36C25518R0522-019.pdf

PDF 10 MB Posted

Attached to
Renovate Wards for Patient Privacy P/N 589A7-17-203
Solicitation number
36C25518R0522
Issued by

About this file

36C25518R0522 06 Mechanical Drawings Vol 1.pdf

View the file

Other files

File Type Posted
36C25518R0522-011.docx DOCX document
36C25518R0522-015.pdf PDF
36C25518R0522-012.pdf PDF
36C25518R0522-021.pdf PDF
36C25518R0522-013.pdf PDF
36C25518R0522-014.pdf PDF
36C25518R0522-020.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEISMIC BRACING NOTES

SOME MECHANICAL AND PLUMBING COMPONENTS OF THIS

BUILDING REQUIRE SEISMIC BRACING. IT IS THE

RESPONSIBILITY OF THIS CONTRACTOR AND THE GC TO

ENGAGE A SEISMIC DESIGN ENGINEER TO DETERMINE AND

DESIGN THE REQUIRED BRACING FOR EACH SYSTEM.

SYSTEMS REQUIRING BRACING INCLUDE, BUT ARE NOT

LIMITED TO, THE FOLLOWING:

1. ALL LIFE-SAFETY COMPONENTS INCLUDING FIRE

PROTECTION SYSTEMS.

2. COMPONENTS WEIGHING MORE THAN 400 POUNDS.

3. COMPONENTS WITH A CENTER OF MASS GREATER

THAN 4 FEET ABOVE FLOOR LEVEL AND WEIGHING

MORE THAN 20 POUNDS (E.G. TERMINAL UNITS).

4. DISTRIBUTION SYSTEMS WEIGHING MORE THAN 5

POUNDS PER FOOT. (E.G. 12x12, 22 GAUGE, SHEET

STEEL DUCTWORK AND CHILLED, HEATING,

DOMESTIC HOT, AND DOMESTIC COLD WATER PIPING

LARGER THAN 1 1/2".

FLEXIBLE CONNECTIONS ARE REQUIRED BETWEEN ALL

COMPONENTS AND ASSOCIATED DUCTWORK, PIPING, AND

CONDUITS.

THE FOLLOWING COMPONENTS ARE NOT REQUIRED TO BE

BRACED:

1. PLUMBING FIXTURES

THE CONTRACTOR SHALL PROVIDE ALL COMPONENT

SUBMITTALS WITH COMPONENT WEIGHTS TO SEISMIC

DESIGN ENGINEER FOR USE IN BRACING DESIGN.

BRACING SHALL BE DESIGNED TO MEET ASCE 7 AND NFPA 13

BRACING REQUIREMENTS. REFER TO ASCE 7 CHAPTER 13

FOR MORE INFORMATION ON SYSTEMS REQUIRED TO BE

BRACED.

GENERAL NOTES

1. ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE

CONCEALED IN A FURRED CHASE OR ABOVE THE HARD

SUSPENDED CEILING.

2. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF

FACE SHOWN OR INDICATED. DUCT SIZES ARE NET INSIDE

DIMENSIONS.

3. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE

REQUIRED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS,

CONTROLS, ETC. ACCESS PANELS SHALL BE FURNISHED AND

INSTALLED UNDER THE ARCHITECTURAL SPECIFICATIONS.

4. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES

INCLUDES DUCT SYSTEM, TERMINAL UNITS, FILTERS, COILS,

ETC.

5. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS TO

EQUIPMENT, SEE STANDARD EQUIPMENT DETAILS.

6. DIFFUSER, REGISTER, AND GRILLE SIZES SHOWN ON FLOOR

PLANS ARE NECK SIZES.

7. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING

COILS SHALL BE MADE TO PROVIDE COUNTER FLOW BETWEEN

WATER AND AIR.

8. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR

EXACT LOCATIONS OF CEILING DIFFUSERS, REGISTERS, AND

GRILLES.

9. SEISMIC PROVISIONS - SEE SPECS. ALL PRESSURES LISTED

ARE GAGE PRESSURE UNLESS OTHERWISE NOTED.

10. SIZES OF ALL HWS & HWR RUNOUTS TO TERMINAL UNITS CAN

BE FOUND ON THE EQUIPMENT SCHEDULES.

11. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING

WORK. BRING ANY DISCREPANCIES FROM THE DRAWINGS AND

NOTES TO THE OWNER’S REPRESENTATIVE IMMEDIATELY.

MINOR CHANGES IN THE SCOPE OF THE DEMOLITION WORK

SHALL NOT JUSTIFY AN ADDITIONAL COST.

12. ALL DRAINED PIPING RISERS AND MAINS SHALL BE REFILLED

WITH FLUID AND PROPERLY VENTED BY THIS CONTRACTOR,

ONCE NEW WORK HAS BEEN INSTALLED.

13. COORDINATE WITH THE OWNER THE REMOVAL AND

REPLACEMENT OF ALL EXISTING CEILINGS, WALL, ETC. AS

REQUIRED FOR MECHANICAL DEMOLITION WORK.

GENERAL NOTES

14. CONTRACTOR SHALL PROVIDE PROTECTIVE PLASTIC DROP

CLOTHS TO PROTECT THE EXISTING OCCUPIED AREAS AND

EQUIPMENT FROM DUST AND DEBRIS DURING THE

CONSTRUCTION WORK AND SHALL CLEAN THE AREAS OF ALL

CONSTRUCTION DIRT DAILY, AND UPON COMPLETION OF THE

WORK.

15. ALL CUTTING AND CHANNELING OF EXISTING NON-

STRUCTURAL ELEMENTS SHALL BE ACCOMPLISHED IN A NEAT

AND WORKMANLIKE MANNER WITHOUT REMOVAL OF EXCESS

MATERIALS. THIS CONTRACTOR SHALL PATCH AND REPLACE

WITH MATERIAL SIMILAR TO ADJACENT CONSTRUCTION.

16. CUTTING OF STRUCTURAL MEMBERS IS NOT ALLOWED.

17. THIS CONTRACTOR SHALL GIVE FULL COOPERATION TO THE

OWNER IN THE SCHEDULING AND PROCEDURE OF WORK AND

SHALL TAKE EVERY PRECAUTION TO PREVENT DAMAGE FROM

FREEZING TO EXISTING SYSTEMS.

18. RELOCATE EXISTING DUCTWORK, PIPING, ELECTRICAL

CONDUITS, AND CABLING AS NECESSARY TO ACCOMPLISH

FINAL INSTALLATION AS SHOWN.

19. CAP ALL EXISTING DUCTWORK SHOWN TO BE DISCONNECTED

AND NOT RE-USED.

20. COORDINATE ROUTING OF PLUMBING AND HVAC PIPING WITH

DUCTWORK, LIGHTS, ARCHITECTURAL CEILING AND

STRUCTURAL ELEMENTS. PIPING SHALL RISE AND DROP, JOG

OR OFFSET, AS REQUIRED TO AVOID CONFLICTS. DUCTWORK

SHALL TAKE PRECEDENCE OVER ALL PIPING, EXCEPT WHERE

GRADE MUST BE MAINTAINED FOR DRAINAGE.

21. ANY EXPENSES RISING FROM LACK OF COORDINATION SHALL

BE AT CONTRACTOR’S EXPENSE. ALL DUCT AND PIPE

ELEVATIONS SHOWN IN PARENTHESIS ARE BOTTOM OF DUCT

OR PIPE UNLESS INDICATED OTHERWISE ON PLANS.

22. ALL SUPPLY, RETURN, AND EXHAUST BRANCHES TO GRILLES,

REGISTERS, AND DIFFUSERS SHALL HAVE A MANUAL BALANCE

DAMPER.

23. THIS CONTRACTOR IS RESPONSIBLE FOR SUBMITTING FULL

COORDINATION AND LAYOUT DRAWINGS PER SPECIFICATIONS

SECTION 230511, 1.4 (G). COORDINATION SHOULD BE

COMPLETED WITH ALL TRADES INCLUDED. CONSTRUCTION

SHALL NOT BEGIN UNTIL COORDINATION DRAWINGS HAVE

BEEN REVIEWED BY THE ENGINEER AND COR.

