This is a revised Statement of Work (SOW) for generator maintenance and load bank testing services at Edward Hines Jr. VA Hospital in Hines, Illinois. The contract (36C25226Q0582) requires a contractor to furnish all labor, management, materials, and equipment to perform preventive maintenance, inspection, calibration, testing, and documentation for twenty backup generators that provide critical power for patient health and life safety operations.
The contract period runs from September 1, 2026 through August 31, 2027 for the base year, with four option years extending through August 31, 2031. Services include annual load bank testing in September and two levels of preventive maintenance: Level 1 in January and Level 2 in July. Load bank testing follows a defined sequence from no-load through 100% generator load rating over approximately three hours. Preventive maintenance encompasses fuel systems, cooling systems, air induction and exhaust, lubrication systems, starting systems, engine monitors, safety controls, and generator electrical components, with Level 2 requiring full oil and filter changes for all 20 generators during the base year and thereafter as needed. The contractor must perform an overall Emergency Power Supply System condition assessment during PM Level 2 activities, documenting vibration issues, leaks, temperature concerns, abnormal noises, and component deterioration. All work must be coordinated with the VA Engineering Department one week in advance and performed during normal business hours, Monday through Friday, 7:00 a.m. to 4:00 p.m. CST. Deliverables include detailed Engineering Service Reports submitted within 30 days of test completion, containing inspection checklists, measured data, test results, photographic evidence, deficiency lists, and cost estimates. The contractor must comply with VA Directive 1028, NFPA 99 and 110, Joint Commission standards, local and state regulations, ASTM fuel testing standards, and OEM guidance.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW FINAL V2.docx | DOCX document | |
| 36C25226Q0582 0002.docx | DOCX document | |
| S02 -Revised Equipment Listing.xlsx | XLSX spreadsheet | |
| S06 - 36C25226Q0582 0001.docx | DOCX document | |
| S02 - WD2015-5017R32D5.13.26.pdf | ||
| 36C25226Q0582.docx | DOCX document | |
| S02 - Map of Grounds.docx | DOCX document | |
| S02 - 852.219-75.docx | DOCX document | |
| S02 - Equipment Listing.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25226Q0582
B.2 STATEMENT OF WORK
1. Scope of Work Edward Hines Jr. VA hospital requires the services of a contractor to perform load bank testing, and maintenance for (20) generators. These generators provide backup power and have a direct impact on patient health and life safety throughout the Hines VA Campus. The Contractor shall furnish all labor, management, materials, equipment to perform preventive maintenance, inspection, calibration, testing and documentation for the generators listed on the equipment listing.
2. Place of Performance Edward Hines Jr. VA hospital 5000 S. 5th Avenue, Hines, Illinois 60141
3. Period of Performance Base Year: September 1 ,2026 through August 31,2027 Option Year 1: September 1, 2027, through August 31, 2028 Option Year 2: September 1, 2028, through August 31, 2029 Option Year 3: September 1, 2029, through August 31, 2030 Option Year 4: September 1, 2030, through August 31, 2031
4. Schedule Load Bank Testing shall be performed in September Preventive Maintenance (PM) Level 1 shall be performed in January.
Preventive Maintenance (PM) Level 2 shall be performed in July.
Any deviations from this schedule shall only be made with prior approval from the Contracting Officer Representative (COR)
5. Description of Services
5.1. Load Bank Testing Specifications:
· The generators shall be load tested using the following sequence:
· Idle / No-Load Readings.
· Baseline data recorded before applying load.
· 30% of Generator Load Rating for 30 minutes
· 50% of Generator Load Rating for next 30 minutes
· 75% of Generator Load Rating for 60 minutes (1 hour)
· 100% of Generator Load Rating for 60 minutes (1 hour)
· The VA will not provide switching, isolation or connection support. VA will communicate and answer questions, but the contractor shall perform all the work.
5.2. Preventive Maintenance - Level 1
5.2.1. The Contractor shall perform:
· Fuel System
· Change all fuel filters
· Inspect main tank and day tank for leaks, level, condition
· Drain water traps/separators
· Inspect primary/secondary filters; clean primary filter
· Check governor, controls, linkages, and oil level
· Inspect fuel lines, brackets, and connections
· Check fuel pressure gauge for correct operation
· Cooling System
· Inspect radiator/heat exchanger (leaks, debris, louvers)
· Inspect coolant level and condition; test protection level
· Inspect hoses and connections for deterioration
· Inspect/lubricate fan pulleys, fan bearings; check clearance
· Inspect fan belts (wear, tension)
· Inspect jacket water heater and thermostat setting
· Inspect water pump for leaks/noise
· Air Induction & Exhaust
· Inspect/clean primary & secondary air filters; reset indicators
· Replacement if needed of primary & secondary air filters shall be done through a separate quote and authorization from the CO.
