537-16-102A Construction Plans IFC 08302020-2.pdf

PDF 13 MB Posted

Attached to
Z1DA--537-16-102A Corrections to Sprinkler System
Solicitation number
36C25222B0007
Issued by

About this file

This document outlines a federal contract opportunity for corrections to a sprinkler system. The solicitation number is 36C25222B0007 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12. The opportunity is for Project 537-16-102A which involves making corrections to an existing sprinkler system. No other details are provided in the document regarding response dates, pricing terms, set asides, incumbent contractors, or work requirements.

View the file

Other files

File Type Posted
S06 - 537-16-102A Construction Plans IFC - Photos - 4.pdf PDF
36C25222B0007 0013.docx DOCX document
36C25222B0007 0012.docx DOCX document
S06 - 537-16-102A Construction Plans IFC - Photos - 6.pdf PDF
S06 - 537-16-102A Construction Plans IFC - Photos - 5.pdf PDF
S06 - 537-16-102A Construction Plans IFC - Photos - 7.pdf PDF
S06 - 537-16-102A Construction Plans IFC - Photos - 2.pdf PDF
S06 - 537-16-102A Construction Plans IFC - Photos - 1.pdf PDF
36C25222B0007 0011.docx DOCX document
S06 - 537-16-102A Construction Plans IFC - Photos - 4.pdf PDF
S06 - 537-16-102A Construction Plans IFC - Photos - 3.pdf PDF
S06 - 537-16-102A Construction Plans Issued for Bid and Construction 02_11_2022 - (1).pdf PDF
S06 - 537-16-102A Construction Plans Issued for Bid and Construction 02_11_2022 - (2).pdf PDF
S06 - VA Responses to RFIs.pdf PDF
S06 - Wage Determination 01_14_2022.pdf PDF
36C25222B0007 0010.docx DOCX document
S06 - 537-16-102A Specifications Issued for Bid and Construction 02_03_2022.pdf PDF
36C25222B0007 0009.docx DOCX document
36C25222B0007 0008.docx DOCX document
36C25222B0007 0007.docx DOCX document
S06 - Campus Floor Plan 1 of 2.pdf PDF
S06 - Pre-Bid Site Visit Attendance Sheet - 1-14-22.pdf PDF
S06 - Record Drawings 1 of 8.pdf PDF
S06 - Pre-Bid Site Visit Attendance Sheet - 1-5-22.pdf PDF
36C25222B0007 0006.docx DOCX document
S06 - Attachments 0006.zip ZIP file
36C25222B0007 0005.docx DOCX document
537-16-102A Construction Plans IFC 08302020 - 2.pdf PDF
36C25222B0007 0004.docx DOCX document
537-16-102A Construction Plans IFC 08302020 - 1.pdf PDF
S06 - Record Drawings 4 of 8.pdf PDF
36C25222B0007 0003.docx DOCX document
S06 - Record Drawings 8 of 8.pdf PDF
S06 - Record Drawings 5 of 8.pdf PDF
S06 - Record Drawings 7 of 8.pdf PDF
S06 - Record Drawings 6 of 8.pdf PDF
S06 - Attachments 0002.zip ZIP file
36C25222B0007 0002.docx DOCX document
36C25222B0007 0001.docx DOCX document
S06 - Attachments 0001.zip ZIP file
S02 - 537-16-102A Specifications IFC 02082020.pdf PDF
S02 - 537-16-102A Construction Plans IFC 08302020.pdf PDF
S02 - VHA Sup Con Req for Combatting COVID-19.pdf PDF
S02 - Statement of Work.pdf PDF
S02 - Wage Determination as of 12_3_21.pdf PDF
36C25222B0007.docx DOCX document
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENVIRONMENTAL MANAGEMENT

ENGINEERING SERVICE

OFFICE STAFF

CPRS

OFFICE

TELECOM

32T1

ELECTRICAL

32E2

ELEVATOR

P-1A

ELEVATOR

P-2A

ELEVATOR

S-3A

ELEVATOR

ELEVATOR

P-5A

ELECTRICAL

32E4

LOCKSMITH

ELECTRICAL

32E5

3299A

ELECTRICAL

32E3

VESTIBULE

C3201

CORRIDOR

C3203

CORRIDOR

C3206

CORRIDOR

C3205

CORRIDOR

C3204

CORRIDOR

C3202

OFFICE STAFF

ENGG SVC

DRAFTING AREA

CONFERENCE RM

ADMIN OFFICE

ENGG CHIEF

TRANSIT CO-ORDR

ASST CHIEF

ENGINEER

OFFICE STAFF

ENERGY MGR

OFFICE STAFF

OFFICE STAFF

32783277327632753274

TELECOM

32T2 STAIR

NO 9

INTERIOR DESIGN

OFFICE

SECY

ADMIN OFFICER

INTERIOR DESIGNER

EMS CHIEF

STORAGE

STORAGE

MALE TOILET

FEMALE

TOILET

WORK AREA

WORK AREA

ANALYST

OFFICE

PATIENT HEALTH

RESOURCE

CENTER

PHARMACY DRUG

STORAGE

PHARMACY DRUG

STORAGE

CREDENTIALING

PGM

CREDENTIALING

PGM

EMS HAC

SUPERVISOR P&P

IH OFFICE

EMERGENCY MGMT

OFFICE

HAC

STAIR

NO 11

NURSE CONFERENCE RM

NURSE

EDUCATION

STAIR

NO 10

CLASS RM

COMPUTER

NURSE

OFFICE

NURSE

OFFICE

NURSE

OFFICE

CPRS OFFICE

CPRS OFFICE

OFFICE

FEC

FEC

FEC

OFFICE

CUBICLE

OFFICE

CUBICLE

OFFICE

CUBICLE

OFFICE

CUBICLE

OFFICE

CUBICLE

OFFICE CUBICLE

COPIER RMKITCHENFILE STORAGE

3280A

ROOF

ANALYST

OFFICE

B11A WEST

B11A EAST

B

A

B

B

B11A WEST

B11A EAST

B11A

B30

T3

A1

T3

A2

T3

A3

T3

A4

T3

A4

T3

A5

LIBRARY SVC

CONFERENCE RM

CONFERENCE RM

STAIR

NO 12

32E1

ELECTRICAL CLOSET

FEC

ANALYST

OFFICE

3210A

TRAINING RM

3210B

CHIEF OFFICE

3210C

OFFICE

3210D

B11A WEST

B11A EAST

B11A WEST

B11A EAST

T3

A6

T3

A7

B11A FX103

BUILDING 11A

THIRD FLOOR PLAN

08/30/2020

100% Complete and Final

Issued for 100% Complete and Final

Issued for 100% CD

08/30/2020

02/10/2020

B11A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 engineering discipline: Fire Protection Virtual Energy Solutions

31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Sprinkler Corrections

Jesse Brown VAMC

Chicago, IL

537-16-102A

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

BUILDING 11A 3RD FLOOR PLAN WEST

1/8" = 1'-0"

BUILDING 11A 3RD FLOOR PLAN EAST

1/8" = 1'-0"

FIRE PROTECTION KEYED NOTES:

**THE NOTES PROVIDED HERE CORRESPOND TO THE ASSOCIATED PHOTOS

GENERATED IN THE FIELD REPORT FOR THIS AREA. REFER TO PHOTOS FOR

OBSERVED DEFICIENCIES, DEFECTS, OMISSIONS, AND ERRORS OF THE EXISTING

SPRINKLER SYSTEM. 11-14-2019 & 12-11-2019 BUILDING 11A 3RD FLOOR.

SPRINKLER AND ESCUTCHEON ARE FALLING OUT. REPLACE CEILING

TILE WITH NEW AND CUT NEW HOLE FOR SPRINKLER HEAD. (PHOTO 1)

SPRINKLER AND ESCUTCHEON ARE FALLING OUT. REPLACE CEILING

TILE WITH NEW AND CUT NEW HOLE FOR SPRINKLER HEAD. (PHOTO 2)

SPRINKLER AND ESCUTCHEON ARE CROOKED. CORRECT.

(PHOTO 3)

SPRINKLERS ARE TOO FAR OFF OF THE WALL. RELOCATE.

RUSTY PIPE. REPLACE.

NO RESTRAINTS ON ARMOVERS. PROVIDE SPRINKLER PIPE BRACING

ON ARMOVER.

SPRINKLER HEADS LOCATED FURTHER THAN 9'-0" FROM WALL. ADD

ADDITIONAL SPRINKLER HEADS OR RELOCATE HEADS TO MEET NFPA

REQUIREMENTS. (PHOTO 4)

