36C25219B0035-006.pdf
PDF 16 MB Posted
- Solicitation number
- 36C25219B0035
About this file
36C25219B0035 S02 - Att - Final Drawing 08Mar19 - 3 of 5.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25219C0136-000.docx | DOCX document | |
| 36C25219B0035-A00003001.pdf | ||
| 36C25219B0035-A00003000.docx | DOCX document | |
| 36C25219B0035-A00003002.pdf | ||
| 36C25219B0035-A00002001.pdf | ||
| 36C25219B0035-A00002000.docx | DOCX document | |
| 36C25219B0035-A00002002.pdf | ||
| 36C25219B0035-0001001.pdf | ||
| 36C25219B0035-0001000.docx | DOCX document | |
| 36C25219B0035-007.pdf | ||
| 36C25219B0035-005.pdf | ||
| 36C25219B0035-002.docx | DOCX document | |
| 36C25219B0035-003.pdf | ||
| 36C25219B0035-004.pdf | ||
| 36C25219B0035-008.pdf | ||
| 36C25219B0035-001.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W
ES
T A1
EA
ST
A
W
ES
T A1
EA
ST
A
WORK IN THIS AREA IS
ABOVE CEILING STEAM
PIPING DEMOLITION.
REMOVE AND REPLACE
SUSPENDED ACOUSTICAL
TILE CEILINGS AS NEEDED.
WORK IN THIS AREA IS
ABOVE CEILING STEAM
PIPING DEMOLITION.
REMOVE AND REPLACE
SUSPENDED ACOUSTICAL
TILE CEILINGS AS NEEDED.
WORK IN THIS AREA IS
ABOVE CEILING STEAM
PIPING DEMOLITION.
REMOVE AND REPLACE
SUSPENDED ACOUSTICAL
TILE CEILINGS AS NEEDED.
WORK IN THIS AREA IS
ABOVE CEILING STEAM
PIPING DEMOLITION.
REMOVE AND REPLACE
SUSPENDED ACOUSTICAL
TILE CEILINGS AS NEEDED.
WORK IN THIS AREA IS
ABOVE CEILING STEAM
PIPING DEMOLITION.
REMOVE AND REPLACE
SUSPENDED ACOUSTICAL
TILE CEILINGS AS NEEDED.
1. Light lines indicate existing construction. Dark lines indicate new work.
2. Remove and re-install suspended acoustical tile ceilings as required for work above ceilings for piping at this floor and removal of steam lines serving floor above.
3. Where existing piping is removed from full height partitions patch holes to match partition construction.
4. Where existing piping is removed from floor penetrations seal holes with fire stopping per 07 84 00.
5. At new piping penetrations through full height partitions provide silicone sealant to seal all voids. At fire rated partitions and floors provide fire stopping system per 07 84 00.
6. At new piping penetrations through floors provide fire stopping system per 07 84 00.
7. Many of the pipe sleeves through the floor at steam convectors to be removed have sections of asbestos containing pipe insulation within the sleeves. Where original insulation remains at pipe sleeves remove per 02 82 13.13. See detail 1/M503.
8. All work in OI&T, Travel and Agent Cashier offices (1286A, 1288A) and Union offices will require an escort and must be performed on day shift. Arrange in advance of work with COR.
1. Infill existing convector opening for new convector per detail 4/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.
2. Remove vinyl wall covering from this wall and repair surface to receive new paint finish.
3. Infill existing convector opening for new convector per detail 4/A500. Paint this wall PNT-1 and provide new
4" vinyl wall base to match existing.
4. Infill existing projecting steel convector box for new convector per detail 5/A500. Paint new work to match existing wall and provide 4" vinyl base to match existing.
5. Not used.
6. Infill abandoned convector opening per detail 7/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.
7. Infill abandoned convector opening per detail 8/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.
8. Infill existing convector opening per detail 1/A500.
9. Paint wall PNT-2 and provide new 4" vinyl wall base to match existing.
10.Cut existing gypsum board as required to install new piping. Patch with 5/8" gypsum board to match existing.
11.Paint wall PNT-3 and provide new 4" vinyl wall base to match existing.
12.Infill abandoned convector opening per detail 9/A500. Provide new CT-1 ceramic wall tile. Extend resinous flooring integral cove base up face of wall infill to match existing.
13.Remove existing gypsum board, insulation and studs at former convector opening. Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face. Provide new plastic laminate window stool per detail 3/A500.
14.Paint wall PNT-1 and provide new 4" vinyl wall base to match existing.
15.Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face.
16.Remove existing plaster ceiling in this room including suspension system and hangers. Install new ATC-1 ceiling at height shown.
17.Remove and reinstall pews as needed to access wall.
18.Remove existing plaster and structural clay wall at column. After installation of new piping replace with light gage framing and 5/8" gypsum board.
19.Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face. Provide new plastic laminate window stool per detail 3/A500.
20.Paint wall PNT-4. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
21.Paint wall PNT-4 and provide new 4" vinyl wall base to match existing.
22.Paint wall PNT-5 and provide new 4" vinyl wall base to match existing.
23.Paint wall PNT-6 and provide new 4" vinyl wall base to match existing.
