36C25220B0015-0005001.pdf
PDF Posted
- Attached to
- Z1DA--676-19-105 Replace Steam Condensate Lines Federal contract opportunity
- Solicitation number
- 36C25220B0015
About this file
This document contains a pre-solicitation notice and related questions and answers file for the replacement of approximately 8,400 linear feet of steam condensate lines at the Tomah VA Medical Center in Tomah, Wisconsin. The project value is estimated between $2-5 million and will require phased construction to maintain building operations. The replacement project includes associated asbestos abatement work. The solicitation is scheduled for posting on February 24, 2020 to SAM.gov with a bid opening of March 25, 2020. A pre-bid site walkthrough will be held. The NAICS code is 238220 with a $16.5 million size standard. The period of performance is 720 calendar days from notice to proceed. The acquisition is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses.
36C25220B0015 0005 S02 - ATTACHMENT C. RFI Log - Bidding Questions .pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25220B0015-0008000.docx | DOCX document | |
| 36C25220B0015-0007000.docx | DOCX document | |
| 36C25220B0015-0007001.pdf | ||
| 36C25220B0015-0006000.docx | DOCX document | |
| 36C25220B0015-0005000.docx | DOCX document | |
| 36C25220B0015-0005002.pdf | ||
| 36C25220B0015-0005003.pdf | ||
| 36C25220B0015-0004006.docx | DOCX document | |
| 36C25220B0015-0004007.pdf | ||
| 36C25220B0015-0003000.docx | DOCX document | |
| 36C25220B0015-0002000.docx | DOCX document | |
| 36C25220B0015-0001000.docx | DOCX document | |
| 36C25220B0015-036.pdf | ||
| 36C25220B0015-032.pdf | ||
| 36C25220B0015-033.pdf | ||
| 36C25220B0015-034.pdf | ||
| 36C25220B0015-035.pdf | ||
| 36C25220B0015-031.docx | DOCX document |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COR LEWIS WATERS
Lewis.Waters@va.gov X66095
Project#676-19-105 Replace Steam Condensate Lines
Tomah VA Medical Center
RFI# RFI-Description Answer Date-RFI
Submitted
Who
Responsible for
Response
AE/COR/ACOR
Status/Comments
1 What is the ICRA level we are to abide by during any time in a facility?
Or is there more than 1 ICRA level?
TYPE ‘C’, LEVEL II,
CLASS II (SEE
ATTACHED)
4/13/2020 COR/AE Amendment #0005
2 Is this project tax exempt? Reference Amendment
4/13/2020 CO Amendment #0005
3 Interior ICRA partitions are called to go from floor to underside of floor slab above per sheet GC103? What is the floor to underside of floor construction?
PER DETAIL 1/GC103 – 3
5/8” STUDS AT 16” O/C
W/ 5/8” DRYWALL
BOTH SIDES
4/13/2020 COR/AE Amendment #0005
4 Poly critical partition is also called out on sheet HA001. What partition type / details are we to use for bidding
– construction?
METAL / WOOD STUDS
AS REQUIRED AT 16”
O/C FOR UNSUPPORTED
AREAS, PLUS DETAIL
1/ HA001
4/13/2020 COR/AE Amendment #0005
5 12’ gates as called out do not allow for larger equipment including trailers, excavators etc. to pass through. Smallest gates which we have utilized are 24’ wide. Provide clarification on this issue and if larger gates are to be utilized
12’ GATES. YOUR
DRIVERS SHOULD BE
ABLE TO NAVIGATE.
4/13/2020 COR/AE Amendment #0005
6 Gates as shown on sheet C501 with sandbag stabilization seem to always fall over and are unusable. Should gates be changed to posts embedded in concrete?
NO. PER NOTE #4 ON
3/C501.
4/13/2020 COR/AE Amendment #0005
7 Piping work as called out between buildings 424 and 452 do not have a
Priority provided. Is this Priority 2 or
Priority 3? Provide clarification of this area
PRIORITY 2 4/13/2020 COR/AE Amendment #00005
8 Area of work between buildings 403 and 424 listed as Priority 2 does not have a gate called out. Is this area to have a 12’ wide gate?
NO. ACCESS CAN BE
CONTROLED WITH THE
EXISTING FENCE /
GATE THAT IS FROM
BUILDING #424 TO
TRAM WALKWAY.
4/13/2020 COR/AE Amendment #0005
9 Existing piping systems as called out on site plans are missing the depth of existing concrete trench boxes (details
5/C502 & 6/C502) below grade.
