S06 - Att4a STC-000000 SPECIFICATIONS BOOK COVER.pdf
PDF 248 KB Posted
- Solicitation number
- 36C25227Q0013
About this file
This is a Specifications Book for a construction project at Edward Hines, Jr. VA Hospital in Hines, Illinois. The document is a comprehensive table of contents organized by CSI MasterFormat divisions, serving as the bid set dated June 6, 2019, for USP 800 Construction under Hines Project #578-19-036.
The specifications book encompasses construction work across 48 divisions covering general requirements, existing conditions, concrete, masonry, metals, wood and plastics, thermal and moisture protection, openings, finishes, specialties, equipment, furnishings, special construction, conveying equipment, fire suppression, plumbing, HVAC, electrical, communications, electronic safety and security, earthwork, exterior improvements, and utilities. Key sections include General Requirements (Division 01) with provisions for scheduling, submittals, safety, sustainability, and commissioning; site preparation and demolition (Division 02) including asbestos and lead abatement; structural and envelope systems (Divisions 03-07); interior systems including mechanical, electrical, and plumbing (Divisions 22-28); and site work (Divisions 31-33). The specifications reference various technical standards, performance requirements, and equipment specifications with revision dates ranging from 2010 to 2016, indicating a mature and regularly updated specification framework for federal healthcare facility construction standards.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department Of Veterans Affairs
Specifications Book Edward Hines, Jr. VA Hospital
5000 South 5th Avenue, Hines, Illinois 60141
USP 800 Construction Hines Project # 578-19-036
Bid Set 6/6/19
Section 00 01 10
Project Name 1 Project #578-XX-XXX
TABLE OF CONTENTS
DIVISION 00 - SPECIAL SECTIONS DATE
00 01 15 List of Drawing Sheets 07-15 00 11 21 Request for Proposal to Design Build 11-15
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-15 01 32 16.01 Architectural and Engineering CPM Schedules 01-11 01 32 16.13 Network Analysis Schedule – Major Projects 09-15 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build) 04-13 01 32 16.16 Network Analysis Schedules (Design-Build Only) 02-15 01 32 16.17 Project Schedules (Small Projects – Design/Build) 04-11 01 33 00 Submittal Register (Example, For Contractor Reference) 06-19 01 33 23 Shop Drawings, Product Data, and Samples 07-15 01 35 26 Safety Requirements 10-14 01 42 19 Reference Standards 07-15 01 45 29 Testing Laboratory Services 06-15 01 57 19 Temporary Environmental Controls 01-11 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 09-13 01 81 13 Sustainable Construction Requirements 09-15 01 81 13.01 Sustainability Certification Requirements – LEED NC V3 09-15 01 81 13.02 Sustainability Certification Requirements – LEED NC V4 09-15 01 81 13.11 Sustainability Certification Requirements – LEED HC V3 09-15 01 81 13.21 Sustainability Certification Requirements – GREEN
GLOBES
09-15
01 91 00 General Commissioning Requirements 10-15
DIVISION 02 – EXISTING CONDITIONS
02 21 00 Site Surveys 05-13 02 41 00 Demolition 02-15 02 65 00 Underground Storage Tank Removal 05-13 02 82 11 Traditional Asbestos Abatement 09-15 02 82 13.13 Glovebag Asbestos Abatement 09-15 02 82 13.19 Asbestos Floor Tile and Mastic Abatement 09-15 02 82 13.21 Asbestos Roofing Abatement 09-15 02 82 13.31 Asbestos Transite Abatement 09-15 02 82 13.41 Asbestos Abatement for Total Demolition Project 04-15 02 83 33.13 Lead-Based Paint Removal and Disposal 08-11
DIVISION 03 – CONCRETE
03 23 00 Stressing Tendons 07-11 03 30 00 Cast-in-Place Concrete 12-15 03 30 53 (Short-Form) Cast-in-Place Concrete 02-16 03 37 13 Shotcrete 07-11
Project Name 2 Project #578-XX-XXX
03 41 13 Precast Concrete Hollow Core Planks 07-11 03 41 33 Precast Structural Pretension Concrete 07-11 03 45 00 Precast Architectural Concrete 10-15 03 51 13 Cementitious Wood Fiber Decks 09-11 03 51 16 Gypsum Concrete Roof Decks 09-11 03 52 00 Lightweight Concrete Roof Insulation 05-15 03 55 11 Gypsum Concrete Floor Decks 07-11
DIVISION 04 – MASONRY
04 01 00 Maintenance of Masonry 02-16 04 05 13 Masonry Mortaring 02-16 04 05 16 Masonry Grouting 02-16 04 20 00 Unit Masonry 02-16 04 72 00 Cast Stone Masonry 02-15
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 02-16 05 21 00 Steel Joist Framing 03-10 05 31 00 Steel Decking 02-16 05 36 00 Composite Metal Decking 10-15 05 40 00 Cold-Formed Metal Framing 07-11 05 50 00 Metal Fabrications 07-14 05 51 00 Metal Stairs 10-15
DIVISION 06 – WOOD,PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-15 06 16 63 Cementitious Sheathing 02-16 06 20 00 Finish Carpentry 06-13