MECHANICAL DEMO NOTES

1. PLANS ARE SCHEMATIC IN NATURE. LAYOUT IS BASED ON BEST

AVAILABLE INFORMATION. CONTRACTOR SHALL FIELD VERIFY

EXISTING CONDITIONS AND DIMENSIONS. BRING ANY

DISCREPANCIES FROM THE DRAWINGS AND NOTES TO THE

OWNER’S REPRESENTATIVE IMMEDIATELY. MINOR CHANGES IN

THE SCOPE OF THE DEMOLITION WORK SHALL NOT JUSTIFY AN

ADDITIONAL COST.

2. REMOVAL OF EXISTING FIXTURES AND EQUIPMENT WILL

REQUIRE ISOLATING THE PIPING RISERS OR MAINS VIA SHUT-

OFF VALVES. INSTALL NEW ISOLATION VALVES WHERE

REQUIRED FOR COMPLETION OF NEW WORK.

3. REMOVAL OF EXISTING DUCTWORK, DIFFUSERS, GRILLES,

REGISTERS, PLUMBING FIXTURES, ETC. WILL REQUIRE

TEMPORARY CAPPING AND SEALING EXISTING MAINS OR

BRANCHES AS NECESSARY AND REQUIRED TO ALLOW THE

REMAINING SYSTEMS TO FULLY OPERATE WITHOUT

DEGRADATION.

4. CONTRACTOR SHALL PROVIDE PROTECTIVE PLASTIC DROP

CLOTHS TO PROTECT ANY EXISTING OCCUPIED AREAS AND

EQUIPMENT FROM DUST AND DEBRIS DURING THE

CONSTRUCTION WORK AND SHALL CLEAN THE AREAS OF ALL

CONSTRUCTION DIRT DAILY, AND UPON COMPLETION OF THE

WORK.

5. ALL DRAINED PIPING RISERS AND MAINS SHALL BE REFILLED

WITH FLUID AND PROPERLY VENTED BY THIS CONTRACTOR.

6. COORDINATE WITH OWNER THE REMOVAL AND REPLACEMENT

OF ALL EXISTING CEILINGS, WALLS, ETC. AS REQUIRED FOR

MECHANICAL DEMOLITION WORK.

7. EXISTING DUCTS, PIPING, AND EQUIPMENT, ETC., NOT TO BE

UTILIZED IN THE COMPLETED BUILDING SHALL BE

DISCONTINUED OR REMOVED AS REQUIRED. ALL ENDS OF

DISCONTINUED PIPING AND DUCTS SHALL BE CAPPED IN THE

NEAREST WALL, CEILING, OR FLOOR SO THAT THEY ARE

COMPLETELY CONCEALED. OPENINGS LEFT IN WALLS,

CEILINGS, ETC. WHERE EQUIPMENT, PIPE AND DUCTS, ETC.

ARE REMOVED AND NOT REPLACED, SHALL BE PATCHED

NEATLY WITH SIMILAR MATERIAL TO ADJACENT

CONSTRUCTION.

MECHANICAL DEMO NOTES

8. EXISTING PIPING, FIXTURES, AND EQUIPMENT THAT NOT TO BE

REUSED SHALL BE REMOVED AND SHALL REMAIN THE

PROPERTY OF THE OWNER IF THEY WISH TO RETAIN

OWNERSHIP OF THE SAME. IF NOT, EQUIPMENT SHALL

BECOME THE PROPERTY OF THIS CONTRACTOR AND SHALL

BE REMOVED FROM THE SITE AS SOON AS PRACTICAL AND

DISPOSED OF IN ACCORDANCE WITH APPLICABLE LAWS AND

REGULATIONS.

9. ALL CUTTING AND CHANNELING OF EXISTING BUILDING SHALL

BE ACCOMPLISHED IN A NEAT AND WORKMANLIKE MANNER

WITHOUT REMOVAL OF EXCESS MATERIALS. THIS

CONTRACTOR SHALL PATCH AND REPLACE WITH MATERIAL

SIMILAR TO ADJACENT CONSTRUCTION.

10. CUTTING OF STRUCTURAL MEMBERS IS NOT ALLOWED.

11. WHERE EXISTING DUCTS, PIPING, AND EQUIPMENT, ETC. THAT

ARE TO BE UTILIZED IN THE COMPLETED PROGRAM CONFLICT

WITH NEW CONSTRUCTION AND THE REQUIRED DEMOLITION,

THEY SHALL BE RELOCATED AND RECONNECTED TO MAINTAIN

THE DESIRED SERVICE.

12. ALL CONTRACTORS SHALL GIVE FULL COOPERATION TO THE

OWNER IN THE SCHEDULING AND PROCEDURE OF WORK AND

SHALL TAKE EVERY PRECAUTION TO PREVENT DAMAGE FROM

FREEZING TO EXISTING SYSTEMS.

13. DEMOLISH ALL DUCTWORK, PIPING, AND EQUIPMENT SHOWN

ON DEMO PLANS AS DASHED AND IN A DARK LINE WEIGHT.

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MM001

MECHANICAL NOTES AND SYMBOLS

BOH AR04/26/2018

SHEET LIST

MM001 MECHANICAL NOTES AND SYMBOLS

MM002 MECHANICAL NOTES AND SYMBOLS

MD101 HVAC DEMOLITION PLAN - BASEMENT

MD101.4 HVAC DEMOLITION PLAN - BASEMENT - BID ITEM #4

MD111 HVAC DEMOLITION PLAN - FIRST FLOOR

MD121 HVAC DEMOLITION PLAN - SECOND FLOOR

MD131 HVAC DEMOLITION PLAN - THIRD FLOOR

MD131.3 HVAC DEMOLITION PLAN - THIRD FLOOR - BID ITEM #3

MD131.4 HVAC DEMOLITION PLAN - THIRD FLOOR - BID ITEM #4

MD141 HVAC DEMOLITION PLAN - ATTIC

MD141.4 HVAC DEMOLITION PLAN - ATTIC - BID ITEM #4

MD201 HYDRONIC DEMOLITION PLAN - BASEMENT

MD201.4 HYDRONIC DEMOLITION PLAN - BASEMENT - BID ITEM #4

MD221 HYDRONIC DEMOLITION PLAN - SECOND FLOOR

MD231 HYDRONIC DEMOLITION PLAN - THIRD FLOOR

MD231.3 HYDRONIC DEMOLITION PLAN - THIRD FLOOR - BID ITEM #3

MD231.4 HYDRONIC DEMOLITION PLAN - THIRD FLOOR - BID ITEM #4

MH101 HVAC PLAN - BASEMENT

MH101.4 HVAC PLAN - BASEMENT - BID ITEM #4

MH111 HVAC PLAN - FIRST FLOOR

MH121 HVAC PLAN - SECOND FLOOR

MH121.3 HVAC PLAN - SECOND FLOOR - BID ITEM #3

MH121.4 HVAC PLAN - SECOND FLOOR - BID ITEM #4

MH131 HVAC PLAN - THIRD FLOOR

MH131.3 HVAC PLAN - THIRD FLOOR - BID ITEM #3

MH131.4 HVAC PLAN - THIRD FLOOR - BID ITEM #4

MH141 HVAC PLAN - ATTIC

MH141.4 HVAC PLAN - ATTIC - BID ITEM #4

MH151 HVAC PLAN - ROOF

MP101 HYDRONICS PLAN - OVERALL BASEMENT

MP101.4 HYDRONICS PLAN - OVERALL BASEMENT - BID ITEM #4

MP102 HYDRONICS PLAN - WEST BASEMENT

MP102.4 HYDRONICS PLAN - WEST BASEMENT - BID ITEM #4

MP121 HYDRONICS PLAN - SECOND FLOOR

MP131 HYDRONICS PLAN - THIRD FLOOR

MP131.3 HYDRONICS PLAN - THIRD FLOOR - BID ITEM #3

MP131.4 HYDRONICS PLAN - THIRD FLOOR - BID ITEM #4

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-503 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES

M-602 MECHANICAL SCHEDULES

M-701 MECHANICAL CONTROL DETAILS

M-702 MECHANICAL CONTROL DETAILS

M-801 AIRFLOW DIAGRAM

M-802 AIRFLOW DIAGRAM

A/E ARCHITECT/ENGINEER

AAHX AIR TO AIR HEAT EXCHANGER

AB AIR BLENDER

AAV AUTOMATIC AIR VENT

ACC AIR COOLED CONDENSER

ACCH AIR COOLED CHILLER

ACCU AIR COOLED CONDENSING UNIT

ACU AIR CONDITIONING UNIT

ACD AUTOMATIC CONTROL DAMPER, MODULATING

ACD-TP AUTOMATIC CONTROL DAMPER, TWO POSITION

AD ACCESS DOOR

AF AFTER FILTER

AFCV AIR FLOW CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AFMD AIR FLOW MEASURING DEVICE

AFW AIR FOIL WHEEL (FAN)

