
22x14
10x10
14"ø x1
RG-25 - 14"ø
14"ø
10x1024 x1
RG-27 - 22x14
22x14 x1 x1
"ø
8" ø
RG-23 - 10"ø
10"ø
RG-23 - 10"ø
RG-23 - 10"ø10"ø
8x
10x6
RR-51 - 8x8
RR-51 - 8x8
6x6
6x6 8x8
RR-52 - 10x8
12x10 x8
12x10
RR-51 - 8x8
6x x1
RR-51 - 8x8
RR-51 - 8x8
RR-51 - 8x8
6x
6x 66x
8x x8 x8
RR-51 - 8x8
8x
10x10 10x8
RR-51 - 8x8
14x10 x1
RR-53 - 12x12
10x8 x8 x8
RR-51 - 8x8
6x
12x8
RR-51 - 8x8
6x
RR-52 - 10x10
8x8 10x8 x8
14x6 x8
18x8 x8 x8
10"ø
10"ø
8x8
A
26x26 UP
1-ACV1
EQUIP. STOR.
229-1
CLEAN UTILITY
231-1
6x
"ø
8"ø
RR-51 - 8x8
8x8
SD-15 - 8"ø
8"ø
8" ø
8x6
8x6 x8 x8 x1
1-FSD1 1-FSD2
1-FSD3
1-FSD4
B
1-FD3
PHASE 1
A. PROVIDE DAMPER AT TAP OFF BOTTOM
OF DUCT.
B. CONTRACTOR TO TEMPORARILY
ROUTE EXHAUST 22x14 RISER UP THRU
EXISTING CHASE ON THIRD FLOOR, TIE
IN EXISTING THIRD FLOOR EXHAUST
MAIN, LOCATED IN THE SAME CHASE,
AND ROUTE THE EXHAUST MAIN UP TO
THE ATTIC FOR CONNECTION TO
EXHAUST FAN. DURING THIRD FLOOR
WORK, CONTRACTOR TO RE-ROUTE
EXHAUST AS SHOWN ON PLAN.
PLAN NOTES
Drawing Title Project Title
Date
Location
Checked
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
589A7-17-203
Robert J. Dole VA Medical Center
RENOVATE WARDS FOR PATIENT
PRIVACY PHASE 1, B1
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA
142 N. MOSELY ST
WICHITA, KANSAS
MH121
HVAC PLAN - SECOND FLOOR
BOH AR04/26/2018
1/4" = 1'-0"
HVAC PLAN - SECOND FLOOR
2' 4' 8'0'
1/4" = 1'-0"
1-H
1-J
1-M
1-N
1-Q
1-T
1-V
1-W
1-U
1-3A
1-6 1-9
1-11
1-13
1-X
1-R
1-I
1-D
1-20 1-211-16
1-121-101-7
1-G
PATIENT ROOM
221-1
PATIENT ROOM
216-1
AIRBORNE INFECTION ISO.
PATIENT ROOM
214-1
TOILET
209-1
PATIENT ROOM
208-1
PATIENT ROOM
204-1
PATIENT ROOM
233-1
PATIENT ROOM
236-1
TOILET
238-1
EXIST. STAIRS
2-STAIR-W
CORR
200-1
CORR
225-1
CORR
207-1
STAFF TOILET
222-1
HSKPG
240-1
PATIENT ROOM
221-1
TOILET
220-1
SOILED UTILITY
218-1TOILET
217-1
PATIENT ROOM
216-1
TOILET
213-1
PATIENT ROOM
211-1
TOILET
209-1
PATIENT ROOM
208-1
PATIENT ROOM
204-1
BARIATRIC PATIENT ROOM
202-1
MEDICATION
230-1
PATIENT ROOM
233-1
PATIENT ROOM
234-1
PATIENT ROOM
236-1
TOILET
232-1
ANTE RM
215-1
CHARTING
206-1
TOILET
238-1
RECEPTION
241-1
NURSE STATION
224-1
EXIST. STAIRS
2-STAIR-W
TOILET
210-1
TOILET
203-1
TOILET
205-1
CORR
200-1
CORR
201-1
CORR
225-1
CORR
212-1
CORR
219-1
CORR
207-1
12x10 UP TO
THIRD FLOOR.
1-T2.2 (350)
1-T2.1 (450)
1-T2.13 (800)
1-T2.12 (350)
1-T2.14 (750)
1-T2.7 (450)
1-T2.3 (550)
1-T2.5 (550)
1-T2.11 (1575)
1-T2.8 (350)
1-T2.9 (400)
1-T2.10 (325)
(EX)TU
(EX)TU
1-T2.4 (475)
30x16
"ø
28x14 x1
"ø
12"ø 10"ø
NOURISH.
227-1
ELECT.
228-1 x1 x1
22x14 UP
14x10 x1
NOT IN SCOPE
SD-21 - 6"ø
SD-21 - 6"ø
SD-13 - 10"ø
"ø
6" ø
10"ø
6" ø
SD-23 - 10"ø
10"ø
10"ø
"ø
12x12
SD-14 - 12"ø 375
SD-14 - 12"ø
12"ø
12"ø
10x14
SD-13 - 10"ø
SD-22 - 8"ø
8x12
SD-13 - 10"ø
SD-22 - 6"ø
10"ø
6" ø
12"ø
"ø
SD-13 - 10"ø
SD-21 - 6"ø
6" ø
10"ø
10"ø
SD-13 - 10"ø
SD-22 - 10"ø
10"ø
8x12
"ø
SD-12 - 8"ø
SD-11 - 6"ø
SD-13 - 10"ø
SD-13 - 10"ø
SD-21 - 8x8
SD-11 - 6"ø
10"ø
12x12 12x6
6" ø
8x10
6"ø
8x
6x6
SD-13 - 10"ø
1-T2.6 (250)
10"ø
SD-21 - 6"ø
SD-21 - 6"ø
SD-13 - 10"ø
SD-13 - 10"ø
6"ø
10"ø
"ø
"ø
6" ø
SD-13 - 10"ø x8
10"ø x8
SD-21 - 6"ø
6" ø
SD-11 - 6"ø
8"ø
SD-13 - 10"ø
SD-11 - 6"ø
SD-21 - 6"ø
SD-21 - 6"ø
20x6 x6
6"ø
"ø x1 x1
14"ø
12"ø x1 x1
20x12
SD-13 - 10"ø
10"ø
20x10
8"ø
10"ø
SD-12 - 8"ø
8" ø
20x10 20x8
10"ø12 x6
SD-13 - 10"ø
SD-13 - 10"ø
SD-13 - 10"ø
SD-13 - 10"ø
14x8 14x8
14x8 12x10
10"ø
10"ø
6" ø x4 x4
RR-54 - 14x14
RR-51 - 8x8
RG-23 - 10"ø
RG-23 - 10"ø
"ø x6
"ø
14x6
14x6
14x6
RG-23 - 10"ø 175
RG-23 - 10"ø
RG-22 - 6"ø
10"ø
8"ø
"ø x6
10"ø
22x8 x1
22x8
RG-23 - 10"ø
10"ø x1 x1 x1
16x12 x1
RG-25 - 14"ø
10x1022 x1
14"ø
RG-25 - 14"ø
22x14
10x10
14"ø x1
RG-25 - 14"ø
14"ø
10x1024 x1
RG-27 - 22x14
22x14 x1 x1
"ø
8" ø
RG-23 - 10"ø
10"ø
RG-23 - 10"ø
RG-23 - 10"ø10"ø
8x
10x6
RR-51 - 8x8
RR-51 - 8x8
6x6
6x6 8x8
RR-52 - 10x8
12x10 x8
12x10
RR-51 - 8x8
6x x1
RR-51 - 8x8
RR-51 - 8x8
RR-51 - 8x8
6x
6x 66x
8x x8 x8
RR-51 - 8x8
8x
10x10 10x8
RR-51 - 8x8
14x10 x1
RR-53 - 12x12
10x8 x8 x8
RR-51 - 8x8
6x
12x8
RR-51 - 8x8
6x
RR-52 - 10x10
8x8 10x8 x8
14x6 x8
18x8 x8 x8
10"ø
10"ø
8x8
A
26x26 UP
1-ACV1
1-FD1
1-FD2
1-FD3
EQUIP. STOR.
229-1
CLEAN UTILITY
231-1
6x
"ø
8"ø
RR-51 - 8x8
8x8
SD-15 - 8"ø
8"ø
8" ø
8x6
8x6 x8 x8 x1
B
1-FD3
22x14
1-FSD1 1-FSD2
1-FSD3
1-FSD4
A. PROVIDE DAMPER AT TAP OFF BOTTOM
OF DUCT.
B. CONTRACTOR TO TEMPORARILY
ROUTE EXHAUST 22x14 RISER UP THRU
EXISTING CHASE ON THIRD FLOOR, TIE
IN EXISTING THIRD FLOOR EXHAUST
MAIN, LOCATED IN THE SAME CHASE,
AND ROUTE THE EXHAUST MAIN UP TO
THE ATTIC FOR CONNECTION TO
EXHAUST FAN. DURING THIRD FLOOR
WORK, CONTRACTOR TO RE-ROUTE
EXHAUST AS SHOWN ON PLAN.