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 01 50.19 Preparation for Re-Roofing 02-16 07 08 00 Facility Exterior Closure Commissioning 06-13 07 11 13 Bituminous Dampproofing 02-16 07 12 00 Built-Up Bituminous Waterproofing 09-11 07 13 00 Sheet Waterproofing 04-13 07 13 52 Modified Bituminous Sheet Waterproofing 09-11 07 14 21 Latex Mastic Deck Covering 05-15 07 18 13 Pedestrian Traffic Coatings 05-15 07 21 13 Thermal Insulation 02-16 07 21 23 Loose-Fill Insulation 02-16 07 22 00 Roof and Deck Insulation 02-16 07 24 00 Exterior Insulation and Finish Systems 02-16 07 27 26 Fluid-Applied Membrane Air Barrier, Vapor Permeable 02-16 07 27 27 Fluid-Applied Membrane Air Barrier, Vapor Retarding 02-16 07 31 13 Asphalt Shingles 02-16 07 31 26 Slate Shingles 02-16 07 31 29.13 Wood Shingles 02-16 07 32 13 Clay Roof Tiles 02-16
Project Name 3 Project #578-XX-XXX
07 40 00 Roofing and Siding Panels 10-15 07 51 00 Built-Up Bituminous Roofing 07-14 07 51 00.11 Built-Up Bituminous Roofing, Hot-Applied 10-15 07 51 00.13 Built-Up Bituminous Roofing, Cold-Applied 10-15 07 52 16 Styrene-Butadiene-Styrene Modified Bituminous Membrane
Roofing, Hot Applied 10-15
07 52 16.13 Styrene-Butadiene-Styrene Modified Bituminous Membrane, Roofing, Cold Applied
10-15
07 53 23 Ethylene-Propylene-Diene-Monomer Roofing 02-16 07 54 16 Ethylene Interpolymer (KEE) Roofing 10-15 07 54 19 Polyvinyl-Chloride (PVC) Roofing 02-16 07 54 23 Thermoplastic Polyolefin (TPO) Roofing 10-15 07 56 00 Fluid-Applied Roofing 05-15 07 57 13 Sprayed Polyurethane Foam Roofing 10-15 07 60 00 Flashing and Sheet Metal 07-14 07 61 16 Batten Seam Copper Roofing 10-15 07 71 00 Roof Specialties 10-15 07 72 00 Roof Accessories 10-15 07 81 00 Applied Fireproofing 10-15 07 84 00 Firestopping 02-16 07 92 00 Joint Sealants 10-15 07 95 13 Expansion Joint Cover Assemblies 02-16
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-13 08 11 73 Sliding Metal Fire Doors 02-16 08 14 00 Interior Wood Doors 02-16 08 17 10 Integrated Door Assemblies 02-16 08 31 13 Access Doors and Frames 02-16 08 33 00 Coiling Doors and Grilles 02-16 08 33 13 Coiling Counter Doors 02-16 08 34 36 Darkroom Doors 07-15 08 34 53 Security Doors and Frames 05-15 08 34 59 Vault Doors and Day Gates 02-16 08 35 13.13 Accordion Folding Doors 05-15 08 36 13 Sectional Doors 05-15 08 38 16 Flexible Traffic Doors 02-16 08 41 13 Aluminum-Framed Entrances and Storefronts 10-15 08 42 33 Revolving Door Entrances 05-15 08 44 13 Glazed Aluminum Curtain Walls 10-15 08 51 13 Aluminum Windows 02-16 08 51 13.11 Side-Hinged Aluminum Windows 10-13 08 51 23 Steel Windows 02-16 08 51 69.11 Aluminum Storm Windows 05-15 08 56 19 Pass Windows 02-16 08 56 53 Blast Resistant Windows 02-16 08 56 59 Service and Teller Window Units 02-16 08 56 66 Detention Window Screens 02-16 08 63 00 Metal-Framed Skylights 10-15 08 71 00 Door Hardware 01-16 08 71 13 Automatic Door Operators 02-16 08 71 13.11 Low Energy Power Assist Door Operators 12-13
Project Name 4 Project #578-XX-XXX
08 80 00 Glazing 10-15 08 90 00 Louvers and Vents 05-15
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 02-15 09 06 00 Schedule for Finishes 04-15 09 22 16 Non-Structural Metal Framing 10-14 09 23 00 Gypsum Plastering 10-15 09 24 00 Portland Cement Plastering 10-15 09 26 00 Veneer Plastering 10-15 09 29 00 Gypsum Board 11-14 09 30 13 Ceramic/Porcelain Tiling 09-15 09 51 00 Acoustical Ceilings 12-15 09 54 23 Linear Metal Ceilings 10-15 09 63 13 Brick Flooring 02-16 09 63 40 Stone Flooring 10-15 09 65 13 Resilient Base and Accessories 02-16 09 65 16 Resilient Sheet Flooring 02-16 09 65 19 Resilient Tile Flooring 12-15 09 66 13 Portland Cement Terrazzo Flooring 10-15 09 66 16 Terrazzo Floor Tile 10-15 09 67 23.20 Resinous Epoxy Base With Vinyl Chip Broadcast (RES 2) 07-14 09 67 23.30 Resinous (Epoxy Resin Composition)Mortar Flooring (RES-
3) 07-14
09.67.23.40 Resinous Poured In Place Resilient Flooring (RES-4) 07-14 09 67 23.50 Resinous (Epoxy Terrazzo) Flooring (RES-5) 07-14 09 67 23.60 Resinous (Urethane and Epoxy Mortar) Flooring (RES-6) 07-14 09 68 00 Carpeting 10-15 09 68 21 Athletic Carpeting 10-15 09 69 00 Access Flooring 10-15 09 72 16 Vinyl-Coated Fabric Wall Covering 10-15 09 72 31 Polypropylene Fabric Wall Covering 05-15 09 84 33 Sound-Absorbing Wall Units 10-15 09 91 00 Painting 01-16 09 94 19 Multicolor Interior Finishing 05-13 09 96 59 High-Build Glazed Coatings 07-14
DIVISION 10 – SPECIALTIES
10 11 13 Chalkboards and Markerboards 10-15 10 11 23 Tackboards 10-15 10 13 00 Directories 05-15 10 14 00 Signage 10-15 10 21 13 Toilet Compartments 12-15 10 21 16 Shower and Dressing Compartments 11-11 10 21 23 Cubicle Curtain Tracks 05-15 10 22 13 Wire Mesh Partitions 10-15 10 22 19.13 Demountable Metal Partitions 06-12 10 22 26.13 Accordion Folding Partitions 05-15 10 25 13 Patient Bed Service Walls 10-15 10 26 00 Wall and Door Protection 10-15
Project Name 5 Project #578-XX-XXX
10 28 00 Toilet, Bath, and Laundry Accessories 02-16 10 44 13 Fire Extinguisher Cabinets 08-14 10 75 00 Flagpoles 02-16
DIVISION 11 – EQUIPMENT
