36C25219B0047-0002020.pdf

PDF 6 MB Posted

Attached to
TJC and Safety Corrections 695-19-102
Solicitation number
36C25219B0047
Issued by

About this file

36C25219B0047 0002 P01 - Drawings Part 1.pdf

View the file

Other files

File Type Posted
36C25219C0172-000.docx DOCX document
36C25219B0047-0004002.pdf PDF
36C25219B0047-0004000.docx DOCX document
36C25219B0047-0004003.pdf PDF
36C25219B0047-0004004.pdf PDF
36C25219B0047-0004001.pdf PDF
36C25219B0047-0003002.pdf PDF
36C25219B0047-0003001.pdf PDF
36C25219B0047-0003000.docx DOCX document
36C25219B0047-0002022.pdf PDF
36C25219B0047-0002014.docx DOCX document
36C25219B0047-0002021.pdf PDF
36C25219B0047-0002016.pdf PDF
36C25219B0047-0002015.pdf PDF
36C25219B0047-0002023.pdf PDF
36C25219B0047-0002018.pdf PDF
36C25219B0047-0002024.pdf PDF
36C25219B0047-0002019.pdf PDF
36C25219B0047-0002017.pdf PDF
36C25219B0047-0001016.docx DOCX document
36C25219B0047-001.docx DOCX document
36C25219B0047-000.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

G-001

COVER SHEET

A

F i l e

P a t h

P

M

BID DOCUMENTS

N/A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

FY19 TJC & SAFETY

CORRECTIONS

5000 W NATIONAL AVE

695-19-102

MULTIPLE

Project Director

4/1/2019 MAP ASBRevisions: Date:

