S06 - 537-16-102A Construction Plans IFC - Photos - 1.pdf

PDF 19 MB Posted

Attached to
Z1DA--537-16-102A Corrections to Sprinkler System
Solicitation number
36C25222B0007
Issued by

About this file

This document outlines a federal contract opportunity for corrections to a sprinkler system. The solicitation number is 36C25222B0007 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12. The opportunity is for Project 537-16-102A which involves corrections to an existing sprinkler system. No other details are provided in the document regarding response dates, pricing terms, set asides, incumbent contractors, or work requirements.

View the file

Other files

File Type Posted
S06 - 537-16-102A Construction Plans IFC - Photos - 4.pdf PDF
36C25222B0007 0013.docx DOCX document
36C25222B0007 0012.docx DOCX document
S06 - 537-16-102A Construction Plans IFC - Photos - 6.pdf PDF
S06 - 537-16-102A Construction Plans IFC - Photos - 5.pdf PDF
S06 - 537-16-102A Construction Plans IFC - Photos - 7.pdf PDF
S06 - 537-16-102A Construction Plans IFC - Photos - 2.pdf PDF
36C25222B0007 0011.docx DOCX document
S06 - 537-16-102A Construction Plans IFC - Photos - 4.pdf PDF
S06 - 537-16-102A Construction Plans IFC - Photos - 3.pdf PDF
S06 - 537-16-102A Construction Plans Issued for Bid and Construction 02_11_2022 - (1).pdf PDF
S06 - 537-16-102A Construction Plans Issued for Bid and Construction 02_11_2022 - (2).pdf PDF
S06 - VA Responses to RFIs.pdf PDF
S06 - Wage Determination 01_14_2022.pdf PDF
36C25222B0007 0010.docx DOCX document
S06 - 537-16-102A Specifications Issued for Bid and Construction 02_03_2022.pdf PDF
36C25222B0007 0009.docx DOCX document
36C25222B0007 0008.docx DOCX document
36C25222B0007 0007.docx DOCX document
S06 - Campus Floor Plan 1 of 2.pdf PDF
S06 - Pre-Bid Site Visit Attendance Sheet - 1-14-22.pdf PDF
S06 - Record Drawings 1 of 8.pdf PDF
S06 - Pre-Bid Site Visit Attendance Sheet - 1-5-22.pdf PDF
36C25222B0007 0006.docx DOCX document
S06 - Attachments 0006.zip ZIP file
36C25222B0007 0005.docx DOCX document
537-16-102A Construction Plans IFC 08302020-2.pdf PDF
537-16-102A Construction Plans IFC 08302020 - 2.pdf PDF
36C25222B0007 0004.docx DOCX document
537-16-102A Construction Plans IFC 08302020 - 1.pdf PDF
S06 - Record Drawings 4 of 8.pdf PDF
36C25222B0007 0003.docx DOCX document
S06 - Record Drawings 8 of 8.pdf PDF
S06 - Record Drawings 5 of 8.pdf PDF
S06 - Record Drawings 7 of 8.pdf PDF
S06 - Record Drawings 6 of 8.pdf PDF
S06 - Attachments 0002.zip ZIP file
36C25222B0007 0002.docx DOCX document
36C25222B0007 0001.docx DOCX document
S06 - Attachments 0001.zip ZIP file
S02 - 537-16-102A Specifications IFC 02082020.pdf PDF
S02 - 537-16-102A Construction Plans IFC 08302020.pdf PDF
S02 - VHA Sup Con Req for Combatting COVID-19.pdf PDF
S02 - Statement of Work.pdf PDF
S02 - Wage Determination as of 12_3_21.pdf PDF
36C25222B0007.docx DOCX document
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Jesse Brown Veteran’s Hospital Project 537-16-102A Sprinkler Corrections Field Report 10-02-2019 Areas of concern Building 1 – Basement

1 – Incoming Fire Service main – Corroded and Rusted 3 – Corrosion on valves

2 – Zip tie connecting sprinkler pipe to conduit 4 – Elbow rusted

5 – Severe condensation and Rust on fittings 7 – Elbows rusted

6 – Piping rusting 8 – Couplings rusting

9 – Condensation and couple rusting 11 – Couplings and fitting rusting

10 – Elbow fitting rusting 12 – Fittings rusting

13 – Piping and fittings rusting 15 – Piping rusting

14 – Alternate view – Pipe rusting 16 – Severe condensation build up

17 – Rusting at mechanical tee and elbow 19 – Sprinkler piping to elevator pit not painted.

18 – Fire Piping penetration- Not Fire Sealed

20 – Block of wood used to separate piping & conduit

21 – non-rising stem, unlocked valve on fire main 23 – Severe condensation on all piping in space. Apparent

Steam line leak.

22 – Sprinkler piping to elevator pit not painted. 24 – Rusting fittings

Field Report 10-17-2019

Building 1 – 2nd Floor

1 – 2nd Floor Stairwell 2 – 2nd Floor Standpipe and hose valve

3 – 2nd Floor Stairwell control valve and pressure gauge 4 – Transition from CPVC in corridor to steel pipe.

