36C25219B0047-0002021.pdf

PDF 9 MB Posted

Attached to
TJC and Safety Corrections 695-19-102
Solicitation number
36C25219B0047
Issued by

About this file

36C25219B0047 0002 P01 - Drawings Part 2.pdf

View the file

Other files

File Type Posted
36C25219C0172-000.docx DOCX document
36C25219B0047-0004002.pdf PDF
36C25219B0047-0004000.docx DOCX document
36C25219B0047-0004003.pdf PDF
36C25219B0047-0004004.pdf PDF
36C25219B0047-0004001.pdf PDF
36C25219B0047-0003002.pdf PDF
36C25219B0047-0003001.pdf PDF
36C25219B0047-0003000.docx DOCX document
36C25219B0047-0002022.pdf PDF
36C25219B0047-0002014.docx DOCX document
36C25219B0047-0002016.pdf PDF
36C25219B0047-0002020.pdf PDF
36C25219B0047-0002015.pdf PDF
36C25219B0047-0002023.pdf PDF
36C25219B0047-0002018.pdf PDF
36C25219B0047-0002024.pdf PDF
36C25219B0047-0002019.pdf PDF
36C25219B0047-0002017.pdf PDF
36C25219B0047-0001016.docx DOCX document
36C25219B0047-001.docx DOCX document
36C25219B0047-000.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

G-005

BUILDING 111 4TH FLOOR

STATEMENT OF CONDITIONS

A

F i l e

P a t h

P

M

N/A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

FY19 TJC & SAFETY

CORRECTIONS

5000 W NATIONAL AVE

695-19-102

Project Director

4/1/2019 MAP ASBRevisions: Date:

DLK

BID DOCUMENTS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

G-006

BUILDING 111 7TH FLOOR

STATEMENT OF CONDITIONS

A

F i l e

P a t h

P

M

N/A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

FY19 TJC & SAFETY

CORRECTIONS

5000 W NATIONAL AVE

695-19-102

Project Director

4/1/2019 MAP ASBRevisions: Date:

DLK

BID DOCUMENTS

File details come from the government source that posted it.