PLAN NOTES
PHASE 1 BID ITEM #3
Drawing Title Project Title
Date
Location
Checked
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
589A7-17-203
Robert J. Dole VA Medical Center
RENOVATE WARDS FOR PATIENT
PRIVACY PHASE 1, B1
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA
142 N. MOSELY ST
WICHITA, KANSAS
MH121.3
HVAC PLAN - SECOND FLOOR - BID ITEM
#3
BOH RMH04/26/2018
1/4" = 1'-0"
HVAC PLAN - SECOND FLOOR - BID ITEM 3
N 2' 4' 8'0'
1/4" = 1'-0"
1-H
1-J
1-M
1-N
1-Q
1-T
1-V
1-W
1-U
1-3A
1-6 1-9
1-11
1-13
1-X
1-R
1-I
1-D
1-20 1-211-16
1-121-101-7
1-G
PATIENT ROOM
221-1
PATIENT ROOM
216-1
AIRBORNE INFECTION ISO.
PATIENT ROOM
214-1
TOILET
209-1
PATIENT ROOM
208-1
PATIENT ROOM
204-1
PATIENT ROOM
233-1
PATIENT ROOM
236-1
TOILET
238-1
EXIST. STAIRS
2-STAIR-W
CORR
200-1
CORR
225-1
CORR
207-1
STAFF TOILET
222-1
HSKPG
240-1
PATIENT ROOM
221-1
TOILET
220-1
SOILED UTILITY
218-1TOILET
217-1
PATIENT ROOM
216-1
TOILET
213-1
PATIENT ROOM
211-1
TOILET
209-1
PATIENT ROOM
208-1
PATIENT ROOM
204-1
BARIATRIC PATIENT ROOM
202-1
MEDICATION
230-1
PATIENT ROOM
233-1
PATIENT ROOM
234-1
PATIENT ROOM
236-1
TOILET
232-1
ANTE RM
215-1
CHARTING
206-1
TOILET
238-1
RECEPTION
241-1
NURSE STATION
224-1
EXIST. STAIRS
2-STAIR-W
TOILET
210-1
TOILET
203-1
TOILET
205-1
CORR
200-1
CORR
201-1
CORR
225-1
CORR
212-1
CORR
219-1
CORR
207-1
12x10 UP TO
THIRD FLOOR.
1-T2.2 (350)
1-T2.1 (450)
1-T2.13 (800)
1-T2.12 (350)
1-T2.14 (750)
1-T2.7 (450)
1-T2.3 (550)
1-T2.5 (550)
1-T2.11 (1575)
1-T2.8 (350)
1-T2.9 (400)
1-T2.10 (325)
(EX)TU
(EX)TU
1-T2.4 (475)
30x16
"ø
28x14 x1
"ø
12"ø 10"ø
NOURISH.
227-1
ELECT.
228-1 x1 x1
22x14 UP
14x10 x1
NOT IN SCOPE
SD-21 - 6"ø
SD-21 - 6"ø
SD-13 - 10"ø
"ø
6" ø
10"ø
6" ø
SD-23 - 10"ø
10"ø
10"ø
"ø
12x12
SD-14 - 12"ø 375
SD-14 - 12"ø
12"ø
12"ø
10x14
SD-13 - 10"ø
SD-22 - 8"ø
8x12
SD-13 - 10"ø
SD-22 - 6"ø
10"ø
6" ø
12"ø
"ø
SD-13 - 10"ø
SD-21 - 6"ø
6" ø
10"ø
10"ø
SD-13 - 10"ø
SD-22 - 10"ø
10"ø
8x12
"ø
SD-12 - 8"ø
SD-11 - 6"ø
SD-13 - 10"ø
SD-13 - 10"ø
SD-21 - 8x8
SD-11 - 6"ø
10"ø
12x12 12x6
6" ø
8x10
6"ø
8x
6x6
SD-13 - 10"ø
1-T2.6 (250)
10"ø
SD-21 - 6"ø
SD-21 - 6"ø
SD-13 - 10"ø
SD-13 - 10"ø
6"ø
10"ø
"ø
"ø
6" ø
SD-13 - 10"ø x8
10"ø x8
SD-21 - 6"ø
6" ø
SD-11 - 6"ø
8"ø
SD-13 - 10"ø
SD-11 - 6"ø
SD-21 - 6"ø
SD-21 - 6"ø
20x6 x6
6"ø
"ø x1 x1
14"ø
12"ø x1 x1
20x12
SD-13 - 10"ø
10"ø
20x10
8"ø
10"ø
SD-12 - 8"ø
8" ø
20x10 20x8
10"ø12 x6
SD-13 - 10"ø
SD-13 - 10"ø
SD-13 - 10"ø
SD-13 - 10"ø
14x8 14x8
14x8 12x10
10"ø
10"ø
6" ø x4 x4
RR-54 - 14x14
RR-51 - 8x8
RG-23 - 10"ø
RG-23 - 10"ø
"ø x6
"ø
14x6
14x6
14x6
RG-23 - 10"ø 175
RG-23 - 10"ø
RG-22 - 6"ø
10"ø
8"ø
"ø x6
10"ø
22x8 x1
22x8
RG-23 - 10"ø
10"ø x1 x1 x1
16x12 x1
RG-25 - 14"ø
10x1022 x1
14"ø
RG-25 - 14"ø
22x14
10x10
14"ø x1
RG-25 - 14"ø
14"ø
10x1024 x1
RG-27 - 22x14
22x14 x1 x1
"ø
8" ø
RG-23 - 10"ø
10"ø
RG-23 - 10"ø
RG-23 - 10"ø10"ø
8x
10x6
RR-51 - 8x8
RR-51 - 8x8
6x6
6x6 8x8
RR-52 - 10x8
12x10 x8
12x10
RR-51 - 8x8
6x x1
RR-51 - 8x8
RR-51 - 8x8
RR-51 - 8x8
6x
6x 66x
8x x8 x8
RR-51 - 8x8
8x
10x10 10x8
RR-51 - 8x8
14x10 x1
RR-53 - 12x12
10x8 x8 x8
RR-51 - 8x8
6x
12x8
RR-51 - 8x8
6x
RR-52 - 10x10
8x8 10x8 x8
14x6 x8
18x8 x8 x8
10"ø
10"ø
8x8
A
26x26 UP
1-ACV1
EQUIP. STOR.
229-1
CLEAN UTILITY
231-1
6x
"ø
8"ø
RR-51 - 8x8
8x8
SD-15 - 8"ø
8"ø
8" ø
8x6
8x6 x8 x8 x1
14x1016x14 x1
1-FSD1 1-FSD2
1-FSD3
1-FSD4
1-FD4
PHASE 1 BID ITEM #4
Drawing Title Project Title
Date
Location
Checked
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
589A7-17-203
Robert J. Dole VA Medical Center
RENOVATE WARDS FOR PATIENT
PRIVACY PHASE 1, B1
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA
142 N. MOSELY ST
WICHITA, KANSAS
MH121.4
HVAC PLAN - SECOND FLOOR - BID ITEM
#4
BOH RMH04/26/2018
1/4" = 1'-0"
HVAC PLAN - SECOND FLOOR - BID ITEM 4
2' 4' 8'0'
1/4" = 1'-0"
1-H
1-J
1-M
1-N
1-Q
1-T
1-V
1-W
1-U
1-3A
1-6 1-9
1-11
1-13
1-X
1-R
1-I
1-D
1-20 1-211-16
1-121-101-7
1-G
12x10 DOWN TO
SECOND FLOOR.
16x14 UP TO 1-EF2.
1-T3.2 (500)
1-T3.1 (300)
1-T3.4 (475)
1-T3.3 (200)
1-T3.5 (450)
1-T3.16 (500)
1-T3.15 (750)
1-T3.14 (800)
1-T3.13 (475)
1-T3.6 (250)
1-T3.12 (1600)
1-T3.7 (450)
1-T3.8 (225)
1-T3.11 (200)
1-T3.10 (325)
1-T3.9 (325)
"ø
"ø
12"ø x1
16"ø x1
2 10x10 8"ø10x10
8"ø x8
22x14 DN
22x14
10x10 x1 x8 x1
32x16
12x12
12x12
26x26
SD-13 - 10"ø
SD-22 - 8"ø
SD-21 - 6"ø
SD-13 - 10"ø
SD-13 - 10"ø
SD-23 - 10"ø
10"ø
SD-14 - 12"ø
SD-14 - 12"ø
12"ø
"ø x1
10x14
SD-13 - 10"ø
SD-22 - 8"ø
10x12
10"ø
8"ø
SD-13 - 10"ø
10"ø
SD-13 - 10"ø
SD-21 - 6"ø
SD-22 - 6"ø
10"ø
SD-21 - 6"ø
SD-11 - 6"ø
8x
6"ø
6" ø
SD-13 - 10"ø
SD-22 - 10"ø
8x
8x12
"ø
10"ø
SD-13 - 10"ø
"ø
SD-11 - 6"ø
SD-13 - 10"ø
SD-11 - 6"ø
SD-21 - 8x8
10x10
6"ø
6x
SD-13 - 10"ø
"ø
10"ø
SD-13 - 10"ø
SD-21 - 6"ø
8x12
8x
10"ø
6"ø
SD-13 - 10"ø
SD-21 - 6"ø
6" ø x1
SD-12 - 8"ø
8" ø
SD-14 - 12"ø
SD-13 - 10"ø
SD-13 - 10"ø
SD-13 - 10"ø
SD-13 - 10"ø
18x14
10"ø
22x10 18x10
10"ø
14x10
8"ø
10"ø
14x10 12x8
12"ø12x8
6"ø
SD-13 - 10"ø
SD-11 - 6"ø
SD-21 - 6"ø
"ø
8x x4 x4
"ø
12x12
10"ø
8x
6" ø
12x6 x812x4 x4
RG-23 - 10"ø
RG-26 - 16"ø
RG-25 - 14"ø
RG-25 - 14"ø
RG-22 - 8"ø
RG-23 - 10"ø
RG-22 - 8"ø
RG-23 - 10"ø
RG-23 - 10"ø
RG-22 - 8"ø
RG-21 - 6"ø
RG-23 - 10"ø
RG-23 - 10"ø
RG-23 - 10"ø
20x12 x1
8x6 x1
10x10
8x8 x1
6"ø
14x6
16x8
22x822x8 x1
8"ø
16x12 x1
10x1020 x1
22x14 x1 x1 x1
RG-27 - 22x22 x1
10"ø x1 x2
8" ø
"ø
10"ø
10"ø x1
12x12 x8 x8
RR-54 - 14x14
14x8
RR-51 - 8x6
8x6
RR-51 - 8x6 8x6
RR-52 - 10x10
10x10
RR-51 - 8x8
6x
RR-51 - 8x8
6x6
6x6
RR-51 - 8x6
8x6
RR-51 - 8x6
6x6 8x6
10x8
8x x8
RR-51 - 8x8
6x
RR-52 - 10x10
RR-51 - 8x8
6x
10x8
RR-53 - 12x12
10x8
RR-52 - 10x10
8x8 x8
14x8
14x8 x8 x8
14x
16x10 x1 x1
12x10
PATIENT ROOM
336-1
EQUIP. STOR.