AHU AIR HANDLING UNIT

AMP AMPERAGE

AP ACCESS PANEL

APD AIR PRESSURE DROP

ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE

AS AIR SEPARATOR

ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS

AW AIR WASHER

AXF AXIAL FLOW

B BOILER

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BDR BASEBOARD RADIATOR

BFP BACKFLOW PREVENTER

BFT BOILER PLANT FIRE TUBE

BG BOTTOM GRILLE

BHP BRAKE HORSEPOWER

BHW HOT WATER HEATING BOILER

BHX BOILER BLOWDOWN HEAT EXCHANGER

BIW BACKWARD INCLINED WHEEL (FAN)

BMT BONE MARROW TRANSPLANT

BR BOTTOM REGISTER

BSC BIOLOGICAL SAFETY CABINETS

BT BLOWOFF TANK

BTC BLOWOFF TANK CONTROL VALVE

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

BWT BOILER PLANT WATER TUBE

C CENTIGRADE (CELCIUS)

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CD CEILING DIFFUSER

CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION 1)

CD-2 CONSTRUCTION DOCUMENTS (SUBMISSION 2)

CENT CENTRIFICAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CFP CHEMICAL FEED PUMP

CG CEILING GRILLE

CH CHILLER

CHP CHILLED WATER PUMP

CHW CHILLER WATER

CI CAST IRON

CM CARBON MONOXIDE

CM CUBIC METER

CM/S CUBIC METER PER SECOND

CO CLEAN OUT

CO2 CARBON DIOXIDE

COMP COMPRESSOR UNIT

COP COEFFICIENT OF PERFORMANCE

CP CONDENSATE PUMP

CR CEILING REGISTER

CS CONDENSATE STORAGE TANK

CSG CLEAN STEAM GENERATOR

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

CWCC CHILLED WATER COOLING COIL

CWP CONDENSER WATER PUMP

CWR CHILLED WATER RETURN

CWS CHILLED WATER SUPPLY

D DAMPER - AUTOMATIC

D-1 OUTDOOR AIR DAMPER

D-2 RETURN AIR DAMPER

D-3 RELIEF AIR DAMPER

DB DECIBELS

Db DRY-BULB TEMPERATURE

DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)

DD-2 DESIGN DEVELOPMENT (SUBMISSION 2)

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DF DIFFUSER

DIA DIAMETER

DIW DEIONIZED WATER

DP DEW POINT TEMPERATURE

DP DIFFUSER PLATE

DPA DIFFERENTIAL PRESSURE ASSEMBLY

DPS DIFFERENTIAL PRESSURE SENSOR

DX DIRECT EXPANSION

DXCC DIRECT EXPANSION COOLING COIL

E EXISTING

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EC EVAPORATIVE COOLER

ECC ENGINEERING CONTROL CENTER

ECU EVAPORATIVE CONDENSER UNIT

EDH ELECTRIC DUCT HEATER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EGS EMERGENCY GAS SHUTOFF

EGT ENTERING GLYCOL TEMPERATURE

EH EXHAUST HOOD

EJ EXPANSION JOINT

EMD END OF MAIN DRIP (STEAM)

ENT ENTERING

ER EXHAUST REGISTER

ERC ELECTRIC REHEAT COIL

ERP ELECTRIC RADIANT PANEL

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

ETO ETHYLENE OXIDE

EUH ELECTRIC UNIT HEATER

EWC EVAPORATIVE WATER COOLER

EWT ENTERING WATER TEMPERATURE

EX EXISTING

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

F/SDPR COMBINATION FIRE SMOKE DAMPER

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT (4 PIPE)

FCUC FAN COIL UNIT COOLING ONLY

FCUH FAN COIL UNIT HEATING ONLY

FCW FORWARD CURVED WHEEL (FAN)

FD FLOOR DRAIN

FD FIRE DAMPER

FF FINAL FILTER

FHX FLUE GAS/FEEDWATER HEAT EXCHANGER

FM FLOW METER

FOP FUEL OIL PUMP

FOT FUEL OIL TANK

FOHX FUEL OIL HEAT EXCHANGER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FPTU FAN POWERED TERMINAL UNIT

FR FLOOR REGISTER

FRP FIBER REINFORCED POLYESTER

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT-LB FOOT-POUND

FTR FIN TUBE RADIATION

FV FACE VELOCITY

GA GAUGE

GAL GALLONS

GH GRAVITY HOOD

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GS GALVINIZED STEEL

H HUMIDIFIER

H&CW HOT & COLD WATER

HAC HOUSEKEEPING AID CLOSET

HB HOSE BIBB

HC HEATING COIL

HD HEAD

HD HOOD

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HORSEPOWER

HPDT HIGH PRESSURE DRIP TRAP

HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)

HPS HIGH PRESSURE SUPPLY (STEAM)

HRC HEAT RECOVERY COIL

HRD HEAT RECOVERY DEVICE

HRP HYDRONIC RADIANT (CEILING) PANEL

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HTM HUMIDIFIER TERMINAL

HUM HUMIDIFIER UNIT MOUNTED

HVU HEATING AND VENTILATING UNIT

HW HOT WATER

HWC HOT WATER COIL

HWHC HOT WATER HEATING COIL

HWP HEATING HOT WATER PUMP

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

HWUH HOT WATER UNIT HEATER

HVD HOISTWAY VENT DAMPER

HX HEAT EXCHANGER

HZ HERTZ

I/O INOUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ICF INLINE CENTRIFUGAL FAN

ICU INTENSIVE CARE UNIT

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTEGRATED PART LOAD VALUE

IRH INFRARED HEATER

IS INSECT SCREEN

IU INDUCTION UNIT

IV INLET VANES

kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR

L LITER

L/h LITERS PER HOUR L/m LITERS PER MINUTE L/s LITERS PER SECOND

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT

LGT LEAVING GLYCOL TEMPERATURE

LH LATENT HEAT

LPG LIQUID PROPANE GAS

LPR LOW PRESSURE RETURN (STEAM CONDENSATE)

LPRC LOW PRESSURE STEAM RETURN (CLEAN)

LLHX LIQUID TO LIQUID HEAT EXCHANGER

LPS LOW PRESSURE STEAM

LPSC LOW PRESSURE STEAM (CLEAN)

LSD LINEAR SLOT DIFFUSER

LTCP LOCAL TEMPERATURE CONTROL PANEL

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

M METER, SI UNIT

M/s METER PER SECOND

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAU MAKEUP AIR UNIT

MAV MANUAL AIR VENT

MAX MAXIMUM

MB MIXING BOX

MBH 1000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY REPORTING VALUE

MH MANHOLE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MOV MOTOR OPERATED VALVE

MPR MEDIUM PRESSURE RETURN (STEAM CONDENSATE)

MPS MEDIUM PRESSURE SUPPLY (STEAM)

MRI MAGNETIC RESONANCE IMAGING

MTD MEAN TEMPERATURE DIFFERENCE

MVD MANUAL VOLUME DAMPER

MZ MULTI-ZONE

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NG NATURAL GAS

NGFM NATURAL GAS FLOWMETER

NO NORMALLY OPEN

NOAA NATIONAL OCEANIC & ATMOSPHERIC ADMINISTRATION

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NTS NOT TO SCALE

OA OUTSIDE AIR

OAG OUTSIDE AIR GRILLE

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

OFM OIL FLOWMETER

OR OPERATING ROOM

P PUMP

PA PASCAL

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT

PD PRESSURE DROP

PEF PROPELLER (TYPE) EXHAUST FAN

PF PRE-FILTER

PG PRESSURE GAUGE

PGW PROPYLENE GLYCOL-WATER (SOLUTION)

