This document summarizes a federal contract solicitation for corrections to a sprinkler system. The solicitation number is 36C25222B0007 issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12 for Project 537-16-102A. The opportunity type is listed as a solicitation for corrections to an existing sprinkler system located at a Veterans Affairs medical facility. No other details are provided regarding response dates, pricing terms, set asides, incumbent contractors, or work requirements.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jesse Brown Veteran’s Hospital Project 537-16-102A Sprinkler Corrections Field Report 01-15-2020 Areas of concern Full Campus – 1st Floor
1 – Bed Tower 1st Floor Stairwell 2 – Bed Tower 1st Floor Stairwell
3 – Bed Tower 1st Floor Stairwell 4 – Bed Tower 1st Floor Stairwell
5 – Bed Tower 1st - Hose Valve & Riser in stairwell 6 – Bed Tower 1st – Control Valve & Riser in stairwell
7 – Bed Tower 1st – Pressure Gauge in stairwell 8 – Bed Tower 1st – Control Valve & Pressure Gauge in stairwell
9 – Bed Tower 1st – Copper Piping corroded. Sprinkler fitting rusted. Replace damaged piping.
10 – Bed Tower 1st – Sprinkler fitting rusted. Replace piping.
11 – Bed Tower 1st – Sprinkler fitting rusted. Replace fitting. 12 – Bed Tower 1st – Sprinkler fitting rusted. Replace ftting.
13 – Bed Tower 1st – Escutcheon opening too large. Patch hole.
14 – Ogden 1st – Tapered Drop rusted, replace with standard drop and reducing fitting.
15 – Ogden 1st Floor stairwell 16 – Ogden 1st - Hose Valve & Riser in stairwell
17 – Ogden 1st - Hose Valve in corridor 18 – Ogden 1st – Tapered Drop rusted, replace with
19 – Ogden 1st – Sprinkler needed in drywall ceiling.
Concealed head too close to drop.
20 – Ogden 1st – Tapered Drop rusted, replace with
21 – Ogden 1st – Tapered Riser rusted, replace with standard riser and reducing fitting.
22 – Ogden 1st – Sprinkler riser and dry pipe valve for MRI sprinklers. Closet not marked.
23 – Bed Tower 1st Floor stairwell 24 – Bed Tower 1st - Hose Valve & Riser in stairwell
25 – Bed Tower 1st – Control Valve & Pressure Gauge in
26 – Damon 1st – Sprinkler head farther than 9’-0” from back wall. Move sprinkler 2’-0” close to wall.
27 – Damon 1st Floor stairwell 28 – Damon 1st - Hose Valve & Riser in stairwell
29 – Damon 1st – Control Valve & Pressure Gauge in
30 – Damon 1st Floor stairwell
31 – Damon 1st – Control Valve & Riser in stairwell 32 – Damon 1st – Control Valve & Riser in stairwell
Field Report 01-17-2020
33 – Damon 1st – Sprinkler piping rusted. About 4’-6” length. 34 – Damon 1st – Sprinkler piping rusted. About 4’-6” length.
35 – Damon 1st – Sprinkler fitting rusted. 36 – Damon 1st – Sprinkler piping and fittings rusted.
37 – Damon 1st – Sprinkler piping rusted. About 4’-6” length. 38 – Damon 1st – Drain pan connected to sprinkler piping. .
39 – Damon 1st – Sprinkler hanger rod bent. Replace. 40 – Damon 1st – Sprinkler not located under ductwork.
41 – Damon 1st – Sprinkler coverage in garage Not on dry system. Provide new Dry pipe valve for space.
42 - Damon 1st – Sprinklers blocked by ceiling elevation change.
43 – Damon 1st – Sprinkler coverage missing under roll up doors. Provide additional heads
44 – Damon 1st – Rusted Tee. Replace fitting.
45 – Damon 1st – Head not within 8” of ceiling. CPVC exposed in tele closet. Not permitted.
46 – Damon 1st – Rusted Tee. Replace fitting.
47 – Damon 1st – Rusted fittings. Replace fitting. 48 – Damon 1st – Rusted fittings. Replace fitting.
49 - Damon 1st –Sprinkler head rusted. Surrounding ceiling has water damage. Replace head.
50 - Damon 1st – Sidewall head obstructed by drain line.
Relocate head or add head on opposite side of pipe
51 – Damon 1st Floor stairwell 52 – Damon 1st - Hose Valve & Riser in stairwell
53 – Damon 1st – Control Valve & Pressure Gauge in
54 – Damon 1st – Lower stairwell missing sprinkler protection. Provide additional coverage.
55 – Damon 1st – Sprinkler fitting rusted. Replace fitting. 56 – Damon 1st – Crawlspace access does not include any sprinkler coverage.
57 – Damon 1st – Crawlspace access does not include any
58 – Damon 1st – Crawlspace access does not include any
59 – Damon 1st Floor stairwell 60 – Damon 1st - Hose Valve & Riser in stairwell
61 – Damon 1st - Hose Valve & Riser in stairwell 62 – Damon 1st – Control Valve & Pressure Gauge in
63 – Atrium 1st – Sprinkler head too far from door. Move to 7’-6” from door.
64 – Atrium 1st – Alcoves do not have sprinkler heads.
(6 locations) Install new heads in each alcove.
65 – Atrium 1st – Alcoves do not have sprinkler heads.
(6 locations) Install new heads in each alcove.
66 – Atrium 1st – Location of control valve above ceiling.
67 – Atrium 1st – Location of control valve above ceiling. 68 – Atrium 1st – Location of control valve above ceiling.
69 – Taylor 1st – Sprinkler fitting rusted. Replace fitting. 70 – Taylor 1st – Sprinkler piping and fitting rusted. Replace with new.
71 – Taylor 1st – Sprinkler piping and fitting rusted. Replace
72 – Taylor 1st – Sprinkler piping connected to conduit with wire. Remove and support sprinkler piping with hanger
73 – Taylor 1st – Sprinkler piping and fitting rusted. Replace
74 – Taylor 1st – Sprinkler piping and fitting rusted. Replace
75 – Taylor 1st – Sprinkler piping and fitting rusted. Replace
76 – Taylor 1st – Sprinkler piping and fitting rusted. Replace
77 – Taylor 1st – Sprinkler piping and fitting rusted. Replace
78 – Taylor 1st – Sprinkler piping and fitting rusted. Replace
79 – Taylor 1st – Sprinkler piping and fitting rusted. Replace
80 – Taylor 1st – Sprinkler piping and fitting rusted. Replace
81 – Taylor 1st – Sprinkler piping and fitting rusted. Replace
82 – Taylor 1st – Sprinkler piping and fitting rusted. Replace
| 01-15-2020 -Full Campus Level 01 Field Report |
| 01-17-2020 -Full Campus Level 01 Field Report |
File details come from the government source that posted it. Updated .