338-1
EQUIP. ALCOVE
300-1
HALL
301-1
HALL
326-1
HALL
339-1
EXIST. STAIRS
3-STAIR-W
ELECT.
328-1
CLEAN UTILITY
330-1
TOILET
337-1
PATIENT ROOM
334-1
TOILET
335-1
SOILED UTILITY
319-1
PATIENT RM
316-1
TOILET
317-1
STORAGE
320-1
TOILET
321-1
ANTE RM
318-1
PATIENT RM
322-1
PATIENT RM
314-1
HSKPG
324-1
NURSE STATION
325-1
STAFF TOILET
323-1
TOILET
313-1
CHASE
NOURISH.
327-1
PATIENT RM
311-1
TOILET
310-1
TOILET
309-1
PATIENT RM
308-1
BARIATRIC PATIENT ROOM
302-1
PATIENT RM
304-1
TOILET
305-1
HALL
307-1
HALL
312-1
CHARTING
306-1
ALCOVE
301-1A
CLOSET
307A-1
MEDICATION
331-1
EQUIP. STOR.
329-1
"ø
1-ACV2
10"ø
"ø
22x2022x20
22x22 UP x8
1-FSD5
1-FSD6
1-FSD8
1-FSD7
8x
12"ø
8x
10"ø
6" ø
8"ø x1
1-FSD9
PHASE 1
A. PROVIDE DAMPER AT TAP OFF BOTTOM
OF DUCT.
PLAN NOTES
Drawing Title Project Title
Date
Location
Checked
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
589A7-17-203
Robert J. Dole VA Medical Center
RENOVATE WARDS FOR PATIENT
PRIVACY PHASE 1, B1
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA
142 N. MOSELY ST
WICHITA, KANSAS
MH131
HVAC PLAN - THIRD FLOOR
BOH AR04/26/2018
1/4" = 1'-0"
HVAC PLAN - THIRD FLOOR
2' 4' 8'0'
1/4" = 1'-0"
1-H
1-J
1-M
1-N
1-Q
1-T
1-V
1-W
1-U
1-3A
1-6 1-9
1-11
1-13
1-X
1-R
1-I
1-D
1-20 1-211-16
1-121-101-7
1-G
12x10 DOWN TO
SECOND FLOOR.
16x14 UP TO 1-EF2.
1-T3.11 (200)
1-T3.10 (325)
8"ø
22x14 DN 26x26
SD-13 - 10"ø
SD-21 - 6"ø
6" ø x1
SD-12 - 8"ø
8" ø
8"ø
6"ø
RG-23 - 10"ø
RG-23 - 10"ø
RR-51 - 8x6
PATIENT ROOM
336-1
EQUIP. STOR.
338-1
EQUIP. ALCOVE
300-1
HALL
301-1
HALL
326-1
HALL
339-1
EXIST. STAIRS
3-STAIR-W
ELECT.
328-1
CLEAN UTILITY
330-1
TOILET
337-1
PATIENT ROOM
334-1
TOILET
335-1
SOILED UTILITY
319-1
PATIENT RM
316-1
TOILET
317-1
STORAGE
320-1
TOILET
321-1
ANTE RM
318-1
PATIENT RM
322-1
PATIENT RM
314-1
HSKPG
324-1
NURSE STATION
325-1
STAFF TOILET
323-1
TOILET
313-1
CHASE
NOURISH.
327-1
PATIENT RM
311-1
TOILET
310-1
TOILET
309-1
PATIENT RM
308-1
BARIATRIC PATIENT ROOM
302-1
PATIENT RM
304-1
TOILET
305-1
HALL
307-1
HALL
312-1
CHARTING
306-1
ALCOVE
301-1A
CLOSET
307A-1
MEDICATION
331-1
EQUIP. STOR.
329-1
"ø
22x22 UP
1-FSD5
1-FSD6
1-FSD8
1-FSD7
RG-27 - 22x22
20x12
(E)-230 (E)-230
(EX)8"ø (EX)11"ø
(E X
)6 "ø
(E X
)6 "ø
(EX)TU-460
(EX)5"ø
(E)-90 (E)-90
(EX)TU-180
(EX)8"ø
(E X
)5 "ø
(EX)5"ø
(EX)4"ø
(EX)10x4
(EX) EG-50
(EX) EG-50
5" ø
10"ø12 x1
10"ø
"ø
8"ø
"ø x8 x8
14x8 x1
12x12
10"ø
10x10
6" ø
8" ø
10"ø
"ø
8x 8 6"ø
6x6 x1
10x10
8x6
10x10
6x6
10"ø
8x
"ø
"ø
"ø
12"ø
6"ø x4
8x
6" ø x8
12x6
12x4 x4
"ø
8x
12"ø
6" ø 8" ø
10x10 10 x8
8x8 x8
14x
16x10 x8 x1
10"ø
12x12 10"ø
10"ø
18x14
10"ø 10"ø
22x10
10"ø
18x10 14x10
10"ø
12x8 12"ø
8x
12"ø
10"ø
6" ø
10x1014x622x8 x1
16x12 x1
22x14 x1 x1 x1 x1
8"ø
8"ø
6"ø
10"ø
10"ø x1
8x8 x1
16x8
"ø
8x6
8"ø
10x10
10"ø
8x
6"ø
6" ø
10"ø 10"ø
6"ø
6x6
6x
10x10
10x10
8x
8x6 x8
6x
22x1422x20
32x16 x1 x1
12x12 12x12
16"ø
14"ø x1
8x6
26x20
6"ø
6" ø
RG-23 - 10"ø
RG-23 - 10"ø
RG-23 - 8"ø
RR-54 - 14x14
RR-51 - 8x6
SD-13 - 10"ø
SD-13 - 10"ø
SD-21 - 6"ø
SD-22 - 6"ø
SD-21 - 6"ø
SD-11 - 6"ø
RR-51 - 8x8
RR-51 - 8x6
RR-52 - 10x10
RR-51 - 8x8
SD-13 - 10"ø
SD-22 - 10"ø
SD-13 - 10"ø
SD-11 - 6"ø
SD-21 - 6"ø
SD-13 - 10"ø
SD-13 - 10"ø
SD-22 - 8"ø
SD-21 - 6"ø
RG-25 - 14"ø
RR-53 - 12x12
RR-52 - 10x10
SD-13 - 10"ø
SD-13 - 10"ø
SD-23 - 10"ø
SD-14 - 12"ø
SD-13 - 10"ø
SD-13 - 10"ø
SD-13 - 10"ø
SD-13 - 10"ø
RG-25 - 14"ø
RG-22 - 8"ø
RG-23 - 10"ø
RG-21 - 6"ø
RG-22 - 8"ø
RG-23 - 10"ø
SD-13 - 10"ø
SD-21 - 6"ø
SD-13 - 10"ø75
SD-11 - 6"ø
SD-13 - 10"ø
SD-11 - 6"ø
SD-21 - 8x8
RR-140 - 8x6
RR-51 - 8x8
1-ACV2
(300)
1-T3.2 (500)
1-T3.3 (200)
1-T3.1 (300)
1-T3.4 (475)
1-T3.9 (325)
1-T3.8 (225)
1-T3.7 (450)
1-T3.14 (800)
1-T3.13 (475)
1-T3.6 (250)
1-T3.12 (1600)
1-T3.5 (450)
14x8
10"ø x1
1-FSD9
PHASE 1 BID ITEM #3
Drawing Title Project Title
Date
Location
Checked
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
589A7-17-203
Robert J. Dole VA Medical Center
RENOVATE WARDS FOR PATIENT
PRIVACY PHASE 1, B1
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA
142 N. MOSELY ST
WICHITA, KANSAS
MH131.3
HVAC PLAN - THIRD FLOOR - BID ITEM #3
BOH RMH04/26/2018
1/4" = 1'-0"
HVAC PLAN - THIRD FLOOR - BID ITEM 3
N 2' 4' 8'0'
1-H
1-J
1-M
1-N
1-Q
1-T
1-V
1-W
1-U
1-3A
1-6 1-9
1-11
1-13
1-X
1-R
1-I
1-D
1-20 1-211-16
1-121-101-7
1-G
12x10 DOWN TO
SECOND FLOOR.