T3

A1

T3

A2

T3

A3

T3

A4

T3

A5

T3

A6

T3

A7

CWT/PRRC

PGM ASST

PRRC SOCIAL WORK

4293A

ELECTRICAL

42E2

ELECTRICAL

42E3

PRRC

COORDINATOR

PRRC NURSE

CWT

OFFICE

CWT

OFFICE

UR NURSE

TELECOM

42T2

IRM

CLOSET

4298A

CWT

OFFICE

RECREATION

THERAPIST OFFICE

FIRE

CLOSET

FAC

SOCIAL WORK

CUBICLE

4210B

SOCIAL WORK

CUBICLE

4210C

VOLUNTARY SVC

4245 CORRIDOR

C4205

CORRIDOR

C4206

CORRIDOR

C4203

CORRIDOR

C4201

CORRIDOR

C4202

DAY TREATMENT RM

VESTIBULE

PRRC

OFFICE

RN OFFICE

4284A

ISO OFFICE

4286A CWT OFFICE

STORAGE

KITCHEN

PRRC

SOCIAL WORK

PRRC

CLASS RM

VOC

REHAB

IRM WORK AREA

OPEN

STORAGE

STORAGE

RECEPTION

FILE

STORAGE

AREA

4270A

SECRETARY

AREA

4263A

OPEN

OFFICE

STAFFING

CHIEF

LABOR

RELATION

CHIEF

A/O

OFFICE

MALE TOILET

STORAGE/

OFFICE

HAC

OFFICE

SOCIAL

WORK

LOGISTICS

NURSING

STAFF

OFFICE

LOCKER

4245E

STORAGE

4245FCHIEF

4245G

ASST CHIEF

OFFICE

4245D

VOLUNTARY

STAFF

4245C

VOLUNTARY

OFFICE

4245C

OFFICE

4245B

RECEPTION

AREA

4245B1

IRM

CLOSET

42T1

CLERK OFFICE

EDUCATION

STAFF

STRIKE

FORCE

EDUCATION STAFF

OFFICE

STAIR

NO 10

STAIR

NO 9

COMPUTER LAB

4295A

CWT OFFICE

RECREATION

THERAPIST

OFFICE

PURCHASE

CARE

CO-ORDR

4276A

FEMALE

TOILET

ELEVATOR

P-5A

ELEVATOR

P-4A

ELEVATOR

S-3A

ELEVATOR

P-1A

ELEVATOR

P-2A

STAIR

NO 11

STORAGE

STORAGE

4279A

ELECTRIC

CLOSET

42E4STORAGE

STORAGE

4245A

CHIEF OFFICE

BUDGET OFFICE

OFFICE

OFFICE

STORAGE

ROOF

CONFERENCE

RM

CWT

OFFICE

4289A

LOCKER/REFRIG

4289C

WAITING

RM

4289B

CORRIDOR

C4201A

CWT GROUP RM

4280A

B11A WEST

B11A EAST

B

A

B

B

B11A WEST

B11A EAST

B11A

B30

T4

A1

T4

A2

T4

A3

T4

A4

T4

A5

T4

A6

T4

A7

ELECTRICAL

42E1

FIRE

CLOSET

4200A

4210B

SOCIAL WORK

4210A

RECEPTION/WAITING

PROG

ASSIST

4205B

CORRIDOR

C4204

LOGISTICS

PERSONAL

PROPERTY MGMT

OFFICE

SOCIAL WORKER

4205E

CONFERENCE RM

SOCIAL WORK

SOCIAL

WORK

SOCIAL

WORK

SUPV

OFFICE

SOCIAL

WORK

A.O. OFFICE

CHIEF OFFICE

STAIR

NO 12

OFFICE

4205C

CHIEF

OFFICE

SUPV OFFICE

4205D

LOGISTICS MGR OFFICE

4207B

OFFICE

4207A

LOGISTICS

PERSONAL

PROPERTY MGNT

PROG

ASSIST

4205A

B11A WEST

B11A EAST

B11A WEST

B11A EAST

B11A FX104

BUILDING 11A

FOURTH FLOOR PLAN

08/30/2020

100% Complete and Final

Issued for 100% Complete and Final

Issued for 100% CD

08/30/2020

02/10/2020

B11A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 engineering discipline: Fire Protection Virtual Energy Solutions

31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Sprinkler Corrections

Jesse Brown VAMC

Chicago, IL

537-16-102A

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

BUILDING 11A 4TH FLOOR PLAN WEST

1/8" = 1'-0"

BUILDING 11A 4TH FLOOR PLAN EAST

1/8" = 1'-0"

FIRE PROTECTION KEYED NOTES:

**THE NOTES PROVIDED HERE CORRESPOND TO THE ASSOCIATED PHOTOS

GENERATED IN THE FIELD REPORT FOR THIS AREA. REFER TO PHOTOS FOR

OBSERVED DEFICIENCIES, DEFECTS, OMISSIONS, AND ERRORS OF THE

EXISTING SPRINKLER SYSTEM. 11-14-2019 BUILDING 11A 4TH FLOOR.

WIRE ALL OVER PIPE. NEEDS A HANGER.

(PHOTO 1)

CROOKED ESCUTCHEON. PLEASE CORRECT.

(PHOTO 2)

RUSTY ELBOW. REPLACE WITH NEW.

(PHOTO 3)

SPRINKLER IS OBSTRUCTED BY EXIT SIGN. PLEASE RELOCATE

SPRINKLER. (PHOTO 4)

LEAK IN PIPE AT COUPLING. REVIEW PIPING AT JOINT AND REPLACE

COUPLING AND PIPING AS REQUIRED. (PHOTO 5)

RUSTY FITTING. REPLACE WITH NEW.

NO RESTRAINTS PROVIDED ON FLOOR. PLEASE PROVIDE.

T4

A1

T4

A2

T4

A3

T4

A4

T4

A5

T4

A6

T4

ACCESS TO CHASE

METAL DOOR 2'

ZONE 200

BLDG 11A

MCCR

HBPC

RE

LE

AS

E O

F I

NF

OR

MA

TIO

N

PROGRAM

SUPPORT

ASST

FAC

FAC

CHIEF OPHTHALMOLOGY

ELECTRICAL

CLOSET

52E3

ELECTRICAL

CLOSET

52E5

ELEVATOR

CLOSED

P-4A

ELEVATOR

P-5A

ELEVATOR

P-2A

ELEVATOR

P-1A

ADMINISTRATION

OFFICER

TEL

52T1

ELECTRICAL

52E2

PRINTER/FAX

AREA

PGM

SPECIALIST

OFFICE

ELECTRICAL

CLOSET

52E4

OFFICE

FEMALE

TOILET

CONFERENCE RM

STORAGE

TISSUE

CULTURE

5278A

RESEARCH

LAB-5

VOLUNTARY

STORAGE

VOLUNTARY

STORAGE

5284A

OFFICE

OFFICE

VOLUNTARY

STORAGE

CORRIDOR

C5202

CORRIDOR

C5201

TEL

5291 STAIR

NO 9

MECH RM

MECH RM

5292A

OFFICE

OFFICE

5289 AUTOCLAVE

GLASS

WASH

RESEARCH

LAB-4

TISSUE

CULTURE

LAB

LAB

OFFICE

5279COLD

LAB

TISSUE

CULTURE

5275ARESEARCH

LAB-1

OFFICE AREA

OFFICE AREA

5230 CPAC

PREVENTION

CO-ORDR

PGM

SPECIALIST

CPAC

RECEPTION

TIME KEEPER

TIME

KEEPER

MALE

TOILET

SUPPLY

HAC

CORRIDOR

C5203

STORAGE

ELEVATOR

S-3A

NURSING

TRAINING

SUPV-RECORD

PROCESSING

SUPV

CPAC

OFFICE

INFECTION

CONTROL

CORRIDOR

C5205

STAIR

NO 11

CORRIDOR

C5206

REPRODUCTION

5260A

SWING SPACE

5260B

FISCAL

OFFICE

FEE BASIS

FEE

BASIS

WAITING

AREA

PASSAGE

CORRIDOR

C5207

STAIR

NO 10

PGM

SPECIALIST

PI SPECIALIST

PI

SPECIALIST

PATIENT

SAFETY

MGR

PI CHIEF

FISCAL OFFICE

RELEASE OF

INFO

RELEASE OF

INFO

RELEASE OF INFO

RELEASE OF INFO

MEDICAL

RECORDS

RELEASE OF

INFO

RELEASE OF

INFO

FISCAL

OFFICE

FISCAL

OFFICE

COPIER

AREA

C5207

ROOF

CPAC OFFICE

AREA

5232B

CPAC WAITING

AREA

5232A

ENTRANCE

T5

A1

T5

A4

T5

A5

T5

A6

T5

A7

FEE BASIS

FEE BASIS

FAC

STORAGE

OFFICE AREA

5230 CPAC

C5204PATIENT

SAFETY

ELECTRICAL

CLOSET

52E1

ADMIN ASST

TIME KEEPER

TIME KEEPER

CLAIM ASST

PASSAGE

5201A

SECY AND

CLERK

INPT

ASSOC

OUT

PATIENT

ASSOC

CONFERENCE RM

5208 NURSING

CHIEF

STAIR

NO 12

NURSE

OFFICE

LEAD CLAIM

ASST

MAGNET

CO-ORDR

ADPAC

TIME

KEEPER

HEALTH

SCIENCE

SPECIALIST

SPECIALIST

OFFICE

AREA

5230A

NURSE OFFICE

NURSING

COPIER

5204A

CONFERENCE RM

5205A

NURSE OFFICE

PGM SPECIALIST

T5

A2

T5

A3

B11A FX105

BUILDING 11A

FIFTH FLOOR PLAN

08/30/2020

100% Complete and Final

Issued for 100% Complete and Final

Issued for 100% CD

08/30/2020

02/10/2020

B11A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 engineering discipline: Fire Protection Virtual Energy Solutions

31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Sprinkler Corrections

Jesse Brown VAMC

Chicago, IL

537-16-102A

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

BUILDING 11A 5TH FLOOR PLAN WEST

1/8" = 1'-0"

BUILDING 11A 5TH FLOOR PLAN EAST

1/8" = 1'-0"

FIRE PROTECTION KEYED NOTES:

**THE NOTES PROVIDED HERE CORRESPOND TO THE ASSOCIATED PHOTOS

GENERATED IN THE FIELD REPORT FOR THIS AREA. REFER TO PHOTOS FOR

OBSERVED DEFICIENCIES, DEFECTS, OMISSIONS, AND ERRORS OF THE EXISTING

SPRINKLER SYSTEM. 11-14-2019, 12-10-2019, & 12-11-2019 BUILDING 11A 5TH FLOOR.

SPRINKLER IS OBSTRUCTED. PLEASE RELOCATE SO IT IS NO LONGER

OBSTRUCTED. (PHOTO 1)

FITTING IS RUSTED SHUT FROM LEAKING. WATER STAINS ARE

PRESENT. REPLACE WITH NEW FITTING. (PHOTO 2)

SPRINKLER IS CROOKED. PLEASE CORRECT.

(PHOTO 3)

FITTING IS RUSTED. REPLACE WITH NEW FITTING.

(PHOTO 4)

FITTING AND PIPE ARE RUSTED. REPLACE WITH NEW.

(PHOTO 5)

FITTING IS RUSTED. REPLACE WITH NEW FITTING.

(PHOTO 6)

EXISTING 2 1/2" BUTTERFLY VALVE WITH TAMPER SWITCH TO FEED

FLOOR SPRINKLER ZONE TO REMAIN.