Provide the following information:
A. Depth of top of existing trench box?
A. VARIES
B. VARIES
4/13/2020 COR/AE Amendment #0005 mailto:Lewis.Waters@va.gov
B. Total depth of existing trench boxes?
10 New concrete pipe trench box (detail
7/C502) is missing the following information which we feel is required.
A. Bottom of concrete trench box below finished grade
AS REQUIRED TO
MAINTAIN PROPER
FLOW FOR
CONDENSATE LINE.
4/13/2020 COR/AE Amendment #0005
11 Piping as called out on sheet HA011 / note 2 calls for direct bury condensate piping. Provide buried depths of all lines to allow for accurate estimate of excavation and backfill required
AT BIDWALKS THE
ELEVATIONS WERE
VIEWED, ELEVATIONS
VARIES
4/13/2020 COR/AE Amendment #0005
12 Per sheet HA011, several condensate piping sections are missing keyed note designation. Provide clarification
/ identification of what type of piping occurs in the following areas:
A. Piping lengths “AA” / “B” / “D” /
“C” / “W”
AT AREAS WHERE NO
‘KEYED NOTES’ ARE
LISTED, ASSUME
CONDENSATE PIPES
AND COVERINGS NOT
TO HAVE ASBESTOS.
4/13/2020 COR/AE Amendment #0005
13 Sheet ED103 / coded note 2: What is the distance from existing source panel?
CONTRACTOR TO
VERIFY, AS REQUIRED.
4/13/2020 COR/AE Amendment #0005
14 Provide confirmation that existing pumps which are called out to be removed do not contain ACM piping covering which is to be removed?
ASSUMING NONE,
UNLESS CALLED OUT.
4/13/2020 COR/AE Amendment #0005
15 Confirm that all existing electrical panels currently in use follow current
NEC?
A VAST AMOUNT OF
THE ELECTRICAL
PANELS HAVE BEEN
UPGRADED IN THE
LAST TEN (10) YEARS.
ALL PANELS WERE
INSTALLED TO THE
NEC STANDARD OF
THAT TIME. ALL
PANELS HAVE HAD AN
ARC FLASH STUDY
DONE IN 2019.
4/13/2020 COR/AE Amendment #0005
16 Demolition shows areas of existing parking lot and streets to have existing painted striping. Provide a site plan reflecting what areas are to have new striping installed, width of stripes and colors?
PLAN ON SHEET CD011,
SCOPE IS FOR
ANYTHING THAT WAS
DAMAGED OR
REMOVED AND SPEC
SECTION 321723 FOR
MARKING
REQUIREMENTS.
4/13/2020 COR/AE Amendment #0005
17 Sheet CD011 existing sidewalk removal / replacement on 3rd Street.
This area shows sidewalk and crosswalk? Please confirm? Is there to be new ADA tactile pavers to be installed in sidewalk on both sides of crosswalk? Provide specification of
ADA tactile paver if to be installed, type of installation and new striping for sidewalk. See question #16 above
YES. NO ADA TACTILE
PAVERS ON WEST SIDE.
YES, FOR THE EAST
SIDE. SEE ABOVE
ANSWER.
ENSURE THAT WHEN
REPLACING SIDEWALK
– STEAM ACCESS
COVERS THEY HAVE
NO MORE THAN ¼”
ELEVATION
DIFFERENCE, PER ADA
CODE. REUSE COVERS
AS POSSIBLE AND
REPLACE AS REQUIRED
4/13/2020 COR/AE Amendment #0005
18 Detail 7/C502, pipe support system:
Can Unistrut systems be utilized in lieu of support system as shown?
WE WANT CONTINUITY
FOR THE SYSTEM.
HOWEVER, YOU MAY
SUBMIT A PROPOSAL
FOR REVIEW
4/13/2020 COR/AE Amendment #0005
19 Specification Section 21 13 13 Wet
Pipe Sprinkler Systems / 1.1 / B calls for portions of building 404 to have entire Attic Space and partial head relocation / replacement in the
Mechanical Basement Room. Provide the following:
a. Existing / as-built building 404 sprinkler drawings
b. Existing building 404 hydraulic calculations – information.
c. Confirm the there is sufficient water pressure to add the areas of entire Attic Space and partial head relocation / replacement in the
Mechanical Basement Room to the existing system without the addition of a fire pump
PLEASE OMIT – NOT
PART OF SCOPE.
4/13/2020 COR/AE Amendment #0005
20 The specifications appear to have an unaltered Division 23 09 specification. Is any Division 23 09
(DDC) work required on this project?