16x14 UP TO 1-EF2.
1-T3.11 (200)
1-T3.10 (325)
8"ø
26x26
SD-13 - 10"ø
SD-21 - 6"ø
6" ø x1
SD-12 - 8"ø
8" ø
8"ø
6"ø
RG-23 - 10"ø
RG-23 - 10"ø
RR-51 - 8x6
"ø
TOILET
337-1
PATIENT ROOM
336-1
8x6
8x
10x10
"ø
"ø
"ø
(EX)8"ø
(E X
)6 "ø
(EX)11"ø
(E X
)6 "ø
(EX)5"ø
(EX)8"ø
(E X
)5 "ø
(EX)5"ø
(E X
)1 2x
(E
X )8 x8
(E X
)8 x4
(EX)10"ø(EX)8"ø
(E X
)6 "ø
(E X
)6 "ø
(E X
)6 "ø
(EX)10x8
(E X
)8 x8
(EX)6"ø
(EX)6"ø(EX)6"ø
(E X
)6 "ø
(EX)5"ø
(E X
)9 "ø
(EX)9"ø
(E X
)8 x6
(E X
)1 8x
(E
X )1
6x
(EX)12x10
(EX)9"ø
(E X
)6 "ø
(E X
)1 0" ø
(E X
)1 0x
(EX)8x4
(E X
)8 "ø
(E X
)6 "ø
(EX)5"ø(EX)5"ø
(EX)16"ø
(EX)12x16
(E X
)1 4x
(EX)14x10
(E X
)1 2x
(EX)12x8
(EX)6"ø
(E X
)6 "ø
(EX)6"ø
(E X
)6 "ø
(E X
)6 "ø
(E X
)9 "ø
(E X
)8 "ø
(EX)10x4
(E X
)1 0" ø
(EX)9"ø
(EX)9"ø
(EX)8x6
(EX)12x8
(EX)12x8
(E X
)1 0x
(EX)6"ø
(EX)6"ø
(EX)6"ø
(EX)8"ø
(EX)6"ø
(EX)6"ø
(EX)8x6(EX)8x8
(E X
)8 x4
(EX)6"ø
(E X
)1 4x
(E X
)6 "ø
(EX)5"ø
(E X
)6 "ø
(EX)TU-460
(EX)TU-180
(EX)TU-150
(EX)TU-300
(EX)TU-380
(EX)TU-150 (EX)TU-90
(EX)TU-280
(EX)TU-300
(EX)TU-350
(EX)TU-300
(EX)TU-150
(EX)TU-110
(EX)TU-100
(EX)TU-180
(EX)TU-160
(E X
)6 "ø
(E)-50 (E)-50
(E)-60(E)-60
(E)-90
(E)-100
(E)-90(E)-100
(E)-100
(E)-100
(E)-100
(E)-50
(E)-100
(E)-150
(E)-90
(E)-50
(E)-50
(E)-180
(E)-130
(E)-100(E)-100
(E)-100
(E)-110
(E)-60
(E)-300
(E)-50
(E)-100
(E)-110
(E)-100
(E)-90
(E)-0
(E)-50 (E)-110
22x22 UP
TO ATTIC.
(EX) RG-90(EX) RG-90
(EX) RG-150
(EX) RG-150
(EX) RG-100(EX) RG-100(EX) RG-50(EX) RG-100
(EX) RG-110
(EX) RG-120
(EX) RG-120(EX) RG-150
(EX) RG-150
(EX) RG-150
(EX) RG-150
(EX) RG-180
(EX) RG-50
(EX) RG-190
(EX) RG-190
(EX) EG-50
(EX) EG-50
(EX) EG-50
(EX) EG-40
(EX) EG-40
(EX) EG-210
(EX) EG-90
(EX) EG-100
1-FSD10
8x6
14x10
PHASE 1 BID ITEM #4
Drawing Title Project Title
Date
Location
Checked
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
589A7-17-203
Robert J. Dole VA Medical Center
RENOVATE WARDS FOR PATIENT
PRIVACY PHASE 1, B1
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA
142 N. MOSELY ST
WICHITA, KANSAS
MH131.4
HVAC PLAN - THIRD FLOOR - BID ITEM #4
BOH RMH04/26/2018
1/4" = 1'-0"
HVAC PLAN - THIRD FLOOR - BID ITEM 4
2' 4' 8'0'
1/4" = 1'-0"
1-H
1-J
1-M
1-N
1-Q
1-T
1-V
1-W
1-U
1-3A
1-6
1-9
1-11
1-13
1-X
1-R
1-I
1-D
1-20 1-211-16
1-121-101-7
1-G
1-EF1
(3485)
22x22 DOWN TO THIRD FLOOR.
UP TO 1-EF2
16x14 x2 x2
CAP
PHASE 1
Drawing Title Project Title
Date
Location
Checked
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
589A7-17-203
Robert J. Dole VA Medical Center
RENOVATE WARDS FOR PATIENT
PRIVACY PHASE 1, B1
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA
142 N. MOSELY ST
WICHITA, KANSAS
MH141
HVAC PLAN - ATTIC
BOH RMH04/26/2018
1/4" = 1'-0"
HVAC PLAN - ATTIC
2' 4' 8'0'
1/4" = 1'-0"
1-H
1-J
1-M
1-N
1-Q
1-T
1-V
1-W
1-U
1-3A
1-6
1-9
1-11
1-13
1-X
1-R
1-I
1-D
1-20 1-211-16
1-121-101-7
1-G
1-EF1
(3485)
UP TO 1-EF2
16x14 x2 x2
22x22 DOWN TO THIRD FLOOR.
22x22 x2
(E X
)1 8x
(EX)16x12
(E X
)1 6x
(EX) EXHAUST FAN
(EX) 16x12 UP
FROM THIRD
FLOOR.
(EX) 16x12 UP
FROM THIRD
FLOOR.
PHASE 1 BID ITEM #4
Drawing Title Project Title
Date
Location
Checked
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
589A7-17-203
Robert J. Dole VA Medical Center
RENOVATE WARDS FOR PATIENT
PRIVACY PHASE 1, B1
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA
142 N. MOSELY ST
WICHITA, KANSAS
MH141.4
HVAC PLAN - ATTIC - BID ITEM #4
BOH RMH04/26/2018
1/4" = 1'-0"
HVAC PLAN - ATTIC - BID ITEM 4
N 2' 4' 8'0'
PHASE 1
1-51-31-21-1
1-H
1-J1A-A
1-M
1-N
1-Q1A-D
1A-C
1A-B
1-T
1-V
1-W
1-U
1-3A
1-6
1-9
1-R
1-I
1-101-7
1-G
1-EF2
MIN. 10'-0"
MAINTAIN 25'-0" CLEARANCE BETWEEN FAN EXHAUST AND ALL AIR INTAKES
Drawing Title Project Title
Date
Location
Checked
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
589A7-17-203
Robert J. Dole VA Medical Center
RENOVATE WARDS FOR PATIENT
PRIVACY PHASE 1, B1
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA
142 N. MOSELY ST
WICHITA, KANSAS
MH151
HVAC PLAN - ROOF
BOH AR04/26/2018
1/4" = 1'-0"
HVAC PLAN - ROOF
2' 4' 8'0'
1/4" = 1'-0"
PHASE 1
1-51-31-21-1
1-H
1-J1A-A
1-M
1-N
1-Q1A-D
1A-C
1A-B
1-T
1-V
1-W
1-U
1-3A
1-6
1-9
1-11
1-13
1-X
1-R
1-I
1-D
1-20 1-211-16
1-121-101-7
1-G
1-AHU1
AFMS-SAAFMS-RA
(EX) 1-P3
(EX) 1-P4 (EX) 1-C2
(EX) 1-C1
(EX) ET
(EX)HWS
(EX)HWR
(EX)HWR
(EX)HWS
(EX)HWS
(EX)HWR
(EX)3" (EX)3" (EX)1" (EX)1"
(EX)3"(EX)3"
(EX)3"
(EX)3"
(EX)3"(EX)2"
(EX)2"(EX)2"
(EX)HWS
(EX)HWR
(EX) EXIST PIPING TO
1ST FLOOR MAIN
ENTRY UNITS
1-C31-P5
3"
3"
1-RF1
REF. MP102 FOR WEST
BASEMENT HYDRONICS
(E X
)3
(EX)3"
Drawing Title Project Title
Date
Location
Checked
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
589A7-17-203
Robert J. Dole VA Medical Center
RENOVATE WARDS FOR PATIENT
PRIVACY PHASE 1, B1
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA
142 N. MOSELY ST
WICHITA, KANSAS
MP101
HYDRONICS PLAN - OVERALL BASEMENT
BOH AR04/26/2018
4' 8' 16'
1/8" = 1'-0"
0'
N
1/8" = 1'-0"
HYDRONICS PLAN - OVERALL BASEMENT
1-H
1-J1A-A
1-M
1-N
1-Q1A-D
1A-C
1A-B
1-T
1-V
1-W
1-U
1-3A
1-6
1-9
1-11
1-13
1-X
1-R
1-I
1-D
1-20 1-211-16
1-121-101-7
1-G
(EX) 1-P3
(EX) 1-P4 (EX) 1-C2
(EX) 1-C1
(EX) ET
(EX)HWS
(EX)HWR
(EX)HWR
(EX)HWS
(EX)HWS
(EX)HWR
(EX)3" (EX)3" (EX)1" (EX)1"
(EX)3"(EX)3"
(EX)3"
(EX)3"
(EX)3"(EX)2"
(EX)2"(EX)2"
(EX)HWS
(EX)HWR
(EX) EXIST PIPING TO
1ST FLOOR MAIN
ENTRY UNITS
1-C31-P5
3"
3"
REF. MP102 FOR WEST
BASEMENT HYDRONICS
(E X
)3
(EX)3"
(EX)1-AHU1
(EX)3"CWS
(EX)3"CWR
PHASE 1 BID ITEM #4
Drawing Title Project Title
Date
Location
Checked
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
589A7-17-203
Robert J. Dole VA Medical Center
RENOVATE WARDS FOR PATIENT
PRIVACY PHASE 1, B1
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA
142 N. MOSELY ST
WICHITA, KANSAS
MP101.4
HYDRONICS PLAN - OVERALL BASEMENT -
BID ITEM #4
BOH RMH04/26/2018
1/8" = 1'-0"
HYDRONICS PLAN - OVERALL BASEMENT - BID ITEM 4
4' 8' 16'
1/8" = 1'-0"
0'
1-H
1-J
1-M
1-N
1-Q
1-T
1-V
1-W
1-U
1-3A
1-6
1-9
1-11
1-13
1-X
1-R
1-I
1-D
1-20 1-211-16
1-121-101-7
1-G
1-AHU1
AFMS-SA
AFMS-RA
(EX)HWS
(EX)HWR
(EX) 2-1/2" HWS
AND HWR UP IN
CHASE.
