This document contains a field report detailing corrections needed for the sprinkler system at the Jesse Brown Veteran's Hospital in Chicago, Illinois. The report identifies 15 areas across multiple buildings requiring repairs or replacement of sprinkler heads, piping, fittings and other system components. Issues include improper pipe extensions, rust, damage, missing components and capped uninstalled heads. The related federal contract opportunity is solicitation number 36C25222B0007 for project 537-16-102A to perform the corrections to the sprinkler system identified in the field report. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12.

View the file

Other files

File Type Posted
S06 - 537-16-102A Construction Plans IFC - Photos - 4.pdf PDF
36C25222B0007 0013.docx DOCX document
36C25222B0007 0012.docx DOCX document
S06 - 537-16-102A Construction Plans IFC - Photos - 6.pdf PDF
S06 - 537-16-102A Construction Plans IFC - Photos - 5.pdf PDF
S06 - 537-16-102A Construction Plans IFC - Photos - 2.pdf PDF
S06 - 537-16-102A Construction Plans IFC - Photos - 1.pdf PDF
36C25222B0007 0011.docx DOCX document
S06 - 537-16-102A Construction Plans IFC - Photos - 4.pdf PDF
S06 - 537-16-102A Construction Plans IFC - Photos - 3.pdf PDF
S06 - 537-16-102A Construction Plans Issued for Bid and Construction 02_11_2022 - (1).pdf PDF
S06 - 537-16-102A Construction Plans Issued for Bid and Construction 02_11_2022 - (2).pdf PDF
S06 - VA Responses to RFIs.pdf PDF
S06 - Wage Determination 01_14_2022.pdf PDF
36C25222B0007 0010.docx DOCX document
S06 - 537-16-102A Specifications Issued for Bid and Construction 02_03_2022.pdf PDF
36C25222B0007 0009.docx DOCX document
36C25222B0007 0008.docx DOCX document
36C25222B0007 0007.docx DOCX document
S06 - Campus Floor Plan 1 of 2.pdf PDF
S06 - Pre-Bid Site Visit Attendance Sheet - 1-14-22.pdf PDF
S06 - Record Drawings 1 of 8.pdf PDF
S06 - Pre-Bid Site Visit Attendance Sheet - 1-5-22.pdf PDF
36C25222B0007 0006.docx DOCX document
S06 - Attachments 0006.zip ZIP file
36C25222B0007 0005.docx DOCX document
537-16-102A Construction Plans IFC 08302020-2.pdf PDF
537-16-102A Construction Plans IFC 08302020 - 2.pdf PDF
36C25222B0007 0004.docx DOCX document
537-16-102A Construction Plans IFC 08302020 - 1.pdf PDF
S06 - Record Drawings 4 of 8.pdf PDF
36C25222B0007 0003.docx DOCX document
S06 - Record Drawings 8 of 8.pdf PDF
S06 - Record Drawings 5 of 8.pdf PDF
S06 - Record Drawings 7 of 8.pdf PDF
S06 - Record Drawings 6 of 8.pdf PDF
S06 - Attachments 0002.zip ZIP file
36C25222B0007 0002.docx DOCX document
36C25222B0007 0001.docx DOCX document
S06 - Attachments 0001.zip ZIP file
S02 - 537-16-102A Specifications IFC 02082020.pdf PDF
S02 - 537-16-102A Construction Plans IFC 08302020.pdf PDF
S02 - VHA Sup Con Req for Combatting COVID-19.pdf PDF
S02 - Statement of Work.pdf PDF
S02 - Wage Determination as of 12_3_21.pdf PDF
36C25222B0007.docx DOCX document
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Jesse Brown Veteran’s Hospital Project 537-16-102A Sprinkler Corrections Field Report 01-07-2020 Areas of concern All over Campus

1 – Damon 2nd – Improper extension. Min 1” pipe req’d 2 – Damon 2nd – Discoloration/rust on head and ceiling.

Potential leak above ceiling. Replace head.

3 – Damon 3rd – Deflector on head bent – Replace head. 4 – Damon 7th – Head rusted, replace head.

5 – Damon 8th – CPVC Piping damaged from leaking mech equipment – Replace piping.

6 – Damon 10th Stairwell

7 – Damon 10th – Standpipe and pressure gauge at top. 8 – Taylor 6th – Sprinkler escutcheon missing – Add

Escutcheon.

9 – Ogden 4th Floor Stairwell 10 – Ogden 4th Floor Standpipe and hose valve

11 – Ogden 4th – rusted fitting to sprinkler head. Replace 12 – Ogden 4th – Rusted fittings to sprinkler head. Replace

13 – Ogden 4th – Sprinkler head painted, replace head 14 – Bed Tower 2nd – Sprinkler pipe capped no heads installed in room as noted on plans. Provide heads.

15 – Bed Tower 4th – Missing concealed head cover plate.