DLK

CLEMENT J. ZABLOCKI VA MEDICAL CENTER

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295-001

CONSTRUCTION DOCUMENTS

APRIL 1, 2019

695-19-102 FY19 TJC AND SAFETY CORRECTIONS

G-001 COVER SHEET

GENERAL

G-002 INFECTION CONTROL NOTES

G-003 GENERAL & FIRE PROTECTION NOTES

G-004 BUILDING 111 1ST FLOOR STATEMENT OF CONDITIONS

G-005 BUILDING 111 4TH FLOOR STATEMENT OF CONDITIONS

G-006 BUILDING 111 7TH FLOOR STATEMENT OF CONDITIONS

G-007 BUILDING 111 9TH FLOOR STATEMENT OF CONDITIONS

G-008 BUILDING 123 STATEMENT OF CONDITIONS- WINGS A & B

G-009 BUILDING 123 STATEMENT OF CONDITIONS- WINGS C & D

G-010 BUILDING 146 STATEMENT OF CONDITIONS

G-011 BUILDING 147 STATEMENT OF CONDITIONS

G-012 BUILDING 148 STATEMENT OF CONDITIONS

SUBTASK 1 PATIENT LIFTS

1-001 BUILDING 111 4TH FLOOR PLAN

1-002 BUILDING 111 4TH FLOOR WORK PLAN

1-003 BUILDING 111 8TH FLOOR PLAN

1-004 BUILDING 111 8TH FLOOR WORK PLAN

SUBTASK 2 9TH FLOOR BATHROOM REPAIRS

2-001 SUBTASK 2 GENERAL & INFECTION CONTROL NOTES

2-002 BUILDING 111 9TH FLOOR A-WING

2-003 TYPICAL BATHROOM LAYOUTS & DETAILS

SUBTASK 3 70 D-WING OPERATORS

3-001 BUILDING 70 BASEMENT FLOOR PLAN

3-002 BUILDING 70 BASEMENT FLOOR WORK PLAN

SUBTASK 4 CLC DOOR HARDWARE

4-001 BUILDING 146 FIRST FLOOR WORK PLAN

4-002 BUILDING 147 FIRST FLOOR WORK PLAN

4-003 BUILDING 148 FIRST FLOOR WORK PLAN

SUBTASK 5 FISHER HOUSE CARPET REPLACEMENT

5-001 BUILDING 150 (FISHER HOUSE) FIRST FLOOR WORK PLAN

5-002 TYPICAL ROOM LAYOUT

SUBTASK 6 AMBULANCE BAY DOOR REPLACEMENT

6-001 BUILDING 111 FIRST FLOOR PLAN

6-002 BUILDING 111 FIRST FLOOR WORK PLAN

6-003 BUILDING 111 ELEVATION 1 DEMO

MADISON

PROJECT

MILWAUKEE

WISCONSIN

LOCATION

GREEN BAY

APPLETON

LA CROSSE

PROJECT

LOCATION

SUBTASK 7 BUILDING 123 DISHROOM SANITARY REPAIR

7-001 BUILDING 123 1ST FLOOR PLAN

7-002 BUILDING 123 EQUIPMENT RELOCATION

7-003 BUILDING 123 PLUMBING DEMO

7-004 BUILDING 123 NEW PLUMBING

SUBTASK 8 REPLACE ROOFTOP EXHAUST FANS 112

8-001 BUILDING 112 ROOF PLAN/FAN INFORMATION

8-002 BUILDING 112 1ST FLOOR ELECTRICAL PANEL LOCATIONS

SUBTASK 9 INSTALL NEW VAV BUILDING 70 CONF. 1

9-001 BUILDING 70 2ND FLOOR PLAN

9-002 BUILDING 70 2ND FLOOR EXISTING/DEMO

9-003 BUILDING 70 2ND FLOOR NEW WORK

SUBTASK 10/10A EXTERIOR IMPROVEMENTS

10-001 10TH FLOOR WORK PLAN

10-002 SUBTASK 10 WORK PLAN

10-003 SUBTASK 10A WORK PLAN

AutoCAD SHX Text

DRAWING INDEX

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

DRAWING INDEX

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

G-002

INFECTION CONTROL NOTES

A

F i l e

P a t h

P

M

N/A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

FY19 TJC & SAFETY

CORRECTIONS

5000 W NATIONAL AVE

695-19-102

MULTIPLE

Project Director

4/1/2019 MAP ASBRevisions: Date:

DLK

1. PER IC MATRIX THIS SHEET, PROVIDE NECESSARY INFECTION

CONTROL BARRIERS AT ALL PHASES OF CONSTRUCTION. REFER

TO SECTION 01 01 10 1SN AND 01 35 16 ARTICLE 1.12 FOR MORE

INFORMATION. EXISTING WALLS BEING USED AS PART OF THE

CONSTRUCTION BARRIER SHALL BE UPGRADED TO COMPLY WITH

1-HOUR FIRE RATED WALL REQUIREMENTS.

2. THE INTENT OF IC ISOLATION IS TO PROTECT PATIENTS WITH LOW

IMMUNE LEVELS. THEREFORE, CONTRACTOR SHALL ENSURE HIS IC

BARRIERS CONTAIN DUST AND PARTICULATE MATTER TO THE

CONSTRUCTION AREA.

3. PROVIDE TRIATEK NEGATIVE AIR ISOLATION MONITORS (MINIMUM

(1) ONE IN AREAS LESS THAN 1000 SF, (2) TWO MINIMUM IN AREAS

BETWEEN 1000 SF AND 5000 SF, AND (3) THREE FOR AREAS

BETWEEN 5000 SF AND 10000 SF.) DURING CLASS III OR CLASS IV

CONSTRUCTION OPERATIONS THAT LAST THREE DAYS OR MORE.

EACH AREA TO BE UNDER NEGATIVE PRESSURE (0.02" WC) DURING

THESE CONSTRUCTION OPERATIONS. MONITOR AND DOCUMENT

AS DIRECTED BY THE COR.

4. WHEN THE CONTRACTOR DESIRES TO REDUCE OR RELAX THE ICRA

PERMIT AS CONSTRUCTION PROGRESSES, PROVIDE A WRITTEN

REQUEST TO THE COR AND VA INFECTION CONTROL NURSE. ONLY

UPON AUTHORIZATION, PROCEED TO THE REDUCED CLASS OF

CONSTRUCTION. PROVIDE AT LEAST 10 DAYS NOTICE FOR EACH

PERMIT.

5. DETAILS FOR THE CONSTRUCTION OF INFECTION CONTROL AND

CONSTRUCTIN BARRIERS CAN BE FOUND IN NFPA 241, AND

SPECIFICATION SECTIONS 01 10 10 SN AND 01 35 26.

