S06 - Drawing P104.pdf
PDF 2 MB Posted
- Attached to
- Z1DZ--607-18-108 Renovate 4B for Inpatient Ward
- Solicitation number
- 36C25221B0031
About this file
This document provides details for a federal construction contract opportunity and related solicitation documents. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12 is seeking bids to complete Project 607-18-108 to renovate approximately 10,000 square feet of space on the fourth floor of Building 1 at the William S. Middleton Memorial Veterans Hospital in Madison, Wisconsin. The renovation involves demolition and construction work, along with coordinated work in mechanical rooms and on other floors to complete necessary plumbing connections. Scope of work includes demolition, hazardous material removal, interior finishes, doors and windows, medical equipment installation, plumbing, HVAC, electrical, communications systems and other construction activities. The solicitation for bids will be issued on September 20th, 2021 with bids due by October 20th, 2021. The project budget is estimated between $5-10 million. The NAICS code is 236220 for construction of commercial and institutional buildings with a size standard of $39.5 million. The contract has a set-aside for Service-Disabled Veteran-Owned Small Businesses and is available on the Contact Opportunities website.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25221B0031 0003.docx | DOCX document | |
| S06 - Drawing P100.pdf | ||
| S06 - Drawing PD103.pdf | ||
| 36C25221B0031 0002.docx | DOCX document | |
| S06 - Drawing P000.pdf | ||
| S06 - Drawing P103.pdf | ||
| S06 - Drawing PD104.pdf | ||
| S06 - SF 1442 - Revised.pdf | ||
| 52.223-99.pdf | ||
| 36C25221B0031 0001.docx | DOCX document | |
| 852.219-77.pdf | ||
| S04 - Pre-Bid Sign in Sheet.pdf | ||
| S02 - Drawings VOL2A.pdf | ||
| 36C25221B0031_1.docx | DOCX document | |
| S02 - Drawings VOL1B.pdf | ||
| P07 - Wage Determination.pdf | ||
| S02 - Drawings VOL2B.pdf | ||
| S02 - Specifications - Volume 1.pdf | ||
| S02 - Drawings VOL2C.pdf | ||
| S02 - Drawings VOL1A.pdf | ||
| S02 - Specifications - Volume 2.pdf | ||
| S02 - Drawings VOL1C.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OFFSET PIPING AT CEILING OF THIS FLOOR AND FLOOR BELOW AS
REQUIRED TO CLEAR STRUCTURE AND OTHER WORK.
FIELD VERIFY PIPING FOR EXACT LOCATIONS AND ORIENTATION.
AT TYPICAL PATIENT TOILET ROOM, EXTEND VALVED 1-1/2"CW, 1/2"HW
TO FIXTURES. KEEP VALVES ACCESSIBLE. EXTEND WASTE AND 2"V
TO SYSTEM. SEE TYPICAL PIPE ROUTING SHOWN AT B4094A AND
B4096A.
2"W FROM LAVS AND DIALYSIS BOXES TO FLOOR BELOW. CORED
HOLE IS INSIDE LAV CABINET, FIELD LOCATE. SEE DETAIL 3/P104.
REPLACE B4052 & B4146 LAVs WITH L-3 WHEN DOMESTIC WATER
LOOPS ARE COMPLETED. TO BE COMPLETED DURING OFF-TOUR
HOURS TO NOT DISRUPT PATIENT CARE.
EXTEND VALVED 3/8" CW (SOFT COPPER) TO COFFEE MAKER FROM
SINK SUPPLY, INCLUDE FILTER BANK BELOW SINK, HOLE AND
GROMMET BEHIND COFFEE MAKER, ASSE 1022 (WATTS SD-3) ABOVE
COUNTER, VISIBLY SPILL VENT TO COUNTERTOP.
HORIZONTAL 2" W FROM LAV IN WALL TO CONNECTION IN CHASE IS
ACCEPTABLE ALTERNATE, AT CONTRACTOR DISCRETION, TYPICAL
ALL LOCATIONS. UPDATE RECORD DRAWINGS AS APPROPRIATE.