SPECIFICATION
SECTION WILL BE
REDUCED
4/9/2020 COR/AE Amendment #0005
21 If so, the specification mentions new
ECC among other things, but it also mentions connection to the existing system. Is a new system desired for this project or would just utilizing the existing Metasys system be acceptable?
SPECIFICATION
SECTION WILL BE
REDUCED
4/9/2020 COR/AE Amendment #0005
22 Does the temporary PC piping need to be insulated? If so, with what?
TEMPORARY PC IS NEW
PIPING AND WILL
REQUIRE INSULATION
PER SPECIFICATION
230711.
4/8/2020 COR/AE Amendment #0005
23 Will the direct buried pipe come pre-insulated?
YES, PER
SPECIFICATION 336300
4/8/2020 COR/AE Amendment #0005
24 I read the specs as the only pipe considered to be in an exterior location would be the piping under the sidewalk. The only insulation specified for this is polyisocyanurate which lists a thickness up to 1-1/4" pipe. What thickness would you like on piping larger than 1-1/4"?
POLYISOCYANURATE
INSULATION IS
LIMITED TO EXTERIOR
USE AND THAT SIZE.
OTHER MATERIALS
LISTED IN THE TABLE
CAN BE USED EITHER
FOR ABOVE GROUND
OR BELOW GROUND AS
NOTED WITH THE
PROPER JACKETING
MATERIAL.
4/8/2020 COR/AE Amendment #0005
25 Is the insulation on the piping located under the sidewalk the only insulation to get an additional jacket on it (other than ASJ)?
YES. DIRECT BURIED
PIPING HAS AN
EXTERIOR JACKET AS
PART OF THE
ASSEMBLY
4/8/2020 COR/AE Amendment #0005
26 Does 3rd Street have to be passable at all times, day/night for emergency vehicles and for personnel during construction process? At the site visit there was a comment that it would be opened but the plan indicates otherwise.
YES. 100% OF THE
TIME. YOU MAY HAVE
ROAD WIDTH
REDUCED WITH
SIGNALMEN ON
EITHER SIDE DURING
WORK AT THE ROAD
LOCATION. NOTE THAT
AT ALL TIMES THE
ROAD MUST HAVE
ENOUGH WIDTH AND
STRENGTH TO HOLD
FIRE TRUCKS,
CONCRETE TRUCKS,
AND TRACTOR
TRAILERS. AT NO TIME
SHALL THE THIRD
STREET ROAD BE
IMPASSABLE
4/14/2020 COR/AE Amendment #0005
27 B424-Cafeteria has dumpsters located on the East side of the building during the construction process. This area will not be accessible for refuse disposal. Can the dumpster be relocated to an accessible location for their accessibility for refuse disposal pickup?
NO, THIS IS A LIVE
KITCHEN AREA AND
MUST MAINTAIN
ACCESS TO
DUMPSTERS. GC TO
COORDINATE WORK /
REFUSE SCHEDULE AS
NOT TO IMPEED
KITCHEN STAFF.
4/14/2020 COR/AE Amendment #0005
28 Many of the existing concrete removable covers are severely damaged. Should replacement be included in the cost? If so, the concrete covers that are not exposed due to being covered by asphalt and or dirt and gravel be added as unforeseen if damaged or should a specific dollar value allowance be included?
YES. REUSE AS
POSSIBLE, REPLACE AS
REQUIRED.
4/14/2020 COR/AE Amendment #0005
29 Building 424 to 452:
The drawing (CO11) of the pipe trench is referring to detail 7/502.
This indicates a new concrete pipe trench. If this is correct, there are (2) vaults located outside of B424 and the steam supply and return appear to split the two vaults. There is not (5) feet between the two vaults for a new concrete pipe trench, or does the new concrete pipe trench only go from curb to curb and then the line is to be direct buried before and after the curbs?
NEW VAULT TO BE
REDUCED IN SIZE TO
BE LOCATED BETWEEN
EXISTING ELECTRICAL
VAULTS
4/14/2020 COR/AE Amendment #0005
30 Parking access by some of the tramway hatches is going to be necessary for demolition and replacement of the steam return lines.
Will parking be allowed to cone off up to (4) parking stalls at these locations, to perform work necessary to complete the job?
YES. SUBMIT PLAN
PROPOSALS
4/14/2020 COR/CO
31 Can the construction wash out area be relocated to the other side of the work area, next to the parking area of
B415? There are vaults beneath the area designated on the plans.