6. INFECTION CONTROL BARRIERS ARE TO BE INSTALLED AND

REMOVED ONLY BEFORE 7:30 A.M. AND AFTER 5:00 P.M. IN

OCCUPIED AREAS.

7. AS REQUIRED, PROVIDE BALANCING DAMPERS IN THE MAIN SUPPLY

AND EXHAUST DUCT WORK SERVING AREAS INSIDE THE IC/CN

BARRIERS. TEMPORARILY BALANCE AIR FLOW TO PROVIDE

NEGATIVE AIR FLOW IN CONSTRUCTION ZONE AT ALL TIMES AS

INDICATED BELOW. DAMPERS TO REMAIN IN DUCT AFTER

CONSTRUCTION IS COMPLETE AND IS TO BE SECURED IN FINAL

BALANCING POSITION PRIOR TO TURNING SYSTEM OVER FOR

OCCUPANCY

8. PROVIDE HEPA NEGATIVE AIR MACHINES WHEN REQUIRED.

9. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR

MACHINES TO COMPLETELY EXCHANGE THE REGULATED AREA AIR

VOLUME (4) FOUR ACTUAL TIMES PER HOUR. THE COMPETENT

PERSON SHALL DETERMINE THE NUMBER OF UNITS NEEDED FOR

EACH REGULATED AREA BY DIVIDING THE CUBIC FEET IN THE

REGULATED AREA BY (15) FIFTEEN AND THEN DIVIDING THAT

RESULT BY THE ACTUAL CUBIC FEET PER MINUTE (CFM) FOR EACH

UNIT TO DETERMINE THE NUMBER OF UNITS NEEDED TO EFFECT (4)

FOUR AIR CHANGES PER HOUR. PROVIDE A STANDBY UNIT IN THE

EVENT OF MACHINE FAILURE AND/OR EMERGENCY IN AN

ADJACENT AREA.

10. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED WALLS,

CONSTRUCT NEW SMOKE BARRIER/APPROPRIATE FIRE RATED

WALLS PER NEW PLANS OR CONSTRUCT INFECTION CONTROL

BARRIER TO ACT AS SMOKE BARRIER.

11. ALL CONSTRUCTION DEBRIS, WASTE, AND TRANSPORTATION OF

DEMOLITION ITEMS SHALL BE CONVEYED IN COVERED DUMPSTER

CONTAINERS SUCH THAT NO DEBRIS/ITEMS ARE VISIBLE. ALL

CONTAINERS SHALL BE TRANSPORTED DOWN THE 'B' BANK

FREIGHT ELEVATORS. A MINIMUM OF ONE WALK-OFF MAT ON THE

INSIDE AND MINIMUM OF TWO WALK-OFF MATS ON THE OUTSIDE

SHALL BE PROVIDED FOR THE CONSTRUCTION ACCESS

LOCATIONS/OPENINGS.

12. A PORTION OF THE CORRIDOR MAY BE MADE AVAILABLE TO

CREATE AN INFECTION CONTROL AREA; HOWEVER, A MINIMUM OF 5

FT MUST BE MAINTAINED OPEN FOR THE MOVEMENT OF

PERSONNEL. THE CORRIDOR WILL NOT BE CLOSED OFF. POST

ILSM AS NEEDED.

1. CONTRACTOR IS RESPONSIBLE FOR COORDINATION AND

SEQUENCING OF CONSTRUCTION PHASING WITH THE VA'S SCHEDULE,

INFECTION CONTROL, AND INTERIM LIFE SAFETY REQUIREMENTS.

2. PROVIDE PHASING PLAN AS NEEDED TO COMPLETE WORK. REFER TO

SECTION 01 00 00 ITEM 1.6H FOR GENERAL PHASING REQUIREMENTS.

NOTE THAT SOME PHASES MAY BE CONCURRENT. ENSURE

SCHEDULE CLEARLY SHOWS CONCURRENT PHASES, FLOAT AND

CRITICAL PATH.

