About this file

36C25219B0035 S02 - Att - Final Drawing 08Mar19 - 3 of 5.pdf

View the file

Other files

File Type Posted
36C25219C0136-000.docx DOCX document
36C25219B0035-A00003001.pdf PDF
36C25219B0035-A00003000.docx DOCX document
36C25219B0035-A00003002.pdf PDF
36C25219B0035-A00002001.pdf PDF
36C25219B0035-A00002000.docx DOCX document
36C25219B0035-A00002002.pdf PDF
36C25219B0035-0001001.pdf PDF
36C25219B0035-0001000.docx DOCX document
36C25219B0035-007.pdf PDF
36C25219B0035-005.pdf PDF
36C25219B0035-002.docx DOCX document
36C25219B0035-003.pdf PDF
36C25219B0035-004.pdf PDF
36C25219B0035-008.pdf PDF
36C25219B0035-001.docx DOCX document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W

ES

T A1

EA

ST

A

W

ES

T A1

EA

ST

A

WORK IN THIS AREA IS

ABOVE CEILING STEAM

PIPING DEMOLITION.

REMOVE AND REPLACE

SUSPENDED ACOUSTICAL

TILE CEILINGS AS NEEDED.

WORK IN THIS AREA IS

ABOVE CEILING STEAM

PIPING DEMOLITION.

REMOVE AND REPLACE

SUSPENDED ACOUSTICAL

TILE CEILINGS AS NEEDED.

WORK IN THIS AREA IS

ABOVE CEILING STEAM

PIPING DEMOLITION.

REMOVE AND REPLACE

SUSPENDED ACOUSTICAL

TILE CEILINGS AS NEEDED.

WORK IN THIS AREA IS

ABOVE CEILING STEAM

PIPING DEMOLITION.

REMOVE AND REPLACE

SUSPENDED ACOUSTICAL

TILE CEILINGS AS NEEDED.

WORK IN THIS AREA IS

ABOVE CEILING STEAM

PIPING DEMOLITION.

REMOVE AND REPLACE

SUSPENDED ACOUSTICAL

TILE CEILINGS AS NEEDED.

1. Light lines indicate existing construction. Dark lines indicate new work.

2. Remove and re-install suspended acoustical tile ceilings as required for work above ceilings for piping at this floor and removal of steam lines serving floor above.

3. Where existing piping is removed from full height partitions patch holes to match partition construction.

4. Where existing piping is removed from floor penetrations seal holes with fire stopping per 07 84 00.

5. At new piping penetrations through full height partitions provide silicone sealant to seal all voids. At fire rated partitions and floors provide fire stopping system per 07 84 00.

6. At new piping penetrations through floors provide fire stopping system per 07 84 00.

7. Many of the pipe sleeves through the floor at steam convectors to be removed have sections of asbestos containing pipe insulation within the sleeves. Where original insulation remains at pipe sleeves remove per 02 82 13.13. See detail 1/M503.

8. All work in OI&T, Travel and Agent Cashier offices (1286A, 1288A) and Union offices will require an escort and must be performed on day shift. Arrange in advance of work with COR.

1. Infill existing convector opening for new convector per detail 4/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.

2. Remove vinyl wall covering from this wall and repair surface to receive new paint finish.

3. Infill existing convector opening for new convector per detail 4/A500. Paint this wall PNT-1 and provide new

4" vinyl wall base to match existing.

4. Infill existing projecting steel convector box for new convector per detail 5/A500. Paint new work to match existing wall and provide 4" vinyl base to match existing.

5. Not used.

6. Infill abandoned convector opening per detail 7/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.

7. Infill abandoned convector opening per detail 8/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.

8. Infill existing convector opening per detail 1/A500.

9. Paint wall PNT-2 and provide new 4" vinyl wall base to match existing.

10.Cut existing gypsum board as required to install new piping. Patch with 5/8" gypsum board to match existing.

11.Paint wall PNT-3 and provide new 4" vinyl wall base to match existing.

12.Infill abandoned convector opening per detail 9/A500. Provide new CT-1 ceramic wall tile. Extend resinous flooring integral cove base up face of wall infill to match existing.

13.Remove existing gypsum board, insulation and studs at former convector opening. Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face. Provide new plastic laminate window stool per detail 3/A500.

14.Paint wall PNT-1 and provide new 4" vinyl wall base to match existing.

15.Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face.

16.Remove existing plaster ceiling in this room including suspension system and hangers. Install new ATC-1 ceiling at height shown.

17.Remove and reinstall pews as needed to access wall.

18.Remove existing plaster and structural clay wall at column. After installation of new piping replace with light gage framing and 5/8" gypsum board.

19.Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face. Provide new plastic laminate window stool per detail 3/A500.

20.Paint wall PNT-4. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.

21.Paint wall PNT-4 and provide new 4" vinyl wall base to match existing.

22.Paint wall PNT-5 and provide new 4" vinyl wall base to match existing.

23.Paint wall PNT-6 and provide new 4" vinyl wall base to match existing.

24.Remove existing gypsum board, insulation and studs at former convector opening. Frame opening for new convector per detail 1/A500.

25.Paint wall PNT-2. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.

26.Paint wall PNT-7 and provide new 4" vinyl wall base to match existing.

27.Remove and re-install existing casework as required to access wall.

28.Paint wall PNT-8 and provide new 4" vinyl wall base to match existing.

29.Paint wall PNT-9 and provide new 4" vinyl wall base to match existing.

30.Provide new CT-2 ceramic wall tile and cover base over tile backer board at infilled opening to match existing.

31.Coordinate with Owner for removal and reinstallation of lab equipment to access convector.

32.Paint wall PNT-8. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.

33.Paint wall PNT-9. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.

34.Extend existing pipe pit in concrete floor per detail 10/A500.

35.Remove asbestos containing pipe insulation above ceiling per 02 82 13.13. Approximately 72 LF.

36.Remove asbestos containing pipe insulation above ceiling per 02 82 13.13. Approximately 10 LF.

37.Provide new wall protection sheet and 4" vinyl wall base to match existing.

38.New surface mounted convector in stairwell. Piping to be provided with surface mounted cover per mechanical.

39.Existing convector to remain with new equipment per Mechanical. Remove and reinstall existing cover.

Keynotes

General Notes

SCALE:

Second Floor Plan - East

1/8"=1'-0"

N

MEP PROJECT NO.: G29.18.02

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date: Dwg. of

420 RAIL STREET

NEGAUNEE, MI 49866

PHONE: 906-475-6616

NDW PROJECT NUMBER: 1825

AutoCAD SHX Text

DUCT THRU FLR

AutoCAD SHX Text

COOLING UNIT FOR PACS RM.