PROVIDE PROPOSED
PLAN ON 8 ½ x 11.
4/14/2020 COR/AE Amendment #0005
32 Refer to drawing CO11-new pipe trenches. There are no footages for length or set elevations to determine grade/ top or bottom of the new pipe trenches. Please provide.
OPPORTUNITY FOR
VISUAL INSPECTION OF
CRAWL SPACES
DURING BID-WALKS,
CONTRACTOR TO
DETERMINE
33 During the site visit the COR brought up to install 36" X 36" access doors to assist with abatement and removal of the steam condensate lines. Please provide specific locations and specifications for bidding.
THE COR SAID THAT,
SOMETHING COULD
POSSIBLY BE DONE
WITH THE EXISTING
BUILDING VENTS AT
THE BUILDING CRAWL
SPACE. HOWEVER, IF
ANYTHING IS DONE,
AN ACCESS OF 36” x 36”
WOULD NEED TO BE
USED. THE DESIGN BY
CONTRACTOR, WITH
CALCULATIONS AND
DRAWINGS STAMPED
BY REGESTERED
PROFESSIONAL
ENGINEER. ACTION
SHALL BE
CATEGORIZED AS
CONTRACTOR MEANS
AND METHODS.
4/14/2020 COR/AE Amendment #0005
34 Provide additional information for removal and reinstallation of any sprinkler pipe and sprinkler heads including footage and quantities
PLEASE OMIT – NOT
PART OF SCOPE.
4/14/2020 COR/AE Amendment #0005
35 Refer to drawing MP011, B25, Detail
4/MP303. This detail is of B36 basement plan. Is a detail of B25 available
SEE UPDATED
DRAWINGS.
4/14/2020 COR/AE Amendment #0005
36 Is Coring acceptable through crawl spaces at (4) locations below grade, to access the crawl spaces, and to be able to move longer length pipe into the work areas? Locations would be re-bricked and waterproofed when work in the areas are complete.
NO 4/14/2020 COR/AE Amendment #0005
37 The steam tunnel from B415 to B403, where it enters B403 is under the front entrance of the building. The concrete sidewalk at this location does not appear removable. The site-specific plan calls for this location to determine if the area would have to be replaced, or if there is enough room under the walk area to access the site, to perform work without demolition of the walkway.
OPTION TO REVISIT
SITE WITH PROPER PPE
AND EXAMINE FROM
CRAWL SPACE UNDER
BUILDING 403. MUST
BE DONE BEFORE 3PM,
04-28-2020. PLEASE
EMAIL DATE AND TIME
REQUEST TO LEWIS
WATERS
4/14/2020 COR/AE Amendment #0005
38 On the South-East side of B416 the loading dock has been extended and covers the PC and HPS lines. Is it the
GC's responsibility to remove or will the loading dock extension have to be rebuilt, and if so, by whom?
FULL ACCESS UNDER
BUILDING 416 TO GET
TO THE SOUTH SIDE OF
BUILDING. ALL
EXISTING PARKING
AND ROADS TO BE
DEMOED AND
REPAIRED BY GC, AS
REQUIRED
39 Please confirm if Ultrasonic Testing
Per 136.4.6 of section B31.1 is acceptable in lieu of
Radiography. Due to the radiation source required and proximity to an occupied area and walkway. Areas would need to be shut down during any tests.
MEANS AND METHODS
BY GC AS LONG AS
REQUIRED
INFORMATION IS
ATTAINED,
DOCUMENTED, AND
VERIFIABLE.
4/16/2020 COR/AE Amendment #0005
40 Does 3rd Street have to remain open at all times (day/night) for emergency vehicles and personnel during construction?
YES. 100% OF THE
TIME. YOU MAY HAVE
ROAD WIDTH
REDUCED WITH
SIGNALMEN ON
EITHER SIDE DURING
WORK AT THE ROAD
LOCATION. NOTE THAT
AT ALL TIMES THE
ROAD MUST HAVE
ENOUGH WIDTH AND
STRENGTH TO HOLD
FIRE TRUCKS,
CONCRETE TRUCKS,
AND TRACTOR
TRAILERS. AT NO TIME
SHALL THE THIRD
STREET ROAD BE
IMPASSABLE
4/16/2020 COR/AE Amendment #0005
41 Building 424 to 452
A. Is this to be direct buried or will it be in box conduit? B .The HPS pipe appears to run above the PC line, are we to replace both pipes?
A.PER SECTION 5/C502,
NEW CONCRETE PIPE
TRENCH WITH LID.