(PHOTOS 7-9)

T5

A1

T5

A2

T5

A3

T5

A4

T5

A5

T5

A6

T5

TEL

62T1

PSTD SOCIAL

WORKER

ELECTRICAL

6277A

ELECTRICAL

6277B

ELECTRICAL

62E3

ELECTRICAL

62E2

FAC

6290B

RESEARCH

LAB

RESEARCH

LAB

GROUP

THERAPY

WAITING

GROUP THERAPY

LAB

62E4

EMS

LAB

RESEARCH

LAB

CORRIDOR

C6201

RESEARCH

LAB

FILE RM

FILE RM

CORRIDOR

C6203

CORRIDOR

C6202

CORRIDOR

C6205

PSTD

PSYCHIAST

MHICM VOC

REHAB

MHICM

OFFICE

MHICM

OFFICE

MHICM

OFFICE

MHICM

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

CYLINDER

RM

ELEVATOR

LOBBY

C6204

ELEVATOR

P5-A

ELEVATOR

ELEVATOR

S3-A

GLASS

WASH

LAB

LAB

CORRIDOR

C6207

CORRIDOR

C6206

MICRO

OFFICE

RESEARCH

LAB

LAB

RESEARCH

LAB

OFFICE

REFRIG

6254A

STAIR

NO-10

OFFICE

CONFERENCE RM

MULTI RM

STORAGE

OFFICE

LAB

6245A

RESEARCH

LAB

STORAGE

RESEARCH

LAB

RESEARCH

LAB

RESEARCH

LAB

ELEVATOR

P2-A

ELEVATOR

P1-A

STAIR

NO-11

COOL

LAB

OFFICE

OFFICE

OFFICE

OFFICE

IOINATION

TISSUE

CULTURE

6227 PSTD

PSYCHIATIST

PSY

FELLOW

PTSD

PSYCHIATIST

TEL

62T2 STAIR

NO-9

STER

GLASS

WASHING

OFFICE

OFFICE

WISE

OFFICE

FEMALE

TOILET

MALE TOILET

SUPPY

EMS

COMMON FREEZER RM

RESEARCH

RESEARCH

LAB

CONFERENCE RM

OFFICE

FEC

REFR

WALK-IN

6250A

P4-A

VESTIBULE

ROOF

COPIER RM

6290C

B

A

B

B

B11A WEST

B11A EAST

B

A

B

B

B11A WEST

B11A EAST

B11A

B30

T6

A1

T6

A2

T6

A3

T6

A4

T6

A1

T6

A4

T6

A4

T6

A6

T6

A7

ELECTRICAL

62E1

RESEARCH

LAB

RESEARCH

LAB

RESEARCH

OFFICE

RESEARCH OFFICE

OFFICE

OFFICE

OFFICE

STORAGE

STAIR

NO-12

RESEARCH

ADMIN

STORAGE

CONFERENCE RM

OFFICE

OFFICE

OFFICE

SECY

OFFICE

ACOS

B11A WEST

B11A EAST

B11A WEST

B11A EAST

T6

A4

B11A FX106

BUILDING 11A

SIXTH FLOOR PLAN

08/30/2020

100% Complete and Final

Issued for 100% Complete and Final

Issued for 100% CD

08/30/2020

02/10/2020

B11A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 engineering discipline: Fire Protection Virtual Energy Solutions

31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Sprinkler Corrections

Jesse Brown VAMC

Chicago, IL

537-16-102A

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

BUILDING 11A 6TH FLOOR PLAN WEST

1/8" = 1'-0"

BUILDING 11A 6TH FLOOR PLAN EAST

1/8" = 1'-0"

FIRE PROTECTION KEYED NOTES:

**THE NOTES PROVIDED HERE CORRESPOND TO THE ASSOCIATED PHOTOS

GENERATED IN THE FIELD REPORT FOR THIS AREA. REFER TO PHOTOS FOR

OBSERVED DEFICIENCIES, DEFECTS, OMISSIONS, AND ERRORS OF THE

EXISTING SPRINKLER SYSTEM. 12-10-2019 BUILDING 11A 6TH FLOOR &

01-07-2020 FULL CAMPUS MISSED ROOMS.

SPRINKLER PIPING IS RUSTED. REPLACE FITTINGS WITH NEW.

(PHOTOS 5,6,18)

SPRINKLER PIPE WELD-O-LET RUSTED/DAMAGED/ REPLACE PIPING

AND TEE. (PHOTO 12)

SPRINKLER MAIN PENETRATION THROUGH STAIRWELL WALL RUSTED

AND FIRE SEALANT COMPROMISED. REPLACE PIPING AND RESEAL

PENETRATION. (PHOTOS 16,17)

EXISTING 2 1/2" BUTTERFLY VALVE WITH TAMPER SWITCH TO FEED

FLOOR SPRINKLER ZONE TO REMAIN.

(PHOTOS 1-3. 7-11,13-15)

NOTED OMITTED.

SPRINKLER ESCUTCHEON MISSING. PROVIDE NEW COVER PLATE.

(PHOTO 8)

HEAD NOT INSTALLED PER PLANS. PROVIDE NEW HEAD IN ROOM.

T6

A1

T6

A2

T6

A3

T6

A4

T6

A5

T6

A6

T6

ROOF

ELEVATOR

72T1

ELECTRICAL

72E4

ELECTRICAL

72E3

ULTRA LIGHT

LAB

RESEARCH LAB

RESEARCH LAB

7282 REFR

7284A

ELECTRICAL

72E5

RESEARCH LAB

RESEARCH LAB

RESEARCH LAB

RESEARCH LAB

HAC

BREAK RM

RESEARCH LAB

RADIATION

SAFETY

OFFICE

OFFICE

OFFICE

CORRIDOR

C7202

CORRIDOR

C7205

CORRIDOR

C7204

ELEVATOR

P5-A

ELEVATOR

P4-A

ELEVATOR

S3-A

CORRIDOR

C7201

RESEARCH LAB RESEARCH LAB

OFFICE

ELEVATOR

P2-A

P1-A

CORRIDOR

C7305

TEL

72T2

RESEARCH LAB

OFFICE

GLASS

WASHING

STERILIZATION

GLASS WASHING

AND STERILIZATION

RESEARCH LAB

RESEARCH LAB

TISSUE

CULTURE

FEMALE

TOILET

MALE TOILET

STORAGE

EMS

FREEZER RM

RESEARCH LAB

RESEARCH LAB

RESEARCH LAB

OFFICE

OFFICE

BREAK RM

OFFICE

RESEARCH LAB

RESEARCH LAB

RESEARCH LAB

RESEARCH LAB CONFERENCE RM

RESEARCH LAB

REFR

STORAGE

STORAGE

TISSUE

CULTURE

OFFICE

OFFICE

OFFICE

OFFICE

RADIATION SAFETY

OFFICE

LAB

STAIR

NO 9

STAIR

NO 11

STAIR

NO 10

RADIATION

SAFETY

RESEARCH LAB

ELECTRICAL

72E2

TELECOM

CLOSET

RESEARCH

AND

DEVELOPMENT

B11A WEST

B11A EAST

B

A

B

B

B11A WEST

B11A EAST

B11A

B30

F L

FL

T7

A5

T7

A6

T7

A7

T7

A8

T7

A2

T7

A3

T7

A4

T7

A1

T7

A7

T7

A7

T7

A9

T7

B1

STERILIZER

7201A

STORAGE

7202A

CORRIDOR

C7203

RESEARCH LAB

RESEARCH LAB

ANTE

RM

CONTAINMENT LAB

STORAGE

CONTAINMENT LAB

CORRIDOR

OFFICE

OFFICE

RESEARCH LAB

OFFICE

7207A

OFFICE

TISSUE CULTURE

RESEARCH LAB

RESEARCH LAB

STAIR

NO 12

72E1

ELECTRICAL

B11A WEST

B11A EAST

B11A WEST

B11A EAST

T7

A7

T7

A8

B11A FX107

BUILDING 11A

SEVENTH FLOOR PLAN

08/30/2020

100% Complete and Final

Issued for 100% Complete and Final

Issued for 100% CD

08/30/2020

02/10/2020

B11A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 engineering discipline: Fire Protection Virtual Energy Solutions

31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Sprinkler Corrections

Jesse Brown VAMC

Chicago, IL

537-16-102A

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

BUILDING 11A 7TH FLOOR PLAN WEST

1/8" = 1'-0"

BUILDING 11A 7TH FLOOR PLAN EAST

1/8" = 1'-0"

FIRE PROTECTION KEYED NOTES:

**THE NOTES PROVIDED HERE CORRESPOND TO THE ASSOCIATED PHOTOS

GENERATED IN THE FIELD REPORT FOR THIS AREA. REFER TO PHOTOS FOR

OBSERVED DEFICIENCIES, DEFECTS, OMISSIONS, AND ERRORS OF THE

EXISTING SPRINKLER SYSTEM. 12-10-2019, 12-11-2019 BUILDING 11A 7TH FLOOR.

SPRINKLER PIPING TEE IS STARTING TO RUST. REPLACE FITTING WITH

NEW. (PHOTO 5)

SPRINKLER PIPING AND FITTINGS RUSTING. REPLACE WITH NEW.

(PHOTO 6)

SPRINKLER HEAD COATED WITH SOMETHING, REPLACE HEAD.

(PHOTO 7)

SPRINKLER PIPING DOWN TO HEAD RUSTING, REPLACE PIPING

(PHOTO 13)

WATER CRYSTALLIZATION ON SPRINKLER HEAD. REPLACE SPRINKLER

HEAD. (PHOTO 14)

PROVIDE ADDITIONAL HANGER ON SPRINKLER LINE. HANGERS ARE

TOO FAR APART. (PHOTO 15)

EXISTING 2 1/2" BUTTERFLY VALVE WITH TAMPER SWITCH TO FEED

FLOOR SPRINKLER ZONE TO REMAIN.

(PHOTOS 1-4,9-12,16-18, 21-23)

STAIRWELLS MISSING SPRINKLERS REFERENCED ON PLANS. PROVIDE

NEW SPRINKLER HEAD IN STAIRWELL.

SPRINKLER FITTINGS RUSTED, REDUCING TEE AND ELBOW. REPLACE

WITH NEW. (PHOTO 19)

DRY PENDANT SPRINKLER HEAD IN COOLER TO BE REPLACED.

(PHOTO 20)

T7

A1

T7

A2

T7

A3

T7

A4

T7

A5

T7

A6

T7

A7

T7

A8

T7

A9

T7

B1

8 FLOOR ROOF

P200

STAIR

NO-11

B11A WEST

B11A EAST

T8

A5

T8

A2

T8

A3

T8

A4

T8

A1

T8

A5

T8

A5

STAIR

NO 11

F L

T8

A4

B11A FX108

BUILDING 11A

PENTHOUSE FLOOR PLAN

08/30/2020

100% Complete and Final

Issued for 100% Complete and Final

Issued for 100% CD

08/30/2020

02/10/2020

B11A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 engineering discipline: Fire Protection Virtual Energy Solutions

31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Sprinkler Corrections

Jesse Brown VAMC

Chicago, IL

537-16-102A

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

BUILDING 11A 8TH FLOOR PLAN

1/8" = 1'-0"

BUILDING 11A 9TH FLOOR PLAN

1/8" = 1'-0"

FIRE PROTECTION KEYED NOTES:

**THE NOTES PROVIDED HERE CORRESPOND TO THE ASSOCIATED PHOTOS

GENERATED IN THE FIELD REPORT FOR THIS AREA. REFER TO PHOTOS FOR

OBSERVED DEFICIENCIES, DEFECTS, OMISSIONS, AND ERRORS OF THE

EXISTING SPRINKLER SYSTEM. 12-09/11-2019 BUILDING 11A 8TH FLOOR.