11 05 12 General Motor Requirements for Equipment 11-11 11 12 00 Parking Control Equipment 02-16 11 17 36 Package Transfer Units 02-13 11 26 00 Unit Kitchens 11-11 11 27 00 Photographic Processing Equipment 11-11 11 40 11 Custom Fabricated Food Service Equipment 11-11 11 40 21 Food Service Equipment-Utility Distribution System 11-11 11 41 00 Food Storage Equipment 11-11 11 41 21 Walk-In Coolers and Freezers 05-15 11 44 00 Food Cooking Equipment 11-11 11 48 00 Cleaning and Disposal Equipment 11-11 11 53 13 Laboratory Fume Hoods 05-15 11 53 23 Laboratory Refrigerators 11-11 11 53 53 Biological Safety Cabinets Laminar Airflow Stations 01-11 11 53 61 Custom Fabricated Laboratory Equipment 11-11 11 53 71 Solution Warming Cabinets 11-11 11 71 01 Medical Washing and Sterilizing Equipment 02-11 11 71 02 Laboratory Washing and Sterilizing Equipment 10-11 11 73 00 Ceiling Mounted Patient Lift System 09-14 11 78 00 Mortuary Equipment 11-11 11 78 13 Mortuary Refrigerators 11-11 11 79 13 Hydrotherapy Equipment 11-11 11 82 19 Packaged Incinerators 11-11
DIVISION 12 – FURNISHINGS
12 22 16 Drapery Track and Accessories 05-15 12 24 00 Window Shades 09-15 12 24 21 Lightproof Shades 05-15 12 31 00 Manufactured Metal Casework 05-15 12 32 00 Manufactured Wood Casework 09-15 12 34 00 Manufactured Plastic Casework 10-15 12 35 70.21 Medication Cabinet 02-16 12 36 00 Countertops 12-15 12 56 70.11 Suspended Table 02-16
DIVISION 13 - SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non-Structural
Components 01-14
13 17 23 Therapeutic Pools 05-15 13 17 23.11 Therapeutic Pool Accessories 05-15 13 19 13 Kennel Enclosures and Gates 02-16 13 21 29 Constant Temperature Rooms 11-11 13 34 19 Metal Building Systems 01-13 13 49 00 Radiation Protection 02-16
Project Name 6 Project #578-XX-XXX
DIVISION 14– CONVEYING EQUIPEMENT
14 12 11 Electric Dumbwaiters Geared Traction and Winding Drum 05-11 14 21 00 Electric Traction Elevators 09-11 14 21 11 Traction Cartlift 06-11 14 24 00 Hydraulic Elevators 05-11 14 24 11 Hydraulic Cartlift 06-11 14 24 24 Renovation Hydraulic Elevator (Custom Written by VACO) 14 26 26 Renovation Traction Elevator (Custom Written by VACO) 14 91 33 Laundry and Linen Chutes 06-12 14 91 82 Trash Chutes 06-12
DIVISION 21- FIRE SUPPRESSION
21 08 00 Commissioning of Fire Suppression System 05-15 21 12 00 Manual Dry Standpipe Systems 06-15 21 13 13 Wet-Pipe Sprinkler Systems 06-15 21 13 16 Dry-Pipe Sprinkler Systems 01-15 21-22-00 Clean Agent Fire Suppression Systems 05-15 21-30-13 Electric-Driven, Fire Pumps 05-15 21-30-16 Diesel-Driven, Fire Pumps 05-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 09-15 22 05 12 General Motor Requirements for Plumbing Equipment 09-15 22 05 19 Meters and Gages for Plumbing Piping 09-15 22 05 23 General-Duty Valves for Plumbing Piping 09-15 22 05 33 Heat Tracing for Plumbing Piping 09-15 22 07 11 Plumbing Insulation 09-15 22 08 00 Commissioning of Plumbing Systems 06-13 22 11 00 Facility Water Distribution 09-15 22 11 23 Domestic Water Pumps 09-15 22 12 16 Facility Elevated, Potable-Water Storage Tanks 09-15 22 13 00 Facility Sanitary and Vent Piping 09-15 22 13 23 Sanitary Waste Interceptors 09-15 22 13 29 Sanitary Sewerage Pumps 09-15 22 13 29.13 Wet-Pit Mounted, Vertical Sewerage Pumps 09-15 22 13 33 Packaged, Submersible Sewerage Pump Units 09-15 22 14 00 Facility Storm Drainage 09-15 22 14 29 Sump Pumps 09-15 22 14 33 Packaged, Pedestal Drainage Pump Units 09-15 22 14 36 Packaged, Submersible, Drainage Pump Units 09-15 22 15 00 General Service Compressed-Air Systems 09-15 22 31 11 Water Softeners 09-15 22 33 00 Electric Domestic Water Heaters 09-15 22 34 00 Fuel-Fired Domestic Water Heaters 09-15 22 35 00 Domestic Water Heat Exchangers 09-15 22 40 00 Plumbing Fixtures 09-15 22 42 26 Commercial Disposers 09-15 22 61 13.74 Dental Compressed-Air Piping 09-15 22 61 19.74 Dental Compressed-Air Equipment 09-15
Project Name 7 Project #578-XX-XXX
22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 09-15 22 62 19.74 Dental Vacuum and Evacuation Equipment 09-15 22 63 00 Gas Systems for Laboratory and Healthcare Facilities 09-15 22 66 00 Chemical-Waste Systems for Laboratory and Healthcare
Facilities 09-15
22 67 19.16 Reverse-Osmosis Water Equipment 09-15 22 67 21 Water Dealkalizing System 09-15
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 10 Common Work Results for Boiler Plant and Steam
Generation 02-15
23 05 11 Common Work Results for HVAC 02-15 23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment 11-10
23 05 41 Noise and Vibration Control for HVAC Piping and Equipment
02-15