(EX) 3" CWS
AND CWR UP
IN CHASE.
(EX)HWS
(EX)HWR
(EX)2 1/2"(EX)2 1/2"
(EX)3"
(EX)3"
(EX)3" (EX)3"
(EX)1"
(EX)1"
(EX)HWR
(EX)HWS
(EX) EXIST PIPING TO
1ST FLOOR MAIN
ENTRY UNITS
(EX)HWR
(EX)HWS
1-RF1
(E X
)1
/4
M P
S
M P
R M
P R
M P
S
CWR
CWS
(E X
)3
(E X
)3
M P
R
1-TP1
1-TP2
AAA
A
AA
A
A
A
A A
A AA
1-TP3
(E X
)1
/4
(E X
)3 /4
B
3" 3"
3" 3"
1 1/4"
1"3/ 4"
PHASE 1
A. EXISTING STEAM SUPPLY AND RETURN
RISERS UP TO SERVE ALL FLOORS
ABOVE.
B. RELOCATE EXISTING PIPING AROUND/
ABOVE NEW AIR HANDLER AS NEEDED
FOR NEW UNIT INSTALLATION AND
CLEARANCE.
PLAN NOTES
Drawing Title Project Title
Date
Location
Checked
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
589A7-17-203
Robert J. Dole VA Medical Center
RENOVATE WARDS FOR PATIENT
PRIVACY PHASE 1, B1
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA
142 N. MOSELY ST
WICHITA, KANSAS
MP102
HYDRONICS PLAN - WEST BASEMENT
Checker Author04/26/2018
1/4" = 1'-0"
HYDRONICS PLAN - WEST BASEMENT
2' 4' 8'0'
1/4" = 1'-0"
1-H
1-J
1-M
1-N
1-Q
1-T
1-V
1-W
1-U
1-3A
1-6
1-9
1-11
1-13
1-X
1-R
1-I
1-D
1-20 1-211-16
1-121-101-7
1-G
(EX)HWS
(EX)HWR
(EX) 2-1/2" HWS
AND HWR UP IN
CHASE.
(EX) 3" CWS
AND CWR UP
IN CHASE.
(EX)HWS
(EX)HWR
(EX)2 1/2"(EX)2 1/2"
(EX)3"
(EX)3"
(EX)3" (EX)3"
(EX)1"
(EX)1"
(EX)HWR
(EX)HWS
(EX) EXIST PIPING TO
1ST FLOOR MAIN
ENTRY UNITS
(EX)HWR
(EX)HWS
(E X
)1
/4
M P
S
M P
R
(E X
)3
(E X
)3
AAA
A
AA
A
A
A
A A
A AA
(E X
)1
/4
(E X
)3 /4
(EX)1-AHU1
PHASE 1 BID ITEM #4
A. EXISTING STEAM SUPPLY AND RETURN
RISERS UP TO SERVE ALL FLOORS
ABOVE.
B. RELOCATE EXISTING PIPING AROUND/
ABOVE NEW AIR HANDLER AS NEEDED
FOR NEW UNIT INSTALLATION AND
CLEARANCE.
PLAN NOTES
Drawing Title Project Title
Date
Location
Checked
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
589A7-17-203
Robert J. Dole VA Medical Center
RENOVATE WARDS FOR PATIENT
PRIVACY PHASE 1, B1
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA
142 N. MOSELY ST
WICHITA, KANSAS
MP102.4
HYDRONICS PLAN - WEST BASEMENT - BID
ITEM #4
BOH RMH04/26/2018
1/4" = 1'-0"
HYDRONICS PLAN - WEST BASEMENT - BID ITEM 4
N 2' 4' 8'0'
1-H
1-J
1-M
1-N
1-Q
1-T
1-V
1-W
1-U
1-3A
1-6 1-9
1-11
1-13
1-X
1-R
1-I
1-D
1-20 1-211-16
1-121-101-7
1-G
1-T2.10 (0.9)
1-T2.9 (0.6)
1-T2.8 (0.6)
1-T2.5 (0.7)
1-T2.11 (2.1)
1-T2.12 (0.5)
1-T2.14 (1.1)
1-T2.13 (1.1)
1-T2.7 (0.8)
1-T2.3 (0.8)
1-T2.1 (0.7)
1-T2.4 (0.9)
1-T2.2 (0.4)
PATIENT ROOM
221-1
TOILET
220-1
SOILED UTILITY
218-1
TOILET
217-1
PATIENT ROOM
216-1
AIRBORNE INFECTION ISO.
PATIENT ROOM
214-1
TOILET
213-1
PATIENT ROOM
211-1
TOILET
209-1
PATIENT ROOM
208-1
PATIENT ROOM
204-1
BARIATRIC PATIENT ROOM
202-1
MEDICATION
230-1
EQUIP. STOR.
229-1
PATIENT ROOM
233-1
PATIENT ROOM
234-1 PATIENT ROOM
236-1
TOILET
232-1
ANTE RM
215-1
CHARTING
206-1
CLEAN UTILITY
231-1
TOILET
238-1
RECEPTION
241-1
NURSE STATION
224-1
EXIST. STAIRS
2-STAIR-W
TOILET
210-1
TOILET
203-1
TOILET
205-1
CORR
200-1
CORR
201-1
CORR
225-1
CORR
212-1
CORR
219-1
CORR
207-1
STAFF TOILET
222-1
HSKPG
240-1
CHASE
ELECT.
228-1
NOURISH.
227-1
ALCOVE
201A-1
CLEAN LINEN
201B-1
TOILET
235-1
TOILET
237-1
CLOSET
207A-1
1-T2.6 (0.3)
(E X
)2
(E X
)1
/2
3/ 4"
3/ 4"
3/ 4" 3/ 4"
3/ 4"
3/ 4"
3/ 4"
3/ 4"
3/ 4"
3/ 4" 1"
1" 1" 1"1" 1"
1/
4" 1 1/
4"
1/
4"
1/
4"
1 1/2"
1 1/2" 1 1/2"
1 1/2"
(E X
)3 /4
"H W
R
(E X
)1 "H
W S
(EX)3"CWS
(EX)3"CWR
HWS
HWR
H W
R H
W S
H W
R H
W S
HWS
HWR
HWS
HWR
HWS
HWR
(EX)TU
(EX)TU
(0.25)
(0.15)
1.5
3/ 4"
3/ 4"
3/ 4"
3/4"3/4"1"
1" 3/4" 3/4"
3/ 4"
3/ 4"
7 GPM FUTURE
CAPACITY
PHASE 1
Drawing Title Project Title
Date
Location
Checked
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
589A7-17-203
Robert J. Dole VA Medical Center
RENOVATE WARDS FOR PATIENT
PRIVACY PHASE 1, B1
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA
142 N. MOSELY ST
WICHITA, KANSAS
MP121
HYDRONICS PLAN - SECOND FLOOR
BOH AR04/26/2018
1/4" = 1'-0"
HYDRONICS PLAN - SECOND FLOOR
2' 4' 8'0'
1/4" = 1'-0"
1-H
1-J
1-M
1-N
1-Q
1-T
1-V
1-W
1-U
1-3A
1-6 1-9
1-11
1-13
1-X
1-R
1-I
1-D
1-20 1-211-16
1-121-101-7
1-G
1-T3.1 (0.4)
1-T3.4 (0.9)
1-T3.2 (0.7)
1-T3.3 (0.4)
1-T3.5 (0.4)
1-T3.6 (0.3)
1-T3.7 (0.7)
1-T3.8 (0.3)
1-T3.9 (0.6)
1-T3.10 (1.1)
1-T3.11 (0.4)
1-T3.13 (0.9)
1-T3.15 (1.1)
1-T3.14 (1.1)
1-T3.16 (0.6) 1-T3.12
(1.4)
(E X
)3 /4
(E X
)3 /4
(EX)1"
(EX)1 1/4"(EX)1"
(EX)1"
(E X
)2
(E X
)2
20 GPM FOR FUTURE PHASE
2"
2"
2"
2"
2" 2"
1"
1"
3/ 4"
3/ 4"
3/ 4"
3/ 4"
3/ 4"
3/ 4"
3/ 4"
3/ 4"
3/ 4"3/ 4"
PATIENT ROOM
336-1
EQUIP. STOR.