SPRINKLER PIPING INSULATION FALLING OFF. REPAIR INSULATION ON

PIPING. (PHOTO 1)

PROVIDE ADDITIONAL SPRINKLERS UNDER UNPROTECTED

DUCTWORK. (PHOTO 2)

REPLACE CORRODED SPRINKLER TEE FITTING.

(PHOTO 4)

EXISTING 2 1/2" BUTTERFLY VALVE WITH TAMPER SWITCH TO FEED

FLOOR SPRINKLER ZONE TO REMAIN.

(PHOTOS 5-7)

INSTALL SPRINKLER HEADS UNDERNEATH ALL DUCTWORK GREATER

THAN 48" WIDE. APPROXIMATELY 8 HEADS REQUIRED.

T8

A1

T8

A2

T8

A3

T8

A4

T8

A5

CURB

CURB

RAMP UP

UP

UP

UP

UP

TO DOOR

METAL LADDER

PIPE BASEMENT

TO DOOR

METAL LADDER

UP

PIPE BASEMENT

UP STAIR

STAIR

STAIR

B300

B370 B330

NO 9

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

NO 6

NO 8

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

OGDEN

ELEVATOR

ELEVATOR

S10B

ELEVATOR

P9B

ELEVATOR

P8B

ELEVATOR

P7B

ELEVATOR

FUTURE

STAIR

NO 7

MECH RM

SVC RM

B340

MECH RM

B344

STAIR

B346

PLUMBING

STORAGE

B350

MECH

B352 MECH SPACE

B344A

P6B B300A

LOUVER

WINDOW

FL

TS

TS

TS

TS

TS

B

A

B

B

B

A

B

B

B

B

B

E

A S

T

B

B

B

E

A S

T

B11A

B30

B11B

B30

O0

A1

O0

A2

O0

A3

O0

A4

O0

A5

O0

A6

O0

A7

O0

A8

O0

A9

O0

B2

O0

B1

O0

B3

O0

B2

O0

B2

O0

B4 T0

A1

T0

A1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 engineering discipline: Fire Protection Virtual Energy Solutions

31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Sprinkler Corrections

Jesse Brown VAMC

Chicago, IL

537-16-102A

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

B11B FX100

BUILDING 11B

BASEMENT PLAN

08/30/2020

100% Complete and Final

Issued for 100% Complete and Final

Issued for 100% CD

08/30/2020

02/10/2020

B11B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 engineering discipline: Fire Protection Virtual Energy Solutions

31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Sprinkler Corrections

Jesse Brown VAMC

Chicago, IL

537-16-102A

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

FIRE PROTECTION KEYED NOTES:

**THE NOTES PROVIDED HERE CORRESPOND TO THE ASSOCIATED PHOTOS

GENERATED IN THE FIELD REPORT FOR THIS AREA. REFER TO PHOTOS FOR

OBSERVED DEFICIENCIES, DEFECTS, OMISSIONS, AND ERRORS OF THE

EXISTING SPRINKLER SYSTEM. 10-02-2019 BUILDING 11 LOWER LEVEL.

EXISTING GALVANIZED PIPING TO BE REPLACED WITH NEW. PROVIDE NEW

STEEL MAINS AND BRANCHLINES THROUGHOUT SPACE. PAINT RED PER VA

STANDARD FOR MECHANICAL ROOMS. (PHOTO 1)

EXISTING FIRE ALARM WIRING FROM REMOVED FIRE PUMP TO BE FULLY

DEMOLISHED. PROVIDE NEW WIRING FROM NEW OS&Y VALVES AND TIE INTO

FIRE ALARM CONTROL PANEL AT NEW PUMP LOCATION IN BUILDING 40 FIRE

PUMP ROOM. (PHOTO 2)

EXISTING GALVANIZED PIPING TO BE REPLACED WITH NEW. PROVIDE NEW

MAINS AND BRANCHLINES THROUGHOUT SPACE. (PHOTO 3)

EXISTING FIRE ALARM WIRING FROM REMOVED FIRE PUMP. WIRING SHALL BE

REMOVED. PROVIDE NEW WIRING FROM NEW OS&Y VALVES AND TIE INTO FIRE

ALARM CONTROL PANEL AT NEW PUMP LOCATION IN BUILDING 40 FIRE PUMP

ROOM. (PHOTO 4)

EXISTING BRANCHLINE, GALVANIZED, CHIPPING AND RUSTING. PIPING

THROUGHOUT BASEMENT SHALL BE REPLACED WITH NEW STEEL PIPE. PAINT

RED PER VA STANDARD FOR MECHANICAL ROOMS. (PHOTO 5)

EXISTING 6" WELDED STEEL MAIN SUPPLY PIPING INTO BASEMENT SHALL BE

CUT AND REPLACED. PROVIDE NEW CONNECTIONS FOR CONNECTION TO

FLOOR CONTROL VALVE. PROVIDE STEEL PIPING WITH COUPLINGS ON NEW

PIPING CONNECTIONS. (PHOTO 6)

EXISTING BRANCHLINE, GALVANIZED, CHIPPING AND RUSTING. PIPING

THROUGHOUT BASEMENT SHALL BE REPLACED WITH NEW STEEL PIPE. PAINT

RED PER VA STANDARD FOR MECHANICAL ROOMS. (PHOTO 7)

EXTRA CONTROL VALVE ON REWORKED SUPPLY MAIN. VA SHALL DO ONE OF

THE FOLLOWING: 1 REMOVE EXTRA VALVE. 2. PROVIDE ADDITIONAL TAMPER

SWITCH. 3. INSTALL LOCK MECHANISM ON VALVE TO PREVENT CLOSURE.

(PHOTO 8)

EXISTING BRANCHLINE, GALVANIZED, CHIPPING AND RUSTING. PIPING

THROUGHOUT BASEMENT SHALL BE REPLACED WITH NEW STEEL PIPE. PAINT

RED PER VA STANDARD FOR MECHANICAL ROOMS. (PHOTO 9)

EXISTING FIRE PUMP CONCRETE PAD, 30" X 72" X 10" TO BE DEMOLISHED.

RESURFACE REMAINING CONCRETE TO MATCH SURROUNDING AREA.

EXISTING 6" BUTTERFLY VALVE WITH TAMPER SWITCH TO FEED RISERS TO

REMAIN.

EXISTING LOCATION OF FLOOR CONTROL VALVE, TO REMAIN.

PIPING AT THIS INTERSECTION DOES NOT REFLECT INSTALLED CONDITIONS ON

FIRE PUMP REPLACEMENT DRAWINGS. VALVES AND PIPE ROUTING ARE IN

DIFFERENT LOCATIONS. FP CONTRACTOR TO UPDATE AND SHOW ON

AS-BUILTS.

O0

A1

O0

A2

O0

A3

O0

A4

O0

A5

O0

A6

O0

A7

O0

A8

O0

A9

O0

B1

O0

B2

O0

B3

O0

B4

FEC

HIGH MAGNET AREA

BUILDING -07

PATIO

ENTRANCE CORRIDOR TO

BUILDING 30, 11A, 11B

ATM

1329A

13E5

ELECTRICAL

13E4

PNEUMATIC

TUBE

ENTRANCE/LOBBY

C1608

CORRIDOR

CORRIDOR

C1301

CORRIDOR

CORRIDOR

C1305

1302C

CORRIDOR

C1302

CORRIDOR

C1303

WAITING RM

OUTPATIENT

SPECIMEN LAB

REST RM

REST RM

WOMENS

REST RM

MALE REST RM

CORRIDOR

C1304

SOILED

UTILITY RM

MRI

SUITE

1345 IMAGING

SUPV

OFFICE

1345A

VIEW

1345C

IP

HOLDING

1345E

HAC

FUTURE

ELEVATOR

ELEVATOR

P-7B

STAIR

NO 7

TEL PHONE/

DATA RM

13T1

WOMENS

TOILET

ELEVATOR

P-8B

ELEVATOR

P-9B

ELEVATOR

S-10B

HAC

SUPV

BLOOD

DRAW

OFFICE

1363A

MULTI

PURPOSE RM

PATH

SUPPLY

1363B

OUTPATIENT

SPECIMEN

LAB

1363C

OUTPATIENT

RADIOLOGY

WAITING AREA

CORRIDOR

REST RM

DRESSING

RM

DRESSING

RM

ULTRASOUND

OUTPATIENT

RADIOLOGY EXAM/

TREATMENT RM

CONTROL RM

OUTPATIENT

RADIOLOGY EXAM/

TREATMENT RM

1383STAIR

NO 6

HOLDING AREA

FIRE RISER

1390A

DRESSING RM

1390B DRESSING RM

1390C

MRI

CONTROL RM

MRI SCAN RM

MECH RM

MRI

EQUIP

1390D

MRI GANTRY RM

1345I

CONTROL RM

1345G

SUPPORT

ALCOVE

1345H

STAGING

1345F

DRESS

1345D

OFFICE

TOILET

1345B

MOHS LAB

CANTEEN RETAIL

STORAGE

DECON

EQUIPMENT

CORRIDOR

ELECTRICAL

13E2

CORRIDOR

PHOTO THERAPY

WAITING

PROCEDURE

RM-A

PROCEDURE

RM-B

ACCESSIBLE

STAFF TOILET

STORAGE

13E3

STAIR

NO 8

PHYSICIAN OFFICE

EXAM

RM-6

EXAM

RM-5

EXAM

RM-4

EXAM

RM-3

EXAM

RM-2

EXAM

RM -1

INTAKE

NURSE

CLERICAL

SUPPORT

TRANSFORMER RM

CORRIDOR

CORRIDOR

CORRIDOR

C1606

CHAPLAIN

OFFICE

ESCORT

WAITING RM

FIRE COMMAND

CENTER

SECY

VESTIBULE

BLESSED

SACRAMENT

ENTRANCE/LOBBY

C1103

ELECTRICAL

STORAGE

VESTIBULE

FIRE

CLOSET

ELECTRICAL

CLOSET EQUIP CLOSET

TOOL STORAGE

FIRE

CLOSET

PATHOLOGY

LAB

RETAIL STORAGE

PHONE

CLOSET

1602A

STAIRS/TRANSFORMER

1345J

1376A

P-6B

1361A

CORRIDOR

GENERATOR

RM

1300A

STAIR

CHIEF

OFFICE

1302B

ELECTRICAL

13E1

CLOSET

1394A

B

B

B

B

B

B

B

E

A S

T

B

B

B

E

A S

T

B11B

B30

B11B

B30

2 2

2 2 2 2

22222

O1

A2

O1

A3

O1

A4

O1

A1

O1

A1

O1

A1

O1

A1

B11B FX101

BUILDING 11B

FIRST FLOOR PLAN

08/30/2020

100% Complete and Final

Issued for 100% Complete and Final

Issued for 100% CD

08/30/2020

02/10/2020

B11B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 engineering discipline: Fire Protection Virtual Energy Solutions

31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Sprinkler Corrections

Jesse Brown VAMC

Chicago, IL

537-16-102A

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

FIRE PROTECTION KEYED NOTES:

**THE NOTES PROVIDED HERE CORRESPOND TO THE ASSOCIATED PHOTOS

GENERATED IN THE FIELD REPORT FOR THIS AREA. REFER TO PHOTOS FOR

OBSERVED DEFICIENCIES, DEFECTS, OMISSIONS, AND ERRORS OF THE EXISTING

SPRINKLER SYSTEM. 01-15-2020 & 01-17-2020 FULL CAMPUS 1ST FLOOR.