23 05 51 Noise and Vibration Control for Boiler Plant 02-15 23 05 93 Testing, Adjusting, and Balancing for HVAC 02-15 23 07 11 HVAC and Boiler Plant Insulation 02-15 23 08 00 Commissioning of HVAC Systems 06-13 23 08 11 Demonstrations and Tests for Boiler Plant 02-15 23 09 11 Instrumentation and Control for Boiler Plant 02-15 23 09 23 Direct-Digital Control System for HVAC 09-11 23 10 00 Facility Fuel Systems 02-15 23 11 23 Facility Natural-Gas Piping 02-15 23 21 11 Boiler Plant Piping Systems 02-15 23 21 13 Hydronic Piping 09-12 23 21 23 Hydronic Pumps 02-15 23 22 13 Steam and Condensate Heating Piping 02-15 23 22 23 Steam Condensate Pumps 02-15 23 23 00 Refrigerant Piping 02-15 23 25 00 HVAC Water Treatment 02-15 23 31 00 HVAC Ducts and Casings 03-13 23 34 00 HVAC Fans 02-15 23 36 00 Air Terminal Units 02-15 23 37 00 Air Outlets and Inlets 02-15 23 38 13 Commercial-Kitchen Hoods 01-11 23 40 00 HVAC Air Cleaning Devices 02-12 23 50 11 Boiler Plant Mechanical Equipment 05-11 23 51 00 Breechings, Chimneys, and Stacks 05-11 23 52 25 Low-Pressure Water Heating Boilers 05-10 23 52 33 Water-Tube Boilers 02-15 23 52 39 Fire-Tube Boilers 02-15 23 56 00 Solar Energy Heating System 01-13 23 57 33 Geothermal Energy – Direct Use (Heating Applications) 01-13 23 64 00 Packaged Water Chillers 04-11 23 65 00 Cooling Towers 02-15 23 72 00 Air-to-Air Energy Recovery Equipment 05-11 23 73 00 Indoor Central-Station Air-Handling Units 04-11 23 74 13 Packaged, Outdoor, Central-Station Air-Handling Units 04-11 23 81 00 Decentralized Unitary HVAC Equipment 02-11
Project Name 8 Project #578-XX-XXX
23 81 23 Computer-Room Air-Conditioners 04-11 23 81 43 Air-Source Unitary Heat Pumps 04-11 23 81 46 Water-Source Unitary Heat Pumps 04-11 23 81 49 Ground-Source Heat Pump 01-13 23 82 00 Convection Heating and Cooling Units 04-11 23 82 16 Air Coils 04-11 23 84 00 Humidity Control Equipment 05-11
DIVISION 25 – INTEGRATED AUTOMATION
25 10 10 Advanced Utility Metering System 02-10
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16 26 05 13 Medium-Voltage Cables 12-12 26 05 19 Low-Voltage Electrical Power Conductors and Cables 07-13 26 05 26 Grounding and Bonding for Electrical Systems 12-12 26 05 33 Raceway and Boxes for Electrical Systems 05-14 26 05 36 Wireways for Radiology Equipment 05-14 26 05 39 Underfloor Raceways for Electrical Systems 08-14 26 05 41 Underground Electrical Construction 12-12 26 05 73 Overcurrent Protective Device Coordination Study 12-15 26 08 00 Commissioning of Electrical Systems 06-13 26 09 23 Lighting Controls 05-14 26 11 16 Secondary Unit Substations 02-16 26 12 19 Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers 12-15 26 13 13 Medium-Voltage Circuit Breaker Switchgear 12-12 26 13 16 Medium-Voltage Fusible Interrupter Switches 12-12 26 20 11 Isolated Power Systems 07-15 26 22 00 Low-Voltage Transformers 12-15 26 23 00 Low-Voltage Switchgear 12-12 26 23 13 Generator Paralleling Controls 12-12 26 24 13 Distribution Switchboards 08-14 26 24 16 Panelboards 05-14 26 24 19 Motor Control Centers 08-14 26 25 11 Busways 12-12 26 26 00 Power Distribution Units for Static Uninterruptible
Power Systems 08-14
26 27 26 Wiring Devices 01-16 26 29 11 Motor Controllers 08-14 26 29 21 Enclosed Switches and Circuit Breakers 12-12 26 32 13 Engine Generators 07-15 26 33 53 Static Uninterruptible Power Supply 12-12 26 35 26 Harmonic Filters 08-14 26 36 23 Automatic Transfer Switches 12-12 26 41 00 Facility Lightning Protection 12-12 26 42 00 Cathodic Protection 12-12 26 43 13 Surge Protective Device 12-12 26 51 00 Interior Lighting 08-14 26 55 71 Medical and Surgical Lighting Fixtures 11-14 26 56 00 Exterior Lighting 05-14
Project Name 9 Project #578-XX-XXX
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 06-15 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 06-15 27 05 61 Leased Space, Communication Equipment and Systems 06-15 27 08 00 Commissioning of Communications Systems 06-15 27 10 00 Control, Communication and Signal Wires 06-15 27 11 00 Communications Equipment Room Fittings 06-15 27 15 00 Communications Horizontal Cabling 01-16 27 31 00 Voice Communications Switching and Routing Equipment 06-15 27 31 31 Voice Communications Switching and Routing Equipment -
Extension 06-15
27 32 41 Two-Way Radio Equipment and Systems 10-15 27 41 31 Master Antenna Television Equipment and Systems 06-15 27 51 16 Public Address and Mass Notification Systems 10-15 27 51 23 Intercommunications and Program Systems 06-15 27 52 23 Nurse Call and Code Blue Systems 10-15 27 52 41 Miscellaneous Medical Systems 06-15 27 53 19 Distributed Radio Antenna (Within Building) Equipment and System 09-12
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 09-11 28 05 13 Conductors and Cables for Electronic Safety and
Security 09-11
28 05 26 Grounding and Bonding for Electronic Safety and Security
09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and Security
09-11
28 08 00 Commissioning of Electronic Safety and Security Systems 06-13 28 13 00 Physical Access Control System 10-11 28 13 16 Physical Access Control System and Database Management 09-11 28 13 53 Security Access Detection 09-11 28 16 00 Intrusion Detection System 10-11 28 23 00 Video Surveillance 09-11 28 26 00 Electronic Personal Protection System 09-11 28 31 00 Fire Detection and Alarm 10-11 28 52 31 Emergency Call System 06-15
DIVISION 31 – EARTHWORK
31 20 00 Earthwork 10-12 31 20 11 Earthwork (Short Form) 10-12 31 23 19 Dewatering 10-12 31 23 23.33 Flowable Fill 10-12 31 32 23 Pressure Grouting Soil Stabilization 10-12 31 62 00 Driven Piles 10-12 31 63 16 Auger Cast Grout Piles 10-12 31 63 26 Drilled Caissons 10-12
Project Name 10 Project #578-XX-XXX
