S06 - 537-16-102A Construction Plans IFC - Photos - 2.pdf

PDF 17 MB Posted

Attached to
Z1DA--537-16-102A Corrections to Sprinkler System
Solicitation number
36C25222B0007
Issued by

About this file

This document outlines a federal contract opportunity for corrections to a sprinkler system. The solicitation number is 36C25222B0007 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12. The opportunity is for Project 537-16-102A which involves corrections to an existing sprinkler system. No other details are provided in the document regarding response dates, award dates, pricing terms, set asides, incumbent contractors, or work requirements.

View the file

Other files

File Type Posted
S06 - 537-16-102A Construction Plans IFC - Photos - 4.pdf PDF
36C25222B0007 0013.docx DOCX document
36C25222B0007 0012.docx DOCX document
S06 - 537-16-102A Construction Plans IFC - Photos - 6.pdf PDF
S06 - 537-16-102A Construction Plans IFC - Photos - 5.pdf PDF
S06 - 537-16-102A Construction Plans IFC - Photos - 7.pdf PDF
S06 - 537-16-102A Construction Plans IFC - Photos - 1.pdf PDF
36C25222B0007 0011.docx DOCX document
S06 - 537-16-102A Construction Plans IFC - Photos - 4.pdf PDF
S06 - 537-16-102A Construction Plans IFC - Photos - 3.pdf PDF
S06 - 537-16-102A Construction Plans Issued for Bid and Construction 02_11_2022 - (1).pdf PDF
S06 - 537-16-102A Construction Plans Issued for Bid and Construction 02_11_2022 - (2).pdf PDF
S06 - VA Responses to RFIs.pdf PDF
S06 - Wage Determination 01_14_2022.pdf PDF
36C25222B0007 0010.docx DOCX document
S06 - 537-16-102A Specifications Issued for Bid and Construction 02_03_2022.pdf PDF
36C25222B0007 0009.docx DOCX document
36C25222B0007 0008.docx DOCX document
36C25222B0007 0007.docx DOCX document
S06 - Campus Floor Plan 1 of 2.pdf PDF
S06 - Pre-Bid Site Visit Attendance Sheet - 1-14-22.pdf PDF
S06 - Record Drawings 1 of 8.pdf PDF
S06 - Pre-Bid Site Visit Attendance Sheet - 1-5-22.pdf PDF
36C25222B0007 0006.docx DOCX document
S06 - Attachments 0006.zip ZIP file
36C25222B0007 0005.docx DOCX document
537-16-102A Construction Plans IFC 08302020-2.pdf PDF
537-16-102A Construction Plans IFC 08302020 - 2.pdf PDF
36C25222B0007 0004.docx DOCX document
537-16-102A Construction Plans IFC 08302020 - 1.pdf PDF
S06 - Record Drawings 4 of 8.pdf PDF
36C25222B0007 0003.docx DOCX document
S06 - Record Drawings 8 of 8.pdf PDF
S06 - Record Drawings 5 of 8.pdf PDF
S06 - Record Drawings 7 of 8.pdf PDF
S06 - Record Drawings 6 of 8.pdf PDF
S06 - Attachments 0002.zip ZIP file
36C25222B0007 0002.docx DOCX document
36C25222B0007 0001.docx DOCX document
S06 - Attachments 0001.zip ZIP file
S02 - 537-16-102A Specifications IFC 02082020.pdf PDF
S02 - 537-16-102A Construction Plans IFC 08302020.pdf PDF
S02 - VHA Sup Con Req for Combatting COVID-19.pdf PDF
S02 - Statement of Work.pdf PDF
S02 - Wage Determination as of 12_3_21.pdf PDF
36C25222B0007.docx DOCX document
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Jesse Brown Veteran’s Hospital Project 537-16-102A Sprinkler Corrections Field Report 10-21-2019 Areas of concern Building 1 – 4th Floor

25 – Exit Sign missing face plate 26 – Sprinkler head not installed under ductwork in mechanical room

27 – 4th Floor Stairwell – Standpipe, hose valve and control valve

28 – Pressure Gauge in Stairwell

Field Report 10-21-2019

29 – Sprinkler head installed above ceiling over fire hose cabinet

30 – Sprinkler bracing not secured.