PHC PREHEAT COIL

PPM PARTS PER MILLION

PRS PRESSURE REGULATING (VALVE) STATION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH - ABSOLUTE

PSIG POUNDS PER SQUARE INCH - GAUGE

PSS PRIMARY SECONDARY SYSTEM

PSV PRESSURE SAFETY VALVE

PTAC PACKAGED TERMINAL AIR CONDITIONER

R/E RETURN OR EXHAUST

RA RETURN AIR

RAD REFRIGERANT AIR DRYER

RAF RADIO FREQUENCY

RAHX ROTARY AIR HEAT EXCHANGER

RAT RETURN AIR TEMPERATURE

RCCH REMOTE CONDENSER CHILLER

RCU RECIPROCATING CHILLER UNIT

RD REFRIGERANT DISCHARGE

RDS ROOM DATA SHEETS

REA RELIEF AIR

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RO REVERSE OSMOSIS

RPM REVOLUTIONS PER MINUTE

RR RETURN REGISTER

RS REFRIGERANT SUCTION LINE

RTU ROOFTOP UNIT

RV RELIEF VALVE

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCFM STANDARD CUBIC FEET PER MINUTE

SCI SPINAL CORD INJURY

SCR SILICON CONTROLLER RECTIFIER

SCV STEAM CONDENSATE VENT

SD SMOKE DETECTOR

SD SUPPLY AIR DIFFUSER

SD-1 SCHEMATIC DESIGN (SUBMISSION 1)

SD-2 SCHEMATIC DESIGN (SUBMISSION 2)

SDPR SMOKE DAMPER

SDR SMOKE DAMPER (RETURN)

SDS SMOKE DAMPER (SUPPLY)

SEN SENSIBLE HEAT

SF SUPPLY FAN

SG SUPPLY AIR GRILLE

SH STEAM HUMIDIFIER

SHC STEAM HEATING COIL

SI SQUARE INCHES

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPD SUPPLY PROCESS AND DISTRIBUTION

SPRV STEAM PRESSURE REDUCING VALVE

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOR

SR SUPPLY AIR REGISTER

SS STAINLESS STEEL

SSHX STEAM TO STEAM HEAT EXCHANGER

SSR SOLID SEPARATOR

ST STEAM TRAP

SUH STEAM UNIT HEATER

SV STEAM PRESSURE REDUCING VALVE

SVS STEAM VENT SILENCER

SWHX STEAM TO WATER HEAT EXCHANGER

T&PCV TEMPERATURE AND PRESSURE CONTROL VALVE

TAB TESTING, ADJUSTING, AND BALANCE

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TG TRANSFER GRILLE

TP TRAP

TR TOP REGISTER

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

TWU THRU-WALL UNIT

UC UNDER CUT

UC UNIT COOLER

UH UNIT HEATER

UL UNDERWRITER'S LABORATORY

URV UPBLAST UNIT VENTILATOR

V VALVE

VAF VANE-AXIAL FAN

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL OPPOSED BLADE)

VFD VARIABLE FREQUENCY DRIVE

VHA VETERAN'S HEALTH ADMINISTRATION

VI VIBRATION ISOLATOR

VIV VARIABLE INLET VANES

VP VACUUM PUMP

VPS VARIABLE PRIMARY SYSTEM

VR VACUUM RETURN (STEAM CONDENSATE)

VSD VARIABLE SPEED DRIVE

VUH VERTICAL UNIT HEATER

W WATTS

WAG WASTE ANETHESIA GAS

Wb WET-BULB (TEMPERATURE)

WC WATER COOLED

WCCH WATER COOLED CHILLER

WCCU WATER COOLED CONDENSING UNIT

WCHP WATER COOLED HEAT PUMP

WCPU WATER COOLED PACKAGED UNIT

WEF WALL EXHAUST FAN

WF WATER FILTER

WFCV WATER FLOW CONTROL VALVE

WFM WATER FLOWMETER

WFMD WATER FLOR MEASURING DEVICE

WG WATER GAUGE

WPD WATER SIDE PRESSURE DROP

YR YEAR

No. Description Date

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MM002

MECHANICAL NOTES AND SYMBOLS

BOH AR04/26/2018

OVERFLOW

RH

SCH

SH

TH

PS

RC

WB

CSH

SS

LC

M

PIPING SYMBOLS

VACUUM CONDENSATE RETURN

CONDENSATE TRANSFER PUMP SUCTION

CONDENSATE TRANSFER PUMP DISCHARGE

FEEDWATER PUMP DISCHARGE

FEEDWATER PUMP SUCTION

VR

CTPS

CTPD

FWPS

FWPD

FEEDWATER SAMPLE (FROM DEAERATOR)

BOILER WATER SAMPLE

CONTINUOUS BLOWDOWN

CF

FWS

BWS

CBD

BO

CHEMICAL FEED

BOILER BLOWOFF

TUBE CLEANER WATER SUPPLYTC

A

OFL

COMPRESSED AIR

COLD WATER (CITY WATER)

LIQUEFIED PETROLEUM GAS IGNITER FUEL

NATURAL GAS IGNITER FUEL

NATURAL GAS MAIN FUEL

HW

SW

CW

FOR

FOS

LPG(I)

G(I)

G

HOT WATER

SOFTENED WATER

FUEL OIL RETURN

FUEL OIL SUPPLY

RISER CLAMP (TYPE 42)*

FLOOR-SUPPORTED PIPE STAND

CLEVIS-TYPE HANGER

VARIABLE SPRING-TYPE HANGER (TYPE 51)*

ROLLER-TYPE HANGER

TO TRAPEZE EXCEPT WHERE RH ARE INDICATED)

TRAPEZE HANGER (PROVIDE U-BOLT PIPE ATTACHMENT

SPRING CUSHION-TYPE HANGER (TYPE 48 OR 49)*

STANDARD PRACTICE SP-58

SLIDING SUPPORTS (TYPE 35)*

CONSTANT SUPPORT HANGER (TYPE 54, 55, 56)*

WALL BRACKET (TYPE 31, 32, 33)*

* TYPE NUMBERS REFER TO MANUFACTURER'S STANDARDIZATION SOCIETY

DRAWING SYMBOLS

26-SF 3

26-TU-I-I

DETAIL NUMBER

DRAWING NUMBER WHERE SHOWN

SECTION LETTER

TYPICAL UNIT NO.

BUILDING NO. WHERE EQUIPMENT IS LOCATED.

SUPPLY FAN NO. 3 IN BUILDING NO. 26

EQUIPMENT ABBREVIATION (SUPPLY FAN)

ITEM NUMBER (TERMINAL UNIT NO. 1)

ITEM (TERMINAL UNIT SHOWN)

SERVED BY AIR HANDLER UNIT NO. 1

DRAWING NUMBER WHERE DRAWN

BUILDING NO. WHERE EQUIPMENT IS LOCATED

AIR TERMINAL SYMBOLS

TERMINAL UNIT WITH REHEAT COIL

PIPING SYMBOLS

HIGH PRESSURE STEAM CONDENSATE RETURN

HIGH PRESSURE STEAM (60 PSIG AND ABOVE)

HOT WATER HEATING SUPPLY

CONDENSATE PUMP DISCHARGE

LOW PRESSURE STEAM CONDENSATE RETURN

LOW PRESSURE STEAM (15 PSIG AND BELOW)

MEDIUM PRESSURE STEAM CONDENSATE RETURN

MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)

VENT LINE

SOLAR WATER RETURN

SOLAR WATER SUPPLY

GLYCOL-WATER HEATING RETURN

GLYCOL-WATER HEATING SUPPLY

REFRIGERANT SUCTION

REFRIGERANT HOT GAS

REFRIGERANT LIQUID

CHILLED WATER SUPPLY

CHILLED WATER RETURN

DRAIN LINE

MAKE-UP WATER

CONDENSER WATER RETURN (TO TOWER)

CHILLED GLYCOL-WATER RETURN

CHILLED GLYCOL-WATER SUPPLY

CONDENSER WATER SUPPLY (FROM TOWER)

HOT WATER HEATING RETURN

HPS

HPR

MPS

MPR

LPS

LPR

PC

HWS

HWR

GHS

GHR

V

SWS

SWR

CWR

CHR

GCR

RL

RS

RHG

CWS

CHS

GCS

MW

D

GLYCOL-WATER RUN AROUND SUPPLY

GLYCOL-WATER RUN AROUND RETURNGRR

GRS

X EXISTING PIPE TO BE REMOVED

GENERAL PIPING SYMBOLS

ANCHOR

REDUCER OR INCREASER

DIRECTION OF FLOW

SIDE CONNECTION

ECCENTRIC REDUCER

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

DIRECTION OF PIPE PITCH (DOWN)