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 05-13 32 12 16 Asphalt Paving 09-15 32 14 16 Brick Unit Paving 04-10 32 17 23 Pavement Markings 04-10 32 31 13 Chain Link Fences and Gates 05-13 32 31 53 Perimeter Security Fences and Gates 05-13 32 84 00 Planting Irrigation 10-11 32 90 00 Planting 10-11
DIVISION 33 – UTILITIES
33 08 00 Commissioning of Site Utility Systems 06-13 33 10 00 Water Utilities 01-14 33 30 00 Sanitary Sewer Utilities 06-13 33 40 00 Storm Sewer Utilities 10-11 33 46 13 Foundation Drainage 10-11 33 51 00 Natural-Gas Distribution 10-11 33 63 00 Steam Energy Distribution 06-13
DIVISION 34 – TRANSPORTATION
34 71 13 Vehicle Barriers 05-13 34 75 13.13 Active Vehicle Barriers 05-13
DIVISION 48 – Electrical Power Generation
48 14 00 Solar Energy Electrical Power Generation System 01-13 48 15 00 Wind Energy Electrical Power Generation System 01-13 48 16 23 Geothermal Energy – Electricity Generation System 01-13
Project Name 1 Project #578-XX-XXX
TABLE OF CONTENTS
DIVISION 00 - SPECIAL SECTIONS DATE
00 01 15 List of Drawing Sheets 07-15 00 11 21 Request for Proposal to Design Build 11-15
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-15 01 32 16.01 Architectural and Engineering CPM Schedules 01-11 01 32 16.13 Network Analysis Schedule – Major Projects 09-15 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build) 04-13 01 32 16.16 Network Analysis Schedules (Design-Build Only) 02-15 01 32 16.17 Project Schedules (Small Projects – Design/Build) 04-11 01 33 00 Submittal Register (Example, For Contractor Reference) 06-19 01 33 23 Shop Drawings, Product Data, and Samples 07-15 01 35 26 Safety Requirements 10-14 01 42 19 Reference Standards 07-15 01 45 29 Testing Laboratory Services 06-15 01 57 19 Temporary Environmental Controls 01-11 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 09-13 01 81 13 Sustainable Construction Requirements 09-15 01 81 13.01 Sustainability Certification Requirements – LEED NC V3 09-15 01 81 13.02 Sustainability Certification Requirements – LEED NC V4 09-15 01 81 13.11 Sustainability Certification Requirements – LEED HC V3 09-15 01 81 13.21 Sustainability Certification Requirements – GREEN
GLOBES
09-15
01 91 00 General Commissioning Requirements 10-15
DIVISION 02 – EXISTING CONDITIONS
02 21 00 Site Surveys 05-13 02 41 00 Demolition 02-15 02 65 00 Underground Storage Tank Removal 05-13 02 82 11 Traditional Asbestos Abatement 09-15 02 82 13.13 Glovebag Asbestos Abatement 09-15 02 82 13.19 Asbestos Floor Tile and Mastic Abatement 09-15 02 82 13.21 Asbestos Roofing Abatement 09-15 02 82 13.31 Asbestos Transite Abatement 09-15 02 82 13.41 Asbestos Abatement for Total Demolition Project 04-15 02 83 33.13 Lead-Based Paint Removal and Disposal 08-11
DIVISION 03 – CONCRETE
03 23 00 Stressing Tendons 07-11 03 30 00 Cast-in-Place Concrete 12-15 03 30 53 (Short-Form) Cast-in-Place Concrete 02-16 03 37 13 Shotcrete 07-11
Project Name 2 Project #578-XX-XXX
03 41 13 Precast Concrete Hollow Core Planks 07-11 03 41 33 Precast Structural Pretension Concrete 07-11 03 45 00 Precast Architectural Concrete 10-15 03 51 13 Cementitious Wood Fiber Decks 09-11 03 51 16 Gypsum Concrete Roof Decks 09-11 03 52 00 Lightweight Concrete Roof Insulation 05-15 03 55 11 Gypsum Concrete Floor Decks 07-11
DIVISION 04 – MASONRY
04 01 00 Maintenance of Masonry 02-16 04 05 13 Masonry Mortaring 02-16 04 05 16 Masonry Grouting 02-16 04 20 00 Unit Masonry 02-16 04 72 00 Cast Stone Masonry 02-15
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 02-16 05 21 00 Steel Joist Framing 03-10 05 31 00 Steel Decking 02-16 05 36 00 Composite Metal Decking 10-15 05 40 00 Cold-Formed Metal Framing 07-11 05 50 00 Metal Fabrications 07-14 05 51 00 Metal Stairs 10-15
DIVISION 06 – WOOD,PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-15 06 16 63 Cementitious Sheathing 02-16 06 20 00 Finish Carpentry 06-13
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 01 50.19 Preparation for Re-Roofing 02-16 07 08 00 Facility Exterior Closure Commissioning 06-13 07 11 13 Bituminous Dampproofing 02-16 07 12 00 Built-Up Bituminous Waterproofing 09-11 07 13 00 Sheet Waterproofing 04-13 07 13 52 Modified Bituminous Sheet Waterproofing 09-11 07 14 21 Latex Mastic Deck Covering 05-15 07 18 13 Pedestrian Traffic Coatings 05-15 07 21 13 Thermal Insulation 02-16 07 21 23 Loose-Fill Insulation 02-16 07 22 00 Roof and Deck Insulation 02-16 07 24 00 Exterior Insulation and Finish Systems 02-16 07 27 26 Fluid-Applied Membrane Air Barrier, Vapor Permeable 02-16 07 27 27 Fluid-Applied Membrane Air Barrier, Vapor Retarding 02-16 07 31 13 Asphalt Shingles 02-16 07 31 26 Slate Shingles 02-16 07 31 29.13 Wood Shingles 02-16 07 32 13 Clay Roof Tiles 02-16
Project Name 3 Project #578-XX-XXX
07 40 00 Roofing and Siding Panels 10-15 07 51 00 Built-Up Bituminous Roofing 07-14 07 51 00.11 Built-Up Bituminous Roofing, Hot-Applied 10-15 07 51 00.13 Built-Up Bituminous Roofing, Cold-Applied 10-15 07 52 16 Styrene-Butadiene-Styrene Modified Bituminous Membrane
Roofing, Hot Applied 10-15
07 52 16.13 Styrene-Butadiene-Styrene Modified Bituminous Membrane, Roofing, Cold Applied
