S06 - 537-16-102A Construction Plans IFC - Photos - 3.pdf

PDF 11 MB Posted

Attached to
Z1DA--537-16-102A Corrections to Sprinkler System
Solicitation number
36C25222B0007
Issued by

About this file

This document outlines a federal contract opportunity for corrections to a sprinkler system. The solicitation number is 36C25222B0007 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12 for Project 537-16-102A. The opportunity type is a solicitation for corrections to an existing sprinkler system located at a Veterans Affairs facility. No other details are provided in the document regarding response dates, pricing terms, set asides, or incumbent contractors.

View the file

Other files

File Type Posted
S06 - 537-16-102A Construction Plans IFC - Photos - 4.pdf PDF
36C25222B0007 0013.docx DOCX document
36C25222B0007 0012.docx DOCX document
S06 - 537-16-102A Construction Plans IFC - Photos - 6.pdf PDF
S06 - 537-16-102A Construction Plans IFC - Photos - 5.pdf PDF
S06 - 537-16-102A Construction Plans IFC - Photos - 7.pdf PDF
S06 - 537-16-102A Construction Plans IFC - Photos - 2.pdf PDF
S06 - 537-16-102A Construction Plans IFC - Photos - 1.pdf PDF
36C25222B0007 0011.docx DOCX document
S06 - 537-16-102A Construction Plans IFC - Photos - 4.pdf PDF
S06 - 537-16-102A Construction Plans Issued for Bid and Construction 02_11_2022 - (1).pdf PDF
S06 - 537-16-102A Construction Plans Issued for Bid and Construction 02_11_2022 - (2).pdf PDF
S06 - VA Responses to RFIs.pdf PDF
S06 - Wage Determination 01_14_2022.pdf PDF
36C25222B0007 0010.docx DOCX document
S06 - 537-16-102A Specifications Issued for Bid and Construction 02_03_2022.pdf PDF
36C25222B0007 0009.docx DOCX document
36C25222B0007 0008.docx DOCX document
36C25222B0007 0007.docx DOCX document
S06 - Campus Floor Plan 1 of 2.pdf PDF
S06 - Pre-Bid Site Visit Attendance Sheet - 1-14-22.pdf PDF
S06 - Record Drawings 1 of 8.pdf PDF
S06 - Pre-Bid Site Visit Attendance Sheet - 1-5-22.pdf PDF
36C25222B0007 0006.docx DOCX document
S06 - Attachments 0006.zip ZIP file
36C25222B0007 0005.docx DOCX document
537-16-102A Construction Plans IFC 08302020-2.pdf PDF
537-16-102A Construction Plans IFC 08302020 - 2.pdf PDF
36C25222B0007 0004.docx DOCX document
537-16-102A Construction Plans IFC 08302020 - 1.pdf PDF
S06 - Record Drawings 4 of 8.pdf PDF
36C25222B0007 0003.docx DOCX document
S06 - Record Drawings 8 of 8.pdf PDF
S06 - Record Drawings 5 of 8.pdf PDF
S06 - Record Drawings 7 of 8.pdf PDF
S06 - Record Drawings 6 of 8.pdf PDF
S06 - Attachments 0002.zip ZIP file
36C25222B0007 0002.docx DOCX document
36C25222B0007 0001.docx DOCX document
S06 - Attachments 0001.zip ZIP file
S02 - 537-16-102A Specifications IFC 02082020.pdf PDF
S02 - 537-16-102A Construction Plans IFC 08302020.pdf PDF
S02 - VHA Sup Con Req for Combatting COVID-19.pdf PDF
S02 - Statement of Work.pdf PDF
S02 - Wage Determination as of 12_3_21.pdf PDF
36C25222B0007.docx DOCX document
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Jesse Brown Veteran’s Hospital Project 537-16-102A Sprinkler Corrections Field Report 10-02-2019 Areas of concern Building 11 – Basement Level

1 – Cutting Grease on Fitting, old galvanized pipe. Painting scraped off

3 – Cutting Grease on Fitting

2 – Fire Alarm Wiring not connected. Not sure if existing was not removed or not, or if not connected to system.

4 – Fire Alarm Wiring not connected. Not sure if existing was not removed or not, or if not connected to system.

Field Report 10-02-2019

Building 11 – Basement Level

5 – Severe rust on pipe and fitting. Paint chipping off. Galv Piping.

7 – Severe rust on pipe and fitting. Paint chipping off. Galv Piping.

8 – Extra Valve, no tamper switch, not locked open.

6 – Rust on old hanger location. 9 – Fitting and pipe joint rusting. Galv Pipe. Paint chipping.