5 – piping sleeve not properly used. Not installed in wall. 6 – Flex drop sprinkler used in tight to fit spaces

7 – Corroded piping outside room 2444 8 – Transition from CPVC to thinwall piping

9 – Exit from room blocked 10 – Stair exit blocked

11 – No sprinkler coverage in exit stairwell 12 – Storage placed in exit stair landing

13 – Chemical drain piping improperly installed back sloped 14 – Leaking drain piping corroding sprinkler fitting

Field Report 10-18-2019

15 – Rusted piping and fittings in mechanical room 16 – Rusted fittings and sprinkler piping

17 – Sprinkler Standpipe and Hose Valve in stairwell 18 – Sprinkler standpipe and control valve in stairwell

19 – Sprinkler piping through stair wall 20 – Inspector’s test drain valve

21 – CPVC piping through wall – poor fire sealant installation

22 – CPVC piping to thinwall transistion

23 – Steel piping fire sealed 24 – Sprinkler head obstructed by light

25 – Sprinkler head obstructed by heater 26 – Stairwell 2nd floor

27 – Standpipe & hose valve in 2nd floor stairwell 28 – Hose valve mounted 5’-0” above floor

29 – Sprinkler control valve – 2nd floor stairwell 30 – Sprinkler line penetration through stairwell wall

31 – Transition from steel sprinkler main to CPVC in corridor

32 – Sprinkler head obstructed by storage – less than 18”

33 – Sprinkler head obstructed by storage – less than 18” 34 – Leaking sanitary piping above ceiling

35 – Thinwall piping used as transition 36 – Sprinkler piping and fitting rusted and corroded

37 – Thinwall piping used as transition 38 – 2nd Floor Stairwell

39 – Stairwell standpipe and hose valve 40 – Stairwell floor control valve and pressure valve

41 – CPVC piping hanger spacing too far, pipe sagging 42 – CPVC piping used as hanger support

43 – Tape and Plastic used to contain leak 44 – Fire sealant on piping remaining, no wall.

45 – 2nd Floor Stairwell standpipe and hose valve 46 – Pressure gauge and control valve in stairwell

Building 1 – 3rd Floor

1 – Hanger Rod rusted 2 – CPVC piping through rated wall – Poor fire stopping

3 – 3rd floor stairwell 4 – 3rd floor standpipe, hose valve and control valve in stairwell

5 – 3rd floor Hose valve in stairwell 6 – Pressure gauge on sprinkler supply to floor – shut down

7 – Control valve shut off 8 – Sprinkler obstructed

9 – Sprinkler piping rusting 10 – 3rd Floor standpipe in stairwell

11 – 3rd floor control valve in stairwell 12 – Pressure gauge in stairwell, wall penetration

13 – Sprinkler coverage obstructed – Need another head 14 – 3rd Floor standpipe

15 – Control valve in stairwell 16 – Pressure gauge in stairwell

17 – Sprinkler coverage missing in drywall ceiling 18 – CPVC piping burnt on exterior. Pipe to be replaced

19 – Corridor to toilet room missing sprinkler coverage

Field Report 10-22-2019

20 – Sprinkler head not installed under ductwork 21 – Sprinkler head to freezer – dry bulb type

22 – Sprinkler head in cooler - rusted 23 – Alternate view – Rusted sprinkler head in cooler

24 – Rusted sprinkler head in cooler 25 – Sprinkler head installed above drop ceiling

26 – Access panel above drop ceiling blocked 27 – Sprinkler head obstructed by piping, completely blocked

28 – Sprinkler piping transition from CPVC to Steel 29 – 3rd Floor Stairwell

30 – Standpipe, control valve and hose valve in stairwell 31 – Pressure gauge in stairwell

32 – Sprinkler head against wall in stairwell 33 – Alternate view – Sprinkler head against wall

34 – 3rd Floor stairwell 35 – Standpipe, control valve and hose valve in stairwell

36 – Control valve located close to floor in stairwell 37 – Pressure gauge in stairwell

38 – Sprinkler head rusted in freezer 39 – Sprinkler head in freezer rusted / Opening exposed

Field Report 10-21-2019

Building 1 – 4th Floor

1 – 4th Floor stairwell 2 – Standpipe and Control valve in stairwell

3 – Pressure gauge in stairwell 4 – Hose valve in stairwell

5 – CPVC piping used as hanger support for light 6 – Corrosion grease from mechanical equipment on sprinkler piping

7 – Sprinkler upright in unfinished room 8 – Missing/removed sprinkler head – not enough protection

9 – Sprinkler transition from CPVC to steel. Steel pipe corroded.

10 – Corrosion debris on sprinkler piping?

11 – Sprinkler elbow and piping rusting 12 – 4th floor stairwell

13 – Standpipe, hose valve and control valve in stairwell 14 – Pressure Gauge in stairwell

15 – Sprinkler piping running through ductwork insulation 16 – Dry Pendant sprinkler head into cooler

17 – Sprinkler head cut into ceiling exposed 18 – Wire zip tied to sprinkler piping

19 – Fire Door exit 4th floor 20 – 4th Floor Stairwell

21 – Standpipe, hose valve in stairwell 22 – Control valve in stairwell

23 – Pressure Gauge in stairwell 24 – Hose valve coated in paint

10-02-2019 - Building 1 - Lower Level Field Report
10-17-2019 - Building 1 - 2nd Floor Field Report
10-18-2019 - Building 1 - 2nd Floor Field Report
10-18-2019 - Building 1 - 3rd Floor Field Report
10-22-2019 - Building 1 - 3rd Floor Field Report
10-21-2019 - Building 1 - 4th Floor Field Report
10-22-2019 - Building 1 - 4th Floor Field Report
10-22-2019 - Building 1 - 5th Floor Field Report
10-22-2019 - Building 1 - 6th Floor Field Report
11-01-2019 - Building 1 - 6th Floor Field Report
11-01-2019 - Building 1 - 7th Floor Field Report
12-09-2019 - Building 1 - 7th Floor Field Report
11-05-2019 - Building 1 - 8th Floor Field Report
12-09-2019 - Building 1 - 8th Floor Field Report
11-13-2019 - Building 1 - 9th Floor Field Report
11-05-2019 - Building 1 - 10th Floor Field Report
12-09-2019 - Building 1 - 10th Floor Field Report
12-11-2019 - Building 1 - 11th Floor Field Report