3. TEMPORARY CONSTRUCTION WALL AND INFECTION CONTROL (IC)

WALL REQUIREMENTS ARE NOT INCLUDED IN THE DRAWINGS. GC

SHALL SHOW IC/CN BARRIERS ON THEIR IC/WORKPLANS TO MEET

REQUIREMENTS OF SPECIFICATIONS & THE IC MATRIX ON THIS SHEET.

4. MAINTAIN EGRESS TO ALL STAIRWELLS.

5. MAINTAIN PUBLIC ACCESS TO ELEVATORS.

6. NORMAL WORKING HOURS FOR THE LABORATORY ARE 7:30 AM TO

5:00 PM, MONDAY THROUGH FRIDAY. OFF-SHIFT WORK SHALL BE

COMPLETED OUTSIDE OF THESE HOURS.

7. NOISE AND VIBRATION OPERATIONS ARE RESTRICTED TO OFF-SHIFT

HOURS. CONTRACTOR SHALL ALSO SCHEDULE SERVICE

INTERRUPTIONS OFF-SHIFT. TWO WEEK MINIMUM NOTICE IS

REQUIRED ON ALL OUTAGE REQUESTS.

8. CONTRACTOR IS RESPONSIBLE FOR ENSURING ILSM AND ICRA

PERMIT ARE POSTED AND CURRENT ALWAYS DURING

CONSTRUCTION.

INFECTION CONTROL GENERAL NOTES:

INFECTIOUS CONTROL DESIGN NOTES:

PHASING PLAN GENERAL NOTES:

BID DOCUMENTS

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

G-003

GENERAL & FIRE/SAFETY

NOTES

A

F i l e

P a t h

P

M

N/A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

FY19 TJC & SAFETY

CORRECTIONS

5000 W NATIONAL AVE

695-19-102

MULTIPLE

Project Director

4/1/2019 MAP ASBRevisions: Date:

DLK

GENERAL CONSTRUCTION NOTES

1. PATCH AND REPAIR ALL AREAS AFFECTED BY DEMO AND / OR CONSTRUCTION TO MATCH EXISTING. PATCHED AREAS ARE TO RECEIVE FINISHES AND TRIM TO

MATCH ADJACENT AREA, EXCEPT AS NOTED IN THE ROOM FINISH SCHEDULE. PATCH CEILINGS AND FLOORS TO ACHIEVE A CONTINUOUS FINISHED APPEARANCE.

2. ALL EQUIPMENT TO BE DISCONNECTED AND REMOVED BY CONTRACTOR. VA TO BE NOTIFIED WHEN EQUIPMENT IS AVAILABLE AND BE GIVEN THE OPTION TO TAKE

POSSESSION OF ALL EQUIPMENT. CONTRACTOR TO DISPOSE OF ALL EQUIPMENT THE VA DOES NOT WANT AND REMOVE ALL ITEMS WITH EXTREME CARE.

3. REMOVE, RELOCATE, STORE AND REINSTALL PORTABLE EQUIPMENT, FURNITURE, SHELVES, CURTAIN RODS, DRAPERY, BULLETIN BOARDS, WHICH WOULD

INTERFERE WITH DEMOLITION WORK.

4. REFER TO SPECIFICATIONS FOR SHORING REQUIREMENTS WHERE DEMOLITION WORK AFFECTS THE STRUCTURAL INTEGRITY OF WALLS OR FLOORS. IF NOT SO

INDICATED IN SPECIFICATIONS, CONTRACTOR SHALL SUBMIT SHORING PLAN AND SHOP DRAWINGS SIGNED BY AN ENGINEER FOR VA APPROVAL. ALL SHORING IS

CONTRACTOR'S RESPONSIBILITY.

5. PROTECT ALL EXISTING SURFACES FROM DAMAGE. ANY DAMAGED SURFACES SHALL BE REPLACED TO MATCH ORIGINAL ITEM OR REPAIRED TO MATCH EXISTING

OR ADJACENT MATERIAL AS APPROVED BY THE VA COR.

6. VERIFY EXISTING CONDITIONS AND LOCATIONS IN FIELD PRIOR TO SUBMITTING PROPOSAL. FAILURE TO DO SO SHALL NOT RELIEVE THIS CONTRACTOR FROM

PERFORMING THE WORK REQUIRED UNDER THIS CONTRACT.