AutoCAD SHX Text

AHU #4 PHARMACY

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

DWV

AutoCAD SHX Text

STM

AutoCAD SHX Text

STAIR 3

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

STAIR 2

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

STAIR 4

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

PASSENGER ELEVATOR

AutoCAD SHX Text

PASSENGER ELEVATOR

AutoCAD SHX Text 1st. FLOOR ROOF

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

MECH CHASE

AutoCAD SHX Text

PASSENGER ELEVATOR

AutoCAD SHX Text

STAIR 8

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

OPEN TO FIRST FLOOR

AutoCAD SHX Text

MECH. SHAFT

AutoCAD SHX Text

CHASE

AutoCAD SHX Text

CHASE

AutoCAD SHX Text

PASSENGER ELEVATOR

AutoCAD SHX Text

MECH. SHAFT

AutoCAD SHX Text

SUB-STERILIZER MECH SPACE

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

PIPE SHAFT

AutoCAD SHX Text

FOLDING WALL

AutoCAD SHX Text

FAN COIL 2180

AutoCAD SHX Text SMOKE RESISTIVE WALL SMOKE BARRIER WITH ONE HOUR FIRE RATING ONE HOUR FIRE RATED WALL TWO HOUR FIRE WALL

AutoCAD SHX Text

SMOKE/ FIRE/ RATED PARTITION TYPES

AutoCAD SHX Text A105

AutoCAD SHX Text

AutoCAD SHX Text

RU

AutoCAD SHX Text

RU

AutoCAD SHX Text

SECOND FLOOR EAST FLOOR PLAN

AutoCAD SHX Text

UPGRADE HEAT EXCHANGERS AND

AutoCAD SHX Text

REPLACE HEATING DESIGN

AutoCAD SHX Text 585-17-120

AutoCAD SHX Text No. 1

AutoCAD SHX Text

IRON MOUNTAIN, MICHIGAN

AutoCAD SHX Text

MARCH 8, 2019

AutoCAD SHX Text

AutoCAD SHX Text

50%%% REVIEW

AutoCAD SHX Text 10/24/2018

AutoCAD SHX Text

95%%% REVIEW

AutoCAD SHX Text 12/05/2018

AutoCAD SHX Text

100%%% DOCUMENTS

AutoCAD SHX Text 12/21/2018

AutoCAD SHX Text

100%%% BID DOCUMENTS

AutoCAD SHX Text 3/8/2019

T A1

EA

ST

A

W

ES

T A1

EA

ST

A

1. Light lines indicate existing construction. Dark lines indicate new work.

2. Remove and re-install suspended acoustical tile ceilings as required for work above ceilings for piping at this floor and removal of steam lines serving floor above.

3. Where existing piping is removed from full height partitions patch holes to match partition construction.

4. Where existing piping is removed from floor penetrations seal holes with fire stopping per 07 84 00.

5. At new piping penetrations through full height partitions provide silicone sealant to seal all voids. At fire rated partitions and floors provide fire stopping system per 07 84 00.

6. At new piping penetrations through floors provide fire stopping system per 07 84 00.

7. Many of the pipe sleeves through the floor at steam convectors to be removed have sections of asbestos containing pipe insulation within the sleeves. Where original insulation remains at pipe sleeves remove per 02 82 13.13. See detail 1/M503.

8. All work in OI&T, Travel and Agent Cashier offices (1286A, 1288A) and Union offices will require an escort and must be performed on day shift. Arrange in advance of work with COR.

1. Infill existing convector opening for new convector per detail 4/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.

2. Remove vinyl wall covering from this wall and repair surface to receive new paint finish.

3. Infill existing convector opening for new convector per detail 4/A500. Paint this wall PNT-1 and provide new

4" vinyl wall base to match existing.

4. Infill existing projecting steel convector box for new convector per detail 5/A500. Paint new work to match existing wall and provide 4" vinyl base to match existing.

5. Not used.

6. Infill abandoned convector opening per detail 7/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.

7. Infill abandoned convector opening per detail 8/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.

8. Infill existing convector opening per detail 1/A500.

9. Paint wall PNT-2 and provide new 4" vinyl wall base to match existing.

10.Cut existing gypsum board as required to install new piping. Patch with 5/8" gypsum board to match existing.

11.Paint wall PNT-3 and provide new 4" vinyl wall base to match existing.

12.Infill abandoned convector opening per detail 9/A500. Provide new CT-1 ceramic wall tile. Extend resinous flooring integral cove base up face of wall infill to match existing.

13.Remove existing gypsum board, insulation and studs at former convector opening. Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face. Provide new plastic laminate window stool per detail 3/A500.

14.Paint wall PNT-1 and provide new 4" vinyl wall base to match existing.

15.Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face.

16.Remove existing plaster ceiling in this room including suspension system and hangers. Install new ATC-1 ceiling at height shown.

17.Remove and reinstall pews as needed to access wall.

18.Remove existing plaster and structural clay wall at column. After installation of new piping replace with light gage framing and 5/8" gypsum board.

19.Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face. Provide new plastic laminate window stool per detail 3/A500.

20.Paint wall PNT-4. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.

21.Paint wall PNT-4 and provide new 4" vinyl wall base to match existing.

22.Paint wall PNT-5 and provide new 4" vinyl wall base to match existing.

23.Paint wall PNT-6 and provide new 4" vinyl wall base to match existing.

24.Remove existing gypsum board, insulation and studs at former convector opening. Frame opening for new convector per detail 1/A500.

25.Paint wall PNT-2. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.

26.Paint wall PNT-7 and provide new 4" vinyl wall base to match existing.

27.Remove and re-install existing casework as required to access wall.

28.Paint wall PNT-8 and provide new 4" vinyl wall base to match existing.

29.Paint wall PNT-9 and provide new 4" vinyl wall base to match existing.

30.Provide new CT-2 ceramic wall tile and cover base over tile backer board at infilled opening to match existing.

31.Coordinate with Owner for removal and reinstallation of lab equipment to access convector.

32.Paint wall PNT-8. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.

33.Paint wall PNT-9. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.

34.Extend existing pipe pit in concrete floor per detail 10/A500.

35.Remove asbestos containing pipe insulation above ceiling per 02 82 13.13. Approximately 72 LF.

36.Remove asbestos containing pipe insulation above ceiling per 02 82 13.13. Approximately 10 LF.

37.Provide new wall protection sheet and 4" vinyl wall base to match existing.

38.New surface mounted convector in stairwell. Piping to be provided with surface mounted cover per mechanical.

39.Existing convector to remain with new equipment per Mechanical. Remove and reinstall existing cover.

1024 21 24 21

24 21

24 21

24 21

24 14

24 21

24 14

24 14

24 14

24 14

24 14

24 14

24 14

24 14

24 14

24 21

21 24 21

10 10

24 21

24 21

24 21

24 21

24 21

24 21

24 21

24 21

24 21

24 21 24 21 24 21 24 21

10 10

IN BID ALTERNATE 1 ELIMINATE ALL THIRD

FLOOR WORK SHOWN ON THIS DRAWING.