PROVIDE TEMPORARY PLUMBING/VALVES FOR FIXTURES IN B4052 AND
B4059 TO REMAIN IN OPERATION FOR THE DURATION OF THE PROJECT.
REMOVE TEMPORARY PLUMBING WHEN NEW DOMESTIC HW & CW
LOOP IS COMPLETED.
KEYED NEW WORK NOTES (P104):
GENERAL NOTES (P104):
1. CEILING SPACE IS VERY LIMITED. COORDINATE PIPE ROUTING WITH
ALL TRADES. OFFSET AROUND, OVER OR UNDER OTHER PIPING AND
DUCTWORK AS REQUIRED. MAINTAIN CLEARANCES FOR ACCESS TO
VALVES.
2. PIPE LOCATIONS SHOWN ARE BASED ON EXISTING DOCUMENTATION
AND FIELD VERIFICATION. CONFIRM PIPE SERVICE AND LOCATION IS
PROPERLY INDICATED PRIOR TO NEW CONNECTION. ADJUST LAYOUT
AS REQUIRED, AND UPDATE RECORD DRAWINGS.
3. NEW FLOOR DRAIN LOCATIONS ARE TO MISS CONCRETE RIBS BELOW,
AND LOCATION OF FLOOR DRAINS MAY NEED TO BE ADJUSTED
ACCORDINGLY. COORDINATE WITH OTHER TRADES.
NURSE
SUPERV
B4083
PR
TOILET
B4091A
PATIENT
ROOM
B4091
LINEN
B4087
B4059
CORRIDOR
B4100 CORRIDOR
B4100
NURSE
MANAGER
B4061
NURSE
ALCOVE
B4143
PR
TOILET
B4063A
PATIENT
ROOM
B4063
PR
TOILET
B4065A
PATIENT
ROOM
B4065
NURSE
ALCOVE
B4140
PR
TOILET
B4069A
PATIENT
ROOM
B4069
PR
TOILET
B4071A
MEDICATION
ALCOVE
B4137
PATIENT
ROOM
B4071
SOILED
UTILITY
B4073
NOURISHMENT
B4079A
TELEMETRY
B4079B
NURSE
STATION
B4079
MEDS
B4081 EQUIPMENT
ROOM
B4085
PATIENT
ROOM
B4093
MEDICATION
ALCOVE
B4125
PR
TOILET
B4095A
PR
TOILET
B4093A
PATIENT
ROOM
B4095
STAFF
TOILET
B4097A
ALCOVE
B4097
STAFF
LOUNGE
B4099
PATIENT
ROOM
B4096
NURSE
ALCOVE
B4119
PR
TOILET
B4096A
PR
TOILET
B4094A
PATIENT
ROOM
B4094
PATIENT
ROOM
B4092
NURSE
ALCOVE
B4116
PR
TOILET
B4088A
PR
TOILET
B4092A
PATIENT
ROOM
B4088
NURSE
ALCOVE
B4113
EQUIPMENT
ALCOVE
B4110
PATIENT
ROOM
B4086PR
TOILET
B4086A
PR
TOILET
B4082A
PATIENT
ROOM
B4082
NURSE
ALCOVE
B4107
NURSE
ALCOVE
B4104
PATIENT
ROOM
B4080
PR
TOILET
B4080A
PR
TOILET
B4076A
PATIENT
ROOM
B4076
PATIENT
ROOM
B4074PR
TOILET
B4074A
PR
TOILET
B4070A
PATIENT
ROOM
B4070
PATIENT
ROOM
B4068PR
TOILET
B4064A
PR
TOILET
B4068A
PATIENT
ROOM
B4064
BARIATRIC
PATIENT ROOM
B4062
PR
TOILET
B4062A
CLEAN
UTILITY
B4060
ALTERNATE
STAIR
STAIR
4"W, 2"V