24.Remove existing gypsum board, insulation and studs at former convector opening. Frame opening for new convector per detail 1/A500.
25.Paint wall PNT-2. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
26.Paint wall PNT-7 and provide new 4" vinyl wall base to match existing.
27.Remove and re-install existing casework as required to access wall.
28.Paint wall PNT-8 and provide new 4" vinyl wall base to match existing.
29.Paint wall PNT-9 and provide new 4" vinyl wall base to match existing.
30.Provide new CT-2 ceramic wall tile and cover base over tile backer board at infilled opening to match existing.
31.Coordinate with Owner for removal and reinstallation of lab equipment to access convector.
32.Paint wall PNT-8. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
33.Paint wall PNT-9. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
34.Extend existing pipe pit in concrete floor per detail 10/A500.
35.Remove asbestos containing pipe insulation above ceiling per 02 82 13.13. Approximately 72 LF.
36.Remove asbestos containing pipe insulation above ceiling per 02 82 13.13. Approximately 10 LF.
37.Provide new wall protection sheet and 4" vinyl wall base to match existing.
38.New surface mounted convector in stairwell. Piping to be provided with surface mounted cover per mechanical.
39.Existing convector to remain with new equipment per Mechanical. Remove and reinstall existing cover.
Keynotes
General Notes
SCALE:
Second Floor Plan - East
1/8"=1'-0"
N
MEP PROJECT NO.: G29.18.02
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
420 RAIL STREET
NEGAUNEE, MI 49866
PHONE: 906-475-6616
NDW PROJECT NUMBER: 1825
AutoCAD SHX Text
DUCT THRU FLR
AutoCAD SHX Text
COOLING UNIT FOR PACS RM.
AutoCAD SHX Text
AHU #4 PHARMACY
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
DWV
AutoCAD SHX Text
STM
AutoCAD SHX Text
STAIR 3
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
STAIR 2
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
STAIR 4
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text 1st. FLOOR ROOF
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
MECH CHASE
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
STAIR 8
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
OPEN TO FIRST FLOOR
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
CHASE
AutoCAD SHX Text
CHASE
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
SUB-STERILIZER MECH SPACE
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
PIPE SHAFT
AutoCAD SHX Text
FOLDING WALL
AutoCAD SHX Text
FAN COIL 2180
AutoCAD SHX Text SMOKE RESISTIVE WALL SMOKE BARRIER WITH ONE HOUR FIRE RATING ONE HOUR FIRE RATED WALL TWO HOUR FIRE WALL
AutoCAD SHX Text
SMOKE/ FIRE/ RATED PARTITION TYPES
AutoCAD SHX Text A105
AutoCAD SHX Text
AutoCAD SHX Text
RU
AutoCAD SHX Text
RU
AutoCAD SHX Text
SECOND FLOOR EAST FLOOR PLAN
AutoCAD SHX Text
UPGRADE HEAT EXCHANGERS AND
AutoCAD SHX Text
REPLACE HEATING DESIGN
AutoCAD SHX Text 585-17-120
AutoCAD SHX Text No. 1
AutoCAD SHX Text
IRON MOUNTAIN, MICHIGAN
AutoCAD SHX Text
MARCH 8, 2019
AutoCAD SHX Text
AutoCAD SHX Text
50%%% REVIEW
AutoCAD SHX Text 10/24/2018
AutoCAD SHX Text
95%%% REVIEW
AutoCAD SHX Text 12/05/2018
AutoCAD SHX Text
100%%% DOCUMENTS
AutoCAD SHX Text 12/21/2018
AutoCAD SHX Text
100%%% BID DOCUMENTS
AutoCAD SHX Text 3/8/2019
T A1
EA
ST
A
W
ES
T A1
EA
ST
A
1. Light lines indicate existing construction. Dark lines indicate new work.
2. Remove and re-install suspended acoustical tile ceilings as required for work above ceilings for piping at this floor and removal of steam lines serving floor above.
3. Where existing piping is removed from full height partitions patch holes to match partition construction.
4. Where existing piping is removed from floor penetrations seal holes with fire stopping per 07 84 00.
5. At new piping penetrations through full height partitions provide silicone sealant to seal all voids. At fire rated partitions and floors provide fire stopping system per 07 84 00.
6. At new piping penetrations through floors provide fire stopping system per 07 84 00.
7. Many of the pipe sleeves through the floor at steam convectors to be removed have sections of asbestos containing pipe insulation within the sleeves. Where original insulation remains at pipe sleeves remove per 02 82 13.13. See detail 1/M503.
8. All work in OI&T, Travel and Agent Cashier offices (1286A, 1288A) and Union offices will require an escort and must be performed on day shift. Arrange in advance of work with COR.
1. Infill existing convector opening for new convector per detail 4/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.
2. Remove vinyl wall covering from this wall and repair surface to receive new paint finish.
3. Infill existing convector opening for new convector per detail 4/A500. Paint this wall PNT-1 and provide new
4" vinyl wall base to match existing.
4. Infill existing projecting steel convector box for new convector per detail 5/A500. Paint new work to match existing wall and provide 4" vinyl base to match existing.