Field Report 10-22-2019

31 – Roughed in CPVC piping – Not connected to service 32 – Sprinkler head removed and capped - Reinstall

33 – Sprinkler head coverage not complete – add head 34 – 4th Floor Stairwell

35 – Standpipe, Control valve, Hose Valve in stairwell 36 – Pressure Gauge in stairwell

37 – Sprinkler head too far from wall. Add additional sprinkler

38 – Sprinkler spacing less than 18” from storage. Relocate mattresses outside corridor

Building 1 – 5th Floor

1 – Aluminum foil used in lieu of fire sealant 2 – 5th Floor Stairwell

3 – Standpipe, Control Valve and Hose Valve in Stairwell 4 – Pressure Gauge in Stairwell

5 – Hanger disconnected – Not enough support on pipe 6 – Item removed from project

7 – 5th Floor Stairwell 8 – Standpipe, Control valve and hose Valve in stairwell

9 – Pressure gauge in stairwell 10 – Corrosion on sanitary piping over sprinkler piping

11 – Sprinkler escutcheon rusted 12 – CPVC piping hangers too far apart – pipe sagging

13 – CPVC Piping burst all over 14 – Alternate view burnt CPVC piping

15- CPVC piping burnt along piping 16 – CPVC piping burnt at fitting

17 – CPVC piping burnt 18 – 5th Floor Stairwell

19 – Standpipe, hose valve, and control valve in stairwell 20 – Pressure Gauge in Stairwell

21 – Steel coupling used on connection of CPVC pipes 22 – 5th Floor Stairwell

23 – Standpipe, Hose valve, and Control valve in stairwell 24 – Pressure Gauge in Stairwell

25 – Sprinkler head blocked by exit sign 26 – 5th Floor Stairwell

27 – Sprinkler head penetration not sealed

Building 1 – 6th Floor

1 – 6th Floor Stairwell 2 – Standpipe, hose valve, and control valve in stairwell

3 – Pressure Gauge in stairwell 4 – Triggered alarm on FACP in stairwell

5 – Door blocked by hinge of adjacent door 6 – Sprinkler missing from underneath ductwork

7 – 6th Floor stairwell 8 – Standpipe, Control valve and hose Valve in stairwell

9 – Pressure gauge in stairwell 10 – CPVC pipe burnt from improper Brazing of Copper pipe

11 – Burnt CPVC pipe 12 – 6th Floor Stairwell

13 – Standpipe, control valve and Hose valve in stairwell 14 – Pressure gauge in stairwell

15 – Sprinkler main penetration through stairwell wall

Field Report 11-01-2019

1 - Burned CPVC Pipe 2 – CPVC Pipe – Yellow and Burned

3 – Change out fittings – RM 6525 4 – Change out fittings – RM 6525

5 – Change out fittings – RM 6525 6 – Burned pipe

7 – Clean fire stop off of pipe 8 – Add sprinkler under duct

Building 1 – 7th Floor

1 – Add hanger to CPVC – Remove tie 2 – Wire hung off of CPVC pipe. Remove zip tie

3 – Bottom of pipe yellow. Replace pipe. 4 – Take tape off of sprinkler

Field Report 12-09-2019

1 – 7th Floor Stairwell 2 – Hose valve and standpipe in stairwell

3 – Floor Control valve, standpipe and hose valve in stairwell 4 – Close up pressure gauge in stairwell

5 – Close up of hose valve, to be replaced per SOW 6 – Control valve for heads in IT room, not combined on floor plans

7 – Sprinkler head painted, replace head 8 – 7th Floor stairwell

9 – Standpipe and hose valve in stairwell 10 – Control valve and pressure gauge in stairwell

11 – Close up of hose valve, to be replaced per SOW 12 – 7th Floor stairwell

13 – Hose valve and riser in stairwell 14 – Floor Control valve and pressure gauge in stairwell.