· Replace all pre-air filters annually for generators 1-5 of building 226.
· Inspect air inlet piping, housings, gaskets
· Inspect turbocharger (leaks, noise)
· Inspect exhaust manifold (hardware, leakage, oil slobber)
· Inspect muffler/silencer and piping for damage or corrosion
· Lubrication System
· Inspect oil level and contamination; inspect for leaks
· Check oil pressure gauge for correct readings
· Inspect pre lube pump
· Inspect crankcase breather and hoses
· Perform full oil analysis (wear metals, contaminants, debris)
· Starting System
· Inspect batteries (condition, leakage, terminals)
· Check electrolyte level & specific gravity (if applicable)
· Inspect battery charger, wiring, terminals
· Inspect starting motor (connections, noise, operation)
· Inspect alternator & drive components
· Engine Monitors & Safety Controls
· Test all engine safety devices (oil pressure, coolant temp, overspeed, over crank, etc.)
· Test remote annunciators and local alarm systems
· Generator & Electrical Components
· Remove and inspect brushes, clean slip rings
· Inspect space heaters for proper operation
· Inspect control panel (manual/auto start, meters, adjustments)
· Verify voltmeter and ammeter readings
· Operational Test Requirements
· Cold engine start observation
· 30 minute operating run
· Monitoring for leaks, noise, vibration
· Verification of all safety shutdowns
· Recording of:
· Amps
· Volts
· Oil pressure
· Coolant temperature
· Fuel pressure
· Frequency
· Real power (kW output)
· Timing and functional verification of:
· Signal delay
· Engine start time
· Load pickup
· Re transfer timing
· Restoration to Service
· Day Tank and Fuel System Functional Testing
· Contractor shall conduct operational checks of the day tank, including:
· Float switch operation
· Transfer pump operation
· Solenoid valve performance (if equipped)
· Inspection of all fuel lines, hoses, connectors, and fittings for wear, corrosion, or leaks
5.3. Preventive Maintenance - Level 2
5.3.1. The Contractor shall perform:
· Fuel System
· Change all fuel filters
· Inspect main and day tank for leaks and fuel level
· Drain water traps/separators
· Inspect fuel lines, fittings, and brackets for leaks or looseness
· Inspect governor oil level, linkages, and controls; add oil as needed
· Inspect/clean primary and secondary fuel filters
· Inspect fuel pressure gauge for correct operation
· Inspect fuel condition for contaminants
· Cooling System
· Inspect radiator/heat exchanger for leaks, debris, damage
· Verify louver operation
· Inspect coolant level, rust, oil contamination, top off to maintain serviceable level
· Check coolant conditioner concentration and freeze/boil protection
· Inspect filler cap sealing surfaces and gasket
· Inspect hoses for deterioration; tighten connections
· Lube and inspect fan-drive bearings and pulleys
· Inspect fan belts for wear; adjust tension
· Verify jacket water heater operation and thermostat setting
· Inspect water pump for leaks, noise, or malfunction
· Air Induction & Exhaust System
· Inspect and clean primary/secondary air filters; reset indicators.
· Inspect air inlet piping, housings, seals, and gaskets
· Inspect turbocharger for oil or exhaust leakage, check for abnormal noise
· Inspect exhaust manifold for leakage, missing hardware, oil slobber
· Inspect exhaust muffler and piping for corrosion or damage
· Lube Oil System
· Provide a full oil and filter change for all 20 generators during the base year.
· Thereafter in the option years, change the oil filter every year and the oil every 250 hours or as needed based on the oil and filter inspection or the manufacturers’ requirements.
· If oil change is needed contractor shall provide a quote to the COR and shall be paid by a separate PO.
