This document outlines a federal contract opportunity for corrections to a sprinkler system. The solicitation number is 36C25222B0007 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12. The opportunity is for Project 537-16-102A which involves corrections to an existing sprinkler system. No other details are provided in the document regarding response dates, award dates, pricing terms, set asides, incumbent contractors, or work requirements.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jesse Brown Veteran’s Hospital Project 537-16-102A Sprinkler Corrections Field Report 10-21-2019 Areas of concern Building 1 – 4th Floor
25 – Exit Sign missing face plate 26 – Sprinkler head not installed under ductwork in mechanical room
27 – 4th Floor Stairwell – Standpipe, hose valve and control valve
28 – Pressure Gauge in Stairwell
Field Report 10-21-2019
29 – Sprinkler head installed above ceiling over fire hose cabinet
30 – Sprinkler bracing not secured.
Field Report 10-22-2019
31 – Roughed in CPVC piping – Not connected to service 32 – Sprinkler head removed and capped - Reinstall
33 – Sprinkler head coverage not complete – add head 34 – 4th Floor Stairwell
35 – Standpipe, Control valve, Hose Valve in stairwell 36 – Pressure Gauge in stairwell
37 – Sprinkler head too far from wall. Add additional sprinkler
38 – Sprinkler spacing less than 18” from storage. Relocate mattresses outside corridor
Building 1 – 5th Floor
1 – Aluminum foil used in lieu of fire sealant 2 – 5th Floor Stairwell
3 – Standpipe, Control Valve and Hose Valve in Stairwell 4 – Pressure Gauge in Stairwell
5 – Hanger disconnected – Not enough support on pipe 6 – Item removed from project
7 – 5th Floor Stairwell 8 – Standpipe, Control valve and hose Valve in stairwell
9 – Pressure gauge in stairwell 10 – Corrosion on sanitary piping over sprinkler piping
11 – Sprinkler escutcheon rusted 12 – CPVC piping hangers too far apart – pipe sagging
13 – CPVC Piping burst all over 14 – Alternate view burnt CPVC piping
15- CPVC piping burnt along piping 16 – CPVC piping burnt at fitting
17 – CPVC piping burnt 18 – 5th Floor Stairwell
19 – Standpipe, hose valve, and control valve in stairwell 20 – Pressure Gauge in Stairwell
21 – Steel coupling used on connection of CPVC pipes 22 – 5th Floor Stairwell
23 – Standpipe, Hose valve, and Control valve in stairwell 24 – Pressure Gauge in Stairwell
25 – Sprinkler head blocked by exit sign 26 – 5th Floor Stairwell
27 – Sprinkler head penetration not sealed
Building 1 – 6th Floor
1 – 6th Floor Stairwell 2 – Standpipe, hose valve, and control valve in stairwell
3 – Pressure Gauge in stairwell 4 – Triggered alarm on FACP in stairwell
5 – Door blocked by hinge of adjacent door 6 – Sprinkler missing from underneath ductwork
7 – 6th Floor stairwell 8 – Standpipe, Control valve and hose Valve in stairwell
9 – Pressure gauge in stairwell 10 – CPVC pipe burnt from improper Brazing of Copper pipe
11 – Burnt CPVC pipe 12 – 6th Floor Stairwell
13 – Standpipe, control valve and Hose valve in stairwell 14 – Pressure gauge in stairwell
15 – Sprinkler main penetration through stairwell wall
Field Report 11-01-2019
1 - Burned CPVC Pipe 2 – CPVC Pipe – Yellow and Burned
3 – Change out fittings – RM 6525 4 – Change out fittings – RM 6525
5 – Change out fittings – RM 6525 6 – Burned pipe
7 – Clean fire stop off of pipe 8 – Add sprinkler under duct
Building 1 – 7th Floor
1 – Add hanger to CPVC – Remove tie 2 – Wire hung off of CPVC pipe. Remove zip tie
3 – Bottom of pipe yellow. Replace pipe. 4 – Take tape off of sprinkler
Field Report 12-09-2019
1 – 7th Floor Stairwell 2 – Hose valve and standpipe in stairwell
3 – Floor Control valve, standpipe and hose valve in stairwell 4 – Close up pressure gauge in stairwell
5 – Close up of hose valve, to be replaced per SOW 6 – Control valve for heads in IT room, not combined on floor plans
7 – Sprinkler head painted, replace head 8 – 7th Floor stairwell
9 – Standpipe and hose valve in stairwell 10 – Control valve and pressure gauge in stairwell
11 – Close up of hose valve, to be replaced per SOW 12 – 7th Floor stairwell
13 – Hose valve and riser in stairwell 14 – Floor Control valve and pressure gauge in stairwell.