5. Not used.
6. Infill abandoned convector opening per detail 7/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.
7. Infill abandoned convector opening per detail 8/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.
8. Infill existing convector opening per detail 1/A500.
9. Paint wall PNT-2 and provide new 4" vinyl wall base to match existing.
10.Cut existing gypsum board as required to install new piping. Patch with 5/8" gypsum board to match existing.
11.Paint wall PNT-3 and provide new 4" vinyl wall base to match existing.
12.Infill abandoned convector opening per detail 9/A500. Provide new CT-1 ceramic wall tile. Extend resinous flooring integral cove base up face of wall infill to match existing.
13.Remove existing gypsum board, insulation and studs at former convector opening. Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face. Provide new plastic laminate window stool per detail 3/A500.
14.Paint wall PNT-1 and provide new 4" vinyl wall base to match existing.
15.Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face.
16.Remove existing plaster ceiling in this room including suspension system and hangers. Install new ATC-1 ceiling at height shown.
17.Remove and reinstall pews as needed to access wall.
18.Remove existing plaster and structural clay wall at column. After installation of new piping replace with light gage framing and 5/8" gypsum board.
19.Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face. Provide new plastic laminate window stool per detail 3/A500.
20.Paint wall PNT-4. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
21.Paint wall PNT-4 and provide new 4" vinyl wall base to match existing.
22.Paint wall PNT-5 and provide new 4" vinyl wall base to match existing.
23.Paint wall PNT-6 and provide new 4" vinyl wall base to match existing.
24.Remove existing gypsum board, insulation and studs at former convector opening. Frame opening for new convector per detail 1/A500.
25.Paint wall PNT-2. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
26.Paint wall PNT-7 and provide new 4" vinyl wall base to match existing.
27.Remove and re-install existing casework as required to access wall.
28.Paint wall PNT-8 and provide new 4" vinyl wall base to match existing.
29.Paint wall PNT-9 and provide new 4" vinyl wall base to match existing.
30.Provide new CT-2 ceramic wall tile and cover base over tile backer board at infilled opening to match existing.
31.Coordinate with Owner for removal and reinstallation of lab equipment to access convector.
32.Paint wall PNT-8. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
33.Paint wall PNT-9. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
34.Extend existing pipe pit in concrete floor per detail 10/A500.
35.Remove asbestos containing pipe insulation above ceiling per 02 82 13.13. Approximately 72 LF.
36.Remove asbestos containing pipe insulation above ceiling per 02 82 13.13. Approximately 10 LF.
37.Provide new wall protection sheet and 4" vinyl wall base to match existing.
38.New surface mounted convector in stairwell. Piping to be provided with surface mounted cover per mechanical.
39.Existing convector to remain with new equipment per Mechanical. Remove and reinstall existing cover.
1024 21 24 21
24 21
24 21
24 21
24 14
24 21
24 14
24 14
24 14
24 14
24 14
24 14
24 14
24 14
24 14
24 21
21 24 21
10 10
24 21
24 21
24 21
24 21
24 21
24 21
24 21
24 21
24 21
24 21 24 21 24 21 24 21
10 10
IN BID ALTERNATE 1 ELIMINATE ALL THIRD
FLOOR WORK SHOWN ON THIS DRAWING.
Keynotes
General Notes
SCALE:
Third Floor Plan - West
1/8"=1'-0"
N
MEP PROJECT NO.: G29.18.02
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
420 RAIL STREET
NEGAUNEE, MI 49866
PHONE: 906-475-6616
NDW PROJECT NUMBER: 1825
AutoCAD SHX Text SMOKE RESISTIVE WALL SMOKE BARRIER WITH ONE HOUR FIRE RATING ONE HOUR FIRE RATED WALL TWO HOUR FIRE WALL
AutoCAD SHX Text
SMOKE/ FIRE/ RATED PARTITION TYPES
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
FIRE EQUIP
AutoCAD SHX Text
RAMP UP 7"
AutoCAD SHX Text
FLOOR UP 7"
AutoCAD SHX Text
AUDIOLOGY SOUND BOOTH
AutoCAD SHX Text
AUDIOLOGY SOUND BOOTH
AutoCAD SHX Text
CARPET
AutoCAD SHX Text
VINYL TILE
AutoCAD SHX Text
FIRE EQUIP
AutoCAD SHX Text
STAIR 1
AutoCAD SHX Text
SERVICE ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
MECHANICAL SHAFT
AutoCAD SHX Text
MECH SHAFT
AutoCAD SHX Text
MECH SHAFT
AutoCAD SHX Text
AUDIOLOGY SOUND BOOTH
AutoCAD SHX Text
AUDIOLOGY SOUND BOOTH
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
LDRY CHUT
AutoCAD SHX Text
STAIR 5
AutoCAD SHX Text
2ND FLOOR ROOF
AutoCAD SHX Text
2ND FLOOR ROOF
AutoCAD SHX Text
FIRE
AutoCAD SHX Text
MECHANICAL SHAFT
AutoCAD SHX Text
SHAFT
AutoCAD SHX Text
UTILITY
AutoCAD SHX Text 3142A
AutoCAD SHX Text
HSKG
AutoCAD SHX Text
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
B.H. CONFERENCE
AutoCAD SHX Text
AutoCAD SHX Text
WORKER
AutoCAD SHX Text
SOCIAL
AutoCAD SHX Text
AutoCAD SHX Text
PSYCHOLOGIST
AutoCAD SHX Text
AutoCAD SHX Text
ASST CHIEF, B.H.