Keynotes

General Notes

SCALE:

Third Floor Plan - West

1/8"=1'-0"

N

MEP PROJECT NO.: G29.18.02

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date: Dwg. of

420 RAIL STREET

NEGAUNEE, MI 49866

PHONE: 906-475-6616

NDW PROJECT NUMBER: 1825

AutoCAD SHX Text SMOKE RESISTIVE WALL SMOKE BARRIER WITH ONE HOUR FIRE RATING ONE HOUR FIRE RATED WALL TWO HOUR FIRE WALL

AutoCAD SHX Text

SMOKE/ FIRE/ RATED PARTITION TYPES

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

FIRE EQUIP

AutoCAD SHX Text

RAMP UP 7"

AutoCAD SHX Text

FLOOR UP 7"

AutoCAD SHX Text

AUDIOLOGY SOUND BOOTH

AutoCAD SHX Text

AUDIOLOGY SOUND BOOTH

AutoCAD SHX Text

CARPET

AutoCAD SHX Text

VINYL TILE

AutoCAD SHX Text

FIRE EQUIP

AutoCAD SHX Text

STAIR 1

AutoCAD SHX Text

SERVICE ELEVATOR

AutoCAD SHX Text

PASSENGER ELEVATOR

AutoCAD SHX Text

PASSENGER ELEVATOR

AutoCAD SHX Text

MECHANICAL SHAFT

AutoCAD SHX Text

MECH SHAFT

AutoCAD SHX Text

MECH SHAFT

AutoCAD SHX Text

AUDIOLOGY SOUND BOOTH

AutoCAD SHX Text

AUDIOLOGY SOUND BOOTH

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

LDRY CHUT

AutoCAD SHX Text

STAIR 5

AutoCAD SHX Text

2ND FLOOR ROOF

AutoCAD SHX Text

2ND FLOOR ROOF

AutoCAD SHX Text

FIRE

AutoCAD SHX Text

MECHANICAL SHAFT

AutoCAD SHX Text

SHAFT

AutoCAD SHX Text

UTILITY

AutoCAD SHX Text 3142A

AutoCAD SHX Text

HSKG

AutoCAD SHX Text

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

B.H. CONFERENCE

AutoCAD SHX Text

AutoCAD SHX Text

WORKER

AutoCAD SHX Text

SOCIAL

AutoCAD SHX Text

AutoCAD SHX Text

PSYCHOLOGIST

AutoCAD SHX Text

AutoCAD SHX Text

ASST CHIEF, B.H.

AutoCAD SHX Text

PSYCHOLOGIST /

AutoCAD SHX Text

AutoCAD SHX Text

WORKER

AutoCAD SHX Text

SOCIAL

AutoCAD SHX Text

AutoCAD SHX Text

WORKER

AutoCAD SHX Text

SOCIAL

AutoCAD SHX Text

AutoCAD SHX Text

OFFICER

AutoCAD SHX Text

ADMIN

AutoCAD SHX Text

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

BREAK

AutoCAD SHX Text

AutoCAD SHX Text

SUPPORT

AutoCAD SHX Text

BH ADMIN

AutoCAD SHX Text

AutoCAD SHX Text

CHIEF, B.H.

AutoCAD SHX Text

PSYCHOLOGIST /

AutoCAD SHX Text

AutoCAD SHX Text

WORKER

AutoCAD SHX Text

SOCIAL

AutoCAD SHX Text

AutoCAD SHX Text

& INTERNS

AutoCAD SHX Text

PYSCHOLOGIST

AutoCAD SHX Text

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

WOMEN'S

AutoCAD SHX Text

AutoCAD SHX Text

TELE-HEALTH

AutoCAD SHX Text B.H.

AutoCAD SHX Text

AutoCAD SHX Text

B.H. ADMIN.

AutoCAD SHX Text

AutoCAD SHX Text

PEERS

AutoCAD SHX Text B.H.

AutoCAD SHX Text

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

MEN'S

AutoCAD SHX Text

AutoCAD SHX Text

PEER

AutoCAD SHX Text B.H.

AutoCAD SHX Text

AutoCAD SHX Text B.H.

AutoCAD SHX Text

AutoCAD SHX Text

PSYCHOLOGIST

AutoCAD SHX Text

AutoCAD SHX Text

PSYCHIATRIST

AutoCAD SHX Text

AutoCAD SHX Text B.H.

AutoCAD SHX Text

AutoCAD SHX Text B.H.

AutoCAD SHX Text

AutoCAD SHX Text

WORKER

AutoCAD SHX Text

SOCIAL

AutoCAD SHX Text

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

SUPPLY

AutoCAD SHX Text

AutoCAD SHX Text

SUPPLY

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

MEDIA

AutoCAD SHX Text

AutoCAD SHX Text

LINEN

AutoCAD SHX Text

SOILED

AutoCAD SHX Text

AutoCAD SHX Text

WORKER

AutoCAD SHX Text

SOCIAL

AutoCAD SHX Text

AutoCAD SHX Text

LINEN

AutoCAD SHX Text

CLEAN

AutoCAD SHX Text

AutoCAD SHX Text

PSYCHOLOGIST

AutoCAD SHX Text

AutoCAD SHX Text

B.H. ADMIN.

AutoCAD SHX Text

AutoCAD SHX Text

WORKER

AutoCAD SHX Text

SOCIAL

AutoCAD SHX Text

AutoCAD SHX Text

PSYCHOLOGIST

AutoCAD SHX Text

AutoCAD SHX Text

PSYCHOLOGIST

AutoCAD SHX Text

AutoCAD SHX Text

WORKER

AutoCAD SHX Text

SOCIAL

AutoCAD SHX Text

AutoCAD SHX Text

WORKER

AutoCAD SHX Text

SOCIAL

AutoCAD SHX Text

AutoCAD SHX Text

WORKER

AutoCAD SHX Text

SOCIAL

AutoCAD SHX Text

AutoCAD SHX Text

THERAPY

AutoCAD SHX Text

SPEECH

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AUDIOLOGY

AutoCAD SHX Text 3280A

AutoCAD SHX Text

AUDIOLOGY

AutoCAD SHX Text

SOUND BOOTH

AutoCAD SHX Text

AUDIOLOGY

AutoCAD SHX Text

SOUND BOOTH

AutoCAD SHX Text

TESTING

AutoCAD SHX Text

HEARING

AutoCAD SHX Text

AutoCAD SHX Text

WORK ROOM

AutoCAD SHX Text

TECHNICIAN

AutoCAD SHX Text 3184A

AutoCAD SHX Text

WAITING RM.