2"W, 1-1/2"V
1-1/2"W, 2"V
1-1/2"V, 2"W2"V, 1-1/2"W, 5"W, 4"V
4"W, 3"V, 2"AV
2"W, 1-1/2"V
4"W, 2"V 2"W, 1-1/2"V
2"W, 1-1/2"V
4"W, 2-1/2"V, 5"ST
4"W, 4"V UP
4"W, 2-1/2"V 1-1/2"V, 2"W
3/4"(UNSOFTENED)
4"W, 2-1/2"V
4"W, 3"V, 2"AV, 3/4"DW
4"W, 2-1/2"V, 2"AV, 6"ST
2"W, 2-1/2"V 2"W, 1-1/2"V
2"W, 1-1/2"V
UP & DN
1"CWR FFA/TFB
3"CW FFB/TBA
2"HW FFB/TFA
1"HWR FFA/TFB
2"W, 1-1/2"V
CSS-1
S-3
S-2
S-2
L-3
1"HW
1-1/2"CW
3"CW
2"HW
L-2
L-31
1 1
L-2 L-2L-2
L-2
L-2
WC-3
L-3
S-1
2"V
MOP BASIN FIELD
READING 07/05/2019
HW 65PSI, CW 65PSI
BEGIN 1" HWR
2"HW
3"CW
2"W-TFB
NO PIPES ABOVE ELECTRICAL PANELS
CONNECT WASTE FROM WC TO
RELOCATED WASTE STACK
BEGIN 1" CWR
CONNECT LAVS INTO 5" W
1-1/2"V 2"V
2"V
2"V
2"V DN TO WC, 4"W-TFB (TYP)
L-1
SH-1
SD-1
WC-1
L-1
SH-1
SD-1
WC-1
L-1
SH-1
SD-1
WC-1
L-1
SH-1
SD-1
WC-1
1-1/2"CW DN TO WC, WHA (TYP)
1-1/2"V DN,
2"W-TFB
L-1
SH-1
SD-1
WC-1
L-1
SH-1
SD-1
WC-1
L-1
SH-1
SD-1
WC-1
L-1
SH-1
SD-1
WC-1
L-1
SH-1
SD-1
WC-1
L-1
SH-1
SD-1
WC-1
L-1
SH-1
SD-1
WC-1
L-1
SH-1
SD-1
WC-1
L-1
SH-1
SD-1
WC-1
L-1
SH-1
SD-1
WC-1
L-1
SH-1
SD-1
WC-2
L-1
SH-1
SD-1
WC-1
L-1
SH-1
SD-1
WC-1
L-1
SH-1
SD-1
WC-2
1/2"CW, 1/2"HW, 1-1/2"V DN, 2"WV(SHOWER)-TFB
(TYP LAV AT PATIENT ROOM TOILET)
1/2"CW, 1/2"HW DN TO SHOWER (TYP)
2"V
1/2"
2"V
2"V
2"V
1-1/2"V-TFB
L-2
P104
ALTERNATE
L-2 L-2 L-2 L-2
DB-1
L-2 L-2
L-2 L-2 L-2
L-2 L-2 L-2 L-2
4 4 4 4 4 4
2" FS-1, REFERENCE PRODUCT
ZURN Z1910-KC-3
L-1
SH-1
SD-1
WC-1
L-1
SH-1
SD-1
WC-1
P104
1-1/2"V
1/2"1/2"
2"V
2"V
3"CW
2"HW
INSTALL 3/4" DRAIN VALVE AT END OF 3/4"
(UNSOFTENED) LINE, VALVE AND HOSE END
CONNECTION TO BE ACCESSIBLE FROM
EXISTING CEILING ACCESS PANEL
3"CW, 2"HW
1-1/2"HW
2"CW
1"HW
1-1/2"CW
1-1/2"HW
2"CW
1-1/2"HW
2-1/2"CW
3"CW
2"HW
2-1/2"CW
1-1/2"HW
1-1/2"HW
2-1/2"CW
1/2"HW
1/2"1/2"1/2"1/2"1-1/2"CW
1/2"HW
2"V
2"V
3/4"CW
1-1/2"V
1-1/2"V
1-1/2"V
1-1/2"V
1-1/2"V
1/2" 1-1/2"V
1/2" 1-1/2"V
1/2"
1-1/2"CW
3/4"HW
2"V DN TO WC, 4"W-TFB (TYP)
1-1/2"CW DN TO WC, WHA (TYP)
1/2"CW, 1/2"HW, 1-1/2"V DN, 2"W-TFB
(TYP LAV OR SINK)
3/4"HW, 1-1/2"CW, 2"V DN, 4"W-TFB, SEE DETAIL 1/P000,