TAPERED FITTING RUSTING. REPLACE WITH STANDARD 1" DROP

NIPPLE AND REDUCING FITTING. (PHOTOS 14, 18, 20 & 21)

SPRINKLER NOT INSTALLED IN DRYWALL CEILING. SPRINKLER IN DROP

CEILING TOO CLOSE TO CEILING ELEVATION CHANGE. ADD SPRINKLER

IN DRYWALL (PHOTO 19)

EXISTING DRY PIPE VALVE IN CLOSET FOR MRI. PROVIDE NEW

SIGNAGE ON CLOSET TO ID VALVE LOCATION. (PHOTO 22)

EXISTING 2 1/2" BUTTERFLY VALVE WITH TAMPER SWITCH TO FEED

FLOOR SPRINKLER ZONE TO REMAIN. (PHOTOS 15, 16, & 17)

O1

A1

O1

A2

O1

A3

O1

A4

CANOPY

VESTIBULE

CONCRETE

OPEN TO BELOW

SURGY CLINIC

PLATE

COVER

TO ACCESS

WOMENS HEALTH

CLINIC

ROOF

STORAGE

ELECTRICAL

23E3

ELECTRICAL

ELECTRICAL

23E4

STORAGE

2297B

ELECTRICAL

23E1

MECH RM

2600A

MENS

TOILET

RECEPTION

CORRIDOR

C2301

PHYSICIANS

OFFICE

EXAM RM-9

EXAM RM-8

CORRIDOR

C2305

PURPLE CLINIC

WAITING RM

CORRIDOR

C2306

LOUNGE

SUPPLY

2379 SOILED

LINEN

OFFICE

EXAM RM-2

WOMENS

TOILET

CORRIDOR

C2304

CORRIDOR

C2303

HAC

NURSE

OFFICE

RADIOLOGY

CORE/

COMPUTER RM

ELECTRICAL

23E2

STAIR

NO 7

HAC

EXAM RM-1

WAITING

RECEPTION

OFFICE

EXAM/

OFFICE

EXAM RM-7

EXAM RM-6

TOILET

EXAM RM-5

EXAM RM-4

EXAM RM-3

DOCTOR OFFICE

PACT NURSE

2376EXAM RM-1

EXAM RM-2

EXAM RM-3

NURSE

OFFICE

PROGRAM

MGNT

DOCTOR OFFICE

STAIR

NO 6

EXAM RM-4

EXAM RM-5

EXAM RM-6

EXAM RM-7

SUPPLY RM

PTSD DAY RM

STAIR

NO 8

STORAGE

GROUP RM

GROUP

RM

CHIEF

DAY PGM

CORRIDOR

C2302

COPY

RM

WOMENS

TOILET

ELEVATOR

P-8 B

ELEVATOR

P-9 B

ELEVATOR

S-10 B

FUTURE

ELEVATOR

ELEVATOR

P-7 B

PSYCHOLOGIST

DOCTOR

STORAGE/

HAC

MEDICAL

STAFF

LCSW OFFICE

LCSW

OFFICE

LCSW

OFFICE

LCSW

OFFICE

STAIR

NO 9

QUIET RM

EXAM RM

LCSW

OFFICE

TRAINEE RM

STAFF

PSYCHOLOGIST

LCSW OFFICE

LCSW

OFFICE

LCSW

OFFICE

VESTIBULE

C2208

TELECOM

22T2

EXAM RM

TOILET

EXAM RM

2292A

PROCEDURE

RM

MEDICAL TEAM

EXAM RM

P-6B

2384A

2344A

C2307

FIRE

CLOSET

VESTIBULE

CLOSET

FIRE

CLOSET

CLOSET

CORRIDOR

ROOF

DN

OPEN TO BELOW

EMERGENCY

GENERATOR

RM/MEZZANINE

1300B

B

A

B

B

B

B

B

E

A S

T

B11A

B30

B11B

B30

2 2

O2

A5

O2

A2

O2

A3

O2

A4

O2

A1

O2

A5

O2

A5

O2

A5

B11B FX102

BUILDING 11B

SECOND FLOOR PLAN

08/30/2020

100% Complete and Final

Issued for 100% Complete and Final

Issued for 100% CD

08/30/2020

02/10/2020

B11B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 engineering discipline: Fire Protection Virtual Energy Solutions

31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Sprinkler Corrections

Jesse Brown VAMC

Chicago, IL

537-16-102A

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

FIRE PROTECTION KEYED NOTES:

**THE NOTES PROVIDED HERE CORRESPOND TO THE ASSOCIATED PHOTOS

GENERATED IN THE FIELD REPORT FOR THIS AREA. REFER TO PHOTOS FOR

OBSERVED DEFICIENCIES, DEFECTS, OMISSIONS, AND ERRORS OF THE EXISTING

SPRINKLER SYSTEM. 12-09-2019, 12-10-2019, 12-11-2019 BUILDING 11A 7TH FLOOR.

SPRINKLER HANGER ROD USED AS HANGER. REPLACE ROD AND

PROVIDE PROPER HANGER. (PHOTOS 1 & 2)

SPRINKLER PIPING AND FITTINGS RUSTING. REPLACE WITH NEW.

(PHOTO 3)

PRIMARY MAIN IS USING THINWALL PIPING, SCHEDULE 5. RECOMMEND

REPLACING AS PIPING WILL CORRODE FASTER. (PHOTO 13)

VA SHALL EITHER KEEP EXISTING PIPING IN PLACE OR REPLACE MAIN

WITH STEEL PIPING SCHEDULE 10 TO MEET VA STANDARDS.

SPRINKLER PIPING DOWN TO HEAD RUSTING, REPLACE PIPING

(PHOTO 29)

EXISTING 2 1/2" BUTTERFLY VALVE WITH TAMPER SWITCH TO FEED

FLOOR SPRINKLER ZONE TO REMAIN.

(PHOTOS 4-12,14-25)

O2

A1

O2

A2

O2

A3

O2

A4

O2

SERVICE RM

UP

PIPE BASEMENT

CHECK-IN

METAL DOOR

WOMENS

TOILET

STORAGE

ELEVATOR

S-10

ELEVATOR

P-9

ELEVATOR

P-8

ELEVATOR

P-6

ELEVATOR

P-7

ELECTRICAL

33E3

ELECTRICAL

33E2

PHONE

ELECTRICAL

33E1

PROSTHETICS WAITING

AREA

CORRIDOR

C3302

WOMENS

TOILET

STAIR

NO 8

CORRIDOR

C3301

LAB

3375A

LAB

STAIR

NO 6

WOMENS LOCKER

3325B

HAC

FITTING RM

STAIR

NO 7

MENS TOILET

HOME

OXYGEN

PROG

PROSTHETIC

ORTHOTIC LAB

TOILET

OFFICE

STAFF OFFICE

PROSTHETIC

OFFICE

PROSTHETIC

REPRESENTATIVE

OFFICE

PROGRAM

SUPPORT

PGM MGR

PROSTHETIC STORAGE

33073303

SHOWER

MENS LOCKER

MENS TOILET

MENS LOCKER

FEC

FEC

PLASTER

AREA

FEC

ROOF

SKYLIGHT ROOF

ROOF

ROOF

ROOF

ROOF

CONCRETE PAD

LADDER

VESTIBULE

EMPLOYEE

LOUNGE

3325A

CORRIDOR

C3303

B

B

B

B

B

B

B

E

A S

T

B

B

B

E

A S

T

B11B

B30

B11B

B30

2 2

2 2

2 2

O3

A2

O3

A3

O3

A1

O3

A3

O3

A3

O3

A4

B11B FX103

BUILDING 11B

THIRD FLOOR PLAN

08/30/2020

100% Complete and Final

Issued for 100% Complete and Final

Issued for 100% CD

08/30/2020

02/10/2020

B11B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 engineering discipline: Fire Protection Virtual Energy Solutions

31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Sprinkler Corrections

Jesse Brown VAMC

Chicago, IL

537-16-102A

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

FIRE PROTECTION KEYED NOTES:

**THE NOTES PROVIDED HERE CORRESPOND TO THE ASSOCIATED PHOTOS

GENERATED IN THE FIELD REPORT FOR THIS AREA. REFER TO PHOTOS FOR

OBSERVED DEFICIENCIES, DEFECTS, OMISSIONS, AND ERRORS OF THE EXISTING

SPRINKLER SYSTEM. 12-09-2019, 12-10-2019, 12-11-2019 BUILDING 11A 7TH FLOOR.

SPRINKLER ESCUTCHEON COVER PLATE MISSING. REPLACE COVER

PLATE. (PHOTOS 5)

ADD SPRINKLER HEAD IN MEN'S LOCKER ROOM, ADDED SPRINKLER

PER NOTES NOT ADDED.

EXISTING 2 1/2" BUTTERFLY VALVE WITH TAMPER SWITCH TO FEED

FLOOR SPRINKLER ZONE TO REMAIN.

(PHOTOS 1-6, 8-11)

SPRINKLER NOT PROVIDED IN STAIRWELL 8. ADD SPRINKLER IN

STAIRWELL.