B.HPS AND PC PIPING
ARE ROUTED STACKED
LEAVING BLDG 424.
THE HPS SHOULD NOT
NEED TO BE
REPLACED. NEW PC
PIPING CAN BE
INSTALLED ABOVE HPS
IF REQUIRED
4/16/2020 COR/AE Amendment #0005
42 On Sheet MP011 building No. 36, No. 40 both show details on sheet
MP304.
a. Building No. 36 appears to be on sheet MP303 detail 4. Please confirm this is correct. 40.appearsto be on
MP303 detail 5. Please confirm this is correct.
THIS IS CORRECT. SEE
MODIFIED DRAWINGS
4/16/2020 COR/AE Amendment #0005
43 On sheet MP011 building No. 25 basement detail is shown to be on
MP303 detail 4. I believe sheet
MP303 detail 4 is of building No. 36.
Is there a detail of building No. 25 basement?
SEE MODIFIED
DRAWINGS
4/8/2020 COR/AE Amendment #0005
44 Is coring acceptable through crawl spaces below grade to access the crawl spaces. These cores would be to
NO 4/8/2020 COR/AE Amendment #0005 move longer lengths of pipe into work areas?
45 ¾” LPR line between buildings No.
36 and No. 40 is shown to be demolished. Can this line be capped and abandoned in place?
NO. THIS LINE IS
ASSUMED TO HAVE
ACM.
4/8/2020 COR/AE Amendment #0005
46 Building No. 36 – Is the intention to run new PC line to pump inside building or to run new PC lines outside tie into existing and reconnect new pump to existing lines?
RUN NEW PC FROM
NEW PUMP INSIDE
BLDG 36.
4/8/2020 COR/AE Amendment #0005
47 Does building No. 423 have any new lines running to it, if so, please provide details.
RUN NEW 1-1/4” HPR
PIPING FROM BLDG 423
PER MP011
4/8/2020 COR/AE Amendment #0005
48 Building No. 403 Basement plan on
MP301 detail 4 does not indicate a termination point of the vent line.
ROUTE UP IN CHASE
AND TERMINATE
ABOVE GRADE AT
EAST WALL
4/8/2020 COR/AE Amendment #0005
49 Building No. 403 basement plan on
MP301 detail 4 does not show continuation of PC lines from sheet
MP104
2-1/2” PC PIPING FROM
BLDG 404 SHOULD BE
ROUTED AROUND
WEST SIDE OF
MECHANICAL ROOM
AND ROUTED TO 5” PC
MAIN. SEE MODIFIED
DRAWINGS
4/8/2020 COR/AE Amendment #0005
50 Hanger detail 5/M051 shows both clevis hanger and roller yoke hanger.
Specification 23 05 10 2.11 J 2 mentions both clevis and roller hangers. Detail on M401 and M402 show roller hangers. Are roller hangers required for all steam and condensate piping?
ALL NEW PC PIPING
SHOULD HAVE ROLLER
HANGER PER
SPECIFICATION
4/16/2020 COR/AE Amendment #0005
51 What is Building No. 23 footing depth in relationship to the new PC pipe?
FOOTING IS BELOW
PIPING
4/16/2020 COR/AE Amendment #0005
52 Drawing MP104 shows a new 2-1/2” condensate pipe entering B403 basement Mechanical Room
(4/MP301) from the North, but detail
4/MP301 does not show the continuation of that pipe. Please advise.
SEE RESPONSE TO
QUESTION 48
4/16/2020 COR/AE Amendment #0005
53 What are the specifications for the condensate vent piping off the condensate return units?
SEE SPECIFICATION
232213
4/16/2020 COR/AE Amendment #0005
54 Detail 4/MP301 shows a 3” vent up in chase. Where does that continue to?
SEE RESPONSE TO
QUESTION 47
4/16/2020 COR/AE Amendment #0005
55 How is the condensate system expected to be maintained when the new condensate units are in the same location as the existing units? What is the maximum allowable shutdown
CONDENSATE CAN BE
DUMPED INTO THE
DRAIN FOR THE
REQUIRED UNIT
SWITCH-OVERS
4/16/2020 COR/AE Amendment #0005 timeframe? Can we dump condensate to a drain for a period of time?
56 The drawing does not indicate any condensate tie-in points other than in the mechanical rooms. Please provide quantities, sizes and locations of all condensate tie-in points for terminal equipment, drip traps, etc. Do any of these associated tie-ins require rework/replacement of steam traps or steam trap assemblies.