SPLASH GUARD REQUIRED, MINIMIZE CHASE DEPTH AT
CSS-1, COORDINATE WITH STRUCTURAL PENETRATION
2"V 2"V
2"V2"V2"V
2"V
2"V
2"V
1-1/2"V
1/2"
EXTEND TO ICE MAKER, SEE DETAIL 7/P000
2"WET V-TFB
2"SAN IN WALL
1-1/2"V
2"V
2"V
1-1/2"V
1-1/2"V
2"V
2"V
CONNECT WC W & V TO
RELOCATED RISERS CONNECT LAV DRAIN INTO
RELOCATED SAN RISER
6 7
EWC-1
1-1/2"V
1/2"CW
CONNECT TEMPORARY DOMESTIC
HOT AND COLD WATER TO SUPPLY
B4052 SINK DURING CONSTRUCTION.
CONNECT TO EXISTING
DOM. HW & CW FOR B4052
SINK
CONNECT TEMPORARY DOMESTIC
HOT RECIRC DURING CONSTRUCTION
AND CAP EXISTING.
MB-1
ALTERNATE
7sf
PATIENT
ROOM 19
196sf
EQUIPMENT
ROOM
B4085
LINEN
B4087
STAFF
TOILET
B4089
CONSULT
ROOM
B4091
WC-3
L-3
1-1/2"V DN, 2"SAN HORIZ IN
WALL TO RISER CONN
3"CW
2"HW
1-1/2"CW
1/2"HW
2"V
2"V DN, 4"SAN HORIZ IN
WALL TO RISER CONN
12" 0 1' 5' 10' 20'
SCALE: 1/8" = 1'-0"
FOURTH FLOOR PLAN - PLUMBING NEW WORK1
B B
A
C
MAM MAM10/19/2021Schematic Design Documents 11.27.2018 Design Developement Documents 5.16.2019 65% Construction Documents 11.11.2019 95% Construction Documents 09.04.2020 100% Construction Documents 11.12.2020
12" 0 1' 5' 10' 20'
SCALE: 1/8" = 1'-0"
FOURTH FLOOR PLAN - PLUMBING NEW WORK DEDUCTIVE ALTERNATE2
"ACCOMPANYING AMENDMENT 36C25221B0031 - 0002"
AutoCAD SHX Text B4147
AutoCAD SHX Text C4159A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SUPPLY CABINET
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B4049D
AutoCAD SHX Text B4147A
AutoCAD SHX Text B4146
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
MORNINGSIDE
AutoCAD SHX Text K-12634
AutoCAD SHX Text
STAMP
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
RENOVATE 4B FOR INPATIENT WARD
AutoCAD SHX Text William S. Middleton Memorial VA, Madison WI
AutoCAD SHX Text 607-18-108
AutoCAD SHX Text Bldg 1 4th Floor B-Wing
AutoCAD SHX Text N
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text Not to Scale
AutoCAD SHX Text
100% CONSTRUCTION DOC
AutoCAD SHX Text P104
AutoCAD SHX Text
FOURTH FLOOR PLAN - PLUMBING NEW WORK
File details come from the government source that posted it. Updated .