Upgrade/Replace Various MCCs Solicitation Number: 36C25219B0054 Project Number: 695-18-120 VAMC Milwaukee Solicitation Requests for Information
1. Per spec section 01 35 26, please clarify that the spec is requiring a superintendent and a separate qualified individual as the SSHO (with no other duties) to be onsite at all times that work is being performed.
ANSWER: VA will accept a single individual to serve as Site Superintendent and SSHO. Specification will be modified in Amendment.
2. Federal bid bond form SF 24 expires on 07/31/19. What form should we use?
ANSWER: The form does not expire until 08/31/2019. Bids are due before that time so GLAC will accept this form. See: https://www.gsa.gov/forms-library/bid-bond.
3. E001, note 17, spec section 26 05 19 Section 3.1 test feeders. What does this mean?
ANSWER: Please refer to step by step description given in spec 26 05 19 section 3.10. Please note as per spec 26 05 19 cable testing shall be performed on all cables that includes branch and feeder cables.
4. We can not find a one line diagram for panel EUL-Q-16-3, could a one line diagram be provided for this panel?
ANSWER: Drawings (sheet E701-111) will be amended to show one-line diagram for this existing panel. Note that detail 3 shows a new condition for the panel.
5. Drawing E101-111: We can not locate the fan coil unit in the second floor morgue above room 1803EC on the drawings, could a drawing be provided to show the location of this fan coil unit?
ANSWER: Drawings (sheet E101-111) will be amended to show location of morgue fan coil unit.
6. Drawing E711.1-111: Can you clarify what is to be done for the feeder from MCC EPH-Q-110-1(N) to 8th floor A-wing mechanical room?
ANSWER: MCC contractor will have no new feeder work; new feeder was run from 8A mechanical room to existing MCC EPH-Q-110-1(N).
36C25219B0054 Upgrade/Replace Various MCCs Project 695-18-120 VAMC Milwaukee Solicitation Requests for Information