AutoCAD SHX Text
PSYCHOLOGIST /
AutoCAD SHX Text
AutoCAD SHX Text
WORKER
AutoCAD SHX Text
SOCIAL
AutoCAD SHX Text
AutoCAD SHX Text
WORKER
AutoCAD SHX Text
SOCIAL
AutoCAD SHX Text
AutoCAD SHX Text
OFFICER
AutoCAD SHX Text
ADMIN
AutoCAD SHX Text
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
BREAK
AutoCAD SHX Text
AutoCAD SHX Text
SUPPORT
AutoCAD SHX Text
BH ADMIN
AutoCAD SHX Text
AutoCAD SHX Text
CHIEF, B.H.
AutoCAD SHX Text
PSYCHOLOGIST /
AutoCAD SHX Text
AutoCAD SHX Text
WORKER
AutoCAD SHX Text
SOCIAL
AutoCAD SHX Text
AutoCAD SHX Text
& INTERNS
AutoCAD SHX Text
PYSCHOLOGIST
AutoCAD SHX Text
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
WOMEN'S
AutoCAD SHX Text
AutoCAD SHX Text
TELE-HEALTH
AutoCAD SHX Text B.H.
AutoCAD SHX Text
AutoCAD SHX Text
B.H. ADMIN.
AutoCAD SHX Text
AutoCAD SHX Text
PEERS
AutoCAD SHX Text B.H.
AutoCAD SHX Text
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
MEN'S
AutoCAD SHX Text
AutoCAD SHX Text
PEER
AutoCAD SHX Text B.H.
AutoCAD SHX Text
AutoCAD SHX Text B.H.
AutoCAD SHX Text
AutoCAD SHX Text
PSYCHOLOGIST
AutoCAD SHX Text
AutoCAD SHX Text
PSYCHIATRIST
AutoCAD SHX Text
AutoCAD SHX Text B.H.
AutoCAD SHX Text
AutoCAD SHX Text B.H.
AutoCAD SHX Text
AutoCAD SHX Text
WORKER
AutoCAD SHX Text
SOCIAL
AutoCAD SHX Text
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
SUPPLY
AutoCAD SHX Text
AutoCAD SHX Text
SUPPLY
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
MEDIA
AutoCAD SHX Text
AutoCAD SHX Text
LINEN
AutoCAD SHX Text
SOILED
AutoCAD SHX Text
AutoCAD SHX Text
WORKER
AutoCAD SHX Text
SOCIAL
AutoCAD SHX Text
AutoCAD SHX Text
LINEN
AutoCAD SHX Text
CLEAN
AutoCAD SHX Text
AutoCAD SHX Text
PSYCHOLOGIST
AutoCAD SHX Text
AutoCAD SHX Text
B.H. ADMIN.
AutoCAD SHX Text
AutoCAD SHX Text
WORKER
AutoCAD SHX Text
SOCIAL
AutoCAD SHX Text
AutoCAD SHX Text
PSYCHOLOGIST
AutoCAD SHX Text
AutoCAD SHX Text
PSYCHOLOGIST
AutoCAD SHX Text
AutoCAD SHX Text
WORKER
AutoCAD SHX Text
SOCIAL
AutoCAD SHX Text
AutoCAD SHX Text
WORKER
AutoCAD SHX Text
SOCIAL
AutoCAD SHX Text
AutoCAD SHX Text
WORKER
AutoCAD SHX Text
SOCIAL
AutoCAD SHX Text
AutoCAD SHX Text
THERAPY
AutoCAD SHX Text
SPEECH
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AUDIOLOGY
AutoCAD SHX Text 3280A
AutoCAD SHX Text
AUDIOLOGY
AutoCAD SHX Text
SOUND BOOTH
AutoCAD SHX Text
AUDIOLOGY
AutoCAD SHX Text
SOUND BOOTH
AutoCAD SHX Text
TESTING
AutoCAD SHX Text
HEARING
AutoCAD SHX Text
AutoCAD SHX Text
WORK ROOM
AutoCAD SHX Text
TECHNICIAN
AutoCAD SHX Text 3184A
AutoCAD SHX Text
WAITING RM.
AutoCAD SHX Text
AUDIOLOGY
AutoCAD SHX Text 3184B
AutoCAD SHX Text
WAITING AREA
AutoCAD SHX Text
AUDIOLOGY
AutoCAD SHX Text
AutoCAD SHX Text
CHECK-IN
AutoCAD SHX Text
AUDIOLOGY
AutoCAD SHX Text 3184C
AutoCAD SHX Text
PHONE
AutoCAD SHX Text
DATA &
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 3199C-1
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 3199A-1
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 3199B-1
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 3299A-1
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
AutoCAD SHX Text
REHAB
AutoCAD SHX Text
B.H. VOC
AutoCAD SHX Text
AutoCAD SHX Text
PSYCHIATRIST
AutoCAD SHX Text
AutoCAD SHX Text
PHARMACIST
AutoCAD SHX Text B.H.