UNION

RISE OR DROP IN PIPE

CAPPED OUTLET

PRESSURE GAGE

THERMOMETER

FLOW ELEMENT

FLOAT & THERMOSTATIC TRAP SET INCLUDING

PIPING ACCESSORIES SEE DETAIL

PIPING ACCESSORIES SEE DETAIL

INVERTED BUCKET TRAP SET INCLUDING

FE

PIPE UP

PIPE DOWN

REFRIGERANT SIGHT GLASS

TEST PLUG (PRESSURE/TEMPERATURE)

AUTOMATIC AIR VENT

AV

MANUAL AIR VENT

MV

THERMOSTATIC TRAP SET INCLUDING

PIPING ACCESSORIES SEE DETAIL

QUICK-COUPLE HOSE CONNECTOR

VALVE SYMBOLS

BALL VALVE

GATE VALVE WITH 3/4" HOSE ADAPTER

CHECK VALVE

ANGLE GLOBE VALVE

BUTTERFLY VALVE

MODULATING CONTROL VALVE

TWO POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

AUTOMATIC BALANCING CONTROL VALVE

PRESSURE SAFETY VALVE

GATE VALVE - THREADED/FLANGED

GLOBE VALVE - THREADED/FLANGED

PRESSURE REGULATING VALVE

THREE-WAY TWO POSITION CONTROL VALVE

WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)

FLEXIBLE CONNECTION

WATER BALANCE DEVICE

MODULATING CONTROL BUTTERFLY VALVE

CIRCUIT SETTER VALVE

GATE VALVE WITH GLOBE-VALVED BYPASS

PLUG VALVE

CONTROL VALVE (CV) - FLOAT-OPERATED

PRESSURE REDUCING VALVE (PRV)

HOSE CONNECTOR

WYE STRAINER WITH VALVED DRAIN AND QUICK-COUPLE

WATER LEVEL CONTROLLER

FLOW METER

DUCTWORK SYMBOLS

LIMIT OF DEMOLITION

(WALL TYPE)

(WALL TYPE)

DN

DN

UP

UP

SUPPLY DUCT (UP & DOWN)

EXHAUST DUCT (UP & DOWN)

ROUND AND SQUARE 4-WAY CEILING DIFFUSERS

SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)

EXHAUST OR RETURN CEILING REGISTER OR GRILLE

EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE

EXHAUST OR RETURN REGISTER OR TOP GRILLE

VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF

CONNECT NEW DUCT TO EXISTING DUCT

D

INCLINED RISE, IN DIRECTION OF AIR FLOW

INCLINED DROP, IN DIRECTION OF AIR FLOW

R

DNUP RETURN DUCT (UP & DOWN)

SQUARE 3-WAY CEILING DIFFUSERS

SQUARE 2-WAY CEILING DIFFUSERS

LINEAR SLOT DIFFUSER

SQUARE 1-WAY CEILING DIFFUSERS

DUCTWORK SYMBOLS

BACK DRAFT DAMPER

BDD

SECTION.)

FC

10x8

FLEXIBLE CONNECTION, EQUIPMENT,

VANED ELBOW (PROVIDE ALL SQUARE OR

RECTANGULAR ELBOWS WITH VANES EVEN IF

SYMBOL IS MISSING)

VANED ELBOW (SHORT RADIUS)

STANDARD RADIUS ELBOW (LONG RADIUS)

NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)

EXISTING DUCT TO REMAIN

LOUVER (LOUVER SPECIFIED IN ARCHITECTURAL

FIRE DAMPER

FD

VD

DUCT WITH SOUND LINING

FLEXIBLE DUCTWORK (INSULATED)

MANUAL VOLUME DAMPER

EXISTING DUCT TO BE REMOVED

VIBRATION, OR SEISMIC

DUCTWORK SYMBOLS

DUCT MOUNTED COIL

DUCT MOUNTED COIL (HOT WATER OR STEAM COIL)

SUPPLY

RETURN45°

RETURN, NO SPLITTER (45° TAP)

STANDARD BRANCH SUPPLY OR

MANUAL SPLITTER DAMPER

45°

N

2 1

POINT OF CHANGE IN DUCT CONSTRUCTION BY

STATIC PRESSURE CLASS. THE NUMBER ASSIGNS

PRESSURE CLASS (IN. OF WATER) WHICH WILL

ACCOMMODATE MAXIMUM OPERATING PRESSURE

COMBINATION FIRE/SMOKE DAMPER

1/24 IN THE DUCT SUBSECTION. THE SYMBOL CONTINUES

THE ASSIGNMENT UNTIL THE DUCT TERMINATES OR

ANOTHER SYMBOL APPEARS. A "N" SUPERSCRIPT

INDICATES NEGATIVE PRESSURE.

STAINLESS STEEL DUCT

(ELECTRIC)

F/S DPR

AUTOMATIC CONTROL DAMPER MODULATING

AUTOMATIC CONTROL DAMPER TWO POSITION

TERMINAL UNIT SYMBOLS

2'x4' RADIANT CEILING PANEL

2'x2' RADIANT CEILING PANEL

AIR CURTAIN

A

PTAC

A TWU

THRU WALL AIR CONDITIONING UNIT.

UNIT. LETTER INDICATES UNIT SIZE.

WINDOW TYPE AIR CONDITIONING

LETTER INDICATES UNIT SIZE.

UNIT HEATER (VERTICAL)

UNIT HEATER (HORIZONTAL)

CONVECTOR OR RADIATOR (RECESSED)

LETTER INDICATES UNIT SIZE.

FLOOR MOUNTED VERTICAL CABINET FAN COIL UNIT.

FLOOR MOUNTED VERTICAL RECESSED FAN COIL UNIT.

LETTER INDICATES UNIT SIZE.

CONVECTOR OR RADIATOR (WALL HUNG)

A

FCU

FCU

A

INDICATES UNIT SIZE.

FLOOR MOUNTED HEAT PUMP. LETTER

PTACA

(E)10x8

FIRE PROTECTION RISER LOCATION

H4

H7

A

1-E

1-51-31-21-1

1-H

1-J1A-A

1-M

1-N

1-Q1A-D

1A-C

1A-B

1-T

1-V

1-W

1-U

1-3A

1-6

1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

(EX)1-AHU-1

A

C

CC

C

C

B

(EX) AFMS

(EX) HUMIDIFIER

(EX) AFMS

(EX) 10'-0" X 3'-0" RELIEF LOUVER

(EX) 12'-0" X 3'-0" INTAKE LOUVER

(EX)30"ø

(EX)24"ø

(E X

)1 x3

(EX)60x24

(E X

)3 6x

C

C

PHASE 1

A. REMOVE (EX) AIR HANDLING UNIT AND

ASSOCIATED CONTROLS.

B. REMOVE (EX) INLINE RETURN AIR FAN

AND CONTROLS.

C. REMOVE (EX) DASHED/SHADED

DUCTWORK.

PLAN NOTES

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MD101

HVAC DEMOLITION PLAN - BASEMENT

BOH AR04/26/2018

1/4" = 1'-0"

HVAC DEMOLITION PLAN - BASEMENT

2' 4' 8'0'

1/4" = 1'-0"

N

1-H

1-J1A-A

1-M

1-N

1-Q1A-D

1A-C

1A-B

1-T

1-V

1-W

1-U

1-3A

1-6

1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

(EX) 1-AFMS1

(EX) HUMIDIFIER

(EX) 1-AFMS2

(EX) 10'-0" X 3'-0" RELIEF LOUVER

(EX) 12'-0" X 3'-0" INTAKE LOUVER

(EX)1-AHU1

(EX)1-RF1

(E X

)1 x3

(EX)60x24

(E X

)3 0" ø

(EX)24"ø

(E X

)3 6x

(EX) AIR HANDLER TO REMAIN IN

BID ITEM #4. NO DEMOLITION WORK

REQUIRED IN BASEMENT.