AutoCAD SHX Text

AUDIOLOGY

AutoCAD SHX Text 3184B

AutoCAD SHX Text

WAITING AREA

AutoCAD SHX Text

AUDIOLOGY

AutoCAD SHX Text

AutoCAD SHX Text

CHECK-IN

AutoCAD SHX Text

AUDIOLOGY

AutoCAD SHX Text 3184C

AutoCAD SHX Text

PHONE

AutoCAD SHX Text

DATA &

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 3199C-1

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 3199A-1

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 3199B-1

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 3299A-1

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

AutoCAD SHX Text

REHAB

AutoCAD SHX Text

B.H. VOC

AutoCAD SHX Text

AutoCAD SHX Text

PSYCHIATRIST

AutoCAD SHX Text

AutoCAD SHX Text

PHARMACIST

AutoCAD SHX Text B.H.

AutoCAD SHX Text

AutoCAD SHX Text

AUDIOLOGY

AutoCAD SHX Text

SOUND BOOTH

AutoCAD SHX Text

AUDIOLOGY

AutoCAD SHX Text

SOUND BOOTH

AutoCAD SHX Text

LDRY

AutoCAD SHX Text

CHUT

AutoCAD SHX Text

WOMEN

AutoCAD SHX Text

AutoCAD SHX Text

CLERKS

AutoCAD SHX Text

RECEPTION

AutoCAD SHX Text 3105A

AutoCAD SHX Text

AUDIOLOGY WAITING RM.

AutoCAD SHX Text

B.H., NURSING,

AutoCAD SHX Text

AutoCAD SHX Text

CLERKS

AutoCAD SHX Text

B.H. CHECK-OUT

AutoCAD SHX Text

AutoCAD SHX Text

GROUP RM.

AutoCAD SHX Text B.H.

AutoCAD SHX Text

AutoCAD SHX Text

GROUP RM.

AutoCAD SHX Text B.H.

AutoCAD SHX Text

AutoCAD SHX Text

TELE-HEALTH

AutoCAD SHX Text B.H.

AutoCAD SHX Text

AutoCAD SHX Text

TELE-HEALTH

AutoCAD SHX Text B.H.

AutoCAD SHX Text

AutoCAD SHX Text A106

AutoCAD SHX Text

AutoCAD SHX Text

RU

AutoCAD SHX Text

RU

AutoCAD SHX Text

THIRD FLOOR WEST FLOOR PLAN

AutoCAD SHX Text

UPGRADE HEAT EXCHANGERS AND

AutoCAD SHX Text

REPLACE HEATING DESIGN

AutoCAD SHX Text 585-17-120

AutoCAD SHX Text No. 1

AutoCAD SHX Text

IRON MOUNTAIN, MICHIGAN

AutoCAD SHX Text

MARCH 8, 2019

AutoCAD SHX Text

AutoCAD SHX Text

50%%% REVIEW

AutoCAD SHX Text 10/24/2018

AutoCAD SHX Text

95%%% REVIEW

AutoCAD SHX Text 12/05/2018

AutoCAD SHX Text

100%%% DOCUMENTS

AutoCAD SHX Text 12/21/2018

AutoCAD SHX Text

100%%% BID DOCUMENTS

T A1

EA

ST

A

W

ES

T A1

EA

ST

A

24 21

1. Light lines indicate existing construction. Dark lines indicate new work.

2. Remove and re-install suspended acoustical tile ceilings as required for work above ceilings for piping at this floor and removal of steam lines serving floor above.

3. Where existing piping is removed from full height partitions patch holes to match partition construction.

4. Where existing piping is removed from floor penetrations seal holes with fire stopping per 07 84 00.

5. At new piping penetrations through full height partitions provide silicone sealant to seal all voids. At fire rated partitions and floors provide fire stopping system per 07 84 00.

6. At new piping penetrations through floors provide fire stopping system per 07 84 00.

7. Many of the pipe sleeves through the floor at steam convectors to be removed have sections of asbestos containing pipe insulation within the sleeves. Where original insulation remains at pipe sleeves remove per 02 82 13.13. See detail 1/M503.

8. All work in OI&T, Travel and Agent Cashier offices (1286A, 1288A) and Union offices will require an escort and must be performed on day shift. Arrange in advance of work with COR.

1. Infill existing convector opening for new convector per detail 4/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.

2. Remove vinyl wall covering from this wall and repair surface to receive new paint finish.

3. Infill existing convector opening for new convector per detail 4/A500. Paint this wall PNT-1 and provide new

4" vinyl wall base to match existing.

4. Infill existing projecting steel convector box for new convector per detail 5/A500. Paint new work to match existing wall and provide 4" vinyl base to match existing.

5. Not used.

6. Infill abandoned convector opening per detail 7/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.

7. Infill abandoned convector opening per detail 8/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.

8. Infill existing convector opening per detail 1/A500.

9. Paint wall PNT-2 and provide new 4" vinyl wall base to match existing.

10.Cut existing gypsum board as required to install new piping. Patch with 5/8" gypsum board to match existing.

11.Paint wall PNT-3 and provide new 4" vinyl wall base to match existing.

12.Infill abandoned convector opening per detail 9/A500. Provide new CT-1 ceramic wall tile. Extend resinous flooring integral cove base up face of wall infill to match existing.

13.Remove existing gypsum board, insulation and studs at former convector opening. Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face. Provide new plastic laminate window stool per detail 3/A500.

14.Paint wall PNT-1 and provide new 4" vinyl wall base to match existing.

15.Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face.

16.Remove existing plaster ceiling in this room including suspension system and hangers. Install new ATC-1 ceiling at height shown.

17.Remove and reinstall pews as needed to access wall.

18.Remove existing plaster and structural clay wall at column. After installation of new piping replace with light gage framing and 5/8" gypsum board.

19.Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face. Provide new plastic laminate window stool per detail 3/A500.

20.Paint wall PNT-4. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.

21.Paint wall PNT-4 and provide new 4" vinyl wall base to match existing.

22.Paint wall PNT-5 and provide new 4" vinyl wall base to match existing.

23.Paint wall PNT-6 and provide new 4" vinyl wall base to match existing.

24.Remove existing gypsum board, insulation and studs at former convector opening. Frame opening for new convector per detail 1/A500.

25.Paint wall PNT-2. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.

26.Paint wall PNT-7 and provide new 4" vinyl wall base to match existing.

27.Remove and re-install existing casework as required to access wall.

28.Paint wall PNT-8 and provide new 4" vinyl wall base to match existing.

29.Paint wall PNT-9 and provide new 4" vinyl wall base to match existing.

30.Provide new CT-2 ceramic wall tile and cover base over tile backer board at infilled opening to match existing.

31.Coordinate with Owner for removal and reinstallation of lab equipment to access convector.

32.Paint wall PNT-8. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.

33.Paint wall PNT-9. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.

34.Extend existing pipe pit in concrete floor per detail 10/A500.

35.Remove asbestos containing pipe insulation above ceiling per 02 82 13.13. Approximately 72 LF.

36.Remove asbestos containing pipe insulation above ceiling per 02 82 13.13. Approximately 10 LF.

37.Provide new wall protection sheet and 4" vinyl wall base to match existing.