10-15
07 53 23 Ethylene-Propylene-Diene-Monomer Roofing 02-16 07 54 16 Ethylene Interpolymer (KEE) Roofing 10-15 07 54 19 Polyvinyl-Chloride (PVC) Roofing 02-16 07 54 23 Thermoplastic Polyolefin (TPO) Roofing 10-15 07 56 00 Fluid-Applied Roofing 05-15 07 57 13 Sprayed Polyurethane Foam Roofing 10-15 07 60 00 Flashing and Sheet Metal 07-14 07 61 16 Batten Seam Copper Roofing 10-15 07 71 00 Roof Specialties 10-15 07 72 00 Roof Accessories 10-15 07 81 00 Applied Fireproofing 10-15 07 84 00 Firestopping 02-16 07 92 00 Joint Sealants 10-15 07 95 13 Expansion Joint Cover Assemblies 02-16
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-13 08 11 73 Sliding Metal Fire Doors 02-16 08 14 00 Interior Wood Doors 02-16 08 17 10 Integrated Door Assemblies 02-16 08 31 13 Access Doors and Frames 02-16 08 33 00 Coiling Doors and Grilles 02-16 08 33 13 Coiling Counter Doors 02-16 08 34 36 Darkroom Doors 07-15 08 34 53 Security Doors and Frames 05-15 08 34 59 Vault Doors and Day Gates 02-16 08 35 13.13 Accordion Folding Doors 05-15 08 36 13 Sectional Doors 05-15 08 38 16 Flexible Traffic Doors 02-16 08 41 13 Aluminum-Framed Entrances and Storefronts 10-15 08 42 33 Revolving Door Entrances 05-15 08 44 13 Glazed Aluminum Curtain Walls 10-15 08 51 13 Aluminum Windows 02-16 08 51 13.11 Side-Hinged Aluminum Windows 10-13 08 51 23 Steel Windows 02-16 08 51 69.11 Aluminum Storm Windows 05-15 08 56 19 Pass Windows 02-16 08 56 53 Blast Resistant Windows 02-16 08 56 59 Service and Teller Window Units 02-16 08 56 66 Detention Window Screens 02-16 08 63 00 Metal-Framed Skylights 10-15 08 71 00 Door Hardware 01-16 08 71 13 Automatic Door Operators 02-16 08 71 13.11 Low Energy Power Assist Door Operators 12-13
Project Name 4 Project #578-XX-XXX
08 80 00 Glazing 10-15 08 90 00 Louvers and Vents 05-15
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 02-15 09 06 00 Schedule for Finishes 04-15 09 22 16 Non-Structural Metal Framing 10-14 09 23 00 Gypsum Plastering 10-15 09 24 00 Portland Cement Plastering 10-15 09 26 00 Veneer Plastering 10-15 09 29 00 Gypsum Board 11-14 09 30 13 Ceramic/Porcelain Tiling 09-15 09 51 00 Acoustical Ceilings 12-15 09 54 23 Linear Metal Ceilings 10-15 09 63 13 Brick Flooring 02-16 09 63 40 Stone Flooring 10-15 09 65 13 Resilient Base and Accessories 02-16 09 65 16 Resilient Sheet Flooring 02-16 09 65 19 Resilient Tile Flooring 12-15 09 66 13 Portland Cement Terrazzo Flooring 10-15 09 66 16 Terrazzo Floor Tile 10-15 09 67 23.20 Resinous Epoxy Base With Vinyl Chip Broadcast (RES 2) 07-14 09 67 23.30 Resinous (Epoxy Resin Composition)Mortar Flooring (RES-
3) 07-14
09.67.23.40 Resinous Poured In Place Resilient Flooring (RES-4) 07-14 09 67 23.50 Resinous (Epoxy Terrazzo) Flooring (RES-5) 07-14 09 67 23.60 Resinous (Urethane and Epoxy Mortar) Flooring (RES-6) 07-14 09 68 00 Carpeting 10-15 09 68 21 Athletic Carpeting 10-15 09 69 00 Access Flooring 10-15 09 72 16 Vinyl-Coated Fabric Wall Covering 10-15 09 72 31 Polypropylene Fabric Wall Covering 05-15 09 84 33 Sound-Absorbing Wall Units 10-15 09 91 00 Painting 01-16 09 94 19 Multicolor Interior Finishing 05-13 09 96 59 High-Build Glazed Coatings 07-14
DIVISION 10 – SPECIALTIES
10 11 13 Chalkboards and Markerboards 10-15 10 11 23 Tackboards 10-15 10 13 00 Directories 05-15 10 14 00 Signage 10-15 10 21 13 Toilet Compartments 12-15 10 21 16 Shower and Dressing Compartments 11-11 10 21 23 Cubicle Curtain Tracks 05-15 10 22 13 Wire Mesh Partitions 10-15 10 22 19.13 Demountable Metal Partitions 06-12 10 22 26.13 Accordion Folding Partitions 05-15 10 25 13 Patient Bed Service Walls 10-15 10 26 00 Wall and Door Protection 10-15
Project Name 5 Project #578-XX-XXX
10 28 00 Toilet, Bath, and Laundry Accessories 02-16 10 44 13 Fire Extinguisher Cabinets 08-14 10 75 00 Flagpoles 02-16
DIVISION 11 – EQUIPMENT
11 05 12 General Motor Requirements for Equipment 11-11 11 12 00 Parking Control Equipment 02-16 11 17 36 Package Transfer Units 02-13 11 26 00 Unit Kitchens 11-11 11 27 00 Photographic Processing Equipment 11-11 11 40 11 Custom Fabricated Food Service Equipment 11-11 11 40 21 Food Service Equipment-Utility Distribution System 11-11 11 41 00 Food Storage Equipment 11-11 11 41 21 Walk-In Coolers and Freezers 05-15 11 44 00 Food Cooking Equipment 11-11 11 48 00 Cleaning and Disposal Equipment 11-11 11 53 13 Laboratory Fume Hoods 05-15 11 53 23 Laboratory Refrigerators 11-11 11 53 53 Biological Safety Cabinets Laminar Airflow Stations 01-11 11 53 61 Custom Fabricated Laboratory Equipment 11-11 11 53 71 Solution Warming Cabinets 11-11 11 71 01 Medical Washing and Sterilizing Equipment 02-11 11 71 02 Laboratory Washing and Sterilizing Equipment 10-11 11 73 00 Ceiling Mounted Patient Lift System 09-14 11 78 00 Mortuary Equipment 11-11 11 78 13 Mortuary Refrigerators 11-11 11 79 13 Hydrotherapy Equipment 11-11 11 82 19 Packaged Incinerators 11-11
DIVISION 12 – FURNISHINGS