PHASE 1 BID ITEM #4

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MD101.4

HVAC DEMOLITION PLAN - BASEMENT -

BID ITEM #4

BOH RMH04/26/2018

1/4" = 1'-0"

HVAC DEMOLITION PLAN - BASEMENT - BID ITEM 4

N 2' 4' 8'0'

1/4" = 1'-0"

1-H

1-J

1A-A

1-M

1-N

1-Q

1A-D

1A-C

1A-B

1-T

1-V

1-W

1-U

1-3A

1-6 1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

NOT IN SCOPE

NOT IN SCOPE

NOT IN SCOPE

A

PHASE 1

A. REMOVE (EX) DASHED/SHADED

DUCTWORK IN BASE BID AND IN BID

ITEM #3. IN BID ITEM #4, DUCTWORK TO

REMAIN IN CHASE AND BE REUSED.

PLAN NOTES

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MD111

HVAC DEMOLITION PLAN - FIRST FLOOR

BOH AR04/26/2018

1/4" = 1'-0"

HVAC DEMOLITION PLAN - FIRST FLOOR

2' 4' 8'0'

1/4" = 1'-0"

1-H

1-J

1A-A

1-M

1-N

1-Q

1A-D

1A-C

1A-B

1-T

1-V

1-W

1-U

1-3A

1-6 1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

(EX)18"ø

(EX)26x16

(E X

)1 8" ø

BB

BBB

BBBB

B

B

B

B

B

B

B

B

B

B B

B

B

B B

B B

A A

A

AA

A

A

A

A

A

A

A

A

A

A

A

AA

A

A

C

C

CC

C

C

C

C

C

C

C

C

C

C

C

CC

C C

C

C

C

C

C

C

C

C

C

C

CC

TU

(E X

)1 0" ø

TU

C

D

C

C

C

PHASE 1

A. REMOVE (EX) TERMINAL UNIT.

B. REMOVE (EX) PERIMETER HEAT

RADIATOR AND ASSOCIATED CONTROLS.

C. REMOVE (EX) DASHED/SHADED

DUCTWORK AND CONNECTED AIR

TERMINALS.

D. REMOVE DUCTWORK BACK TO CAP

LOCATED AT ENTRANCE TO BUILDING 19

(THROUGH BUILDING 19 CORRIDOR).

PLAN NOTES

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MD121

HVAC DEMOLITION PLAN - SECOND FLOOR

BOH AR04/26/2018

1/4" = 1'-0"

HVAC DEMOLITION PLAN - SECOND FLOOR

2' 4' 8'0'

1/4" = 1'-0"

1-H

1-J

1A-A

1-M

1-N

1-Q

1A-D

1A-C

1A-B

1-T

1-V

1-W

1-U

1-3A

1-6 1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

BBB

BBBB

B

B

B

B

B

B

B

B

B

B

B

B B B

B B

B B

A

A A

AA

A A

A

A

A

A

A

A

A

C

C

C

C

C

C

C

C

C

C C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

B

B

B

A

A

A A

A

C

C

C

C

AA

A

C

C

D

C

C

D

E

PHASE 1

A. REMOVE (EX) TERMINAL UNIT.

B. REMOVE (EX) PERIMETER HEAT

RADIATOR AND ASSOCIATED CONTROLS.

C. REMOVE (EX) DASHED/SHADED

DUCTWORK AND CONNECTED AIR

TERMINALS.

D. EXISTING EXHAUST DUCT UP.

CONTRACTOR TO PATCH HOLE TO MATCH

EXISTING SURROUNDING SURFACE.

E. EXISTING DUCT DOWN TO THIRD FLOOR

PLENUM. DUCT IN PAST SERVED

ISOLATION ROOM EXHAUST.

CONTRACTOR TO REMOVE ALL

DUCTWORK ASSOCIATED.

PLAN NOTES

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MD131

HVAC DEMOLITION PLAN - THIRD FLOOR

BOH AR04/26/2018

1/4" = 1'-0"

HVAC DEMOLITION PLAN - THIRD FLOOR

2' 4' 8'0'

1/4" = 1'-0"

1-H

1-J

1A-A

1-M

1-N

1-Q

1A-D

1A-C

1A-B

1-T

1-V

1-W

1-U

1-3A

1-6 1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

BBB

BBBB

B

B

B

B

B

B

B

B

B B B

B B B

B B

A

A A

AA

A

A

A

A

A

A

A

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

B

B

B

A

A

A A

A

C

C

C

C

AA

A

C

C

D

C

C

(EX)8"ø

(EX)11"ø(EX)8"ø

(E X

)6 "ø

(EX)5"ø

(E X

)5 "ø

(EX)5"ø

(EX)4"ø

(E)-230

(EX)TU-460

(EX)TU-180

(E)-90 (E)-90

(E)-230

(E)-50

(E)-50

(EX)10x4

(EX) RADIATOR

TO REMAIN

(EX) RADIATOR

TO REMAIN

(EX) RADIATOR

TO REMAIN

PHASE 1 BID ITEM #3

A. REMOVE (EX) TERMINAL UNIT.

B. REMOVE (EX) PERIMETER HEAT

RADIATOR AND ASSOCIATED CONTROLS.

C. REMOVE (EX) DASHED/SHADED

DUCTWORK AND CONNECTED AIR

TERMINALS.

D. EXISTING EXHAUST DUCT UP.

CONTRACTOR TO PATCH HOLE TO MATCH

EXISTING SURROUNDING SURFACE.

E. EXISTING DUCT DOWN TO THIRD FLOOR

PLENUM. DUCT IN PAST SERVED

ISOLATION ROOM EXHAUST.

CONTRACTOR TO REMOVE ALL

DUCTWORK ASSOCIATED.

PLAN NOTES

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MD131.3

HVAC DEMOLITION PLAN - THIRD FLOOR -

BID ITEM #3

BOH RMH04/26/2018

1/4" = 1'-0"

HVAC DEMOLITION PLAN - THIRD FLOOR - BID ITEM 3

2' 4' 8'0'

1/4" = 1'-0"

1-H

1-J

1A-A

1-M

1-N

1-Q

1A-D

1A-C

1A-B

1-T

1-V

1-W

1-U

1-3A

1-6 1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

B B

A

A A

A

C

C

C

C

C

B

C

A

D

(EX)11"ø(EX)8"ø

(E X

)6 "ø

(E X

)6 "ø

(EX)8"ø (EX)6"ø

(EX)6"ø

(EX)6"ø

(E X

)6 "ø

(E X

)6 "ø

(E X

)6 "ø

(E X

)9 "ø

(EX)9"ø(E X

)1 0" ø

(EX)8"ø(EX)5"ø

(E X

)5 "ø

(EX)10"ø(EX)8"ø

(E X

)6 "ø

(E X

)6 "ø

(EX)6"ø (EX)6"ø

(E X

)6 "ø

(E X

)6 "ø

(EX)6"ø (EX)6"ø

(EX)9"ø

(E X

)5 "ø

(E X

)9 "ø

(E X

)1 0" ø

(EX)9"ø

(E X

)6 "ø

(E X

)6 "ø

(E X

)8 "ø

(EX)5"ø (EX)5"ø

(EX)16"ø (EX)9"ø

(E X

)6 "ø

(EX)6"ø

(EX)8"ø

(E X

)6 "ø

(EX)6"ø

(EX)6"ø

(EX)6"ø (EX)6"ø

(EX)5"ø

(EX)TU-460

(E)-50

(E)-50

(E)-60 (E)-60

(E)-60

(E X

)5 "ø

(EX)TU-300

(E)-300

(E)-100 (E)-100

(E)-100

(E)-110

(E)-130

(E)-180

(E)-50 (E)-50

(EX)TU-280

(E)-150

(EX)TU-380

(E)-100 (E)-90

(E)-90(E)-100

(E)-50

(E)-100

(EX)TU-150

(EX)TU-180

(EX)TU-300

(EX)TU-350

(E)-90

(EX)TU-90

(EX)TU-300

(E)-100

(E)-100

(E)-100

(EX)TU-150

(EX)TU-150

(E)-100 (E)-50

(EX)TU-100

(E)-100

(EX)TU-110

(E)-110

(E)-50

(E)-110

(EX)TU-160

(E)-90

(EX)TU-180

(EX)12x8

(E X

)1 4x

(E X

)1 4x

(E X

)1 4x

(E

X )1

6x

(E X

)1 8x

(EX)12x10

(E X

)1 0x

(EX)8x4

(E X

)8 x8

(EX)12x8

(EX)8x8

(EX) RG-50(EX) RG-90(EX) RG-90

(E)-50

(EX) RG-150

(EX) RG-150

(EX) RG-240

(EX) RG-110

(EX) RG-100(EX) RG-100(EX) RG-50(EX) RG-100

(EX) RG-110

(EX) RG-120

(EX) RG-120(EX) RG-150

(EX) RG-150

(EX) RG-150

(EX) RG-150

(EX) RG-180

(E X

)1 2x

(E

X )8 x8

(EX) RG-50

(EX) RG-190

(EX) RG-190

(E X

)8 x6

(EX)12x16

(EX)10x4

(EX) EG-50

(EX) EG-50

(EX) EG-50

(EX)8x6 (EX)8x8 (EX)8x6 (EX)8x4

(E X

)8 x4

(EX) EG-40

(EX) EG-40

(EX) EG-210

(EX) EG-90

(EX) EG-100

B B B

PHASE 1 BID ITEM #4

A. REMOVE (EX) TERMINAL UNIT.

B. REMOVE (EX) PERIMETER HEAT

RADIATOR AND ASSOCIATED CONTROLS.