· Inspect oil level and contamination, top off to maintain serviceable level
· Inspect generator and engine for leaks
· Inspect pre‑lube pump operation
· Inspect gaskets and seals for deterioration
· Inspect crankcase breather operation and blow-by condition
· Perform full oil analysis (wear metals, contamination, debris)
· Provide oil analysis results to VA with NFPA‑acceptable thresholds
· Starting and Charging System
· Inspect batteries for damage or leakage; clean/tighten terminals
· Check battery electrolyte level and specific gravity (if applicable)
· Inspect battery charger (operation, wiring, connections)
· Inspect starting motor wiring and operation, check for abnormal noise
· Inspect alternator condition, voltage output, belts, and pulleys
· Engine Monitors & Safety Controls
· Test all engine safety shutdowns (oil pressure, coolant temp, over crank, overspeed)
· Inspect annunciators and remote alarm systems
· Check gauge accuracy (oil pressure, temperature, alternator)
· Generator & Mechanical Components
· Remove and inspect brushes; clean slip rings; make adjustments
· Lubricate generator rear bearing
· Inspect vibration isolators for wear and adjust to manufacturers specifications
· Control Panel
· Test manual/auto start controls
· Verify correct voltmeter readings (voltage level, gain, drop)
· Test ammeter with baseline load and no‑load readings
· Inspect circuit breakers for tightness and free movement
· Operational Test to include at a minimum:
· Cold start observation
· 30‑minute operating run
· Monitoring for abnormal vibration, leak, noise
· Verification of safety shutdown devices
· Documenting:
· Amps & volts
· Oil pressure
· Water temperature
· Fuel pressure
· Frequency
· Kilowatt output
· Timing and verification of:
· Signal delay
· Engine start time
· Load pickup
· Load return (re‑transfer)
5.4 General Emergency Power Supply System (EPSS) Condition Assessment
5.4.1 During all PM‑2 activities, the Contractor shall assess and document the overall condition of the EPSS including:
· Vibration issues
· Leaks (fuel, oil, coolant, exhaust)
· Excessive temperature
· Abnormal noises
· Component wear, corrosion, or deterioration
· Any condition that may indicate impending failure
· Contractor shall restore generator and EPSS to automatic mode
· Ensure all equipment is fully operational
6. Reports and Documentation
6.1. ESR (Engineering Service Report)
6.1.1. The ESR shall at a minimum include:
· Building Number
· Test Date
· Start Time / Stop Time
· Generator make, model, serial number
· kW/kVA rating
· Fuel type
· Hours of operation
· Location/Building number
· Hour Meter Start / Hour Meter Finish
· Engine Oil Pressure
· Engine Water Temperature
· Exhaust Gas Temperature (IR, pre turbo)
· Frequency (Hz / cycles)
· Voltage readings
· Generator Loading (Amperage per phase)
· Name and Signature of Technician
· All completed inspection checklists
· All measured data and test results
· Photos or quantifiable evidence before and after repairs, when applicable
· All identified deficiencies
· List of required and recommended repairs with priority classifications
· Itemized cost estimates
· Complete PM 1 test data
· Oil analysis report
6.1.2. A complete Load Bank ESR shall be submitted to the COR within 30 days of the test completion.
6.1.3. The contractor may create a customized ESR, but it must be approved by COR before implementation
6.1.4. The contractor shall document the services rendered on a legible, contractor service report and submit it to the COR for certification (signature)
6.1.5. A copy of the signed service report must be provided to the COR by the contractor at the time the service is provided.
6.1.6. If the COR is unavailable, a signed, authorized copy of the ESR will be sent to the Contractor after the work can be reviewed (if requested or noted on the ESR).
7. Requirements and Qualifications
7.1. Contractor shall have knowledge of and ensure compliance with the current version of the following throughout all performance and reporting requirements.
7.1.1. Veteran Health Agency Directive 1028
7.1.2. NFPA 99 and NFPA 110
7.1.3. Joint Commission standards
7.1.4. local, state, and federal regulations
7.1.5. ASTM fuel testing standards
7.1.6. OEM guidance
7.1.7. VA Engineering policies
8. Facility Check In
8.1. Upon arrival at the Edward Hines Jr VA Hospital, the contractor shall be required to report when on-site and when services are completed with assigned shop.
9. Hours
9.1. The Contractor will coordinate and schedule all test(s) with Hines VA Engineering Department (1) week Prior to onsite visit. The Contractor is required to perform work and tests during normal work hours, Monday through Friday 7:00 am to 4:00 pm. CST.