7. ALL SUB-CONTRACTORS ARE ENCOURAGED TO VISIT AND ATTEND A PRE-BID WALK THRU TO INSPECT THE EXISTING AREA AND THOROUGHLY FAMILIARIZE

THEMSELVES WITH ACTUAL JOB CONDITIONS BEFORE SUBMITTING BID.

8. WHILE THE SIZE AND LOCATION OF NEW WORK AND EQUIPMENT IN THE EXISTING AREA HAS BEEN INDICATED ON THE DRAWINGS AS ACCURATELY AS POSSIBLE, CONTRACTOR SHALL ADJUST HIS WORK AS REQUIRED TO AVOID EXISTING UTILITIES, GAS LINES, SEWER, FIRE ALARM, ROOF DRAINS, ACCESS COVERS, AND OTHER

STRUCTURES NOT PARTICULARLY SHOWN ON THE PLAN AT NO ADDITIONAL COST. BEFORE CONSTRUCTION, INSPECT PREMISES MAKE A DETAILED EXAMINATION

OF ALL LOCATIONS WHERE NEW WORK IS TO BE INSTALLED, EXAMINE EXISTING PIPING, CONDUITS, STRUCTURAL SUPPORTING BEAMS, AND OTHER CONDITIONS.

9. DISCONNECT AT SOURCE AND REMOVE EXISTING MECHANICAL AND ELECTRICAL MATERIALS AND EQUIPMENT WHICH ARE RENDERED OBSOLETE BY THESE

ALTERATIONS AND ADDITIONS. VA TO BE GIVEN THE OPTION TO TAKE POSSESSION OF REMOVED EQUIPMENT AND MATERIALS. ANY EQUIPMENT THAT THE VA DOES

NOT WANT ARE THE PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED FROM THE SITE. NO MECHANICAL, ELECTRICAL, PLUMBING EQUIPMENT, ETC. SHALL

BE ABANDONED IN PLACE.

10. DISCONNECT, REMOVE AND RELOCATE EXISTING MECHANICAL AND ELECTRICAL MATERIALS AND EQUIPMENT WHICH INTERFERE OR ARE INTERFERED WITH, OBSTRUCT OR ARE OBSTRUCTED BY, THESE ALTERATIONS AND ADDITIONS. PERMANENTLY INSTALL SUCH ITEMS IN NEW LOCATIONS AS DIRECTED. RECONNECT

SUCH ITEMS IN PROPER OPERATING CONDITION AT NEW LOCATIONS.

11. DO NOT INTERFERE WITH EXISTING BUILDING'S MECHANICAL, ELECTRICAL, AND SECURITY SYSTEMS OPERATIONS. IF IT IS ABSOLUTELY NECESSARY TO SHUT

DOWN FACILITY SYSTEMS AT ANY TIME, CONSULT COR TO MAKE ARRANGEMENTS TO DO SO ON OFF WORKING HOUR PERIODS AT THE OWNER'S CONVENIENCE.

PRIOR NOTICE SHALL BE GIVEN TO THE COR (14) DAYS IN ADVANCE OF THE DESIRED SHUT-DOWN TIME. ANY PREMIUM OR OVERTIME COSTS NECESSARY TO

ACCOMPLISH THE ABOVE SHALL BE INCLUDED IN THIS BID. FAILURE TO PROCEED WITHOUT PROPER PRIOR NOTIFICATION MAY RESULT IN THE ASSESSMENT OF A

CREDIT TO THE CONTRACT.

12. TYPICAL EXISTING FLOOR TO FLOOR HEIGHTS FOR BUILDING 111 ARE 13'-9-3/8" (+/-) FROM BASEMENT TO SECOND FLOORS AND 11'-6-5/8" (+/-) FROM THIRD FLOOR

THRU TENTH FLOOR. FLOOR CONSTRUCTION IS 10" (+/-) CONCRETE FLOORS, WITH CONCRETE COLUMNS AND FLOOR BEAMS. ALL AS-BUILT CONDITIONS SHOULD BE

VERIFIED BY THE CONTRACTOR IN THE FIELD.