C. REMOVE (EX) DASHED/SHADED

DUCTWORK AND CONNECTED AIR

TERMINALS.

D. EXISTING EXHAUST DUCT UP.

CONTRACTOR TO PATCH HOLE TO MATCH

EXISTING SURROUNDING SURFACE.

E. EXISTING DUCT DOWN TO THIRD FLOOR

PLENUM. DUCT IN PAST SERVED

ISOLATION ROOM EXHAUST.

CONTRACTOR TO REMOVE ALL

DUCTWORK ASSOCIATED.

PLAN NOTES

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MD131.4

HVAC DEMOLITION PLAN - THIRD FLOOR -

BID ITEM #4

BOH RMH04/26/2018

1/4" = 1'-0"

HVAC DEMOLITION PLAN - THIRD FLOOR - BID ITEM 4

N 2' 4' 8'0'

1-H

1-J1A-A

1-M

1-N

1-Q1A-D

1A-C

1A-B

1-T

1-V

1-W

1-U

1-3A

1-6

1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

(EX) EXHAUST FAN

A

B

B

(E X

)1 8x

(E

X )1

6x

(EX) EXHAUST FAN

B

B

B

B

A

C

PHASE 1

A. REMOVE (EX) INLINE EXHAUST FAN.

B. REMOVE (EX) DASHED/SHADED

DUCTWORK.

C. REMOVE (EX) DUCTWORK BACK TO LIMIT

OF DEMOLITION AND INSTALL CAP.

BLANK OFF DUCTWORK ALLOWING

LOUVER TO REMAIN AS IS.

PLAN NOTES

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MD141

HVAC DEMOLITION PLAN - ATTIC

BOH AR04/26/2018

1/4" = 1'-0"

HVAC DEMOLITION PLAN - ATTIC

2' 4' 8'0'

1/4" = 1'-0"

1-H

1-J1A-A

1-M

1-N

1-Q1A-D

1A-C

1A-B

1-T

1-V

1-W

1-U

1-3A

1-6

1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

(EX) EXHAUST FAN TO

BE DEMOLISHED

A

B

B

(EX) EXHAUST FAN

(E X

)1 6x

(EX)16x12

(E X

)1 8x

(EX) 16x12 UP

FROM THIRD

FLOOR.

(EX) 16x12 UP

FROM THIRD

FLOOR.

B

PHASE 1 BID ITEM #4

A. REMOVE (EX) INLINE EXHAUST FAN.

B. REMOVE (EX) DASHED/SHADED

DUCTWORK.

PLAN NOTES

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MD141.4

HVAC DEMOLITION PLAN - ATTIC - BID

ITEM #4

BOH RMH04/26/2018

1/4" = 1'-0"

HVAC DEMOLITION PLAN - ATTIC - BASE BID #4

2' 4' 8'0'

1/4" = 1'-0"

1-H

1-J1A-A

1-M

1-N

1-Q1A-D

1A-C

1A-B

1-T

1-V

1-W

1-U

1-3A

1-6

1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

A

(EX)HWS

(EX)HWR

(EX)2 1/2"(EX)2 1/2"

(EX) 2-1/2" HWS

AND HWR UP IN

CHASE.

(EX) 3" CWS

AND CWR UP

IN CHASE.

(EX)HWS

(EX)HWR

(EX)HWR

(EX)HWS

(EX)HWR

(EX)HWS

(EX)3"

(EX)3"

(EX)HWR

(EX)HWS

(EX)CWR

(EX)CWS

(EX)3"

(EX)3"

A

(EX) EXIST PIPING TO

1ST FLOOR MAIN

ENTRY UNITS TO

REMAIN.

A

(EX)1-AHU-1

BBB

B

BB

B

B

B

B B

B BB

C

1/

4" M

P R

1/

4" M

P S

3" C

W S

3" C

W R

3/ 4"

M P

R

PHASE 1

A. EXISTING AIR HANDLER IS SERVED BY

GLYCOL CHILLED WATER AND MEDIUM

PRESSURE BUILDING STEAM. PIPING IS

TO BE DISCONNECTED FROM EXISTING

AIR HANDLER AND RECONNECTED IN

NEW CONSTRUCTION TO THE NEW AIR

HANDLER.

B. EXISTING STEAM SUPPLY AND RETURN

RISERS UP TO SERVE ALL FLOORS

ABOVE.

C. EXISTING STEAM HUMIDIFIER TO BE

REMOVED.

PLAN NOTES

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MD201

HYDRONIC DEMOLITION PLAN -

BASEMENT

BOH AR04/26/2018

1/4" = 1'-0"

HYDRONICS DEMOLITION PLAN - BASEMENT

2' 4' 8'0'

1/4" = 1'-0"

1-H

1-J1A-A

1-M

1-N

1-Q1A-D

1A-C

1A-B

1-T

1-V

1-W

1-U

1-3A

1-6

1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

(EX)HWS

(EX)HWR

(EX)2 1/2"(EX)2 1/2"

(EX) 2-1/2" HWS

AND HWR UP IN

CHASE.

(EX) 3" CWS

AND CWR UP

IN CHASE.

(EX)HWS

(EX)HWR

(EX)HWR

(EX)HWS

(EX)HWR

(EX)HWS

(EX)3"

(EX)3"

(EX)HWR

(EX)HWS

(EX)CWR

(EX)CWS

(EX)3"

(EX)3"

(EX) EXIST PIPING TO

1ST FLOOR MAIN

ENTRY UNITS TO

REMAIN.

BBB

B

BB

B

B

B

B B

B BB

1/

4" M

P R

1/

4" M

P S

3" C

W S

3" C

W R

3/ 4"

M P

R

(EX)1-AHU1

(EX) AIR HANDLER TO REMAIN IN

BID ITEM #4. NO DEMOLITION WORK

REQUIRED IN BASEMENT.

PHASE 1 BID ITEM #4

A. NOT USED.

B. EXISTING STEAM SUPPLY AND RETURN

RISERS UP TO SERVE ALL FLOORS

ABOVE.

C. NOT USED.

PLAN NOTES

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MD201.4

HYDRONIC DEMOLITION PLAN -

BASEMENT - BID ITEM #4

BOH RMH04/26/2018

1/4" = 1'-0"

HYDRONICS DEMOLITION PLAN - BASEMENT - BID ITEM 4

N 2' 4' 8'0'

1-H

1-J

1A-A

1-M

1-N

1-Q

1A-D

1A-C

1A-B

1-T

1-V

1-W

1-U

1-3A

1-6 1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

AA

AA

AAAA

A

A

A

A

A

AA

AAA

A A

A

A

A

A

A

B

B

B

B

B

B

B

B

B

B

B

B B

B

B

B BBB

B

C

D

E

F

F

F

F

G

PHASE 1

A. REMOVE (EX) PERIMETER HEAT

RADIATOR, ASSOCIATED PIPING AND

CONTROLS. DEMO PIPING IN RISER

BACK FROM 3RD FLOOR TO ABOVE

CEILING ON 1ST FLOOR.

B. REMOVE (EX) TERMINAL UNIT,

ASSOCIATED PIPING, VALVES, AND

CONTROLS.

C. CLOSE EXISTING GATE VALVE AND CAP

EXISTING HWS.

