This document appears to be a list of Patient Lift Locations that are part of a federal contract opportunity. The document identifies the location, priority, risk category, and notes for each patient lift location across various buildings and floors of a healthcare facility. The related federal contract opportunity is for the Installation of Patient Lifts at Multiple Locations (Construction), Solicitation Number 36C25224B0011, issued by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 12. The document provides detailed information about 228 patient lift locations across the facility, including their priority level, risk category, and any special requirements such as ICRA enclosures or off-duty work. The locations are categorized by building, floor, and specific room numbers. This information appears to be provided as an attachment or supporting document for the referenced federal contract opportunity.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Patient Lift Locations
A Priority B Priority C Priority Activity Category
Risk Category
Level
Basement Ambulatory Care A001A H-Track B High II This will require an ICRA enclosure.
1st Floor Emergency Department Ambulance Bay H-Track, Bariatric; Cold Weather Rated B Medium II 1st Floor MRI C105 (holding area) H-Track B High II This will require an ICRA enclosure. This will require off-duty work.
1st Floor X-Ray D102 (holding area) H-Track B High II This will require an ICRA enclosure. This will require off-duty work.
2nd Floor MICU A2095, A2106 (Bays 1, 9) H-Track B High II Only one room at a time can be completed. Drywall ceiling.
2nd Floor SICU B2003, B2016, B2045
(Bays 1,10, 14) H-Track B High II Only one room at a time can be completed. Drywall ceiling.
7th Floor Patient Rooms 701, 709, 713, 714, 716, 721, 725, 735, 737
715 H-Track B High II Only one room at a time can be completed.
10th Floor Observation 1037, 1038, 1041, 1043, 1046 1035 H-Track B High II 1043 & 1046 to be done one at a time. Remaining rooms two at a time.
11th Floor Rehab Gym 1134 - Convert from Dining Room (1) H-Track & (1) Straight B High II This will require an ICRA enclosure. This will require off-duty work.
13th Floor GI Recovery 1349, Bay 4 H-Track B High II This will require an ICRA enclosure.
1st Floor CLC - 1C Patient Room C152 H-Track, Bariatric B High II 1st Floor CLC - 1B Patient Rooms B107, B122, B126, B130 H-Track B High II Two rooms at time can be done.
1st Floor CLC - Geriatric Clinic 1B167, 1B175, 1B176 1B168, 1B171, 1B172 H-Track B High II Only one room at a time can be completed.
2nd Floor CLC - Occupational Therapy 2A34A H-Track B High II This will require off-duty work. Steel deck.
Basement Kinesiotherapy Department B1025 H-Track B High II This will require off-duty work.
5th Floor Rehab Services - Prosthetics 5035, 5038 5042 H-Track B High II 5042 will require an ICRA enclosure. This will require off-duty work.
12 2nd Floor Neurology 205, 226, Toilet Hallway (2) H-Track & (1) Straight with Scale 5 B High II Two rooms at time can be done.
2nd Floor Nuclear Medicine G226 H-Track B High II 2nd Floor Nuclear Medicine G201 H-Track B High II This will require an ICRA enclosure. This will require off-duty work.
3rd Floor Education D355 H-Track B Low II This will require an ICRA enclosure.
113 1st Floor Blind Rehab A128, A133, A134 A121 H-Track 7 B High II Two rooms at time can be done.
128 1st Floor Spinal Cord Injury Rehab Gym A100 H-Track, existing, spans over several therapy stations, convert 1 lift to 3 lifts
8 B High II This will require an ICRA enclosure.
8 1st Floor Bed Repair 19 North 19 South (2) H-Track 9 A Low I Steel deck.
49 4 5
Indicates 24/7 area with patients which may require special provisions.
Clinics with varying hours
RoomsBuilding Area Unit
Total number of new lift locations
PhaseType ICRA Comments
Lift Locations