AutoCAD SHX Text
AutoCAD SHX Text
AUDIOLOGY
AutoCAD SHX Text
SOUND BOOTH
AutoCAD SHX Text
AUDIOLOGY
AutoCAD SHX Text
SOUND BOOTH
AutoCAD SHX Text
LDRY
AutoCAD SHX Text
CHUT
AutoCAD SHX Text
WOMEN
AutoCAD SHX Text
AutoCAD SHX Text
CLERKS
AutoCAD SHX Text
RECEPTION
AutoCAD SHX Text 3105A
AutoCAD SHX Text
AUDIOLOGY WAITING RM.
AutoCAD SHX Text
B.H., NURSING,
AutoCAD SHX Text
AutoCAD SHX Text
CLERKS
AutoCAD SHX Text
B.H. CHECK-OUT
AutoCAD SHX Text
AutoCAD SHX Text
GROUP RM.
AutoCAD SHX Text B.H.
AutoCAD SHX Text
AutoCAD SHX Text
GROUP RM.
AutoCAD SHX Text B.H.
AutoCAD SHX Text
AutoCAD SHX Text
TELE-HEALTH
AutoCAD SHX Text B.H.
AutoCAD SHX Text
AutoCAD SHX Text
TELE-HEALTH
AutoCAD SHX Text B.H.
AutoCAD SHX Text
AutoCAD SHX Text A106
AutoCAD SHX Text
AutoCAD SHX Text
RU
AutoCAD SHX Text
RU
AutoCAD SHX Text
THIRD FLOOR WEST FLOOR PLAN
AutoCAD SHX Text
UPGRADE HEAT EXCHANGERS AND
AutoCAD SHX Text
REPLACE HEATING DESIGN
AutoCAD SHX Text 585-17-120
AutoCAD SHX Text No. 1
AutoCAD SHX Text
IRON MOUNTAIN, MICHIGAN
AutoCAD SHX Text
MARCH 8, 2019
AutoCAD SHX Text
AutoCAD SHX Text
50%%% REVIEW
AutoCAD SHX Text 10/24/2018
AutoCAD SHX Text
95%%% REVIEW
AutoCAD SHX Text 12/05/2018
AutoCAD SHX Text
100%%% DOCUMENTS
AutoCAD SHX Text 12/21/2018
AutoCAD SHX Text
100%%% BID DOCUMENTS
T A1
EA
ST
A
W
ES
T A1
EA
ST
A
24 21
1. Light lines indicate existing construction. Dark lines indicate new work.
2. Remove and re-install suspended acoustical tile ceilings as required for work above ceilings for piping at this floor and removal of steam lines serving floor above.
3. Where existing piping is removed from full height partitions patch holes to match partition construction.
4. Where existing piping is removed from floor penetrations seal holes with fire stopping per 07 84 00.
5. At new piping penetrations through full height partitions provide silicone sealant to seal all voids. At fire rated partitions and floors provide fire stopping system per 07 84 00.
6. At new piping penetrations through floors provide fire stopping system per 07 84 00.
7. Many of the pipe sleeves through the floor at steam convectors to be removed have sections of asbestos containing pipe insulation within the sleeves. Where original insulation remains at pipe sleeves remove per 02 82 13.13. See detail 1/M503.
8. All work in OI&T, Travel and Agent Cashier offices (1286A, 1288A) and Union offices will require an escort and must be performed on day shift. Arrange in advance of work with COR.
1. Infill existing convector opening for new convector per detail 4/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.
2. Remove vinyl wall covering from this wall and repair surface to receive new paint finish.
3. Infill existing convector opening for new convector per detail 4/A500. Paint this wall PNT-1 and provide new
4" vinyl wall base to match existing.
4. Infill existing projecting steel convector box for new convector per detail 5/A500. Paint new work to match existing wall and provide 4" vinyl base to match existing.
5. Not used.
6. Infill abandoned convector opening per detail 7/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.
7. Infill abandoned convector opening per detail 8/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.
8. Infill existing convector opening per detail 1/A500.
9. Paint wall PNT-2 and provide new 4" vinyl wall base to match existing.
10.Cut existing gypsum board as required to install new piping. Patch with 5/8" gypsum board to match existing.
11.Paint wall PNT-3 and provide new 4" vinyl wall base to match existing.
12.Infill abandoned convector opening per detail 9/A500. Provide new CT-1 ceramic wall tile. Extend resinous flooring integral cove base up face of wall infill to match existing.
13.Remove existing gypsum board, insulation and studs at former convector opening. Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face. Provide new plastic laminate window stool per detail 3/A500.
14.Paint wall PNT-1 and provide new 4" vinyl wall base to match existing.
15.Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face.
16.Remove existing plaster ceiling in this room including suspension system and hangers. Install new ATC-1 ceiling at height shown.
17.Remove and reinstall pews as needed to access wall.
18.Remove existing plaster and structural clay wall at column. After installation of new piping replace with light gage framing and 5/8" gypsum board.
19.Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face. Provide new plastic laminate window stool per detail 3/A500.
20.Paint wall PNT-4. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
21.Paint wall PNT-4 and provide new 4" vinyl wall base to match existing.