THE PROJECT SCOPE IS
TO REPLACE
CONDENSATE PUMP
AND PIPING FROM
BUILDING TO
BUILDING.
CONDENSATE PIPING
WITHIN THE BUILDING
ARE NOT TO BE
DISTURBED.
4/16/2020 COR/AE Amendment #0005
57 Detail 2/M501 depicts a steam trap assembly. Please advise where this is applicable on the project.
DETAIL IS FOR
REFERENCE AS
NEEDED. BLDG 40 AND
25 HAVE HPR GRAVITY
CONDENSATE PIPING
THAT MAY HAVE TRAP
IN LINE.
4/16/2020 COR/AE Amendment #0005
58 Detail 3/M501 depicts F&T steam trap assembly. Please advise where this is applicable on the project
DETAIL IS FOR
REFERENCE AS
NEEDED. BLDG 40 AND
25 HAVE HPR GRAVITY
CONDENSATE PIPING
THAT MAY HAVE TRAP
IN LINE.
4/16/2020 COR/AE Amendment #0005
59 Detail 8/M501 depicts HPS & MPS steam trap discharge in pumped condensate. Please advise where this is applicable on the project.
DETAIL IS FOR
REFERENCE AS
NEEDED. BLDG 40 AND
25 HAVE HPR GRAVITY
CONDENSATE PIPING
THAT MAY HAVE TRAP
IN LINE.
4/16/2020 COR/AE Amendment #0005
60 MP011 indicates direct bury (Note 3)
East of Building 403 and then in
Tramway (Note 2). A detail drawing is not included for Building 424. Is the pipe located in a Tramway at some point or is the pipe within the footprint of Building 424 intended to be in the crawl space? If so, please provide a detail of the transition between the direct bury pipe and above ground pipe. Please provide a detail/drawing of Building 424 similar to detail of the other buildings
THE KEYED NOTE #2
SHOULD OMITTED.
THE PIPING GOES
FROM DIRECT BURIED
TO THE CRAWL SPACE
OF 424.
4/16/2020 COR/AE Amendment #0005
61 Please provide location and detail of where and how pipe from Building 23 transitions from overhead to underneath the Tramway
LOOKING NORTH
TOWARDS TRAMWAY
AT WEST END OF
BUILDING 401. PIPES
TURN DOWN TO
TUNNEL BELOW
TRAMWAY
62 Provide a detail of tie-in points/piping arrangement at steam pit East of
Building 416 (Point C) Profile on
M403 does not provide enough information.
THERE IS NO EXISTING
INFORMATION FOR
PIPING WITHIN STEAM
ACCESS STRUCTURE.
THE PC PIPING PASSES
THROUGH PIT AT A
FIXED POINT. USE AS A
REFERENCE EACH
PENETRATION.
CONTRACTOR HAS THE
OPTION TO REVISIT
SITE.
4/16/2020 COR/AE Amendment #0005
63 Please provide profile of direct bury pipe South of Point C serving
Buildings 36 & 40.
THERE IS NO EXISTING
INFORMATION TO
DETERMINE THE
PROFILE OF THE
DIRECT BURIED PIPING.
THE PIPING ELEVATION
IN THE PIT AT POINT C
AND ACCESS PIT AT
BLDG 36 CAN BE USED
AS A REFERENCE.
CONTRACTOR HAS THE
OPTION TO REVISIT
SITE.
4/16/2020 COR/AE Amendment #0005
64 MP011 – Please provide drawing/detail indicating how direct bury pipe is routed to serve area within Building 36 (Refers to Detail
2/MP304 which is actually shown on
4/MP303). No detail of the footprint of the building is provided. Pipe is shown running within the building footprint, but site survey appears to indicate pipe actually runs between
Building 36 and 40.
NEW PIPING FROM
BLDG 40 TO BLDG 36 IS
HPR AND IS TO BE
DIRECT BURIED. NEW
PIPING FROM
CONDENSATE PUMP IN
BLDG 36 PUMP IS
ABOVE GRADE AND
DROPS INTO PIT
OUTSIDE BLDG 36.
NEW HPR AND NEW PC
CONNECT WITHIN PIT.
CONTRACTOR HAS THE
OPTION TO REVISIT
SITE.
4/16/2020 COR/AE Amendment #0005
65 Please provide detail of piping located in the pit on the West side of Building
36.
THE PIPING IS NEW
FROM BLDG 40 AND
WILL CONNECT TO THE
NEW PC PIPING FROM
BLDG 36. CONTRACTOR
HAS THE OPTION TO
REVISIT SITE.