15 – Close up of hose valve to be replaced per SOW

Field Report 11-05-2019

Building 1 – 8th Floor

1 – Burned pipe 2 – Leaky trap

3 – Crooked hanger

1 – 8th Floor stairwell 2 – Fire hose valve and standpipe in stairwell

3 – Floor control valve and pressure gauge in stairwell 4 – Close up of fire hose valve, to be replaced per SOW

5 – Wires draped over plastic piping. Hang wires to not rub piping.

67 – Wires taped to piping. Remove tape and hang wires to not contact piping.

7 – Patch ceiling where tape is used to cover hole 8 – 8th Floor Stairwell

9 – Close up of hose vavle, to be replaced per SOW 10 – floor control valve and pressure gauge in stairwell.

11 – 8th Floor Stairwell 12 – Fire hose valve and standpipe riser in stairwell

13 – Floor control valve and pressure gauge in stairwell 14 – Close up of fire hose valve, to be replaced per SOW

15 – 8th Floor stairwell 16 - Fire hose valve and standpipe riser in stairwell

17 - Floor control valve and pressure gauge in stairwell 18 - Close up of fire hose valve, to be replaced per SOW

19 – 8th Floor stairwell 20 - Close up of fire hose valve, to be replaced per SOW

21 - Floor control valve and pressure gauge in stairwell 22 - Fire hose valve and standpipe riser in stairwell

Field Report 11-13-2019

Building 1 – 9th Floor

1 – CPVC pipe black/burned - Replace 2 – Item removed from project

Building 1 – 10th Floor

1 – Condensate on ceiling – Leaking onto light 2 – Item Removed from project

3 – Obstructed sprinkler 4 – Copper tube taped to pipe

5 – Missing hanger 6 – Crooked sprinkler

1 – 10th floor stairwell 2 – Top of Standpipe pressure gauge in stairwell

3 – Fire hose valve in stairwell, to be replaced per SOW 4 – Pressure gauge at top of standpipe riser

5 – 10th floor stairwell 6 – Floor Control valve, hose valve and pressure gauge at top of riser. Replace hose valve per SOW

7 – 10th floor stairwell 8 - Floor Control valve, hose valve and pressure gauge at top of riser. Replace hose valve per SOW

1 – Penthouse 2 – Penthouse Standpipe and Hose Valve

3 – Penthouse & 12th Floor Control Valves 4 – Close up of existing Penthouse Hose Valve

10-02-2019 - Building 1 - Lower Level Field Report
10-17-2019 - Building 1 - 2nd Floor Field Report
10-18-2019 - Building 1 - 2nd Floor Field Report
10-18-2019 - Building 1 - 3rd Floor Field Report
10-22-2019 - Building 1 - 3rd Floor Field Report
10-21-2019 - Building 1 - 4th Floor Field Report
10-22-2019 - Building 1 - 4th Floor Field Report
10-22-2019 - Building 1 - 5th Floor Field Report
10-22-2019 - Building 1 - 6th Floor Field Report
11-01-2019 - Building 1 - 6th Floor Field Report
11-01-2019 - Building 1 - 7th Floor Field Report
12-09-2019 - Building 1 - 7th Floor Field Report
11-05-2019 - Building 1 - 8th Floor Field Report
12-09-2019 - Building 1 - 8th Floor Field Report
11-13-2019 - Building 1 - 9th Floor Field Report
11-05-2019 - Building 1 - 10th Floor Field Report
12-09-2019 - Building 1 - 10th Floor Field Report
12-11-2019 - Building 1 - 11th Floor Field Report

File details come from the government source that posted it. Updated .