22.Paint wall PNT-5 and provide new 4" vinyl wall base to match existing.
23.Paint wall PNT-6 and provide new 4" vinyl wall base to match existing.
24.Remove existing gypsum board, insulation and studs at former convector opening. Frame opening for new convector per detail 1/A500.
25.Paint wall PNT-2. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
26.Paint wall PNT-7 and provide new 4" vinyl wall base to match existing.
27.Remove and re-install existing casework as required to access wall.
28.Paint wall PNT-8 and provide new 4" vinyl wall base to match existing.
29.Paint wall PNT-9 and provide new 4" vinyl wall base to match existing.
30.Provide new CT-2 ceramic wall tile and cover base over tile backer board at infilled opening to match existing.
31.Coordinate with Owner for removal and reinstallation of lab equipment to access convector.
32.Paint wall PNT-8. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
33.Paint wall PNT-9. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
34.Extend existing pipe pit in concrete floor per detail 10/A500.
35.Remove asbestos containing pipe insulation above ceiling per 02 82 13.13. Approximately 72 LF.
36.Remove asbestos containing pipe insulation above ceiling per 02 82 13.13. Approximately 10 LF.
37.Provide new wall protection sheet and 4" vinyl wall base to match existing.
38.New surface mounted convector in stairwell. Piping to be provided with surface mounted cover per mechanical.
39.Existing convector to remain with new equipment per Mechanical. Remove and reinstall existing cover.
11 10 10
811 811
825 825 8
10 82610 10
10 826 82610
82110 10
IN BID ALTERNATE 1 ELIMINATE THIRD
FLOOR WORK IN ROOM 3280A.
Keynotes
General Notes
SCALE:
Third Floor Plan - East
1/8"=1'-0"
N
MEP PROJECT NO.: G29.18.02
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
420 RAIL STREET
NEGAUNEE, MI 49866
PHONE: 906-475-6616
NDW PROJECT NUMBER: 1825
AutoCAD SHX Text
FIRE EQUIP
AutoCAD SHX Text
LDRY CHUT
AutoCAD SHX Text
RAMP UP 7"
AutoCAD SHX Text
FLOOR UP 7"
AutoCAD SHX Text
DUCT
AutoCAD SHX Text
DUMB WAITER
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
STAIR 3
AutoCAD SHX Text
STAIR 2
AutoCAD SHX Text
STAIR 4
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
MECH SHAFT
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text K-2005
AutoCAD SHX Text
2ND FLOOR ROOF
AutoCAD SHX Text
2ND FLOOR ROOF
AutoCAD SHX Text
2ND FLOOR ROOF
AutoCAD SHX Text
MECH SHAFT
AutoCAD SHX Text
MECH CHASE
AutoCAD SHX Text
2ND FLOOR ROOF
AutoCAD SHX Text
SHAFT
AutoCAD SHX Text
PASSAGE
AutoCAD SHX Text
AutoCAD SHX Text
STOR.
AutoCAD SHX Text
NURSE ED.
AutoCAD SHX Text
AutoCAD SHX Text
THERAPY
AutoCAD SHX Text
SPEECH
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AUDIOLOGY
AutoCAD SHX Text 3280A
AutoCAD SHX Text
AUDIOLOGY
AutoCAD SHX Text
SOUND BOOTH
AutoCAD SHX Text
AUDIOLOGY
AutoCAD SHX Text
SOUND BOOTH
AutoCAD SHX Text
TESTING
AutoCAD SHX Text
HEARING
AutoCAD SHX Text
AutoCAD SHX Text
HEALTH
AutoCAD SHX Text
TELE-
AutoCAD SHX Text
AutoCAD SHX Text
GROUP ROOM
AutoCAD SHX Text
WHOLE HEALTH
AutoCAD SHX Text
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
HEALTH
AutoCAD SHX Text
TELE-
AutoCAD SHX Text
AutoCAD SHX Text
MECH
AutoCAD SHX Text 3244A
AutoCAD SHX Text
LOBBY
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
BIO-MED
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
HSKG
AutoCAD SHX Text
AutoCAD SHX Text
HSKG
AutoCAD SHX Text
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
AREA
AutoCAD SHX Text
WAITING
AutoCAD SHX Text
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
PHONE
AutoCAD SHX Text
DATA &
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 3299A-1
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 3299B-1
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
AutoCAD SHX Text
STERILE
AutoCAD SHX Text
CLEAN STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
LAB
AutoCAD SHX Text
AutoCAD SHX Text
SOILED
AutoCAD SHX Text
AutoCAD SHX Text
OPERATORY
AutoCAD SHX Text
AutoCAD SHX Text
OPERATORY
AutoCAD SHX Text
AutoCAD SHX Text
OPERATORY
AutoCAD SHX Text
AutoCAD SHX Text
OPERATORY
AutoCAD SHX Text
AutoCAD SHX Text
CHIEF, DENTAL
AutoCAD SHX Text
AutoCAD SHX Text
X-RAY
AutoCAD SHX Text
AutoCAD SHX Text
CONTROL
AutoCAD SHX Text 3228A
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
WAITING
AutoCAD SHX Text
AutoCAD SHX Text
PASSAGE
AutoCAD SHX Text 3237A
AutoCAD SHX Text
PASSAGE
AutoCAD SHX Text
AutoCAD SHX Text
WORK
AutoCAD SHX Text
CLERK/
AutoCAD SHX Text
AutoCAD SHX Text
TOILET
AutoCAD SHX Text 3225A
AutoCAD SHX Text
MEN
AutoCAD SHX Text
AutoCAD SHX Text
WOMEN
AutoCAD SHX Text
AutoCAD SHX Text
CLERKS
AutoCAD SHX Text
RECEPTION
AutoCAD SHX Text 3105A
AutoCAD SHX Text
AUDIOLOGY WAITING RM.