15 – Close up of hose valve to be replaced per SOW
Field Report 11-05-2019
Building 1 – 8th Floor
1 – Burned pipe 2 – Leaky trap
3 – Crooked hanger
1 – 8th Floor stairwell 2 – Fire hose valve and standpipe in stairwell
3 – Floor control valve and pressure gauge in stairwell 4 – Close up of fire hose valve, to be replaced per SOW
5 – Wires draped over plastic piping. Hang wires to not rub piping.
67 – Wires taped to piping. Remove tape and hang wires to not contact piping.
7 – Patch ceiling where tape is used to cover hole 8 – 8th Floor Stairwell
9 – Close up of hose vavle, to be replaced per SOW 10 – floor control valve and pressure gauge in stairwell.
11 – 8th Floor Stairwell 12 – Fire hose valve and standpipe riser in stairwell
13 – Floor control valve and pressure gauge in stairwell 14 – Close up of fire hose valve, to be replaced per SOW
15 – 8th Floor stairwell 16 - Fire hose valve and standpipe riser in stairwell
17 - Floor control valve and pressure gauge in stairwell 18 - Close up of fire hose valve, to be replaced per SOW
19 – 8th Floor stairwell 20 - Close up of fire hose valve, to be replaced per SOW
21 - Floor control valve and pressure gauge in stairwell 22 - Fire hose valve and standpipe riser in stairwell
Field Report 11-13-2019
Building 1 – 9th Floor
1 – CPVC pipe black/burned - Replace 2 – Item removed from project
Building 1 – 10th Floor
1 – Condensate on ceiling – Leaking onto light 2 – Item Removed from project
3 – Obstructed sprinkler 4 – Copper tube taped to pipe
5 – Missing hanger 6 – Crooked sprinkler
1 – 10th floor stairwell 2 – Top of Standpipe pressure gauge in stairwell
3 – Fire hose valve in stairwell, to be replaced per SOW 4 – Pressure gauge at top of standpipe riser
5 – 10th floor stairwell 6 – Floor Control valve, hose valve and pressure gauge at top of riser. Replace hose valve per SOW
7 – 10th floor stairwell 8 - Floor Control valve, hose valve and pressure gauge at top of riser. Replace hose valve per SOW
1 – Penthouse 2 – Penthouse Standpipe and Hose Valve
3 – Penthouse & 12th Floor Control Valves 4 – Close up of existing Penthouse Hose Valve
| 10-02-2019 - Building 1 - Lower Level Field Report |
| 10-17-2019 - Building 1 - 2nd Floor Field Report |
| 10-18-2019 - Building 1 - 2nd Floor Field Report |
| 10-18-2019 - Building 1 - 3rd Floor Field Report |
| 10-22-2019 - Building 1 - 3rd Floor Field Report |
| 10-21-2019 - Building 1 - 4th Floor Field Report |
| 10-22-2019 - Building 1 - 4th Floor Field Report |
| 10-22-2019 - Building 1 - 5th Floor Field Report |
| 10-22-2019 - Building 1 - 6th Floor Field Report |
| 11-01-2019 - Building 1 - 6th Floor Field Report |
| 11-01-2019 - Building 1 - 7th Floor Field Report |
| 12-09-2019 - Building 1 - 7th Floor Field Report |
| 11-05-2019 - Building 1 - 8th Floor Field Report |
| 12-09-2019 - Building 1 - 8th Floor Field Report |
| 11-13-2019 - Building 1 - 9th Floor Field Report |
| 11-05-2019 - Building 1 - 10th Floor Field Report |
| 12-09-2019 - Building 1 - 10th Floor Field Report |
| 12-11-2019 - Building 1 - 11th Floor Field Report |