38.New surface mounted convector in stairwell. Piping to be provided with surface mounted cover per mechanical.

39.Existing convector to remain with new equipment per Mechanical. Remove and reinstall existing cover.

11 10 10

811 811

825 825 8

10 82610 10

10 826 82610

82110 10

IN BID ALTERNATE 1 ELIMINATE THIRD

FLOOR WORK IN ROOM 3280A.

Keynotes

General Notes

SCALE:

Third Floor Plan - East

1/8"=1'-0"

N

MEP PROJECT NO.: G29.18.02

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date: Dwg. of

420 RAIL STREET

NEGAUNEE, MI 49866

PHONE: 906-475-6616

NDW PROJECT NUMBER: 1825

AutoCAD SHX Text

FIRE EQUIP

AutoCAD SHX Text

LDRY CHUT

AutoCAD SHX Text

RAMP UP 7"

AutoCAD SHX Text

FLOOR UP 7"

AutoCAD SHX Text

DUCT

AutoCAD SHX Text

DUMB WAITER

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

STAIR 3

AutoCAD SHX Text

STAIR 2

AutoCAD SHX Text

STAIR 4

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

PASSENGER ELEVATOR

AutoCAD SHX Text

PASSENGER ELEVATOR

AutoCAD SHX Text

PASSENGER ELEVATOR

AutoCAD SHX Text

MECH SHAFT

AutoCAD SHX Text

VITREOUS CHINA

AutoCAD SHX Text

C_LAVATORY

AutoCAD SHX Text

KINGSTON

AutoCAD SHX Text K-2005

AutoCAD SHX Text

2ND FLOOR ROOF

AutoCAD SHX Text

2ND FLOOR ROOF

AutoCAD SHX Text

2ND FLOOR ROOF

AutoCAD SHX Text

MECH SHAFT

AutoCAD SHX Text

MECH CHASE

AutoCAD SHX Text

2ND FLOOR ROOF

AutoCAD SHX Text

SHAFT

AutoCAD SHX Text

PASSAGE

AutoCAD SHX Text

AutoCAD SHX Text

STOR.

AutoCAD SHX Text

NURSE ED.

AutoCAD SHX Text

AutoCAD SHX Text

THERAPY

AutoCAD SHX Text

SPEECH

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AUDIOLOGY

AutoCAD SHX Text 3280A

AutoCAD SHX Text

AUDIOLOGY

AutoCAD SHX Text

SOUND BOOTH

AutoCAD SHX Text

AUDIOLOGY

AutoCAD SHX Text

SOUND BOOTH

AutoCAD SHX Text

TESTING

AutoCAD SHX Text

HEARING

AutoCAD SHX Text

AutoCAD SHX Text

HEALTH

AutoCAD SHX Text

TELE-

AutoCAD SHX Text

AutoCAD SHX Text

GROUP ROOM

AutoCAD SHX Text

WHOLE HEALTH

AutoCAD SHX Text

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

EXAM

AutoCAD SHX Text

AutoCAD SHX Text

HEALTH

AutoCAD SHX Text

TELE-

AutoCAD SHX Text

AutoCAD SHX Text

MECH

AutoCAD SHX Text 3244A

AutoCAD SHX Text

LOBBY

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

EXAM

AutoCAD SHX Text

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

BIO-MED

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

HSKG

AutoCAD SHX Text

AutoCAD SHX Text

HSKG

AutoCAD SHX Text

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

EXAM

AutoCAD SHX Text

AutoCAD SHX Text

AREA

AutoCAD SHX Text

WAITING

AutoCAD SHX Text

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

EXAM

AutoCAD SHX Text

AutoCAD SHX Text

PHONE

AutoCAD SHX Text

DATA &

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 3299A-1

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 3299B-1

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

EXAM

AutoCAD SHX Text

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

AutoCAD SHX Text

STERILE

AutoCAD SHX Text

CLEAN STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

LAB

AutoCAD SHX Text

AutoCAD SHX Text

SOILED

AutoCAD SHX Text

AutoCAD SHX Text

OPERATORY

AutoCAD SHX Text

AutoCAD SHX Text

OPERATORY

AutoCAD SHX Text

AutoCAD SHX Text

OPERATORY

AutoCAD SHX Text

AutoCAD SHX Text

OPERATORY

AutoCAD SHX Text

AutoCAD SHX Text

CHIEF, DENTAL

AutoCAD SHX Text

AutoCAD SHX Text

X-RAY

AutoCAD SHX Text

AutoCAD SHX Text

CONTROL

AutoCAD SHX Text 3228A

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

WAITING

AutoCAD SHX Text

AutoCAD SHX Text

PASSAGE

AutoCAD SHX Text 3237A

AutoCAD SHX Text

PASSAGE

AutoCAD SHX Text

AutoCAD SHX Text

WORK

AutoCAD SHX Text

CLERK/

AutoCAD SHX Text

AutoCAD SHX Text

TOILET

AutoCAD SHX Text 3225A

AutoCAD SHX Text

MEN

AutoCAD SHX Text

AutoCAD SHX Text

WOMEN

AutoCAD SHX Text

AutoCAD SHX Text

CLERKS

AutoCAD SHX Text

RECEPTION

AutoCAD SHX Text 3105A

AutoCAD SHX Text

AUDIOLOGY WAITING RM.

AutoCAD SHX Text

B.H., NURSING,

AutoCAD SHX Text

AutoCAD SHX Text

TRAINING ROOM

AutoCAD SHX Text

NURSE EDUCATION

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

NURSE EDUCATI

AutoCAD SHX Text

AutoCAD SHX Text

PASSAGEWAY

AutoCAD SHX Text

AutoCAD SHX Text

TRAINING ROOM

AutoCAD SHX Text

NURSE EDUCATION

AutoCAD SHX Text

AutoCAD SHX Text

RECORDS

AutoCAD SHX Text

MEDICAL

AutoCAD SHX Text

AutoCAD SHX Text

TOILET

AutoCAD SHX Text 3246A

AutoCAD SHX Text

TOILET

AutoCAD SHX Text 3250A

AutoCAD SHX Text

OPERATORY

AutoCAD SHX Text

AutoCAD SHX Text

OPERATORY

AutoCAD SHX Text

AutoCAD SHX Text

SUPPLY

AutoCAD SHX Text

STERILE

AutoCAD SHX Text

AutoCAD SHX Text

SUPPLY

AutoCAD SHX Text

CLEAN

AutoCAD SHX Text

AutoCAD SHX Text

UTILITY

AutoCAD SHX Text

SOILED

AutoCAD SHX Text

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

EXAM

AutoCAD SHX Text

AutoCAD SHX Text

& LOCKERS

AutoCAD SHX Text

STAFF LOUNGE

AutoCAD SHX Text

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

AutoCAD SHX Text

EXAM RM.