AutoCAD SHX Text
B.H., NURSING,
AutoCAD SHX Text
AutoCAD SHX Text
TRAINING ROOM
AutoCAD SHX Text
NURSE EDUCATION
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
NURSE EDUCATI
AutoCAD SHX Text
AutoCAD SHX Text
PASSAGEWAY
AutoCAD SHX Text
AutoCAD SHX Text
TRAINING ROOM
AutoCAD SHX Text
NURSE EDUCATION
AutoCAD SHX Text
AutoCAD SHX Text
RECORDS
AutoCAD SHX Text
MEDICAL
AutoCAD SHX Text
AutoCAD SHX Text
TOILET
AutoCAD SHX Text 3246A
AutoCAD SHX Text
TOILET
AutoCAD SHX Text 3250A
AutoCAD SHX Text
OPERATORY
AutoCAD SHX Text
AutoCAD SHX Text
OPERATORY
AutoCAD SHX Text
AutoCAD SHX Text
SUPPLY
AutoCAD SHX Text
STERILE
AutoCAD SHX Text
AutoCAD SHX Text
SUPPLY
AutoCAD SHX Text
CLEAN
AutoCAD SHX Text
AutoCAD SHX Text
UTILITY
AutoCAD SHX Text
SOILED
AutoCAD SHX Text
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
& LOCKERS
AutoCAD SHX Text
STAFF LOUNGE
AutoCAD SHX Text
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
AutoCAD SHX Text
EXAM RM.
AutoCAD SHX Text
TELE-HEALTH
AutoCAD SHX Text
AutoCAD SHX Text
MANAGER
AutoCAD SHX Text
NURSE
AutoCAD SHX Text
AutoCAD SHX Text
STAFF OFFICE
AutoCAD SHX Text
TELE-HEALTH
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
MSA
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 3299C-1
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
AutoCAD SHX Text SMOKE RESISTIVE WALL SMOKE BARRIER WITH ONE HOUR FIRE RATING ONE HOUR FIRE RATED WALL TWO HOUR FIRE WALL
AutoCAD SHX Text
SMOKE/ FIRE/ RATED PARTITION TYPES
AutoCAD SHX Text A107
AutoCAD SHX Text
AutoCAD SHX Text
RU
AutoCAD SHX Text
RU
AutoCAD SHX Text
THIRD FLOOR EAST FLOOR PLAN
AutoCAD SHX Text
UPGRADE HEAT EXCHANGERS AND
AutoCAD SHX Text
REPLACE HEATING DESIGN
AutoCAD SHX Text 585-17-120
AutoCAD SHX Text No. 1
AutoCAD SHX Text
IRON MOUNTAIN, MICHIGAN
AutoCAD SHX Text
MARCH 8, 2019
AutoCAD SHX Text
AutoCAD SHX Text
50%%% REVIEW
AutoCAD SHX Text 10/24/2018
AutoCAD SHX Text
95%%% REVIEW
AutoCAD SHX Text 12/05/2018
AutoCAD SHX Text
100%%% DOCUMENTS
AutoCAD SHX Text 12/21/2018
AutoCAD SHX Text
100%%% BID DOCUMENTS
1. Light lines indicate existing construction. Dark lines indicate new work.
2. Remove and re-install suspended acoustical tile ceilings as required for work above ceilings for piping at this floor and removal of steam lines serving floor above.
3. Where existing piping is removed from full height partitions patch holes to match partition construction.
4. Where existing piping is removed from floor penetrations seal holes with fire stopping per 07 84 00.
5. At new piping penetrations through full height partitions provide silicone sealant to seal all voids. At fire rated partitions and floors provide fire stopping system per 07 84 00.
6. At new piping penetrations through floors provide fire stopping system per 07 84 00.
7. Many of the pipe sleeves through the floor at steam convectors to be removed have sections of asbestos containing pipe insulation within the sleeves. Where original insulation remains at pipe sleeves remove per 02 82 13.13. See detail 1/M503.
8. All work in OI&T, Travel and Agent Cashier offices (1286A, 1288A) and Union offices will require an escort and must be performed on day shift. Arrange in advance of work with COR.
1. Infill existing convector opening for new convector per detail 4/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.
2. Remove vinyl wall covering from this wall and repair surface to receive new paint finish.
3. Infill existing convector opening for new convector per detail 4/A500. Paint this wall PNT-1 and provide new
4" vinyl wall base to match existing.
4. Infill existing projecting steel convector box for new convector per detail 5/A500. Paint new work to match existing wall and provide 4" vinyl base to match existing.
