01 33 00 - Submittal Log Template-Parking.xlsx

XLSX spreadsheet 263 KB Posted

Attached to
Z1DA--578-15-008 (CON) Update Wayfinding-Parking Signage Hines at the Edward Hines Jr. VA Hospital, Hines, IL.
Solicitation number
36C25224B0010
Issued by

About this file

This document appears to be a submittal log template related to a federal contract opportunity for updating wayfinding and parking signage at the Edward Hines Jr. VA Hospital in Hines, Illinois.

The key details include:

  • The contract opportunity has the solicitation number 36C25224B0010 and the project title "Update Wayfinding-Parking Signage Hines at the Edward Hines Jr. VA Hospital, Hines, IL."
  • The federal agency involved is the Department of Veterans Affairs Veterans Health Administration, Veterans Integrated Service Network 12.
  • The submittal log covers various required submittals such as a security plan, document control procedures, phasing schedules, utility interruption requests, as-built drawings, project schedules, shop drawings, safety plans, waste management plans, and paint/signage samples.
  • Many of the submittals have specific due dates, such as 10 days after bid acceptance, 45 days after NTP, and 30 days after the interim schedule.
  • The submittal requirements cover technical details, product data, and procedural plans related to executing the construction project.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

NUMBERNAMENameDESCRIPTIONREFERENCEDescriptionWHEN
01 00 00GENERAL REQUIREMENTS- Construction Security Requirements1.5.AGeneral Contractor shall submit a security plan that defines both physical and administrative procedures that will remain effective for the entire duration of the project.
01 00 00GENERAL REQUIREMENTSGENERAL REQUIREMENTS-
Document ControlDocument Control1.5.EGeneral Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”
01 00 00GENERAL REQUIREMENTSGENERAL REQUIREMENTS-
PhasingPhasing1.5.IContractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof
01 00 00GENERAL REQUIREMENTSGENERAL REQUIREMENTS-
Utilities ServicesUtilities Services1.5.N.2Contractor shall submit a request to interrupt any such services7 days in advance of proposed interruption
01 00 00GENERAL REQUIREMENTSGENERAL REQUIREMENTS-
SurveySurvey1.7.AContractor shall make a thorough survey with the COR and a representative of VA Supply Service of buildings, areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report
01 00 00GENERAL REQUIREMENTSGENERAL REQUIREMENTS-
As-Built DrawingsAs-Built Drawings1.14.CContractor shall deliver two approved completed sets of as-built drawings in the electronic version15 days after each completed phase
01 32 16.15GENERAL REQUIREMENTSPROJECT SCHEDULES- Contractor's ConsultantResident Engineer's Field Office1.3.AContractor shall submit a qualification proposal to the COR, within 10 days of bid acceptance.10 days within bid acceptance.
01 32 16.15ERROR:#REF!PROJECT SCHEDULES- The Complete Project Schedule SubmittalERROR:#REF!1.5.AContractor shall submit for the COR review; three blue line copies of the interim schedle on 30x42 inch and an electronic file.Within 45 calendar days after receipt of NTP.
01 32 16.15ERROR:#REF!PROJECT SCHEDULES- The Complete Project Schedule SubmittalERROR:#REF!1.5.DContractor shall submit to the COR; the final project schedule.Within 30 calendar days after receipt of the complete project interim schedule.
01 33 23SHOP DRAWINGS, PRODUCT DATA, AND SAMPLESSHOP DRAWINGS, PRODUCT DATA, AND SAMPLES- Submittal RegisterNone1.3Submit samples required by Section 09 06 00, SCHEDULE FOR FINISHES, in quadruplicate. Submit other samples in single units unless otherwise specified. Submittals will receive consideration only when covered by a transmittal letter signed by Contractor. Submittal drawings (shop, erection or setting drawings) and schedules, required for work of various trades, shall be checked before submission by technically qualified employees of Contractor for accuracy, completeness and compliance with contract requirements. For each drawing required, submit one legible photographic paper or vellum reproducible. Reproducible shall be full size and each drawing shall have marked thereon, proper descriptive title. Reproducible shall be full size. Samples, shop drawings, test reports, certificates and manufacturers' literature and data, shall be submitted.