AutoCAD SHX Text

TELE-HEALTH

AutoCAD SHX Text

AutoCAD SHX Text

MANAGER

AutoCAD SHX Text

NURSE

AutoCAD SHX Text

AutoCAD SHX Text

STAFF OFFICE

AutoCAD SHX Text

TELE-HEALTH

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

MSA

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 3299C-1

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

AutoCAD SHX Text SMOKE RESISTIVE WALL SMOKE BARRIER WITH ONE HOUR FIRE RATING ONE HOUR FIRE RATED WALL TWO HOUR FIRE WALL

AutoCAD SHX Text

SMOKE/ FIRE/ RATED PARTITION TYPES

AutoCAD SHX Text A107

AutoCAD SHX Text

AutoCAD SHX Text

RU

AutoCAD SHX Text

RU

AutoCAD SHX Text

THIRD FLOOR EAST FLOOR PLAN

AutoCAD SHX Text

UPGRADE HEAT EXCHANGERS AND

AutoCAD SHX Text

REPLACE HEATING DESIGN

AutoCAD SHX Text 585-17-120

AutoCAD SHX Text No. 1

AutoCAD SHX Text

IRON MOUNTAIN, MICHIGAN

AutoCAD SHX Text

MARCH 8, 2019

AutoCAD SHX Text

AutoCAD SHX Text

50%%% REVIEW

AutoCAD SHX Text 10/24/2018

AutoCAD SHX Text

95%%% REVIEW

AutoCAD SHX Text 12/05/2018

AutoCAD SHX Text

100%%% DOCUMENTS

AutoCAD SHX Text 12/21/2018

AutoCAD SHX Text

100%%% BID DOCUMENTS

1. Light lines indicate existing construction. Dark lines indicate new work.

2. Remove and re-install suspended acoustical tile ceilings as required for work above ceilings for piping at this floor and removal of steam lines serving floor above.

3. Where existing piping is removed from full height partitions patch holes to match partition construction.

4. Where existing piping is removed from floor penetrations seal holes with fire stopping per 07 84 00.

5. At new piping penetrations through full height partitions provide silicone sealant to seal all voids. At fire rated partitions and floors provide fire stopping system per 07 84 00.

6. At new piping penetrations through floors provide fire stopping system per 07 84 00.

7. Many of the pipe sleeves through the floor at steam convectors to be removed have sections of asbestos containing pipe insulation within the sleeves. Where original insulation remains at pipe sleeves remove per 02 82 13.13. See detail 1/M503.

8. All work in OI&T, Travel and Agent Cashier offices (1286A, 1288A) and Union offices will require an escort and must be performed on day shift. Arrange in advance of work with COR.

1. Infill existing convector opening for new convector per detail 4/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.

2. Remove vinyl wall covering from this wall and repair surface to receive new paint finish.

3. Infill existing convector opening for new convector per detail 4/A500. Paint this wall PNT-1 and provide new

4" vinyl wall base to match existing.

4. Infill existing projecting steel convector box for new convector per detail 5/A500. Paint new work to match existing wall and provide 4" vinyl base to match existing.

5. Not used.

6. Infill abandoned convector opening per detail 7/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.

7. Infill abandoned convector opening per detail 8/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.

8. Infill existing convector opening per detail 1/A500.

9. Paint wall PNT-2 and provide new 4" vinyl wall base to match existing.

10.Cut existing gypsum board as required to install new piping. Patch with 5/8" gypsum board to match existing.

11.Paint wall PNT-3 and provide new 4" vinyl wall base to match existing.

12.Infill abandoned convector opening per detail 9/A500. Provide new CT-1 ceramic wall tile. Extend resinous flooring integral cove base up face of wall infill to match existing.

13.Remove existing gypsum board, insulation and studs at former convector opening. Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face. Provide new plastic laminate window stool per detail 3/A500.

14.Paint wall PNT-1 and provide new 4" vinyl wall base to match existing.

15.Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face.

16.Remove existing plaster ceiling in this room including suspension system and hangers. Install new ATC-1 ceiling at height shown.

17.Remove and reinstall pews as needed to access wall.

18.Remove existing plaster and structural clay wall at column. After installation of new piping replace with light gage framing and 5/8" gypsum board.

19.Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face. Provide new plastic laminate window stool per detail 3/A500.

20.Paint wall PNT-4. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.

21.Paint wall PNT-4 and provide new 4" vinyl wall base to match existing.

22.Paint wall PNT-5 and provide new 4" vinyl wall base to match existing.

23.Paint wall PNT-6 and provide new 4" vinyl wall base to match existing.

24.Remove existing gypsum board, insulation and studs at former convector opening. Frame opening for new convector per detail 1/A500.

25.Paint wall PNT-2. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.

26.Paint wall PNT-7 and provide new 4" vinyl wall base to match existing.

27.Remove and re-install existing casework as required to access wall.

28.Paint wall PNT-8 and provide new 4" vinyl wall base to match existing.

29.Paint wall PNT-9 and provide new 4" vinyl wall base to match existing.

30.Provide new CT-2 ceramic wall tile and cover base over tile backer board at infilled opening to match existing.

31.Coordinate with Owner for removal and reinstallation of lab equipment to access convector.

32.Paint wall PNT-8. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.

33.Paint wall PNT-9. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.

34.Extend existing pipe pit in concrete floor per detail 10/A500.

35.Remove asbestos containing pipe insulation above ceiling per 02 82 13.13. Approximately 72 LF.

36.Remove asbestos containing pipe insulation above ceiling per 02 82 13.13. Approximately 10 LF.

37.Provide new wall protection sheet and 4" vinyl wall base to match existing.

38.New surface mounted convector in stairwell. Piping to be provided with surface mounted cover per mechanical.

39.Existing convector to remain with new equipment per Mechanical. Remove and reinstall existing cover.

WORK IN THIS AREA IS ABOVE CEILING

STEAM PIPING DEMOLITION AND NEW

PIPING TO SIXTH FLOOR CONVECTORS.

REMOVE AND REPLACE SUSPENDED

ACOUSTICAL TILE CEILINGS AS NEEDED.

WORK IN THIS AREA IS ABOVE CEILING

STEAM PIPING DEMOLITION AND NEW

PIPING TO SIXTH FLOOR CONVECTORS.

REMOVE AND REPLACE SUSPENDED

ACOUSTICAL TILE CEILINGS AS NEEDED.

WORK IN THIS AREA IS ABOVE CEILING

STEAM PIPING DEMOLITION AND NEW

PIPING TO SIXTH FLOOR CONVECTORS.

REMOVE AND REPLACE SUSPENDED

ACOUSTICAL TILE CEILINGS AS NEEDED.

8'-0"

38 38

Keynotes

General Notes

SCALE:

Fifth Floor Plan

1/8"=1'-0"

N

MEP PROJECT NO.: G29.18.02

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date: Dwg. of

420 RAIL STREET

NEGAUNEE, MI 49866

PHONE: 906-475-6616

NDW PROJECT NUMBER: 1825

AutoCAD SHX Text SMOKE RESISTIVE WALL SMOKE BARRIER WITH ONE HOUR FIRE RATING ONE HOUR FIRE RATED WALL TWO HOUR FIRE WALL

AutoCAD SHX Text

SMOKE/ FIRE/ RATED PARTITION TYPES

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

RAMP UP

AutoCAD SHX Text

FLOOR RAISED 9"

AutoCAD SHX Text

STEP UP

AutoCAD SHX Text

DUMB WAITER

AutoCAD SHX Text

DN

AutoCAD SHX Text

STAIR 5

AutoCAD SHX Text

LDRY CHUT

AutoCAD SHX Text

FIRE EQUIP

AutoCAD SHX Text

STAIR 1

AutoCAD SHX Text

STAIR 3

AutoCAD SHX Text

STEP UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

STAIR 2

AutoCAD SHX Text

DN

AutoCAD SHX Text

STAIR 4

AutoCAD SHX Text

DUCT INTAKE

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

PASSENGER ELEVATOR

AutoCAD SHX Text

PASSENGER ELEVATOR

AutoCAD SHX Text

SERVICE ELEVATOR

AutoCAD SHX Text

MECH SHAFT

AutoCAD SHX Text

MECH. SHAFT

AutoCAD SHX Text

LDRY CHUT

AutoCAD SHX Text

PIPE SHAFT

AutoCAD SHX Text

MECH. SHAFT

AutoCAD SHX Text

MECH. SHAFT

AutoCAD SHX Text

FE

AutoCAD SHX Text K-4330

AutoCAD SHX Text

KINGSTON

AutoCAD SHX Text

C_TOILETS

AutoCAD SHX Text

VITREOUS CHINA

AutoCAD SHX Text K-4330

AutoCAD SHX Text

KINGSTON

AutoCAD SHX Text

C_TOILETS

AutoCAD SHX Text

VITREOUS CHINA

AutoCAD SHX Text K-4330

AutoCAD SHX Text

KINGSTON

AutoCAD SHX Text

C_TOILETS

AutoCAD SHX Text

VITREOUS CHINA

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text

OI&T

AutoCAD SHX Text

AutoCAD SHX Text

CONSTRUCTION

AutoCAD SHX Text

UNDER

AutoCAD SHX Text

AutoCAD SHX Text

SERVERS

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text 5281A

AutoCAD SHX Text

CONSTRUCTION

AutoCAD SHX Text

UNDER

AutoCAD SHX Text

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

WOMENS

AutoCAD SHX Text

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

UNISEX

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text 5215A

AutoCAD SHX Text

MEDICINE

AutoCAD SHX Text

CHIEF OF

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

CAC

AutoCAD SHX Text

AutoCAD SHX Text

TOILET

AutoCAD SHX Text 5207A

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

UNION

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

UNION

AutoCAD SHX Text 5205A

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

UNION

AutoCAD SHX Text

AutoCAD SHX Text

NURSING

AutoCAD SHX Text

OFFICE FOR

AutoCAD SHX Text

AutoCAD SHX Text

OEF/IEF

AutoCAD SHX Text

AutoCAD SHX Text

EQUIP

AutoCAD SHX Text

BIOMED

AutoCAD SHX Text

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text

AutoCAD SHX Text

IMPROVEMENT ADMIN.

AutoCAD SHX Text

PERFORMANCE

AutoCAD SHX Text

AutoCAD SHX Text

OFFICER

AutoCAD SHX Text

COMPLIANCE

AutoCAD SHX Text

AutoCAD SHX Text

IMPROVEMENT

AutoCAD SHX Text

CHIEF, PERFORMANCE

AutoCAD SHX Text

AutoCAD SHX Text

AREA

AutoCAD SHX Text

PRINTER

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

PI/QA

AutoCAD SHX Text

AutoCAD SHX Text

STATIONS

AutoCAD SHX Text

PI/QA WORK

AutoCAD SHX Text

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text

AutoCAD SHX Text

DIRECTOR

AutoCAD SHX Text

HSS TO

AutoCAD SHX Text

AutoCAD SHX Text

OF STAFF

AutoCAD SHX Text

CHIEF

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

OF NURSING

AutoCAD SHX Text

DIRECTOR

AutoCAD SHX Text

AutoCAD SHX Text

SECRETARY'S

AutoCAD SHX Text

NURSING & DIRECTOR'S

AutoCAD SHX Text

AutoCAD SHX Text

CREDENTIALS

AutoCAD SHX Text

AutoCAD SHX Text

ASSOC. DIRECTOR

AutoCAD SHX Text

HHS TO

AutoCAD SHX Text

AutoCAD SHX Text

AD, COS, AND PRI.CARE

AutoCAD SHX Text

ADMIN SUPPORT FOR

AutoCAD SHX Text

AutoCAD SHX Text

PRI CARE / NURS.

AutoCAD SHX Text

ADMIN SUPPORT

AutoCAD SHX Text

AutoCAD SHX Text

PROGRAM MNGR.

AutoCAD SHX Text

WOMEN VETERAN

AutoCAD SHX Text

AutoCAD SHX Text

ADMIN NURSING

AutoCAD SHX Text

HHS TO COS &

AutoCAD SHX Text

AutoCAD SHX Text

PHONE

AutoCAD SHX Text

DATA &

AutoCAD SHX Text

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

MECH

AutoCAD SHX Text 5281B

AutoCAD SHX Text

LOUNGE

AutoCAD SHX Text

STAFF

AutoCAD SHX Text

AutoCAD SHX Text

NURSING

AutoCAD SHX Text

OFFICE FOR

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text 5211A

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 5299B-1

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 5299D-1

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 5299C-1

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 5199A-1

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

AFFAIRS

AutoCAD SHX Text

PUBLIC

AutoCAD SHX Text

AutoCAD SHX Text

OF NURSING

AutoCAD SHX Text

ASST. CHIEF

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

DIRECTORS

AutoCAD SHX Text

AutoCAD SHX Text

DIRECTOR

AutoCAD SHX Text

ASSOCIATE

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 5299E-1

AutoCAD SHX Text

CONSTRUCTION

AutoCAD SHX Text

UNDER

AutoCAD SHX Text 5180-1

AutoCAD SHX Text

LOBBY

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text 5299A-1

AutoCAD SHX Text

CENTER

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text

AutoCAD SHX Text

CONSTRUCTION

AutoCAD SHX Text

UNDER

AutoCAD SHX Text

XXXX

AutoCAD SHX Text

MEN'S RESTRM

AutoCAD SHX Text

AutoCAD SHX Text

RESTROOM

AutoCAD SHX Text

WOMEN'S

AutoCAD SHX Text

AutoCAD SHX Text

CONSTRUCTION

AutoCAD SHX Text

UNDER

AutoCAD SHX Text

XXXX

AutoCAD SHX Text

RM.

