Attachment Pre-Bid RFI 550-26-120CON Amend 00002.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- 36C25226B0002
About this file
This file is a Pre-Bid Request for Information (RFI) for the VA Illiana Healthcare System's South Water Tower Repairs project. The solicitation is a 100% set-aside for Certified Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code classification, with a focus on emergent water tower repairs. Key details include a site visit scheduled for 12/3/2025 from 2:30-3:30 PM, located at Building 102 in Danville, IL, where bidders must check in with VA Police and obtain a temporary day pass.
The RFI addresses multiple contractor inquiries, confirming no lead presence on existing coatings, no temporary water service requirements, and specifying that the water tower must be operational by the end of the performance period. The Contracting Officer's Representative (COR) will conduct two daily inspections during construction, with an estimated project start date of 14 days after Notice to Proceed. Interior coating must adhere to NSF 600 regulations, and contractors must be verified in the SBA certification database to be eligible to bid on this VA Veterans Health Administration project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25226B0002 0007.docx | DOCX document | |
| Pre-Bid RFI 550-26-120CON Amend 0006.xlsx | XLSX spreadsheet | |
| 36C25226B0002 0006.docx | DOCX document | |
| 36C25226B0002 0005.docx | DOCX document | |
| 36C25226B0002 0004.docx | DOCX document | |
| Site Visit Sign In 12.3.25.pdf | ||
| 36C25226B0002 0003.docx | DOCX document | |
| Pre-Bid RFI 550-26-120CON Amend 003.xlsx | XLSX spreadsheet | |
| 36C25226B0002 0002.docx | DOCX document | |
| 36C25226B0002 0001.docx | DOCX document | |
| Pre-Bid RFI 550-26-120CON.xlsx | XLSX spreadsheet | |
| 550-26-120 Drawings.pdf | ||
| 550-26-120 SOW.pdf | ||
| 36C25226B0002_1.docx | DOCX document | |
| S02 Wage Determination 11.10.25.pdf | ||
| 550-26-120 Specifications.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Bid RFIs
| 550-26-120 Emergent repairs South Water Tower | ||||
| Pre-Bid RFIs | ||||
| No. | Date Submitted | SUBJECT/COMMENT | Responder | |
| 1 | 11/19/25 | I would like to bid on this work. I am not Service Disabled Veteran Status. Am I still allowed to bid? | VA | Per the first page of the solicitation Standard Form 1442: This procurement is an 100% set -aside for CVE Verified Service-Disable Veteran-Owned Small Business Firm (SDVOSB) per the Authority 38 U.S.C 8127 (Public Law 109-461). In accordance with VAAR 819.7003(b), at the time of the submission of Bid, and at the time of award of any contract, the bidder must represent to the contracting officer that it is a: |
Classification System (NAICS) code assigned to the acquisition; and (3) Certified SDVOSB listed in the SBA certification database at https://search.certifications.sba.gov/ (see 13 CFR 128).
1 11/20/25 Would another Site Visit be considered? VA yes, another Site visit is scheduled for 12/3/2025 from 2:30-3:30. Meet at Bldg. 102, in the Project Section Project Room (B102 102G) at the VA Illiana Healthcare System (VAIHCS), Danville, IL. Please check in with VA Police (B102 Lobby) for a temporary day pass.
| 1 | 11/21/25 | Is temporary water service or temporary water pressure required while the tank is offline for | |||
| renovations? | VA | No | |||
| 2 | 11/21/25 | Is lead present on any of the existing interior or exterior coatings on the tank? | VA | No | |
| 3 | 11/21/25 | When does the VA anticipate issuing the Notice to Proceed, or what is the estimated project start date? | VA | There will be a notice to preceed meeting held after contract award. Time will be discussed after award. Estimated project start day is 14 days after the NTP per the first page of the solicitation SF 1442. | |
| 4 | 11/21/25 | Is there a required or mandated date by which the tank must be placed back into service? | VA | Water tower must be operational at the end of period of performance. | |
| 5 | 11/21/25 | Who will be performing the inspections for this project? | VA | The COR will be performing two daily inspections during construction. | |
| 6 | 11/21/25 | Will inspections be conducted full-time, or will they be hold-point based? | VA | The COR will be performing two daily inspections during construction. | |
| 7 | 11/21/25 | Is dehumidification required for the interior coating system during application and curing? | VA | Interior coating system must adhere to NSF 600 regulations. Humidification should be controlled based off of manufacture instructions and industry standards. |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |