This document is a Pre-Bid Request for Information (RFI) response sheet for the JB VAMC Construction of Contractor Lay-Down Zone project (Contract Number 537-24-106). The RFI responses, submitted by Youssef Kirollos from JBVAMC on 7/29/2025, address six key questions from the potential contractor regarding project logistics and requirements. Key clarifications include: the Superintendent can fulfill both the Quality Control Manager (QCM) and Site Safety & Health Officer (SSHO) roles, laydown/storage areas and dumpster placement will be determined during mobilization, photographic documentation can be performed in-house by the general contractor, and project submittals can be handled via email or through platforms like Procore.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

No. Date Submitted SUBJECT/COMMENT Responder AE

Response VA Response Included in Amendment

1 7/29/2025 Can the Superintendent fulfill the Quality Control Manager (QCM) role?

Youssef Kirollos -

JBVAMC N/A

Yes, the SI can Fulfill the QCM role 3

2 7/29/2025 Can the Superintendent fulfill the Site Safety & Health (SSHO) role?

Youssef Kirollos -

JBVAMC N/A

Yes, the SI can Fulfill the SSHO role. 3

3 7/29/2025 Will the VA provide laydown/storage areas? If so, where will they be located?

Youssef Kirollos -

JBVAMC N/A

This will be determined based on the available space at the time of mobilization 3

4 7/29/2025 Will the VA provide an area for a dumpster? If so, where will that be located?

Youssef Kirollos -

JBVAMC N/A

This will be determined based on the available space at the time of mobilization.

Dumpsters may be able to be placed on short-term basis at one of the docks

5 7/29/2025

Are there any requirements regarding photographic documentation? Please confirm if this will be required as part of this project? If required, must this be a 3rd party service?

Or can it be performed inhouse by general contractor?

Youssef Kirollos -

JBVAMC N/A

Photographic documentation can be performed by the GC.

6 7/29/2025 Will the VA be providing an electronic submittal program, or is it expected that the general contractor provides this? Are there programs or software that are acceptable?

Youssef Kirollos -

JBVAMC N/A

Submittals can be provided by Email, or GC can provide pricing for setting up a Project on Procore or other alternative

JB VAMC Construction of Contractor Lay-Down Zone 537-24-106

S05 - Pre-Bid RFI Responses - 537-24-106 - 7.29.2025 1 of 1

Pre-Bid RFIs