338-1
EQUIP. ALCOVE
300-1
HALL
301-1
HALL
326-1
HALL
339-1
EXIST. STAIRS
3-STAIR-W
ELECT.
328-1
CLEAN UTILITY
330-1
TOILET
337-1
PATIENT ROOM
334-1
TOILET
335-1
SOILED UTILITY
319-1
PATIENT RM
316-1
TOILET
317-1
STORAGE
320-1 TOILET
321-1
ANTE RM
318-1
PATIENT RM
322-1
PATIENT RM
314-1
HSKPG
324-1
NURSE STATION
325-1
STAFF TOILET
323-1
TOILET
313-1
CHASE
NOURISH.
327-1
PATIENT RM
311-1
TOILET
310-1
TOILET
309-1
PATIENT RM
308-1
BARIATRIC PATIENT ROOM
302-1
PATIENT RM
304-1
TOILET
305-1
HALL
307-1
HALL
312-1
CHARTING
306-1
ALCOVE
301-1A
CLOSET
307A-1
MEDICATION
331-1
EQUIP. STOR.
329-1
(EX)3"CWR
(EX)3"CWS
HWS
HWR
H W
S H
W R
H W
S
HWR
H W
S H
W R
H W
R H
W S
HWR
HWS
H W
S H
W R
H W
R H
W S
HWS
HWR
HWS
HWR
1 1/4"
1/
4"
3/4"
3/4"
PHASE 1
Drawing Title Project Title
Date
Location
Checked
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
589A7-17-203
Robert J. Dole VA Medical Center
RENOVATE WARDS FOR PATIENT
PRIVACY PHASE 1, B1
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA
142 N. MOSELY ST
WICHITA, KANSAS
MP131
HYDRONICS PLAN - THIRD FLOOR
BOH AR04/26/2018
1/4" = 1'-0"
HYDRONICS PLAN - THIRD FLOOR
2' 4' 8'0'
1/4" = 1'-0"
1-H
1-J
1-M
1-N
1-Q
1-T
1-V
1-W
1-U
1-3A
1-6 1-9
1-11
1-13
1-X
1-R
1-I
1-D
1-20 1-211-16
1-121-101-7
1-G
1-T3.10 (1.1)
1-T3.11 (0.4)
(E X
)3 /4
(E X
)3 /4
(EX)1"
(EX)1 1/4"(EX)1"
(EX)1"
(E X
)2
(E X
)2
20 GPM FOR FUTURE PHASE
PATIENT ROOM
336-1
EQUIP. STOR.
338-1
EQUIP. ALCOVE
300-1
HALL
301-1
HALL
326-1
HALL
339-1
EXIST. STAIRS
3-STAIR-W
ELECT.
328-1
CLEAN UTILITY
330-1
TOILET
337-1
PATIENT ROOM
334-1
TOILET
335-1
SOILED UTILITY
319-1
PATIENT RM
316-1
TOILET
317-1
STORAGE
320-1 TOILET
321-1
ANTE RM
318-1
PATIENT RM
322-1
PATIENT RM
314-1
HSKPG
324-1
NURSE STATION
325-1
STAFF TOILET
323-1
TOILET
313-1
CHASE
NOURISH.
327-1
PATIENT RM
311-1
TOILET
310-1
TOILET
309-1
PATIENT RM
308-1
BARIATRIC PATIENT ROOM
302-1
PATIENT RM
304-1
TOILET
305-1
HALL
307-1
HALL
312-1
CHARTING
306-1
ALCOVE
301-1A
CLOSET
307A-1
MEDICATION
331-1
EQUIP. STOR.
329-1
(EX)3"CWR
(EX)3"CWS
HWS
3/4"
1-T3.9 (0.6)
1-T3.8 (0.3)
1-T3.12 (1.4)
1-T3.6 (0.3)
1-T3.7 (0.7)
1-T3.5 (0.4)
1-T3.4 (0.9)
1-T3.1 (0.4)
1-ACV2
(0.0)
1-T3.2 (0.7)
1-T3.3 (0.4)
1-T3.13 (0.9)
1-T3.14 (1.1)
(EX) TU
(EX) TU
HWR
HWS
HWR
HWS
HWR
H W
S H
W R
(EX) PERIMETER HEAT RADIATOR
(EX) PERIMETER HEAT RADIATOR
3/ 4"
3/ 4"
1"
1"
3/ 4"
3/ 4"
3/ 4"
3/ 4"
2"2"
1/
4" 3/
4"
1 1/4"
2" 2"
3/4"
3/4"
3/4"
3/4"
PHASE 1 BID ITEM #3
Drawing Title Project Title
Date
Location
Checked
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
589A7-17-203
Robert J. Dole VA Medical Center
RENOVATE WARDS FOR PATIENT
PRIVACY PHASE 1, B1
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA
142 N. MOSELY ST
WICHITA, KANSAS
MP131.3
HYDRONICS PLAN - THIRD FLOOR - BID
ITEM #3
BOH RMH04/26/2018
1/4" = 1'-0"
HYDRONICS PLAN - THIRD FLOOR - BID ITEM 3
2' 4' 8'0'
1/4" = 1'-0"
1-H
1-J
1-M
1-N
1-Q
1-T
1-V
1-W
1-U
1-3A
1-6 1-9
1-11
1-13
1-X
1-R
1-I
1-D
1-20 1-211-16
1-121-101-7
1-G
1-T3.10 (1.1)
1-T3.11 (0.4)
(E X
)3 /4
(E X
)3 /4
(EX)1"
(EX)1 1/4"(EX)1"
(EX)1"
(E X
)2
(E X
)2
PATIENT ROOM
336-1
EQUIP. STOR.
338-1
EQUIP. ALCOVE
300-1
HALL
301-1
HALL
326-1
HALL
339-1
EXIST. STAIRS
3-STAIR-W
ELECT.
328-1
CLEAN UTILITY
330-1
TOILET
337-1
PATIENT ROOM
334-1
TOILET
335-1
SOILED UTILITY
319-1
PATIENT RM
316-1
TOILET
317-1
STORAGE
320-1 TOILET
321-1
ANTE RM
318-1
PATIENT RM
322-1
PATIENT RM
314-1
HSKPG
324-1
NURSE STATION
325-1
STAFF TOILET
323-1
TOILET
313-1
CHASE
NOURISH.
327-1
PATIENT RM
311-1
TOILET
310-1
TOILET
309-1
PATIENT RM
308-1
BARIATRIC PATIENT ROOM
302-1
PATIENT RM
304-1
TOILET
305-1
HALL
307-1
HALL
312-1
CHARTING
306-1
ALCOVE
301-1A
CLOSET
307A-1
MEDICATION
331-1
EQUIP. STOR.
329-1
(EX)3"CWR
(EX)3"CWS
HWS
3/4"
3/ 4"
3/ 4"
(EX) TU
(EX) TU
(EX) TU
(EX) TU
(EX) TU (EX) TU
(EX) TU
(EX) TU
(EX) TU (EX) TU
(EX) TU
(EX) TU
(EX) TU
(EX) TU
(EX) TU
(EX) TU
(EX) PERIMETER HEAT RADIATOR
(EX) PERIMETER HEAT RADIATOR
(EX) PERIMETER
HEAT RADIATOR
(EX) PERIMETER
HEAT RADIATOR
(EX) PERIMETER
HEAT RADIATOR
(EX) PERIMETER HEAT RADIATOR
(EX) PERIMETER
HEAT RADIATOR
(EX) PERIMETER
HEAT RADIATOR
(EX) PERIMETER
HEAT RADIATOR
(EX) PERIMETER
HEAT RADIATOR
(EX) PERIMETER
HEAT RADIATOR
(EX) PERIMETER
HEAT RADIATOR
(EX) PERIMETER
HEAT RADIATOR
(EX) PERIMETER
HEAT RADIATOR
(EX) PERIMETER
HEAT RADIATOR
(EX) PERIMETER
HEAT RADIATOR
(EX) PERIMETER
HEAT RADIATOR
(EX) PERIMETER
HEAT RADIATOR
(EX) PERIMETER
HEAT RADIATOR
(EX) PERIMETER
HEAT RADIATOR
(EX) PERIMETER
HEAT RADIATOR
(EX) PERIMETER
HEAT RADIATOR
(EX) PERIMETER
HEAT RADIATOR
(E X
)3 /4
(E
X )3
/4
(E X
)3 /4
(EX)3/4"
(EX)1 1/4" (EX)1 1/2"
(EX)1"
(EX)1 1/4"
(EX)1 1/4"
(EX)1"
(EX)1"
(EX)1"
(EX)1 1/4"
(E X
)3 /4
(E X
)3 /4
(E X
)3 /4
(E X
)3 /4
PHASE 1 BID ITEM #4
Drawing Title Project Title
Date
Location
Checked
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
589A7-17-203
Robert J. Dole VA Medical Center
RENOVATE WARDS FOR PATIENT
PRIVACY PHASE 1, B1
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA
142 N. MOSELY ST
WICHITA, KANSAS
MP131.4
HYDRONICS PLAN - THIRD FLOOR - BID
ITEM #4
BOH RMH04/26/2018
1/4" = 1'-0"
HYDRONICS PLAN - THIRD FLOOR - BID ITEM 4
N 2' 4' 8'0'
5 FT
THRU [20]
6 8 10
[32][25] [40]
[65]
[50]
[75]
-1312 14 -16 -
[125][100]
[150]
[250]
[200]
[300]
[400]
[350]
[450]
[600]
[500]
20 241814 16128 1064 532 2 1/21 1/21 1 1/4
[9100] [9600][8500][7600] [8200][7000][5800] [6700][5200][4100] [4900][3700][3000] [3400][2700][2100]
--- --[4900] -[4100][3700] [4000] -[3000][2400][1800][1500]
THRU 3/4
[2100] [2100]
[2100]
[2700]
[2400]
SIDE VIEW TRAPEZE HANGER FOR UP
TO 1000 LB. [453KG] UNIFORM LOAD
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
NOM. SIZE
PIPE
TUBING
IN.
[mm]
FT.
[mm]
FT.
[mm]
[2 5m m
1" M
A X
PROVIDE INSULATION SHIELD
& INSERT FOR ALL PIPING
(8" [200mm] MIN.)
BAND
1-5/8" [43mm] 12 GAUGE CHANNEL OR 2"x2"x1/4" [50x50x6.4mm] ANGLE
1/2" [15mm] DIA.
HANGER RODS WITH
36" [900mm] MAX.
SPACING ON EACH
CHANNEL
WELD
SADDLE
INSULATION SHIELD
AT HANGER
PROVIDE HIGH
COMPRESSIVE STRENGTH
INSULATION (9 PSF MIN.
DENSITY) UNDER
INSULATION SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
NOTES:
SEE SPECIFER FOR DETAILED
HANGER REQUIREMENTS
ADJUSTABLE CLEVIS HANGER
TYPE 1 - SEE SPECIFICATIONS ADJUSTABLE CLEVIS HANGER
TYPE 1 - SEE SPECIFICATIONS
NOTES:
1.
2.
PROVIDE ANCHORS ONLY
WHERE SHOWN ON
DRAWINGS.
EXTEND SLEEVE ABOVE
FLOOR WHERE
SPECIFIED.
INSULATION BOLT
(TYPICAL)
FLOOR
SLAB
FIRE-STOPPING
MATERIAL
BOLT
PIPEPIPE SLEEVE
WHERE SPECIFIED
RISER
CLAMP
RISER
PIPE SLEEVE
WHERE
SPECIFIED
RISER CLAMP.
BOTTOM CLAMP
REQUIRED AT
ANCHOR POINTS
ONLY.ELEVATION
PLAN
RISER
CLAMP
FAN SECTION
TYPE "THR"
NOTES:
1. ATTACH THRUST RESTRAINTS SYMMETRICALLY ON BOTH SIDES OF THE
FAN DISCHARGE.
2. ADJUST RESTRAINT TO ALLOW 1/4" [6 mm] MOVEMENT OF FAN AT
START AND STOP.
FLEXIBLE DUCT
CONNECTIONS
FAN
DISCHARGE
FLEXIBLE DUCT
CONNECTIONS
FAN INLET
VIBRATORS ISOLATORS
AS SCHEDULED OR
SPECIFIED
THRUST
RESTRAINT
COIL SECTION
OR DISCHARGE
DUCT
A
A
BB
SECTION A-A (BASE NOT POURED WITH SLAB)
SECTION A-A (BASE POURED WITH FLOOR SLAB)
PLAN
TYPICAL ANCHOR
BOLT NUT & WASHER
SECTION B-B
EQUIPMENT BASE PLATE
PROVIDE #3 BARS 12"
[300mm] O.C. EACH WAY IN
THE BASE & DOWEL BASE TO FLOOR
EQUIPMENT BASE PLATE
PROVIDE DOUBLE SLAB
REINFORCING IN BASE AREA
WELD HEAD TO PLATE
OR BEND OVER END 5D
FLOOR
PIPE SLEEVE (5D, 3"
[75mm] MIN.)
ANCHOR
BOLT (TYP)
CONCRETE BASE
NOTE:
L & W DIMENSIONS
SHALL BE 6" [150mm]
GREATER THAN THE
EQUIPMENT BASE PLATE.
[400mm]
5" M
IN
[1 m m
5"
M
IN
[1 m m
TYPICAL ANCHOR
BOLT NUT & WASHER
[2 5m m
L /1
L
/1
5D
16"
2D
L
W
D
5D
NOTE:
NOT REQUIRED FOR
AIR TERMINAL UNITS.
EQUIPMENT WEIGHT
250 LBS. [114KG]
OR LESS
SEISMIC BRACING FOR LIGHT
SUSPENDED EQUIPMENT
FLOOR MOUNT EQUIPMENT
RESTRAINED BY RESILIENT PADS
(TYPE DS)
FLOOR
EQUIPMENT
BASE
ANCHOR
BOLT
NEOPRENE
WASHER & SLEEVE
BONDED STEEL
PLATE
RESILIENT
PAD
HANGER
ROD
(TYP)
CROSS BRACING
RODS ALL FOUR
SIDES
LOCK
NUTS
(TYP)
CLAMP
STEEL EXPANSION SHIELD FOR
EXISTING CONSTRUCTION AND
INSERTS FOR NEW CONSTRICTION
THIS TYPE SHALL BE USED ONLY IN
SLABS OR BEAMS OF 4" [100mm]
MIN DEPTH
3/8" [10mm] MIN DIA EXPANSION
BOLTS FOR EXISTING CONSTRUCTION
AND INSERTS FOR NEW CONSTRUCTION
CONCRETE
FLOOR SLAB
CLIP
ANGLE
NUTS & WASHERS
3/8" [10mm] MIN
DIA HANGER RODS
FOR PIPES UNDER 2" [50mm] IN SIZE USE 1 1/2"x1 1/2"x1/4" [40x40x6.4mm] ANGLE. ALL PIPES 2" [50mm] & LARGER USE 3"x3"x1/4" [75x75x6.4mm] ANGLE
TURNBUCKLE
3/8" [10mm] MIN
DIA HANGER RODS
3/8" [10mm] MIN
DIA INSERTS NEW
CONSTRUCTION
ONLY.
STEAM TRAP
ASSEMBLY
STEAM LINE DRIP POCKET
[1 m m
M
IN
[3 m m
M
IN
[1 m m
M
IN
[3 m m
M
IN
DRIP LEG (TYP.)
3/4" [20mm] DRAIN
(ALTERNATE LOCATIONS)
(TYPICAL)
STEAM LINE
(TYPICAL)
CAP (TYPICAL)
PIPE T0 STEAM TRAP
(TYPICAL)
NOTE:
DRIP POCKET PIPE SIZE
SAME AS STEAM MAIN
UNLESS OTHERWISE NOTED.
3/4" [20mm] MIN.
FROM DRIP
CONNECTION
DRIP
RETURN
3/8" [10mm] TEST
CONNECTION
6"
2"
6"
2"
SMACNA FIGURE 4-6
45° LEED IN
RIGID DUCT TO AIR
TERMINAL UNIT.
MAIN SUPPLY
PLAN VIEW
FLOW
F
LO
W
MAIN EXHAUST OR RETURN
PLAN VIEW
AIR
FLOW AIR
FLOW
PROVIDE VOLUME DAMPER
AT EACH BRANCH DUCT
1/4W OR 4"
[100mm] MIN.
BRANCH DUCT
VD
W
FLEXIBLE DUCT SIZE
SAME AS DIFFUSER
INLET: 5'-0" MAX LENGTH.
CEILING
SUPPORT SADDLE
FROM STRUCTURE
VOLUME DAMPER W/
LOCKING QUAD
SHEET METAL
SADDLE
CONICAL OUTLET
BRANCH DUCT
USE RIGID ELBOWS
FOR CHANGE OF
DIRECTION GREATER
THAN 45°
[300mm]
SEE SPECIFICATIONS FOR
CLAMPS AND SEALANT (TYP.)
NOTE:
THE USE OF FLEXIBLE AIR DUCT CONNECTORS ARE NOT PERMITTED
FOR THE DEDICATED AHU SERVING THE SURGICAL SUITE.
TYPICAL
DIFFUSER OR
REGISTER IN
LAY-IN CLG.
THERMAL INSULATION
SEE SPECIFICATIONS
12"
Drawing Title Project Title
Date
Location
Checked
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
589A7-17-203
Robert J. Dole VA Medical Center
RENOVATE WARDS FOR PATIENT
PRIVACY PHASE 1, B1
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA
142 N. MOSELY ST
WICHITA, KANSAS
M-501
MECHANICAL DETAILS
BOH AR04/26/2018
NO SCALE
PIPE HANGERS
NO SCALE
SUPPORT/ANCHOR FOR PIPE RISERS
NO SCALE
THRUST RESTRAINT FOR FANS
NO SCALE
CONCRETE EQUIPMENT BASES
NO SCALE
SEISMIC BRACING FOR EQUIPMENT
NO SCALE
SECURING HANGER RODS IN CONCRETE
NO SCALE
STEAM LINE DRIP POCKET STEAM TRAP ASSEMBLY
NO SCALE
ALTERNATE SUPPLY DUCT TAKEOFF - AIR TERMINAL UNITS
NO SCALE
EXHAUST OR RETURN BRANCH DUCTWORK
NO SCALE
FLEXIBLE AIR DUCT CONNECTOR
NOTE:
1.
2.
DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.
DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR FOR MULTI-BLADE DAMPERS & ROUND DAMPERS.