O3

A1

O3

A2

O3

A3

O3

ENT CLINIC

IRM OFFICE

AUDIOLOGY AND

SPEECH PATHOLOGY

VESTIBULE

STORAGE

NURSE INTAKE

PHONE

ELECTRICAL

CLOSET

43E2

ELECTRICAL

43E3

ELECTRICAL

43E1

FIRE

CLOSET

CORRIDOR

C4302

CORRIDOR

C4303

AUDIO / ENT SUITE

CORRIDOR

C4304

RECEPTION

MENS TOILET

NURSE

INTAKE

CORRIDOR

C4301

BREAK

AREA

RECEPTION

NURSE

INTAKE

NURSE

INTAKE

WAITING AREA

MECH RM

STAIR

NO 6 MECH RM

COMPUTER RM

STORAGE

ENT CLERK

COMPUTER RM

HAC

4374MENS TOILET

WOMENS TOILET

ELEVATOR

S-10B

ELEVATOR

P-9B

ELEVATOR

P-8B

WAITING RM

WAITING

FILE

STORAGE

AREA

CHIEF OFFICE

STORAGE

SPEECH

PATH

ELECTRO

EXAM RM

SPEECH

PATH

AUDIOLOGIST

SPEECH

PATH

AUDIO

OFFICE

WORK SHOP

AUDIO

OFFICE

SOUND

CONTROL

4343A

SOUND

BOOTH

STAIR

NO 8

SOUND

CONTROL

4339A

BOOTH

SOUND

SOUND

BOOTH

SOUND

CONTROL

4341A

SOUND

CONTROL

4333A

COMMON RM

SOUND

BOOTH

HAC

4327 STAIR

NO 7

ELEVATOR

P-7B

STORAGE/OFFICE

OFFICE

4354OFFICE

OFFICE

4349OFFICE

EXAM RM

EXAM RM

EXAM RM

DIRTY

UTILITY

CLEAN SUPPLY

NURSE

INTAKE

WOMENS

TOILET

ROOF

SKYLIGHT ROOF

ROOF

ROOF

ROOF

ROOF

B

B

B

B

B

B

B

E

A S

T

B

B

B

E

A S

T

B11B

B30

2 2

2 2

2 2

O4

A5

O4

A2

O4

A3

O4

A4

O4

A1

O4

A3

O4

A3

O4

A3

O4

A3

O4

A3

O4

A3

O4

A4

O4

A4

O4

A5

O4

A6

B11B FX104

BUILDING 11B

FOURTH FLOOR PLAN

08/30/2020

100% Complete and Final

Issued for 100% Complete and Final

Issued for 100% CD

08/30/2020

02/10/2020

B11B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 engineering discipline: Fire Protection Virtual Energy Solutions

31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Sprinkler Corrections

Jesse Brown VAMC

Chicago, IL

537-16-102A

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

FIRE PROTECTION KEYED NOTES:

**THE NOTES PROVIDED HERE CORRESPOND TO THE ASSOCIATED PHOTOS

GENERATED IN THE FIELD REPORT FOR THIS AREA. REFER TO PHOTOS FOR

OBSERVED DEFICIENCIES, DEFECTS, OMISSIONS, AND ERRORS OF THE EXISTING

SPRINKLER SYSTEM. 12-10-2019 BUILDING 11B 4TH FLOOR & 01-07-2020 FULL

CAMPUS MISSED ROOMS

SPRINKLER PIPING AND FITTING RUSTING. REPLACE BOTH.

(PHOTO 5)

SPRINKLER FITTINGS RUSTING, TEE AND ELBOW. REPLACE WITH NEW.

(PHOTO 8)

SPRINKLER SHOWN ON PLANS MISSING FROM ROOM. INSTALL

SPRINKLER HEADS IN LOCATIONS NOTED TO MEET NFPA.

EXISTING 2 1/2" BUTTERFLY VALVE WITH TAMPER SWITCH TO FEED

FLOOR SPRINKLER ZONE TO REMAIN.

(PHOTOS 1-4, 6-7, 9-10)

FITTINGS TO SPRINKLER HEAD RUSTED

(PHOTOS 11 & 12)

SPRINKLER HEAD PAINTED, REPLACE WITH NEW.

(PHOTO 13)

O4

A1

O4

A2

O4

A3

O4

A4

O4

A5

O4

A6

OUTPATIENT PSYCHIATRY

SOCIAL

WORK

ELECTRICAL

63E1

ELECTRICAL

63E2

PHONE

GROUP

RM

CORRIDOR

C6303

CORRIDOR

C6301

CORRIDOR

C6302

MENS

TOILET

WOMENS

TOILET

ELEVATOR

S10-B

ELEVATOR

P9-B

ELEVATOR

P8-B

HAC

PSY OFFICE

SOCIAL

WORK

PSY

OFFICE

NURSE OFFICE

STAIR

NO-6

GERIATRIC CLINIC

NURSE

PSY

OFFICE

PSY

OFFICE

PSY

OFFICE

SOCIAL

WORK

PSY

OFFICE

SOCIAL

WORK

GROUP

RM

MAIL/

COPIER

CHIEF

OFFICE

PSY

OFFICE

MH TECHNICIAN

PSY

OFFICE

SOCIAL

WORK

PSY

OFFICE

PSY

OFFICE

CORRIDOR

C6304

PSYCHIATRY

WAITING

WAITING

PSY

OFFICE

PSY

OFFICE

PSY

OFFICE

PSY

OFFICE

HAC

WOMENS

TOILET

MENS

TOILET

ELEVATOR

P7-B

ELEVATOR

P6

STAIR

NO-7

PSY

OFFICE

NURSE

OFFICE

PSY

OFFICE

PSY

OFFICE

PSY

OFFICE

PSY

OFFICE

PSY

OFFICE

SOCIAL

WORKER

OFFICE

PSY

FELLOW

PSY

FELLOW

PSY

OFFICE

PSY

OFFICE

NEURO

RESEARCH

NEURO

RESEARCH

STAIR

NO-8

ASSIST. CHIEF

FEC

UNISEX

STAFF

TOILET

6223A

FEC

FEC

ROOF

SKYLIGHT ROOF

ROOF

ROOF

ROOF

ROOF

B

B

B

B

B

B

B

E

A S

T

B

B

B

E

A S

T

B11B

B30

2 2

2 2

O6

A2

O6

A3

O6

A1

O6

A3

O6

A3

B11B FX106

BUILDING 11B

SIXTH FLOOR PLAN

08/30/2020

100% Complete and Final

Issued for 100% Complete and Final

Issued for 100% CD

08/30/2020

02/10/2020

B11B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 engineering discipline: Fire Protection Virtual Energy Solutions

31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Sprinkler Corrections

Jesse Brown VAMC

Chicago, IL

537-16-102A

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

FIRE PROTECTION KEYED NOTES:

**THE NOTES PROVIDED HERE CORRESPOND TO THE ASSOCIATED PHOTOS

GENERATED IN THE FIELD REPORT FOR THIS AREA. REFER TO PHOTOS FOR

OBSERVED DEFICIENCIES, DEFECTS, OMISSIONS, AND ERRORS OF THE

EXISTING SPRINKLER SYSTEM. 12-10-2019 BUILDING 11B 6TH FLOOR.

MECHANICAL PIPING LEAKING DAMAGING SPRINKLER PIPING.

REPLACED DAMAGED MECHANICAL PIPING AND REPLACE DAMAGED

SPRINKLER PIPING. (PHOTO 1)

SPRINKLER STANDPIPE RISER DAMAGED. REPAIR OR REPLACE.

(PHOTO 4)

EXISTING 2 1/2" BUTTERFLY VALVE WITH TAMPER SWITCH TO FEED

FLOOR SPRINKLER ZONE TO REMAIN.

(PHOTOS 2-3, 5-10)

O6

A1

O6

A2

O6

A3

ELECTRICAL

WOMENS

TOILET

QUARANTINE

RM

73E2

73E1

TEL

HAC

CORRIDOR

CORRIDOR

C7304

PROCEDURE RM

PROCEDURAL LAB

QUARANTINE RM

METABOLIC

SCRUB RM

OPERATING RM

WALK IN

COOLER

STORAGE

NECROPSY

PROCEDURE

RM

SUPPLY RM

OFFICE

MENS

TOILET7368

CORRIDOR

C7302

CORRIDOR

C7301

STERILIZER RM

ELEVATOR

P8-B

ELEVATOR

P9-B

S10-B

ELEVATOR

P7-B

ELEVATOR

P6

LOUNGE

CORRIDOR

C7303

ANIMAL

WARD

ANIMAL

WARD

ANIMAL

WARD

ANIMAL

WARD

ANIMAL

WARD

ANIMAL

WARD

ANIMAL WARD

ANIMAL WARD

LAB

LAB

CAGE WASHING

WARD-A

WARD-B

WARD-C

SUPERVISOR

PROCEDURAL

LAB

ANIMAL

TECH

MANAGER/

COORDINATOR

CLEAN CAGE

FEED AND BEDDING

ANIMAL WARD

ANIMAL WARD

ANIMAL WARD

ANIMAL WARD

STERILIZER

CORRIDOR

C7305

STAIR

NO 6

STAIR

NO 7

STAIR

NO 8

HAC

B B

B B

B B

B

E

A S

T

B B

B

E

A S

T

B11B

B30

2 2

F L

O7

A2

O7

A3

O7

A1

O7

A1

O7

A3

O7

A3

B11B FX107

BUILDING 11B

SEVENTH FLOOR PLAN

08/30/2020

100% Complete and Final

Issued for 100% Complete and Final

Issued for 100% CD

08/30/2020

02/10/2020

B11B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 engineering discipline: Fire Protection Virtual Energy Solutions

31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Sprinkler Corrections

Jesse Brown VAMC

Chicago, IL

537-16-102A

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

FIRE PROTECTION KEYED NOTES:

**THE NOTES PROVIDED HERE CORRESPOND TO THE ASSOCIATED PHOTOS

GENERATED IN THE FIELD REPORT FOR THIS AREA. REFER TO PHOTOS FOR

OBSERVED DEFICIENCIES, DEFECTS, OMISSIONS, AND ERRORS OF THE EXISTING

SPRINKLER SYSTEM. 12-09-2019, 12-10-2019, 12-11-2019 BUILDING 11A 7TH FLOOR.

DRY PENDANT SPRINKLER HEADS IN FREEZER RUSTED. REPLACE

WITH MINIMUM 12" DRY PENDANT SPRINKLER. (PHOTOS 1-3)

SPRINKLER PIPING AND FITTINGS RUSTING. REPLACE WITH NEW.