4/16/2020 COR/AE Amendment #0005
66 Please provide profile of direct bury pipe between Buildings 424 & 452
EXISTING DIRECT
BURIED PC PIPING IS
TO BE REMOVED.
CONTRACTOR TO
PROVIDE NEW TUNNEL
FOR NEW PC PIPING
AND EX. HPS PIPING.
FOLLOW EXISTING PIPE
ELEVATIONS/PROFILE
67 Are the Tramways open to the crawl spaces or are they sealed off and requiring cutting/coring?
OPEN ACCESS. 4/16/2020 COR/AE Amendment #0005
68 Is the pipe located within the footprint of Building 425 located in a crawl space? Please provide a detail/drawing for the Building 425
IF REFERING TO BLDG
452, PIPING IS ABOVE
GRADE IN CRAWL
SPACE.
4/16/2020 COR/AE Amendment #0005
69 MP011 identifies direct bury piping between the pit East of building 41 to the Southeast corner of Building 41.
Drawing CD011 does not identify any work there. Please advise
IF REFERING TO BLDG
416, PORTION OF AREA
SHOULD BE
REMOVED/EXCAVATED
WHERE PIPING IS
BEING REMOVED,
REFERENCE KEYED
NOTE #4. DRAWING
CD-011 WILL BE
MODIFIED.
4/16/2020 COR/AE Amendment #0005
70 Please provide detail/drawing of pipe routing from basement of Building 23 to where pipe exits building into
Tramway. Pipe is overhead at that location.
PIPING IS OVER HEAD
FROM TRAMWAY INTO
BUILDING 23. IN An
OFFICE, THE PIPING
DROPS IN A CAVITY
WALL DOWN TO THE
BASEMENT. SEE
PICTURE BELOW.
4/16/2020 COR/AE Amendment #0005
71 Will grass seed be acceptable in place of sod?
SEE SPECIFICATION 32
90 00
4/16/2020 COR/AE Amendment #0005
72 Would we be able to stage material near working location? For example, by Building 23
NO. MOVE REQUIRED
DAILY MATERIALS IN
THE MORNING, CLEAN
SITE AND ACCESS
AREAS AT END OF
WORKDAY.
4/16/2020 COR/AE Amendment #0005
73 The section between B452 and B424 on drawing C011 appears that road can be shut down for a period of time, dumpsters moved, and traffic blocked off with construction fences and gates, etc. However, on the walk through, it was indicated that no such shutdown will be permitted. Please clarify
NO, THIS IS A LIVE
KITCHEN AREA AND
MUST MAINTAIN
ACCESS TO
DUMPSTERS. GC TO
COORDINATE WORK /
REFUSE SCHEDULE AS
NOT TO IMPEED
KITCHEN STAFF.
4/16/2020 COR/AE Amendment #0005
74 Sheet C011 shows the steam trench stopping at the front steps of B403 and MD011 and MD104 show the piping remove / replace at the inside of the foundation wall. What is the intent for the piping under the steps to the entrance of B403? To access the piping, all of the concrete steps/footings will need to be removed and replaced. Please advise.
OPTION TO REVISIT
SITE WITH PROPER PPE
AND EXAMINE FROM
CRAWL SPACE UNDER
BUILDING 403. MUST
BE DONE BEFORE 3PM,
04-28-2020. PLEASE
EMAIL DATE AND TIME
REQUEST TO LEWIS
WATERS.
75 3rd street in front of B403 has fence across the street. Can this street be shut down, or a temporary side road be constructed so the road can be crossed with the new piping and trench re-installed?
NO. 100% OF THE TIME.
YOU MAY HAVE ROAD
WIDTH REDUCED WITH
SIGNALMEN ON
EITHER SIDE DURING
WORK AT THE ROAD
LOCATION. NOTE THAT
AT ALL TIMES THE
ROAD MUST HAVE
ENOUGH WIDTH AND
STRENGTH TO HOLD
FIRE TRUCKS,
CONCRETE TRUCKS,
AND TRACTOR
TRAILERS. AT NO TIME
SHALL THE THIRD
STREET ROAD BE
IMPASSABLE. A SIDE
ROAD MAY BE
CONSTRUCTED, A
PLAN AND SECTIONS
MUST BE STAMPED
AND SUBMITTED BY
AN LICENCED
PROFESSIONAL
ENGINEER AND
APPROVED BEFORE
ANY ALTERATIONS
ARE DONE
4/16/2020 COR/AE Amendment #0005
76 In the section from B415 to B403, the temp fencing shows 11 double gates, is that many required?
I COUNT SEVEN (7)
PLUS THIRD STREET
4/16/2020 COR/AE
77 MP011 Detail called out for Building
25 (4/MP303) is wrong detail. That is for Building 36. I don’t see a detail for Building 25. Please provide one
SEE RESPONSE TO
QUESTION 47.