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

OFFICES

AutoCAD SHX Text

OI&T

AutoCAD SHX Text

AutoCAD SHX Text

TECH

AutoCAD SHX Text

LEAD IT

AutoCAD SHX Text 5114A

AutoCAD SHX Text

CHIEF

AutoCAD SHX Text

OI&T

AutoCAD SHX Text 5114B

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

OI&T

AutoCAD SHX Text

AutoCAD SHX Text

PHONE

AutoCAD SHX Text

DATA

AutoCAD SHX Text

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

TEAM

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

OPEN

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

OPEN

AutoCAD SHX Text

AutoCAD SHX Text

SPECIALIST

AutoCAD SHX Text

WORKERS COMP

AutoCAD SHX Text

AutoCAD SHX Text

WORKROOM

AutoCAD SHX Text

AutoCAD SHX Text

WORKSTATIONS

AutoCAD SHX Text

OPEN

AutoCAD SHX Text

AutoCAD SHX Text

CHIEF HR

AutoCAD SHX Text

ASSISTANT

AutoCAD SHX Text

AutoCAD SHX Text

HR

AutoCAD SHX Text

CHIEF

AutoCAD SHX Text

AutoCAD SHX Text

ASSIST.

AutoCAD SHX Text

PROGRAM

AutoCAD SHX Text

AutoCAD SHX Text

WORKSTATIONS

AutoCAD SHX Text

OPEN

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

OFFICER

AutoCAD SHX Text

PRIVACY

AutoCAD SHX Text

AutoCAD SHX Text

LOUNGE

AutoCAD SHX Text

STAFF

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 5199B-1

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 5199C-1

AutoCAD SHX Text

CONST.

AutoCAD SHX Text

UNDER

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

PI/QA

AutoCAD SHX Text 5299F-1

AutoCAD SHX Text

CLST

AutoCAD SHX Text

HSKG

AutoCAD SHX Text

AutoCAD SHX Text A108

AutoCAD SHX Text

AutoCAD SHX Text

RU

AutoCAD SHX Text

RU

AutoCAD SHX Text

FIFTH FLOOR PLAN

AutoCAD SHX Text

UPGRADE HEAT EXCHANGERS AND

AutoCAD SHX Text

REPLACE HEATING DESIGN

AutoCAD SHX Text 585-17-120

AutoCAD SHX Text No. 1

AutoCAD SHX Text

IRON MOUNTAIN, MICHIGAN

AutoCAD SHX Text

MARCH 8, 2019

AutoCAD SHX Text

AutoCAD SHX Text

50%%% REVIEW

AutoCAD SHX Text 10/24/2018

AutoCAD SHX Text

95%%% REVIEW

AutoCAD SHX Text 12/05/2018

AutoCAD SHX Text

100%%% DOCUMENTS

AutoCAD SHX Text 12/21/2018

AutoCAD SHX Text

100%%% BID DOCUMENTS

1. Light lines indicate existing construction. Dark lines indicate new work.

2. Remove and re-install suspended acoustical tile ceilings as required for work above ceilings for piping at this floor and removal of steam lines serving floor above.

3. Where existing piping is removed from full height partitions patch holes to match partition construction.

4. Where existing piping is removed from floor penetrations seal holes with fire stopping per 07 84 00.

5. At new piping penetrations through full height partitions provide silicone sealant to seal all voids. At fire rated partitions and floors provide fire stopping system per 07 84 00.

6. At new piping penetrations through floors provide fire stopping system per 07 84 00.

7. Many of the pipe sleeves through the floor at steam convectors to be removed have sections of asbestos containing pipe insulation within the sleeves. Where original insulation remains at pipe sleeves remove per 02 82 13.13. See detail 1/M503.

8. All work in OI&T, Travel and Agent Cashier offices (1286A, 1288A) and Union offices will require an escort and must be performed on day shift. Arrange in advance of work with COR.

1. Infill existing convector opening for new convector per detail 4/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.

2. Remove vinyl wall covering from this wall and repair surface to receive new paint finish.

3. Infill existing convector opening for new convector per detail 4/A500. Paint this wall PNT-1 and provide new

4" vinyl wall base to match existing.

4. Infill existing projecting steel convector box for new convector per detail 5/A500. Paint new work to match existing wall and provide 4" vinyl base to match existing.

5. Not used.

6. Infill abandoned convector opening per detail 7/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.

7. Infill abandoned convector opening per detail 8/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.

8. Infill existing convector opening per detail 1/A500.

9. Paint wall PNT-2 and provide new 4" vinyl wall base to match existing.

10.Cut existing gypsum board as required to install new piping. Patch with 5/8" gypsum board to match existing.

11.Paint wall PNT-3 and provide new 4" vinyl wall base to match existing.

12.Infill abandoned convector opening per detail 9/A500. Provide new CT-1 ceramic wall tile. Extend resinous flooring integral cove base up face of wall infill to match existing.

13.Remove existing gypsum board, insulation and studs at former convector opening. Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face. Provide new plastic laminate window stool per detail 3/A500.

14.Paint wall PNT-1 and provide new 4" vinyl wall base to match existing.

15.Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face.

16.Remove existing plaster ceiling in this room including suspension system and hangers. Install new ATC-1 ceiling at height shown.

17.Remove and reinstall pews as needed to access wall.

18.Remove existing plaster and structural clay wall at column. After installation of new piping replace with light gage framing and 5/8" gypsum board.

19.Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face. Provide new plastic laminate window stool per detail 3/A500.

20.Paint wall PNT-4. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.

21.Paint wall PNT-4 and provide new 4" vinyl wall base to match existing.

22.Paint wall PNT-5 and provide new 4" vinyl wall base to match existing.

23.Paint wall PNT-6 and provide new 4" vinyl wall base to match existing.

24.Remove existing gypsum board, insulation and studs at former convector opening. Frame opening for new convector per detail 1/A500.

25.Paint wall PNT-2. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.

26.Paint wall PNT-7 and provide new 4" vinyl wall base to match existing.

27.Remove and re-install existing casework as required to access wall.

28.Paint wall PNT-8 and provide new 4" vinyl wall base to match existing.

29.Paint wall PNT-9 and provide new 4" vinyl wall base to match existing.

30.Provide new CT-2 ceramic wall tile and cover base over tile backer board at infilled opening to match existing.

31.Coordinate with Owner for removal and reinstallation of lab equipment to access convector.

32.Paint wall PNT-8. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.

33.Paint wall PNT-9. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.

34.Extend existing pipe pit in concrete floor per detail 10/A500.

35.Remove asbestos containing pipe insulation above ceiling per 02 82 13.13. Approximately 72 LF.

36.Remove asbestos containing pipe insulation above ceiling per 02 82 13.13. Approximately 10 LF.

37.Provide new wall protection sheet…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.