12 22 16 Drapery Track and Accessories 05-15 12 24 00 Window Shades 09-15 12 24 21 Lightproof Shades 05-15 12 31 00 Manufactured Metal Casework 05-15 12 32 00 Manufactured Wood Casework 09-15 12 34 00 Manufactured Plastic Casework 10-15 12 35 70.21 Medication Cabinet 02-16 12 36 00 Countertops 12-15 12 56 70.11 Suspended Table 02-16
DIVISION 13 - SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non-Structural
Components 01-14
13 17 23 Therapeutic Pools 05-15 13 17 23.11 Therapeutic Pool Accessories 05-15 13 19 13 Kennel Enclosures and Gates 02-16 13 21 29 Constant Temperature Rooms 11-11 13 34 19 Metal Building Systems 01-13 13 49 00 Radiation Protection 02-16
Project Name 6 Project #578-XX-XXX
DIVISION 14– CONVEYING EQUIPEMENT
14 12 11 Electric Dumbwaiters Geared Traction and Winding Drum 05-11 14 21 00 Electric Traction Elevators 09-11 14 21 11 Traction Cartlift 06-11 14 24 00 Hydraulic Elevators 05-11 14 24 11 Hydraulic Cartlift 06-11 14 24 24 Renovation Hydraulic Elevator (Custom Written by VACO) 14 26 26 Renovation Traction Elevator (Custom Written by VACO) 14 91 33 Laundry and Linen Chutes 06-12 14 91 82 Trash Chutes 06-12
DIVISION 21- FIRE SUPPRESSION
21 08 00 Commissioning of Fire Suppression System 05-15 21 12 00 Manual Dry Standpipe Systems 06-15 21 13 13 Wet-Pipe Sprinkler Systems 06-15 21 13 16 Dry-Pipe Sprinkler Systems 01-15 21-22-00 Clean Agent Fire Suppression Systems 05-15 21-30-13 Electric-Driven, Fire Pumps 05-15 21-30-16 Diesel-Driven, Fire Pumps 05-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 09-15 22 05 12 General Motor Requirements for Plumbing Equipment 09-15 22 05 19 Meters and Gages for Plumbing Piping 09-15 22 05 23 General-Duty Valves for Plumbing Piping 09-15 22 05 33 Heat Tracing for Plumbing Piping 09-15 22 07 11 Plumbing Insulation 09-15 22 08 00 Commissioning of Plumbing Systems 06-13 22 11 00 Facility Water Distribution 09-15 22 11 23 Domestic Water Pumps 09-15 22 12 16 Facility Elevated, Potable-Water Storage Tanks 09-15 22 13 00 Facility Sanitary and Vent Piping 09-15 22 13 23 Sanitary Waste Interceptors 09-15 22 13 29 Sanitary Sewerage Pumps 09-15 22 13 29.13 Wet-Pit Mounted, Vertical Sewerage Pumps 09-15 22 13 33 Packaged, Submersible Sewerage Pump Units 09-15 22 14 00 Facility Storm Drainage 09-15 22 14 29 Sump Pumps 09-15 22 14 33 Packaged, Pedestal Drainage Pump Units 09-15 22 14 36 Packaged, Submersible, Drainage Pump Units 09-15 22 15 00 General Service Compressed-Air Systems 09-15 22 31 11 Water Softeners 09-15 22 33 00 Electric Domestic Water Heaters 09-15 22 34 00 Fuel-Fired Domestic Water Heaters 09-15 22 35 00 Domestic Water Heat Exchangers 09-15 22 40 00 Plumbing Fixtures 09-15 22 42 26 Commercial Disposers 09-15 22 61 13.74 Dental Compressed-Air Piping 09-15 22 61 19.74 Dental Compressed-Air Equipment 09-15
Project Name 7 Project #578-XX-XXX
22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 09-15 22 62 19.74 Dental Vacuum and Evacuation Equipment 09-15 22 63 00 Gas Systems for Laboratory and Healthcare Facilities 09-15 22 66 00 Chemical-Waste Systems for Laboratory and Healthcare
Facilities 09-15
22 67 19.16 Reverse-Osmosis Water Equipment 09-15 22 67 21 Water Dealkalizing System 09-15
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 10 Common Work Results for Boiler Plant and Steam
Generation 02-15
23 05 11 Common Work Results for HVAC 02-15 23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment 11-10
23 05 41 Noise and Vibration Control for HVAC Piping and Equipment
02-15
23 05 51 Noise and Vibration Control for Boiler Plant 02-15 23 05 93 Testing, Adjusting, and Balancing for HVAC 02-15 23 07 11 HVAC and Boiler Plant Insulation 02-15 23 08 00 Commissioning of HVAC Systems 06-13 23 08 11 Demonstrations and Tests for Boiler Plant 02-15 23 09 11 Instrumentation and Control for Boiler Plant 02-15 23 09 23 Direct-Digital Control System for HVAC 09-11 23 10 00 Facility Fuel Systems 02-15 23 11 23 Facility Natural-Gas Piping 02-15 23 21 11 Boiler Plant Piping Systems 02-15 23 21 13 Hydronic Piping 09-12 23 21 23 Hydronic Pumps 02-15 23 22 13 Steam and Condensate Heating Piping 02-15 23 22 23 Steam Condensate Pumps 02-15 23 23 00 Refrigerant Piping 02-15 23 25 00 HVAC Water Treatment 02-15 23 31 00 HVAC Ducts and Casings 03-13 23 34 00 HVAC Fans 02-15 23 36 00 Air Terminal Units 02-15 23 37 00 Air Outlets and Inlets 02-15 23 38 13 Commercial-Kitchen Hoods 01-11 23 40 00 HVAC Air Cleaning Devices 02-12 23 50 11 Boiler Plant Mechanical Equipment 05-11 23 51 00 Breechings, Chimneys, and Stacks 05-11 23 52 25 Low-Pressure Water Heating Boilers 05-10 23 52 33 Water-Tube Boilers 02-15 23 52 39 Fire-Tube Boilers 02-15 23 56 00 Solar Energy Heating System 01-13 23 57 33 Geothermal Energy – Direct Use (Heating Applications) 01-13 23 64 00 Packaged Water Chillers 04-11 23 65 00 Cooling Towers 02-15 23 72 00 Air-to-Air Energy Recovery Equipment 05-11 23 73 00 Indoor Central-Station Air-Handling Units 04-11 23 74 13 Packaged, Outdoor, Central-Station Air-Handling Units 04-11 23 81 00 Decentralized Unitary HVAC Equipment 02-11
Project Name 8 Project #578-XX-XXX