4/16/2020 COR/AE Amendment #0005
78 Drawing MP011 indicates a detail for
Building 415 – 1/MP304. The drawing/detail does not exist. Please provide.
SEE UPDATED
DRAWINGS
4/16/2020 COR/AE Amendment #0005
79 The concrete tunnel section covers are deteriorated. What is the intend for replacement?
ENSURE THAT WHEN
REPLACING SIDEWALK
– STEAM ACCESS
COVERS THEY HAVE
NO MORE THAN ¼”
ELEVATION
DIFFERENCE, PER ADA
CODE. REUSE COVERS
AS POSSIBLE AND
REPLACE AS
REQUIRED.
4/16/2020 COR/AE Amendment #0005
80 Please confirm if Ultrasonic Testing
Per 136.4.6 of section B31.1 is acceptable in lieu of Radiography.
Due to the radiation source required and proximity to an occupied area and
TESTING SHOULD NOT
BE REQUIRED. THE
PIPING IS EITHER
ACCESSIBLE OR NEEDS
TO BE EXCAVATED TO
walkway. Areas would need to be shut down during any tests.
BE
REMOVED/REPLACED.
81 Building 424 to 452
A. Is this to be direct buried or will it be in box conduit? B .The HPS pipe appears to run above the PC line, are we to replace both pipes?
SEE DETAIL 7/C502. 4/16/2020 COR/AE Amendment #0005
82 The plans do not indicate the requirement for Spec Section 23 09
23 Direct Digital Control System.
Please advise if programming is to be included in the bid? Is the current system controlled by DDC?
PROGRAMMING IS TO
BE INCLUDED;
SPECIFICATION
SECTION 230923 WILL
BE REDUCED.
CURRENT SYSTEM IS
LOCAL CONTROL.
4/16/2020 COR/AE Amendment #0005
83 Is the intent to build a wall and install a door around the fire rated doors that lead to the steam pipe basement areas? See note #9 on page GC103.
PROVIDE POLY
CRITICAL BARRIER AT
MECHANICAL ROOM
ACCESS DOORS.
4/17/2020 COR/AE Amendment #0005
84 How many monitors will be needed for a 20,000 square foot building? See note #4 on CG103
PER KEYED NOTE#4 ON
CG103, 3 MONITORS
WOULD COVER UP TO
10,000 SF. FOR AN
ADDITIONAL 10,000 SF,
AN ADDITIONAL 3
MONITORS SHOULD BE
PROVIDED.
4/17/2020 COR/AE Amendment #0005
85 The section between B403 and B424 is currently a direct bury pipe. On the civil drawing C011, it is showing your piping going back into a new concrete trench refer to 7/C502 and similar to your C/M401 drawing.
However, on your drawing MP011, that section is shown as Note 3 and
Note 4. Returned to direct bury piping, plus, how would you do that if the existing 4” HPS remains in the ground?
SEE RESPONSE TO
QUESTION 40. PIPING
SHALL BE IN
CONCRETE TRENCH.
SEE MODIFIED
DRAWINGS.
4/17/2020 COR/AE Amendment #0005
86 How can we exhaust the air out of the buildings and tram way? See note #6 on CG103
SEE DRAWINGS HA101
AND 102 FOR EXHAUST
FAN LOCATIONS AND
DECONTAMINATION
SUITE LOCATIONS.
4/17/2020 COR/AE Amendment #0005
87 Will silt fence be needed between
Buildings 415 and Building
403? There will be no excavation at these areas. Just removing the concrete covers
YES, SILT FENCE
REQUIRED TO
MITIGATE ANY SOIL
DISRUPTION FROM
EQUIPMENT.
4/17/2020 COR/AE Amendment #0005
88 Would silt sock be an approved replacement for silt fence?
THIS IS CURRENTLY
NOT IN THE VA
SPECIFICATIONS.
ALTERNATE METHODS
AND DEVICES
SUBMITTED TO VA COR
FOR APPROVAL PRIOR
TO CONTRACT AWARD.
4/17/2020 COR/AE Amendment #0005
Sketches
Question
Question 61
Question 69
File details come from the government source that posted it. Updated .