This document outlines a federal contract opportunity for corrections to a sprinkler system. The solicitation number is 36C25222B0007 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12 for Project 537-16-102A. The opportunity type is a solicitation for corrections to an existing sprinkler system located at a Veterans Affairs medical facility. No other details are provided in the document regarding response dates, pricing terms, set asides, incumbent contractors, or work requirements.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jesse Brown Veteran’s Hospital Project 537-16-102A Sprinkler Corrections Field Report 12-09-2019 Areas of concern Building 11B – 2nd Floor
1 – Hanger rod bent around pipe; not proper hanger method used on piping. Remove
2 – Hanger rod bent around pipe; not proper hanger method used on piping. Remove
3 – Rust on sprinkler piping, replace with new.
Field Report 12-10-2019
4 – 2nd Floor Stairwell 5 – Standpipe riser and Fire hose valve in stairwell.
6 – Control valve and main drain in stairwell 7 – Floor control valve and pressure gauge in stairwell
8 – Close up of Fire hose valve. Replace per SOW 9 – Damage to standpipe riser. Repair with repainting.
10 – 2nd Floor Stairwell 11 – Standpipe riser and Fire hose valve in stairwell.
12 – Close up of Fire hose valve. Replace per SOW 13 – Primary sprinkler main using thinwall piping.
14 – 2nd Floor Stairwell 15 – Standpipe riser and Fire hose valve in stairwell.
16 – Control valve and main drain in stairwell 17 – Close up of Fire hose valve. Replace per SOW
18 – Floor control valve and pressure gauge in stairwell 19 – Damage to standpipe riser. Repair/replace riser as required. Repaint to match.
20 – 2nd Floor Stairwell 21 – Standpipe riser and Fire hose valve in stairwell.
22 – Close up of Fire hose valve. Replace per SOW
Field Report 12-11-2019
23 – 2nd Floor Stairwell 24 – Standpipe Riser and Fire hose valve in stairwell
25 – Floor control valve and Pressure Gauge in Stairwell 29 – Sprinkler drop piping and reducer valve rusted. Replace with new.
Building 11B – 3rd Floor
1 – 3rd Floor Stairwell 2 – Standpipe riser and hose valve in stairwell
3 – Floor control valve, Pressure gauge in stairwell 4 – Close up of Fire hose valve. Replace per SOW
5 - Escutcheon cover plate for sprinkler missing, replace 6 – 3rd Floor Stairwell
7 – Standpipe riser and hose valve in stairwell 8 – Close up of Fire hose valve. Replace per SOW
9 – 3rd Floor Stairwell 10 – Standpipe riser and hose valve in stairwell
11 – Close up of Fire hose valve. Replace per SOW
Building 11B – 4th Floor
1 – 4th Floor Stairwell 2 – Standpipe Riser and fire hose valve in stairwell
3 – Floor control valve, pressure gauge in stairwell 4 – Close up of fire hose valve, replace per SOW
Building 11B – 4th Floor
5 – Sprinkler pipe outlet and elbow rusted. Replace piping. 6 – 4th Floor Stairwell
7 – Fire hose valve in stairwell, replace per SOW 8 – Fittings rusted, TEE and Elbow, replace with new.
Building 11B – 5th Floor
1 – 5th Floor Stairwell 2 – Standpipe riser and Fire hose valve in stairwell
3 – Floor control valve and pressure gauge in stairwell 4 – Close up of fire hose valve, replace per SOW
5 – 5th Floor Stairwell 6 – Standpipe riser and Fire hose valve in stairwell
7 – Close up of fire hose valve, replace per SOW 8 – 5th Floor Stairwell
9 – Standpipe riser and Fire hose valve in stairwell 10 – Close up of fire hose valve, replace per SOW
11 – Close up of fire hose valve, replace per SOW
Building 11B – 6th Floor
1 – Piping above sprinkler piping corroded. Replace damaged sprinkler piping.
2 – 6th floor stairwell.
3 – 6th Floor stairwell, rusted on riser. 4 – Close up on rusted riser. Replace damaged piping
5 – Floor control valve and pressure gauge in stairwell.. 6 –pressure gauge in stairwell.
7 – Fire hose valve in stairwell to be replaced per SOW 8 – Fire hose valve in stairwell to be replaced per SOW
9 – Fire hose valve in stairwell to be replaced per SOW 10 – Close up date on fire hose valve
Building 11B – 7th Floor
1 – Sprinkler head to freezer rusted replace with new dry pendent sprinkler head.
2 – Sprinkler head to freezer rusted replace with new dry
3 – Sprinkler head to freezer rusted replace with new dry
4 – 7th Floor stairwell
5 – Standpipe Riser and Fire Hose valve in stairwell 6 – Top of standpipe riser pressure gauge in stairwell
7 – Closer view of hose valve, replace per SOW 8 – Piping and fittings rusted. Replace.
9 – 7th Floor Stairwell 10 – Standpipe Riser and Fire Hose valve in stairwell
11 – Top of standpipe riser pressure gauge in stairwell 12 – Closer view of hose valve, replace per SOW
Building 11B – 8th Floor
1 – Standpipe and Fire Hose valve in Mechanical Room 2 – 8th Floor Stairwell
3 – Sprinkler main through stair wall, need fire sealant 4 – Fittings and piping rusted, replace with new
5 – Sprinkler tee rusted, replace with new 6 – Sprinkler Fittings rusted, replace with new
7 – Sprinkler piping and fitting rusted. Replace fitting and piping.
8 – Sprinkler fittings rusted. Replace with new.
9 – Sprinkler piping rusted, replace with new. 10 – Sprinkler piping rusted, replace with new
11 – Drain valve rusted over, replace fitting. 12 – Sprinkler head painted, replace head.
13 – Sprinkler heads missing below ductwork, provide additional heads.
14 – Sprinkler riser nipple piping rusted, replace with new.
| 12-09-2019 - Building 11B - 2nd Floor Field Report |
| 12-10-2019 - Building 11B - 2nd Floor Field Report |
| 12-11-2019 - Building 11B - 2nd Floor Field Report |
| 12-10-2019 - Building 11B - 3rd Floor Field Report |
| 12-10-2019 - Building 11B - 4th Floor Field Report |
| 12-10-2019 - Building 11B - 5th Floor Field Report |
| 12-10-2019 - Building 11B - 6th Floor Field Report |
| 12-11-2019 - Building 11B - 7th Floor Field Report |
| 12-09-2019 - Building 11B - 8th Floor Field Report |