23 81 23 Computer-Room Air-Conditioners 04-11 23 81 43 Air-Source Unitary Heat Pumps 04-11 23 81 46 Water-Source Unitary Heat Pumps 04-11 23 81 49 Ground-Source Heat Pump 01-13 23 82 00 Convection Heating and Cooling Units 04-11 23 82 16 Air Coils 04-11 23 84 00 Humidity Control Equipment 05-11
DIVISION 25 – INTEGRATED AUTOMATION
25 10 10 Advanced Utility Metering System 02-10
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16 26 05 13 Medium-Voltage Cables 12-12 26 05 19 Low-Voltage Electrical Power Conductors and Cables 07-13 26 05 26 Grounding and Bonding for Electrical Systems 12-12 26 05 33 Raceway and Boxes for Electrical Systems 05-14 26 05 36 Wireways for Radiology Equipment 05-14 26 05 39 Underfloor Raceways for Electrical Systems 08-14 26 05 41 Underground Electrical Construction 12-12 26 05 73 Overcurrent Protective Device Coordination Study 12-15 26 08 00 Commissioning of Electrical Systems 06-13 26 09 23 Lighting Controls 05-14 26 11 16 Secondary Unit Substations 02-16 26 12 19 Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers 12-15 26 13 13 Medium-Voltage Circuit Breaker Switchgear 12-12 26 13 16 Medium-Voltage Fusible Interrupter Switches 12-12 26 20 11 Isolated Power Systems 07-15 26 22 00 Low-Voltage Transformers 12-15 26 23 00 Low-Voltage Switchgear 12-12 26 23 13 Generator Paralleling Controls 12-12 26 24 13 Distribution Switchboards 08-14 26 24 16 Panelboards 05-14 26 24 19 Motor Control Centers 08-14 26 25 11 Busways 12-12 26 26 00 Power Distribution Units for Static Uninterruptible
Power Systems 08-14
26 27 26 Wiring Devices 01-16 26 29 11 Motor Controllers 08-14 26 29 21 Enclosed Switches and Circuit Breakers 12-12 26 32 13 Engine Generators 07-15 26 33 53 Static Uninterruptible Power Supply 12-12 26 35 26 Harmonic Filters 08-14 26 36 23 Automatic Transfer Switches 12-12 26 41 00 Facility Lightning Protection 12-12 26 42 00 Cathodic Protection 12-12 26 43 13 Surge Protective Device 12-12 26 51 00 Interior Lighting 08-14 26 55 71 Medical and Surgical Lighting Fixtures 11-14 26 56 00 Exterior Lighting 05-14
Project Name 9 Project #578-XX-XXX
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 06-15 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 06-15 27 05 61 Leased Space, Communication Equipment and Systems 06-15 27 08 00 Commissioning of Communications Systems 06-15 27 10 00 Control, Communication and Signal Wires 06-15 27 11 00 Communications Equipment Room Fittings 06-15 27 15 00 Communications Horizontal Cabling 01-16 27 31 00 Voice Communications Switching and Routing Equipment 06-15 27 31 31 Voice Communications Switching and Routing Equipment -
Extension 06-15
27 32 41 Two-Way Radio Equipment and Systems 10-15 27 41 31 Master Antenna Television Equipment and Systems 06-15 27 51 16 Public Address and Mass Notification Systems 10-15 27 51 23 Intercommunications and Program Systems 06-15 27 52 23 Nurse Call and Code Blue Systems 10-15 27 52 41 Miscellaneous Medical Systems 06-15 27 53 19 Distributed Radio Antenna (Within Building) Equipment and System 09-12
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 09-11 28 05 13 Conductors and Cables for Electronic Safety and
Security 09-11
28 05 26 Grounding and Bonding for Electronic Safety and Security
09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and Security
09-11
28 08 00 Commissioning of Electronic Safety and Security Systems 06-13 28 13 00 Physical Access Control System 10-11 28 13 16 Physical Access Control System and Database Management 09-11 28 13 53 Security Access Detection 09-11 28 16 00 Intrusion Detection System 10-11 28 23 00 Video Surveillance 09-11 28 26 00 Electronic Personal Protection System 09-11 28 31 00 Fire Detection and Alarm 10-11 28 52 31 Emergency Call System 06-15
DIVISION 31 – EARTHWORK
31 20 00 Earthwork 10-12 31 20 11 Earthwork (Short Form) 10-12 31 23 19 Dewatering 10-12 31 23 23.33 Flowable Fill 10-12 31 32 23 Pressure Grouting Soil Stabilization 10-12 31 62 00 Driven Piles 10-12 31 63 16 Auger Cast Grout Piles 10-12 31 63 26 Drilled Caissons 10-12
Project Name 10 Project #578-XX-XXX
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 05-13 32 12 16 Asphalt Paving 09-15 32 14 16 Brick Unit Paving 04-10 32 17 23 Pavement Markings 04-10 32 31 13 Chain Link Fences and Gates 05-13 32 31 53 Perimeter Security Fences and Gates 05-13 32 84 00 Planting Irrigation 10-11 32 90 00 Planting 10-11
DIVISION 33 – UTILITIES
33 08 00 Commissioning of Site Utility Systems 06-13 33 10 00 Water Utilities 01-14 33 30 00 Sanitary Sewer Utilities 06-13 33 40 00 Storm Sewer Utilities 10-11 33 46 13 Foundation Drainage 10-11 33 51 00 Natural-Gas Distribution 10-11 33 63 00 Steam Energy Distribution 06-13
DIVISION 34 – TRANSPORTATION
34 71 13 Vehicle Barriers 05-13 34 75 13.13 Active Vehicle Barriers 05-13
DIVISION 48 – Electrical Power Generation
48 14 00 Solar Energy Electrical Power Generation System 01-13 48 15 00 Wind Energy Electrical Power Generation System 01-13 48 16 23 Geothermal Energy – Electricity Generation System 01-13
File details come from the government source that posted it. Updated .