(PHOTO 8)

EXISTING 2 1/2" BUTTERFLY VALVE WITH TAMPER SWITCH TO FEED

FLOOR SPRINKLER ZONE TO REMAIN.

(PHOTOS 4-7,9-12)

O7

A1

O7

A2

O7

8 FLOOR

8 FLOOR ROOF

8 FLOOR ROOF

P300

MECH RM

P300A

ELEVATOR

S10-B

ELEVATOR

P9-B

ELEVATOR

P8-B

STAIR

NO-7

ELEVATOR

P7-B

ELEVATOR

P6

P350

ROOF

B

B

B

E

A S

T

B

B

B

E

A S

T

O8

A5

O8

A3

O8

A4

O8

A1

O8

A1

O8

A2

O8

A2

O8

A2

O8

A2

O8

A2

O8

A2

O8

A2

O8

A4

O8

A4

STAIR

NO 7

F L

B11B FX108

BUILDING 11B

PENTHOUSE FLOOR PLAN

08/30/2020

100% Complete and Final

Issued for 100% Complete and Final

Issued for 100% CD

08/30/2020

02/10/2020

B11B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 engineering discipline: Fire Protection Virtual Energy Solutions

31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Sprinkler Corrections

Jesse Brown VAMC

Chicago, IL

537-16-102A

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

BUILDING 11B 8TH FLOOR PLAN

1/8" = 1'-0"

BUILDING 11B 9TH FLOOR PLAN

1/8" = 1'-0"

FIRE PROTECTION KEYED NOTES:

**THE NOTES PROVIDED HERE CORRESPOND TO THE ASSOCIATED PHOTOS

GENERATED IN THE FIELD REPORT FOR THIS AREA. REFER TO PHOTOS FOR

OBSERVED DEFICIENCIES, DEFECTS, OMISSIONS, AND ERRORS OF THE EXISTING

SPRINKLER SYSTEM. 12-09-2019, 12-10-2019, 12-11-2019 BUILDING 11A 7TH FLOOR.

SPRINKLER PIPING THROUGH RATED WALL. IMPROPER FIRE SEAL.

REPAIR FIRE SEAL. (PHOTOS 3 & 4)

SPRINKLER PIPING AND FITTINGS RUSTING. REPLACE WITH NEW.

(PHOTO 5-11, 14)

SPRINKLER HEAD PAINTED. REPLACE WITH NEW

(PHOTO 12)

DUCTWORK WIDER THAN 48" MISSING SPRINKLER COVERAGE. ADD

SPRINKLER HEAD UNDER DUCTWORK. (PHOTO 13)

EXISTING 2 1/2" BUTTERFLY VALVE WITH TAMPER SWITCH TO FEED

FLOOR SPRINKLER ZONE TO REMAIN.

(PHOTOS 1& 2)

O8

A1

O8

A2

O8

A3

O8

A4

O8

SOUTH DAMEN AVENUE

PICK UP WINDOW

HALL MODULE-F HALL MODULE-C

MODULE-E MODULE-CMODULE-D MODULE-B MODULE-A

HALL MODULE-E

MODULE-H MODULE-GMODULE-I MODULE-F

HALL MODULE-H HALL MODULE-G

DIABETES CLINIC

HALL MODULE-A

HALL MODULE-BHALL MODULE-D

PICK UP WINDOW

RECEPTION

CHECK-IN

RECEPTION

CHECK-IN

C1104

OUTPATIENT

PHARMACY

HAC

1207 SUPV

OFFICE

WAITING

WAITING

WAITING

WAITING

WAITING

OFFICE

CONSULT

OFFICE

TELECOM

12T2

CORRIDOR

C1115

CORRIDOR

C1114

CORRIDOR

C1112

CORRIDOR

C1111

CORRIDOR

C1110

CORRIDOR

C1109

CORRIDOR

C1107

CORRIDOR

C1106

CORRIDOR

C1105

CORRIDOR

C1108

CORRIDOR

C1113

DIETICIAN

OFFICE

PHARMACY

CONSULTATION

1195A

CASHIER

STORAGE

AGENT

CASHIER

PHARMACY

STAFF

1195B

ELECTRICAL

11E4

NURSE

TELEPHONE

RM

SUPV CLINIC

SUPPORT

OFFICE

STORAGE/

COPIER

DERMATOLOGY

EXAM RM

NURSE

OFFICE

NURSE

OFFICE

URGENT

CARE

EXAM RM

NURSE

OFFICE

URGENT

CARE

EXAM RM

NURSE RM

GU NURSE

URGENT

CARE

EXAM RM

EXAM RM

1181B

EXAM RM

1181A

MENS TOILET

WOMENS

TOILET

ELECTRICAL

11E3

EXAM RM

GREEN

CLINIC

ATTENDING

OFFICE

EXAM RM

URGENT

CARE

EXAM RM

EXAM RM

URGENT

CARE

CONSULTATION RM

NURSE

OFFICE

NURSE

OFFICE

NURSE

OFFICE

GREEN

CLINIC

EXAM RM

EXAM RM

GREEN

CLINIC

EXAM RM

EXAM RM

EXAM RM

BLUE CLINIC

NURSE RM

EXAM RM

MENS TOILET

WOMENS

TOILET

ELECTRICAL

11E2

EXAM RM

EXAM RM

EXAM RM

EXAM RM

EXAM RM

URGENT

CARE

CONSULTATION RM

NURSE

OFFICE

NURSE

OFFICE

EXAM RM

UROLOGY

EXAM RM

EXAM /

SCREENING

EXAM RM

EXAM /

SCREENING

EXAM RM

EXAM /

SCREENING

MENS TOILET

1127 TOILET

ELECTRICAL

11E1

UROLOGY

EXAM RM

EXAM /

SCREENING

GU CLINIC

EXAM RM

EXAM /

SCREENING

GU CLINIC

EXAM RM

CONSULTATION RM

NURSE

INTAKE

NURSE

INTAKE

TOILET

TELECOM

11T1NURSE

OFFICE

GU

PHARMACIST

EXAM RM

CHANGING RM

CLEAN

SUPPLY

DIRTY

UTILITIES

LOUNGE

RN OFFICE

1200A

BEHAVIORAL

HEALTH LAB

1200B

CONFERENCE

RM

MENTAL

HEALTH

URGENT

CARE

EXAM RM

1182A

URGENT

CARE

EXAM RM

1182B

URGENT

CARE

EXAM RM

1162A

EXAM RM

EXAM RM

1161B

EXAM RM

1161A

EXAM RM

URGENT

MAINT

VACANT

TOILET

1139A

URODYNAMIC AND

ULTRASOUND

UROLOGY

TREATMENT

PROCEDURE

EXAM /

SCREENING-6

BREAK

RM

UROLOGY

OFFICE

CLINICS

SUPPLY RM

RECOVERY RM

MINOR OR

SURGY RM

TOILET

HAC

TOILET

ELECTRICAL

CLEAN SUPPLY

CORRIDOR

C1102

ENTRANCE

C1101

1191 1128

URGENT

CARE

EXAM RM

URGENT

CARE

EXAM RM

A1

A2

A1

A3

A1

A1

A1

A1

A1

A2

A1

A2

A1

A2

A1

A2

A1

A2

A1

A3

B30 FX101

BUILDING 30

FIRST FLOOR PLAN

08/30/2020

100% Complete and Final

Issued for 100% Complete and Final

Issued for 100% CD

08/30/2020

02/10/2020

B30

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 engineering discipline: Fire Protection Virtual Energy Solutions

31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Sprinkler Corrections

Jesse Brown VAMC

Chicago, IL

537-16-102A

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

FIRE PROTECTION KEYED NOTES:

**THE NOTES PROVIDED HERE CORRESPOND TO THE ASSOCIATED PHOTOS

GENERATED IN THE FIELD REPORT FOR THIS AREA. REFER TO PHOTOS FOR

OBSERVED DEFICIENCIES, DEFECTS, OMISSIONS, AND ERRORS OF THE EXISTING

SPRINKLER SYSTEM. 01-15-2020 & 01-17-2020 FULL CAMPUS 1ST FLOOR.

SPRINKLER HEAD LOCATED TOO FAR FROM DOOR. RELOCATE TO WITHIN

7'-6" FROM DOOR, 2 HEADS (PHOTO 63)

ALCOVES DO NOT HAVE SPRINKLER PROTECTION, 6 BOOTHS.

(PHOTOS 64 & 65)

CONTROL VALVE LOCATED ABOVE CEILING. NO PROPER SIGNAGE ON

CEILING. INSTALL SIGNAGE ON CEILING IDENTIFYING LOCATION OF VALVE.

(PHOTOS 66-68)

A1

A1

A1

A2

A1

PIPE TUNNEL

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

STAIRUP

NO 3

PIPE BASEMENT

CONNECTING TO

BUILDING 2

PIT

P27

ELEVATOR

PIT

S20;S21;S22

ELEVATOR

PIT

P23;P24;P25

STAIR

NO 13

PIPE BASEMENT

B600

F

L

F L

F L

F

L

TS

TS

TS

F L

F L

F

L

TS

TS

TS

B40 WESTB40 WEST

B40 EASTB40 EAST

B

B

B

E

A S

T

B B

B

E

A S

T

B40 EAST

B01B

B40 EAST

B01B

B0

A1

B0

A2

B0

A4

B0

A5

B0

A4

B0

A4

B0

A4

B0

A4

B0

A4

B0

A4

B0

A4

B0

A5

B0

A6

B0

A6

B0

A6

B0

A6

B0

A6

B0

A5

D0

B3

D0

B3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 engineering discipline: Fire Protection Virtual Energy Solutions

31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Sprinkler Corrections

Jesse Brown VAMC

Chicago, IL

537-16-102A

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

B40 FX100-E

BUILDING 40

BASEMENT PLAN - EAST

08/30/2020

100% Complete and Final

Issued for 100% Complete and Final

Issued for 100% CD

08/30/2020

02/10/2020

B40

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 engineering discipline: Fire Protection Virtual Energy Solutions

31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Sprinkler Corrections

Jesse Brown VAMC

Chicago, IL

537-16-102A

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

FIRE PROTECTION KEYED NOTES:

**THE NOTES PROVIDED HERE CORRESPOND TO THE ASSOCIATED PHOTOS

GENERATED IN THE FIELD REPORT FOR THIS AREA. REFER TO PHOTOS FOR

OBSERVED DEFICIENCIES, DEFECTS, OMISSIONS, AND ERRORS OF THE

EXISTING SPRINKLER SYSTEM. 10-02-2019 BUILDING 40 LOWER LEVEL.