INSULATION SEE
SPECIFICATION
DAMPER
BLADE
1/8" [6mm]
CLEARANCE
ALL AROUND
OUTSIDE END
BEARING
INSIDE END
BEARING
HANDLE WITH
LOCKING
QUADRANT
INSULATION
STAND-OFF
1/2" [15mm]
ROUND ROD PINDUCT
STIFFEN BLADE AS REQUIRED
SIDE ELEVATION SECTION
SECTION "A-A"
"B" "B"
NOTES:
1. LATCHES SHALL BE OF THE WEDGE TYPE TO CLOSE DOORS TIGHTLY.
2. HINGES ON THE ACCESS DOORS SHALL HAVE NON-CORROSIVE PINS.
3. SEE SMACNA 2005, FIGURE 9-15
ACCESS PANEL
ACCESS DOOR
CASING
GASKET
HANDLE INSIDE
FLEXIBLE
WASHER
FACTORY
FABRICATED
LATCH
SECTION "B-B"
INSULATION
DUCT
GASKET
INSULATION
INSULATION
"A"
"A"
HOUSING WELDED TO
DUCT SECTION
ROUND OR
FLAT OVAL
DUCT SECTION
COVER WITH HANDLE AND
CHAIN RETAINER
GASKETED AND
PRESSURE SEALED
ROUND FLEXIBLE CONNECTION
RECTANGULAR FLEXIBLE CONNECTION
FLANGED
CONNECTION ON
FAN SIDE
WASHER 1-1/2" [40mm] MIN. TO 3" [75mm] MAX. INSTALLED. 6" [150mm] NOMINAL WITH MATERIAL
TAUT
FLEXIBLE
MATERIAL AS
SPECIFIED
1"x1/8" [25x3mm] DRAW BAND
1"x1/8" [25x3mm] BAND IRON
BOLT ON 4" [100mm] CENTERS 5/16" [8mm] FLANGE
DUCT
SHEET METAL SCREWS
ON 12" [300mm] CENTERS
RIVET ON 4"
[100mm]
CENTERS
SHEET METAL AS
SPECIFIED FOR
DUCTWORK.
1"x1/8" [25x3mm] BAND IRON
BOLT ON 4" [100mm] CENTERS
1" [25mm] FLANGE & HEM
ALTERNATE POSITION
OF BOLT 1 1/2" [40mm]
POCKET SLIP
DUCT
SHEET METAL AS
SPECIFIED FOR
DUCTWORK.
[15mm] [15mm] [40mm]
1 1/2" [40mm] MIN. TO 3" [75mm] MAX. INSTALLED. 6" [150mm] NOMINAL WITH
MATERIAL TAUT
FLANGED
CONNECTION
ON FAN SIDE
WASHER
FLEXIBLE MATERIAL
AS SPECIFIED
1/2" 1/2" 1 1/2"
NOTE:
1.
2.
3.
4.
5.
6.
7.
A VERTICAL DAMPER IS SHOWN. HORIZONTAL DAMPER INSTALLATION, 1S SIMILAR.
FOLLOW DAMPER MANUFACTUER'S INSTRUCTIONS, INCLUDING FASTENER OPTIONS AND
GAGES FOR SLEEVE AND PERIMETER ANGLES. FIRE DAMPERS MUST BE INSTALLED IN THE
PARTITION OR FLOOR AND NOT OUTSIDE THE PENETRATION.
GALVANIZED SLEEVE: GAGE NOT LESS THAN CONNECTING DUCT. FASTEN SLEEVE TO
DAMPER FRAME AND TO PERIMETER ANGLES.
PERIMETER ANGLES: GALVANIZED STEEL, NOT LESS THAN 1 1/2"x1 1/2" [40x40mm], 14 GAGE, TO PROVIDE 1" [25mm] MINIMUM OVERLAP OF OPENING ON ALL 4 SIDES.
BREAKAWAY DUCT CONNECTION: CONTRACTOR'S OPTION OF TYPES SHOWN IN SMACNA.
ACCESS PANELS: SIZE AND LOCATION TO PERMIT SERVICING THE FUSIBLE LINK OR LINKS.
PROVIDE 1/4" [6mm] PER FOOT OF DUCT HEIGHT/WIDTH CLEARANCE ON HEIGHT AND WIDTH.
FILL OPEN SPACE.
ALL DUCT WORK RISERS WHICH ARE RUN EXPOSED, SUCH AS THRU ATTIC FLOORS
AND MECHANICAL ROOM FLOORS, SHALL BE PROVIDED WITH 3" [75mm] HIGH
CONCRETE CURB AROUND OPENING FOR DUCT.
SLEEVE, NOTE 2
DUCT
CONNECTION
NOTE 4
DAMPER,
NOTE 1
DAMPER COLLAR
EXTENSION INTEGRAL
PART OF SLEEVE
SLEEVE, NOTE 2
NOTE 6
FIRE BARRIER
PARTITION OR CHASE
TYPICAL DUCT
INSULATION
PERIMETER ANGLE, NOTE 3
(NOT FASTENED TO PARTITION)
ACCESS
PANEL
NOTE 5
[2 5m m
2500 [1133]
1320 [598]
420 [190]ONE 1 [25] x 18 GA STRAP36 [900]
TWO 1/2 [13]Ø RODS
TWO 3/8 [10]Ø RODS
ONE 1 [25] x 16 GA STRAP
84 [2100]
60 [1500] 50 [1250] 700 [317]
ONE 1 [25] x 22 GA STRAP
QUANTITY/SIZE
IN. [mm]
MAX. DUCT
Ø IN. [mm]
26 [650]
HANGER STRAPS OR RODS
MAX. LOAD
LBS [kg]
260 [119]
MAX.
SPACING
IN. [mm]
144 [3600]
144 [3600]
144 [3600]
144 [3600]
144 [3600]
NOTE:
TABULATED DATA FROM SMACNA
ALLOWS FOR DUCT REINFORCING AND
INSULATION, BUT NO EXTERNAL LOAD.BAND
OVER 50"
[1250mm]Ø
HANGER RODS
BAND OF
SAME SIZE AS
HANGER STRAP
LOAD RATED
FASTENERS
50" [1250mm]Ø
& UNDER
NOTE:
ALL DUCT WORK RISERS WHICH ARE RUN EXPOSED, SUCH AS THRU ATTIC FLOORS
AND FAN ROOM FLOORS SHALL BE PROVIDED WITH A 3" [75mm] HIGH CONCRETE
CURB AROUND OPENING FOR DUCT.
SEAL HOLE WITH FIREPROOFING
MATERIAL AFTER DUCT INSTALLATION
2"x2"x1/4" [50x50x6mm]
ANGLE INSTALL ON BOTH LONG
DIMENSION SIDES OF DUCT.
DUCT RISER - SEE FLOOR
PLANS FOR DETAILS
SEAL HOLE WITH FIREPROOFING
MATERIAL AFTER DUCT INSTALLATION
FLOOR
EXTEND ANGLE 3"
[75mm] BEYOND DUCT
DUCT RISER - SEE FLOOR
PLANS FOR SIZES SHEET METAL SCREWS 4"
[100mm] ON CENTER
1 1/2"x1 1/2"x1/8" [40x40x3mm] ANGLE
INSTALL ON BOTH LONG DIMENSION
SIDES OF DUCT. FOR DUCTS OVER
60"1500mm] USE 2"x2"x1/8" 50x50x3mm]
ANGLE.
HOLE IN STRUCTURAL FLOOR
DUCT RISER
0.5 INCH WG [125Pa] TO 2 INCHES WG [500Pa] DUCT RISER SUPPORT
ARRANGE RISER SO
REINFORCER TRANSVERSE JOINT
IS AT RISER SUPPORT POINT
FLOOR
2 INCHES WG [500Pa] TO 4 INCHES WG [1000Pa] DUCT RISER SUPPORT
HOLE IN STRUCTURAL FLOOR
DUCT RISER
NOTE:
1.
2.
3.
4.
5.
6.
RIGID STRAIGHT TERMINAL UNIT INLET LENGTH SHALL BE A
MINIMUM OF 3 TIMES THE DIAMETER OF INLET
A FLEXIBLE AIR DUCT CONNECTOR IS NOT MANDATORY FOR INLET TO
THIS BOX, BUT ALLOWED TO ACCOMMODATE MINOR OFFSETS. MAXIMUM
LENGTH 3'-0" [900mm].
A BRANCH DUCT SERVING AN INDIVIDUAL BOX MAY BE THE SAME SIZE
AS THE BOX INLET, PROVIDED THE EQUIVALENT LENGTH OF THE
BRANCH DUCT, AS SHOWN, DOES NOT EXCEED 10 FEET (3 METERS).
FOR LONGER LENGTHS, INCREASE THE DUCT SIZE AND PROVIDE A
DUCT TRANSITION TO MAINTAIN THE DUCT STATIC PRESSURE DROP AT OR BELOW
0.2"/100' [1.65Pa/m].
FLEXIBLE AIR DUCT CONNECTORS, WHEN USED FROM TERMINAL UNIT
SUPPLY AIR DUCT TO DIFFUSER, SHALL NOT EXCEED 5'-0" [1500mm].
USE RIGID ELBOWS FOR CHANGE OF DIRECTION GREATER THAN 45°.
COMPONENT ARRANGEMENT MAY VARY BY MANUFACTURER. PROVIDE
INSULATION W/VAPOR BARRIER FOR CONNECTING DUCT SECTIONS.
USE OF THE FLEXIBLE AIR DUCT CONNECTORS ARE NOT PERMITTED
FOR THE DEDICATED AHU SERVING THE SURGICAL SUITE.
AIR TERMINAL
UNIT (CV OR VAV)
REHEAT COIL SOUND ATTENUATOR SEE
EQUIPMENT SCHEDULE
FLEXIBLE AIR DUCT
C…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.