D. REMOVE EXISTING HWS/R LINES.

E. AFTER INSTALLING NEW HWR LINES,

DEMO EXISTING HWR LINE BACK TO

THIS LOCATION. INSTALL NEW

ISOLATION VALVE.

F. CROSSHATCHED PIPING SERVES B-1

CORE AREAS OUT SIDE OF SCOPE OF

WORK. PIPING TO REMAIN

OPERATIONAL DURING DEMOLTION

UNTIL NEW PIPING IS INSTALLED AND

CHANGE OVER TO NEW PIPING CAN BE

MADE. ONCE CHANGE OVER OCCURS,

REMOVE ALL CROSSHATCHED PIPING.

G. REMOVE PIPING BACK THRU CORRIDOR

TO ENTRANCE INTO B19. PIPING WAS

CAPPED AND ABANDONED IN PAST

PROJECT.

PLAN NOTES

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MD221

HYDRONIC DEMOLITION PLAN - SECOND

FLOOR

BOH AR04/26/2018

1/4" = 1'-0"

HYDRONICS DEMOLITION PLAN - SECOND FLOOR

2' 4' 8'0'

1/4" = 1'-0"

1-H

1-J

1A-A

1-M

1-N

1-Q

1A-D

1A-C

1A-B

1-T

1-V

1-W

1-U

1-3A

1-6 1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

(EX)STEAM

CONVECTION

UNIT TO REMAIN

A

A A A

A A A

A A A

AAA

AAAA

A

A

A

A

A

A A

A

A

A

B

BB

BB

B

B

B

B B

B

BB

B

B

B

B B

B

B B

E

E

E

C

C

C

C

D

F(E X

)3 "C

W S

(E X

)3 "C

W R

(EX)2"HWR

(EX)2"HWS

(E X

)3 /4

"H W

S

(E X

)3 /4

"H W

R

(EX)1 1/4"HWS

(EX)1"HWR

A

PHASE 1

A. REMOVE (EX) PERIMETER HEAT

RADIATOR, ASSOCIATED PIPING AND

CONTROLS. DEMO PIPING IN RISER

BACK FROM 3RD FLOOR TO ABOVE

CEILING ON 1ST FLOOR.

B. REMOVE (EX) TERMINAL UNIT,

ASSOCIATED PIPING, VALVES, AND

CONTROLS.

C. REMOVE EXISTING HWS/R LINES.

D. AFTER INSTALLING NEW HWR LINES,

DEMO EXISTING HWR LINE BACK TO

THIS LOCATION. INSTALL NEW

ISOLATION VALVE. INSTALLED

ISOLATION VALVE TO ALLOW RETURN

BACK TO WEST CHASE.

E. CROSSHATCHED PIPING IS RETURN

LINE FOR EAST WING OUT SIDE OF

SCOPE OF WORK. PIPING TO REMAIN

OPERATIONAL DURING DEMOLTION

UNTIL NEW PIPING IS INSTALLED AND

CHANGE OVER TO NEW PIPING CAN BE

MADE. ONCE CHANGE OVER OCCURS,

REMOVE ALL CROSSHATCHED PIPING.

F. DEMO HWS TO POINT INDICATED.

INSTALL VALVE AND CAP.

PLAN NOTES

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MD231

HYDRONIC DEMOLITION PLAN - THIRD

FLOOR

BOH AR04/26/2018

1/4" = 1'-0"

HYDRONICS DEMOLITION PLAN - THIRD FLOOR

2' 4' 8'0'

1/4" = 1'-0"

1-H

1-J

1A-A

1-M

1-N

1-Q

1A-D

1A-C

1A-B

1-T

1-V

1-W

1-U

1-3A

1-6 1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

(EX)STEAM

CONVECTION

UNIT TO REMAIN

A

A A A

A A A

A A A

AAA

AAAA

A

A

A

A A

A

A

A

B

BB

BB

B

B

B

B

BB

B

B

B

B B

B

B B

E

E

E

C

C

C

C

D

F(E X

)3 "C

W S

(E X

)3 "C

W R

(EX)2"HWR

(EX)2"HWS

(E X

)3 /4

"H W

S

(E X

)3 /4

"H W

R

(EX)1 1/4"HWS

(EX)1"HWR

(EX) STEAM

CONVECTION

UNIT TO REMAIN

(EX) STEAM

CONVECTION

UNIT TO REMAIN

(EX) STEAM

CONVECTION

UNIT TO REMAIN

PHASE 1 BID ITEM #3

A. REMOVE (EX) PERIMETER HEAT

RADIATOR, ASSOCIATED PIPING AND

CONTROLS. DEMO PIPING IN RISER

BACK FROM 3RD FLOOR TO ABOVE

CEILING ON 1ST FLOOR.

B. REMOVE (EX) TERMINAL UNIT,

ASSOCIATED PIPING, VALVES, AND

CONTROLS.

C. REMOVE EXISTING HWS/R LINES.

D. AFTER INSTALLING NEW HWR LINES,

DEMO EXISTING HWR LINE BACK TO

THIS LOCATION. INSTALL NEW

ISOLATION VALVE. INSTALLED

ISOLATION VALVE TO ALLOW RETURN

BACK TO WEST CHASE.

E. CROSSHATCHED PIPING IS RETURN

LINE FOR EAST WING OUT SIDE OF

SCOPE OF WORK. PIPING TO REMAIN

OPERATIONAL DURING DEMOLTION

UNTIL NEW PIPING IS INSTALLED AND

CHANGE OVER TO NEW PIPING CAN BE

MADE. ONCE CHANGE OVER OCCURS,

REMOVE ALL CROSSHATCHED PIPING.

F. DEMO HWS TO POINT INDICATED.

INSTALL VALVE AND CAP.

PLAN NOTES

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MD231.3

HYDRONIC DEMOLITION PLAN - THIRD

FLOOR - BID ITEM #3

BOH RMH04/26/2018

1/4" = 1'-0"

HYDRONICS DEMOLITION PLAN - THIRD FLOOR - BID ITEM 3

2' 4' 8'0'

1/4" = 1'-0"

1-H

1-J

1A-A

1-M

1-N

1-Q

1A-D

1A-C

1A-B

1-T

1-V

1-W

1-U

1-3A

1-6 1-9

1-11

1-13

1-X

1-R

1-I

1-D

1-20 1-211-16

1-121-101-7

1-G

C

C C C

A A A

AAA

C

C

C

C C

B

BB

B

B B

(E X

)3 "C

W S

(E X

)3 "C

W R

(EX)2"HWR

(EX)2"HWS

(E X

)3 /4

"H W

S

(E X

)3 /4

"H W

R

(EX)1 1/4"HWS

(EX)1"HWR

(EX)3/4"HWS

(EX)3/4"HWR

(E X

)3 /4

"H W

S

(E X

)3 /4

"H W

R

(E X

)3 /4

"H W

S

(E X

)3 /4

"H W

R

(E X

)3 /4

"H W

S

(E X

)3 /4

"H W

R

(EX)1 1/4"HWR

(EX)1 1/2"HWR

(E X

)3 /4

"H W

S

(EX)3/4"HWS

(EX)1"HWS

(EX)1 1/4"HWR

(EX)1 1/4"HWR

(EX)1"HWR

(EX)1"HWS

CCC

C

C

C

C

C

C

C

C C C C

PHASE 1 BID ITEM #4

A. REMOVE (EX) PERIMETER HEAT

RADIATOR, ASSOCIATED PIPING AND

CONTROLS. DEMO PIPING IN RISER

BACK FROM 3RD FLOOR TO ABOVE

CEILING ON 1ST FLOOR.

B. REMOVE (EX) TERMINAL UNIT,

ASSOCIATED PIPING, VALVES, AND

CONTROLS.

C. (EX) PERIMETER HEAT RADIATOR TO

REMAIN.

PLAN NOTES

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

589A7-17-203

Robert J. Dole VA Medical Center

RENOVATE WARDS FOR PATIENT

PRIVACY PHASE 1, B1

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA

142 N. MOSELY ST

WICHITA, KANSAS

MD231.4

HYDRONIC DEMOLITION PLAN - THIRD

FLOOR - BID ITEM #4

BOH RMH04/26/2018

1/4" = 1'-0"

HYDRONICS DEMOLITION PLAN - THIRD FLOOR - BID ITEM 4