01 35 26SAFETY REQUIREMENTSSAFETY REQUIREMENTS-
SubmittalsSubmittals1.4.CSubmit the APP for review for compliance with contract requirements in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
01 35 26SAFETY REQUIREMENTSSAFETY REQUIREMENTS-
AHAAHA1.5.C.3Submit AHA for review for compliance with contract requirements in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES for review
01 35 26SAFETY REQUIREMENTSSAFETY REQUIREMENTS-
Infection ControlInfection Control1.12.FPrepare a plan detailing project-specific dust protection measures with associated product data, including periodic status reports
01 35 26SAFETY REQUIREMENTSSAFETY REQUIREMENTS-
Fire SafetyFire Safety1.14.APrior to start of work, prepare a plan detailing project-specific fire safety measures, including periodic status reports
01 74 19CONSTRUCTION WASTE MANAGEMENTCONSTRUCTION WASTE MANAGEMENT-
Demolition Debris Management PlanDemolition Debris Management Plan1.5.B,C,DProcedures to be used for debris management, techniques to be used to minimize waste generation, analysis of the estimated job site waste to be generated, detailed description of the Means/Methods to be used for material handling. Designated Manager responsible for instructing personnel, supervising, documenting and administer over meetings relevant to the Waste Management Plan. Monthly summary of construction and demolition debris diversion and disposal required.
09 91 00PAINTINGPAINTING-
Painter qualificationsPainter qualifications1.3.BPainter Qualifications.
09 91 00PAINTINGPAINTING-
Manufacturer's Literature and Technical DataManufacturer's Literature and Technical Data1.3.CManufacturer's Literature and Data
09 91 00PAINTINGPAINTING-
Sample PanelsSample Panels1.3.DAfter painters' materials have been approved and before work is started submit sample panels showing each type of finish and color specified
09 91 00PAINTINGPAINTING-
Sample PanelsSample Panels1.3.DPanels to Show Color: Composition board, 100 x 250 mm (4 x 10 inch)
09 91 00PAINTINGPAINTING-
Sample PanelsSample Panels1.3.DPanel to Show Transparent Finishes: Wood of same species and grain pattern as wood approved for use, 100 x 250 mm (4 x 10 inch face) minimum, and where both flat and edge grain will be exposed, 250 mm (10 inches) long by sufficient size, 50 x 50 mm (2 x 2 inch) minimum or actual wood member to show complete finish
09 91 00PAINTINGPAINTING-
Sample PanelsSample Panels1.3.DAttach labels to panel stating the following
09 91 00PAINTINGPAINTING-
Sample PanelsSample Panels1.3.DFederal Specification Number or manufacturers name and product number of paints used
09 91 00PAINTINGPAINTING-
Sample PanelsSample Panels1.3.DSpecification code number specified in Section 09 06 00, SCHEDULE FOR FINISHES
09 91 00PAINTINGPAINTING-
Sample PanelsSample Panels1.3.DProduct type and color
09 91 00PAINTINGPAINTING-
Sample PanelsSample Panels1.3.DName of project
09 91 00PAINTINGPAINTING-
SamplesSamples1.3.DSample of identity markers if used
10 14 00SIGNAGESIGNAGE-
Interior Sign SamplesInterior Sign Samples1.4.BSign panels and frames, with letters and symbols, for each sign type
10 14 00SIGNAGESIGNAGE-
Interior Sign SamplesInterior Sign Samples1.4.BSign Panel, 203 x 254 mm (8 x 10 inches), with letters
10 14 00SIGNAGESIGNAGE - EXTERIOR SIGN SAMPLESInterior Sign Samples1.4.BColor samples of each color, 152 x 152 mm (6 x 6 inches. Show anticipated range of color and texture
10 14 00SIGNAGESIGNAGE-
Interior Sign SamplesInterior Sign Samples1.4.BSample of typeface, arrow and symbols in a typical full size layout
10 14 00SIGNAGESIGNAGE-
Manufacturer's LiteratureManufacturer's Literature1.4.CShowing the methods and procedures proposed for the anchorage of the signage system to each surface type
10 14 00SIGNAGESIGNAGE-
Manufacturer's LiteratureManufacturer's Literature1.4.CManufacturer’s printed specifications and maintenance instructions
10 14 00SIGNAGESIGNAGE-
Sign Location PlanSign Location Plan1.4.Dshowing location, type and total number of signs required
10 14 00SIGNAGESIGNAGE-
Shop DrawingsShop Drawings1.4.EScaled for manufacture and fabrication of sign types. Identify materials, show joints, welds, anchorage, accessory items, mounting and finishes
10 14 00SIGNAGESIGNAGE-
Full size layout patternsFull size layout patterns1.4.Ffor dimensional letters