13. IN ALL CONSTRUCTION ZONES AND AREAS, CONTRACTOR RESPONSIBLE FOR MAINTAINING AN ACTIVE STROBE SPEAKER SYSTEM AT ALL TIMES. TYPICAL FOR ALL

CONSTRUCTION ZONES FOR BOTH BUILDINGS 102 & 111.

FIRE AND SAFETY NOTES

1. MAINTAINING THE INTEGRITY OF THE FIRE AND SAFETY SYSTEMS IN PLACE IN THE MEDICAL CENTER AND ALL OF ITS OUT BUILDINGS DURING

CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR.

2. IN ADDITION TO ALL VA MEDICAL CENTER POLICIES, ALL NATIONAL, STATE, AND LOCAL CODES AND ORDINANCES SHALL APPLY TO ALL OF THEIR

CONTRACTORS AND SUB-CONTRACTORS.

3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MEETING ALL PERTINENT OSHA SAFETY REQUIREMENTS.

4. PROVIDE LOCKOUT-TAGOUT AND CONFINED SPACE ENTRY POLICIES AS APPLICABLE AND AS REQUIRED BY OSHA. THESE POLICIES SHALL BE

SUBMITTED FOR PRIOR APPROVAL BY THE VA SAFETY OFFICER / COR.

5. SUBMIT APPROPRIATE INTERIM LIFE SAFETY MEASURES. REFER TO SPECIFICATION 01 01 10 FOR MORE INFORMATION.

6. CONSTRUCT TEMPORARY CONSTRUCTION PARTITIONS OF NON-COMBUSTIBLE MATERIALS WHICH PROVIDE A SMOKE TIGHT SEPARATION

BETWEEN THE CONSTRUCTION AREAS AND ALL OTHER OCCUPIED AREAS. MAINTAIN INTEGRITY OF THE ENCLOSURE DURING THE

CONSTRUCTION. REFER TO SPECIFICATION SECTION 00 01 10-1HR.

7. EXISTING FIRE PROTECTION SYSTEMS, INCLUDING FIRE ALARM SYSTEMS, SMOKE DETECTION SYSTEMS, AND SPRINKLER SYSTEMS SHALL NOT BE

IMPAIRED DURING CONSTRUCTION. SMOKE DETECTOR DISABLE REQUESTS: OUTAGE REQUESTS TO BE SUBMITTED TO FM ENGINEER FOR

APPROVAL FOR SPECIFIC DATE AND TIME. ALARMS WILL ONLY BE TURNED OFF FOR SPECIFIC SHIFTS REQUESTED AND WHEN CONTRACTORS

ARE IN THE CONSTRUCTION AREA. ALARMS WILL BE RESTORED AT THE END OF THE WORK DAY BY CALLING THE SAME EXTENSION. AT NO TIME

WILL ALARMS REMAIN OFF OVERNIGHT. SMOKE DETECTORS AND OR SPRINKLER HEADS: DO NOT COVER BY BAGS, TAPE, AND PLASTIC OR IN ANY

OTHER MANNER THAT WILL DEFEAT THEIR ABILITY TO SENSE SMOKE OR HEAT AND OPERATE AS DESIGNED.

8. DAILY ACCUMULATIONS OF TRASH, COMBUSTIBLE MATERIALS, PACKAGING, AND DEBRIS SHALL BE REMOVED FROM THE CONSTRUCTION AREA ON

A DAILY BASIS. FLAMMABLE MATERIALS MAY BE STORED ON SITE IN AN APPROVED AND APPROPRIATELY MARKED FLAMMABLE MATERIALS

CABINET.

9. MILWAUKEE VA MEDICAL CENTER IS A TOBACCO FREE ZONE. USE OF TOBACCO PRODUCTS IS PROHIBITED, Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

G-004

BUILDING 111 1ST FLOOR

STATEMENT OF CONDITIONS

A

F i l e

P a t h

P

M

N/A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

FY19 TJC & SAFETY

CORRECTIONS

5000 W NATIONAL AVE

695-19-102

Project Director

4/1/2019 MAP ASBRevisions: Date:

DLK

File details come from the government source that posted it.