Field Report 12-11-2019

Building 11A – 1st Floor

1 – 1st Floor Stairwell 2 – Standpipe riser and Hose valve in Stairwell. Replace hose valve per SOW

Field Report 11-06-2019

Building 11A – 2nd Floor

1 – Unattached hanger 2 – Elbow rusted

Field Report 11-14-2019

Building 11A – 3rd Floor

1 – Sprinkler and escutcheon falling out - Replace 2 – Sprinkler and escutcheon falling out - Replace

3 – Sprinkler and escutcheon are crooked - Correct

Building 11A – 3rd Floor

4 – Sprinkler heads located greater than 9’-0” from wall.

Add additional sprinklers or relocate existing heads to meet code spacing requirements.

Building 11A – 4th Floor

1 – Item removed from project 2 – Crooked escutcheon and sprinkler - Correct

3 – Rusty Elbow – Replace with new 4 – Sprinkler obstructed by exit sign

Building 11A – 4th Floor

5 – Leak

Building 11A – 5th Floor

1 – Sprinkler is obstructed - Relocate 2 – Fitting rusted shut from leaking – water stains present -

Replace

3 – Sprinkler and escutcheon are crooked - Correct 4 – Rusted fittings – Replace with new

5 - Rusted pipe and fittings – Replace with new 6 – Rusted fitting – Replace with new

7 – 5th Floor Stairwell 8 – Standpipe and Fire Hose Valve in Stairwell

9 – Close up of hose valve, replace per SOW

Field Report 12-10-2019

Building 11A – 6th Floor

1 – 6th Floor Stairwell 2 – Floor Control valve, Pressure Valve in Stairwell

3 – Fire hose valve in stairwell 4 – Thinwall piping down to head.

5 – Rusted fitting to sprinkler head. Replace fitting 6 – Rusted elbow and tee to sprinkler. Replace fittings.

7 – 6th Floor Stairwell 8 – Hose valve in stairwell

9 – Old hose valve in stairwell, Replace per SOW 10 – 6th Floor Stairwell

11 – Fire hose valve in stairwell 12 – weld-o-let rusted. Replace connection

13 – 6th Floor stairwell 14 – Hose valve in stairwell

15 – Hose valve to be replaced per SOW 16 – Firewall penetration not sealed in stairwell

17 – Sprinkler main penetration rusted, firewall sealant damaged. Replace damaged piping, reseal opening.

18 – Sprinkler fitting rusted, replace fitting.

Building 11A – 7th Floor

1 – 7th Floor Stairwell 2 – Fire hose valve in stairwell

3 – Pressure gauge at top of riser in stairwell 4 – Closer look at Fire hose valve to be replaced per SOW.

5 – Tee starting to rust 6 – Elbow and reducer rusting, replace fittings

7 – Sprinkler head coated with something. Replace head 8 – Thinwall piping down to sprinkler

9 – 7th Floor Stairwell 10 – Fire Hose valve in stairwell

11 – Pressure gauge at top of riser in stairwell 12 – Close up of fire hose valve, to be replaced per SOW

13 – Sprinkler head piping down to head rusting, replace piping

14 – Sprinkler head crystalizing on head, frame and bulb.

Replace head.

15 – Sprinkler piping missing hanger, add hanger. 16 – 7th Floor stairwell

17 – Fire hose valve and pressure gauge at top of riser 18 – Close up of hose valve. Replace per SOW.

19 – Rusted reducing tee and elbow to be replaced 20 – Dry pendant sprinkler head in cooler to be replaced.

21 – 7th Floor Stairwell 22 – Standpipe Riser and Hose Valve in stairwell. Hose valve to be replaced per SOW

23 – Standpipe riser and locked OS&Y valve for future floor control zone.

Field Report 12-09-2019

Building 11A – 8th Floor

1 – Insulation on sprinkler piping to be repaired 2 – Missing sprinkler protection under ductwork

3 – Drain valve 4 – Tee fitting corroded, replace with new.

5 – 8th Floor Stairwell 6 – Floor control valve in stairwell

7 – Floor control valve, pressure gauge and hose valve in stairwell

8 – Sprinklers missing over area in mechanical room. Provide 2 heads 9 – Fire hose valve in stairwell, to be replaced per

SOW

10 – Drain elbow rusted in stairwell, replace valve.

10-02-2019 - Building 11 - Lower Level Field Report
12-11-2019 - Building 11A - 1st Floor Field Report
11-06-2019 - Building 11A - 2nd Floor Field Report
11-14-2019 - Building 11A - 3rd Floor Field Report
12-11-2019 - Building 11A - 3rd Floor Field Report
11-14-2019 - Building 11A - 4th Floor Field Report
11-14-2019 - Building 11A - 5th Floor Field Report
12-11-2019 - Building 11A - 5th Floor Field Report
12-10-2019 - Building 11A - 6th Floor Field Report
12-10-2019 - Building 11A - 7th Floor Field Report
12-11-2019 - Building 11A - 7th Floor Field Report
12-09-2019 - Building 11A - 8th Floor Field Report
12-11-2019 - Building 11A - 8th Floor Field Report