About this file

36C25219B0054 J_A 3EatonATS.pdf

View the file

Other files

File Type Posted
36C25219B0054 0003 36C25219B0054 0003.docx DOCX document
36C25219B0054-0003000.docx DOCX document
36C25219B0054 0002 S06 - Amend 0002 Specs.pdf PDF
36C25219B0054 0002 S06 - Amend 0002 RFIs Answers.docx DOCX document
36C25219B0054 0002 36C25219B0054 0002.docx DOCX document
36C25219B0054 0002 S06 - Amend 0002 Drawings_Part3.pdf PDF
36C25219B0054 0002 S06 - Amend 0002 Drawings_Part2.pdf PDF
36C25219B0054 0002 S06 - Amend 0002 Drawings_Part1.pdf PDF
36C25219B0054-0002011.docx DOCX document
36C25219B0054-0002009.pdf PDF
36C25219B0054-0002010.pdf PDF
36C25219B0054-0002006.docx DOCX document
36C25219B0054-0002008.pdf PDF
36C25219B0054-0002007.pdf PDF
36C25219B0054 0001 S06 - Wage Determination 07.19.19.pdf PDF
36C25219B0054 0001 36C25219B0054 0001.docx DOCX document
36C25219B0054 0001 S04 - Site Visit Sign In 7-18-19.pdf PDF
36C25219B0054-0001000.docx DOCX document
36C25219B0054-0001002.pdf PDF
36C25219B0054-0001001.pdf PDF
36C25219B0054 Drawings Part1.pdf PDF
36C25219B0054 36C25219B0054_1.docx DOCX document
36C25219B0054 J_A FireStop.pdf PDF
36C25219B0054 J_A 3JCI Controls.pdf PDF
36C25219B0054 Drawings Part2.pdf PDF
36C25219B0054 Drawings Part4.pdf PDF
36C25219B0054 Specifications2 695-18-120.pdf PDF
36C25219B0054 Wage Determinations.pdf PDF
36C25219B0054 Drawings Part3.pdf PDF
36C25219B0054-002.pdf PDF
36C25219B0054-010.pdf PDF
36C25219B0054-001.docx DOCX document
36C25219B0054-004.pdf PDF
36C25219B0054-007.pdf PDF
36C25219B0054-003.pdf PDF
36C25219B0054-009.pdf PDF
36C25219B0054-006.pdf PDF
36C25219B0054-008.pdf PDF
36C25219B0054-005.pdf PDF
36C25219B0054 36C25219B0054.docx DOCX document
36C25219B0054-000.docx DOCX document
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHAPM Part 813.106 Simplified Acquisition Procedures: Soliciting from a Single Source Attachment 1: Single Source Justification for SAP under the SAT

VHAPM Part 813.106 Page 1 of 2 Original Date: 08/30/17 Revision 01 Eff Date: 04/23/2018

DEPARTMENT OF VETERANS AFFAIRS

Justification for Single Source Awards IAW FAR 13.106-1 For

Over Micro-Purchase Threshold but Not Exceeding the SAT ($250K)

Acquisition Plan Action ID: 36C252-19-AP-2921

1. Contracting Activity: Department of Veterans Affairs, VISN 12 Zablocki Medical Center

NCO 12 Construction Team 2237# 695-19-3-6922-0013

2. Brief Description of Supplies/ Services required and the intended use/Estimated Amount:

Eaton Automatic Transfer Switches (ATSs) are to be installed on this project, replacing obsolete and outdated equipment. Automatic Transfer Switches are complex electronic equipment designed with two sources of power: a preferred source (normal) and an alternate source (emergency). Upon loss of power to the preferred/normal source – in the event of an emergency – the equipment automatically and without impact to hospital operations allows power to transfer to the alternate/ emergency source.

The estimated expected cost of Eaton provided materials, labor and equipment on this contract is $149,000.00.

3. Unique characteristics that limit availability to only one source, with the reason no other supplies or services can be used:

Eaton Magnum Automatic Transfer Switches are the only equipment that will communicate directly with the existing campus wide metering system. This campus-wide system, as a centralized metering system, currently monitors multiple buildings on the hospital campus. The system will only recognize “like” sensors and cannot be integrated with other manufacturers. Due to the reliability and interoperability of the systems throughout the campus, Eaton Magnum Transfer Switches are required. An incompatible system may require installation of new metering system for all buildings as well as new software, programming and components for a campus wide metering system. Additionally, installation of components that match the existing automatic transfer switches minimizes maintenance costs and bench stock requirements.

4. Description of market research conducted and results or statement why it was not conducted:

VAMC Milwaukee has established a single source provider (Eaton) as our standard for transfer switch equipment. A different system would be incompatible with existing infrastructure and make upgrades superfluous. An incompatible system may require installation of new “front-end” and remote workstations as well as new software and programming. Additionally, installation of components that match the existing metering system minimizes maintenance costs and bench stock requirements.

https://www.acquisition.gov/?q=/browse/far/13

VHAPM Part 813.106 Page 2 of 2 Original Date: 08/30/17 Revision 01 Eff Date: 04/23/2018

VHAPM Part 813.106 Simplified Acquisition Procedures: Soliciting from a Single Source Attachment 1: Single Source Justification for SAP under the SAT

5. Contracting Officer's Certification: Purchase is approved in accordance with FAR13.106-1(b). I certify that the foregoing justification is accurate and complete to the best of my knowledge and belief.

Date

Jerrod Schleis Contracting Officer https://acquisition.gov/far/current/html/Subpart%2013_1.html#wp1125466 VHAMIWSchleJ Typewritten Text June 28, 2019

2019-06-28T10:02:00-0500
Jerrod J Schleis 1002181

File details come from the government source that posted it. Updated .