EXISTING BRANCHLINE HAS CONDENSATION AND FITTINGS ARE

BEGINNING TO RUST. REPLACE FITTINGS (PHOTO 1)

EXISTING PVC PIPING HAS CONDENSATION DRIPPING OFF IT.

BASEMENT LEVEL WALKING PATH IS FLOODED. VA TO CLEAN UP

FLOODING. (PHOTO 2)

EXISTING JOCKEY PUMP TO REMAIN.

(PHOTO 3)

PIPING IN BASEMENT LEVEL UNDER HEAT STRESS. CURRENT STEAM

LEAK HAS STARTED CORROSION OF PIPING AND FITTINGS TO LEVEL

OF CONCERN. PIPING AND FITTINGS ARE RUSTING AND CONTINUAL

CORROSION WILL LEAD TO FAILURE OF PIPING. REPLACEMENT OF

PIPING IS RECOMMENDED. REPAIR OF STEAM LEAK IS RECOMMENDED

AS THIS WILL CONTINUE TO CORRODE PIPING WITHIN THE SPACE.

EXISTING 6" BUTTERFLY VALVE WITH TAMPER SWITCH TO FEED

RISERS TO REMAIN.

WALKWAY BELOW CRAWL SPACE FLOOR FLOODED. VA TO CLEAN UP

FLOODING.

EXISTING FIRE PUMP TO REMAIN. 1000 GPM, 125 PSI

B0

A1

B0

A2

B0

A3

B0

A4

B0

A5

B0

A6

B0

PIPE TUNNEL

FIRE PUMP RM

MECH RM

STAIR

NO 16

ELEVATOR

PIT

S20;S21;S22

ELEVATOR

PIT

P28;P29

ELEVATOR

PIT

P23;P24;P25

STAIR

1679A

PIPE BASEMENT

B600

2 2

UP

B40 WESTB40 WEST

B40 EASTB40 EAST

B0

A3

B0

A7

B0

A4

B0

A4

B0

A4

B0

A4

B0

A4

B0

A4

B0

A4

B0

A4

B0

A6

B0

A6

B0

A6

B0

A6

B0

A6

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 engineering discipline: Fire Protection Virtual Energy Solutions

31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Sprinkler Corrections

Jesse Brown VAMC

Chicago, IL

537-16-102A

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

B40 FX100-W

BUILDING 40

BASEMENT PLAN - WEST

08/30/2020

100% Complete and Final

Issued for 100% Complete and Final

Issued for 100% CD

08/30/2020

02/10/2020

B40

FIRE PROTECTION KEYED NOTES:

**THE NOTES PROVIDED HERE CORRESPOND TO THE ASSOCIATED PHOTOS

GENERATED IN THE FIELD REPORT FOR THIS AREA. REFER TO PHOTOS FOR

OBSERVED DEFICIENCIES, DEFECTS, OMISSIONS, AND ERRORS OF THE

EXISTING SPRINKLER SYSTEM. 10-02-2019 BUILDING 40 LOWER LEVEL.

EXISTING BRANCHLINE HAS CONDENSATION AND FITTINGS ARE

BEGINNING TO RUST. (PHOTO 1)

EXISTING PVC PIPING HAS CONDENSATION DRIPPING OFF IT.

BASEMENT LEVEL WALKING PATH IS FLOODED. (PHOTO 2)

EXISTING JOCKEY PUMP, (PHOTO 3)

PIPING IN BASEMENT LEVEL UNDER HEAT STRESS. CURRENT STEAM

LEAK HAS STARTED CORROSION OF PIPING AND FITTINGS TO LEVEL

OF CONCERN. PIPING AND FITTINGS ARE RUSTING AND CONTINUAL

CORROSION WILL LEAD TO FAILURE OF PIPING. REPLACEMENT OF

PIPING IS RECOMMENDED. REPAIR OF STEAM LEAK IS RECOMMENDED

AS THIS WILL CONTINUE TO CORRODE PIPING WITHIN THE SPACE.

EXISTING 6" BUTTERFLY VALVE WITH TAMPER SWITCH TO FEED

RISERS TO REMAIN.

WALKWAY BELOW CRAWL SPACE FLOOR FLOODED.

EXISTING FIRE PUMP TO REMAIN. 1000 GPM, 125 PSI

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 engineering discipline: Fire Protection Virtual Energy Solutions

31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Sprinkler Corrections

Jesse Brown VAMC

Chicago, IL

537-16-102A

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

B0

A1

B0

A2

B0

A3

B0

A4

B0

A5

B0

A6

B0

PATIO

STARBUCKS

ENTRANCE CORRIDOR TO

BUILDING 30, 11A, 11B

LOUVER

1540 - 49

RADIOLOGY

FEC

FAC

1575B

ENTRANCE/LOBBY

C1608

OUTPATIENT

SPECIMEN

LAB

1363C

OUTPATIENT

RADIOLOGY

WAITING AREA

OUTPATIENT

RADIOLOGY EXAM/

TREATMENT RM

CONTROL RM

OUTPATIENT

RADIOLOGY EXAM/

TREATMENT RM

FIRE RISER

1390A

DRESSING RM

1390C

MRI

CONTROL RM

VESTIBULE

C1507

CORRIDOR

C1606 CORRIDOR

C1510

CORRIDOR

C1505

ELEVATOR

LOBBY

C1602

GAS

CYLINDER

STORAGE

EMS CLEAN

SUPPLY

RECEIVING

16H1

HAC

16H2

CORRIDOR

C1601

ELEVATOR

NO 21

ELEVATOR

NO 22

1662 1658

SHOWER

1662B

TOILET

1662A

VESTIBULE

1661A

VESTIBULE

1657A

EMS STORAGE

1652B

VESTIBULE

1652A

EMS OFFICE

COMM RM

16T1

COMM RM

16T1A

16L1

ELEVATOR

LOBBY

C1605

NO 23

ELEVATOR

NO 24

ELEVATOR

NO 25

WOMENS TOILET

PREPARATION

SOILED RECEIVING /

DECONTAM

SPS CHIEF

SPS

STAFF

OFFICE

STERILE SUPPLY STORAGE

AND DIST

BULK

STORAGE

STAFF LOCKER

1646TOILET

1646A

STAFF

LOCKER

TOILET

1643A

STAFF

LOUNGE

ETO

SVC

ETO

RM

1639A

HAC

16H6

CART STAGING

AREA

1640A

CART

WASH

HAC

16H4

TELEPHONE

ALCOVE

MALE TOILET

VENDING MACHS

CHAPLAIN

OFFICE

CHIEF CHAPLAIN

ELEVATOR

PIT

P-27

ELECTRICAL RM

16E1

ELEVATOR

MACH RM

SECURED

ITEMS

WHEELCHAIR

WASH

ESCORT

WAITING RM

FIRE COMMAND

CENTER

STAIR

NO 13

SECY

VESTIBULE

BLESSED

SACRAMENT

CHAPEL

SACRISTY

CORRIDOR

C1607

ELEVATOR

P-26

HAC

16H5

TOILET

STAFF LOCKER

STAFF

LOUNGE

STAFF LOCKER

TOILET

MANUAL

EQUIP WASH

CORRIDOR

C1509

POLICE CHIEF

RAD EXAM

DOCTOR

OFFICE

RAD

OFFICE

ULTRASOUND

RADIOLOGY

OFFICE

RADIOLOGY

READING RM

RADIOLOGY

OFFICE

RAD

OFFICE

ULTRASOUND

TOILET

SPS SUPV

OFFICE

SPS RECEIVING

STORAGE

SECY OFFICE

RADIOLOGY SVC

CONFERENCE RM

FAN RM

PACS

MANAGER

COMPUTER

CABINET

1581A

ADMIN OFFICE

CHIEF RADIOLOGY

ELECTRICAL

CLOSET

15E2

TELEPHONE

CLOSET

15T1

HAC

STAIR

NO 3

BREAK

FILES

REFRIG

BREAK

ROOM

INPT

CORRIDOR

C1506

CT IMAGING RM - 1

ELECTRICAL RM

15E3

DIGITAL RADIOLOGY

VESTIBULE

SALLY

PORT

VESTIBULE

DINNING

SPACE

STEAM

STERILIZER

1521A

1635A

1602A

1 E A

S T

1 C E

N T

E R

222222

2 2 2

1 1 1 1

1 1

S

S

S

S

S

S

S

1S

S

S

1S

S

1S 1S 1S 1S 1S 1S 1S

S

S

S

S

N

TS

F

L

F L

F L

F

L

E TS

N

TS

N

TS

F L

F L

F

L

N TS

N TS

B40 WESTB40 WEST

B40 EASTB40 EAST

B

B

B

S

T

B B

B

E

A S

T

B40 EAST

B01B

B40 EAST

B01B

B1

A2

B1

A3

B1

A1

B1

A2

B1

A4

B40 FX101-E

BUILDING 40

FIRST FLOOR PLAN - EAST

08/30/2020

100% Complete and Final

Issued for 100% Complete and Final

Issued for 100% CD

08/30/2020

02/10/2020

B40

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 engineering discipline: Fire Protection Virtual Energy Solutions

31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Sprinkler Corrections

Jesse Brown VAMC

Chicago, IL

537-16-102A

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

FIRE PROTECTION KEYED NOTES:

**THE NOTES PROVIDED HERE CORRESPOND TO THE ASSOCIATED PHOTOS

GENERATED IN THE FIELD REPORT FOR THIS AREA. REFER TO PHOTOS FOR

OBSERVED DEFICIENCIES, DEFECTS, OMISSIONS, AND ERRORS OF THE EXISTING

SPRINKLER SYSTEM. 01-15-2020 & 01-17-2020 FULL CAMPUS 1ST FLOOR.

SPRINKLER PIPING RUSTED. PLUMBING PIPING ABOVE CORRODED.

REPLACE PIPING AND FITTINGS. (PHOTO 9)

SPRINKLER FITTING RUSTED. REPLACE WITH NEW.

(PHOTOS 10, 11, & 12)

SPRINKLER ESCUTCHEON OPENING TOO LARGE. PATCH CEILING AND

RE-CUT OPENING TO FIT SPRINKLER. (PHOTO 13)

EXISTING 2 1/2" BUTTERFLY VALVE WITH TAMPER SWITCH TO FEED FLOOR

SPRINKLER ZONE TO REMAIN.