5. Not used.
6. Infill abandoned convector opening per detail 7/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.
7. Infill abandoned convector opening per detail 8/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.
8. Infill existing convector opening per detail 1/A500.
9. Paint wall PNT-2 and provide new 4" vinyl wall base to match existing.
10.Cut existing gypsum board as required to install new piping. Patch with 5/8" gypsum board to match existing.
11.Paint wall PNT-3 and provide new 4" vinyl wall base to match existing.
12.Infill abandoned convector opening per detail 9/A500. Provide new CT-1 ceramic wall tile. Extend resinous flooring integral cove base up face of wall infill to match existing.
13.Remove existing gypsum board, insulation and studs at former convector opening. Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face. Provide new plastic laminate window stool per detail 3/A500.
14.Paint wall PNT-1 and provide new 4" vinyl wall base to match existing.
15.Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face.
16.Remove existing plaster ceiling in this room including suspension system and hangers. Install new ATC-1 ceiling at height shown.
17.Remove and reinstall pews as needed to access wall.
18.Remove existing plaster and structural clay wall at column. After installation of new piping replace with light gage framing and 5/8" gypsum board.
19.Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face. Provide new plastic laminate window stool per detail 3/A500.
20.Paint wall PNT-4. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
21.Paint wall PNT-4 and provide new 4" vinyl wall base to match existing.
22.Paint wall PNT-5 and provide new 4" vinyl wall base to match existing.
23.Paint wall PNT-6 and provide new 4" vinyl wall base to match existing.
24.Remove existing gypsum board, insulation and studs at former convector opening. Frame opening for new convector per detail 1/A500.
25.Paint wall PNT-2. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
26.Paint wall PNT-7 and provide new 4" vinyl wall base to match existing.
27.Remove and re-install existing casework as required to access wall.
28.Paint wall PNT-8 and provide new 4" vinyl wall base to match existing.
29.Paint wall PNT-9 and provide new 4" vinyl wall base to match existing.
30.Provide new CT-2 ceramic wall tile and cover base over tile backer board at infilled opening to match existing.
31.Coordinate with Owner for removal and reinstallation of lab equipment to access convector.
32.Paint wall PNT-8. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
33.Paint wall PNT-9. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
34.Extend existing pipe pit in concrete floor per detail 10/A500.
35.Remove asbestos containing pipe insulation above ceiling per 02 82 13.13. Approximately 72 LF.
36.Remove asbestos containing pipe insulation above ceiling per 02 82 13.13. Approximately 10 LF.
37.Provide new wall protection sheet and 4" vinyl wall base to match existing.
38.New surface mounted convector in stairwell. Piping to be provided with surface mounted cover per mechanical.
39.Existing convector to remain with new equipment per Mechanical. Remove and reinstall existing cover.
WORK IN THIS AREA IS ABOVE CEILING
STEAM PIPING DEMOLITION AND NEW
PIPING TO SIXTH FLOOR CONVECTORS.
REMOVE AND REPLACE SUSPENDED
ACOUSTICAL TILE CEILINGS AS NEEDED.
WORK IN THIS AREA IS ABOVE CEILING
STEAM PIPING DEMOLITION AND NEW
PIPING TO SIXTH FLOOR CONVECTORS.
REMOVE AND REPLACE SUSPENDED
ACOUSTICAL TILE CEILINGS AS NEEDED.
WORK IN THIS AREA IS ABOVE CEILING
STEAM PIPING DEMOLITION AND NEW
PIPING TO SIXTH FLOOR CONVECTORS.
REMOVE AND REPLACE SUSPENDED
ACOUSTICAL TILE CEILINGS AS NEEDED.
8'-0"
38 38
Keynotes
General Notes
SCALE:
Fifth Floor Plan
1/8"=1'-0"
N
MEP PROJECT NO.: G29.18.02
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
420 RAIL STREET
NEGAUNEE, MI 49866
PHONE: 906-475-6616
NDW PROJECT NUMBER: 1825
AutoCAD SHX Text SMOKE RESISTIVE WALL SMOKE BARRIER WITH ONE HOUR FIRE RATING ONE HOUR FIRE RATED WALL TWO HOUR FIRE WALL
AutoCAD SHX Text
SMOKE/ FIRE/ RATED PARTITION TYPES
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
RAMP UP
AutoCAD SHX Text
FLOOR RAISED 9"
AutoCAD SHX Text
STEP UP
AutoCAD SHX Text
DUMB WAITER
AutoCAD SHX Text
DN
AutoCAD SHX Text
STAIR 5
AutoCAD SHX Text
LDRY CHUT
AutoCAD SHX Text
FIRE EQUIP
AutoCAD SHX Text
STAIR 1
AutoCAD SHX Text
STAIR 3
AutoCAD SHX Text
STEP UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
STAIR 2
AutoCAD SHX Text
DN
AutoCAD SHX Text
STAIR 4
AutoCAD SHX Text
DUCT INTAKE
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
SERVICE ELEVATOR
AutoCAD SHX Text
MECH SHAFT
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
LDRY CHUT
AutoCAD SHX Text
PIPE SHAFT
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
FE
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text
OI&T
AutoCAD SHX Text
AutoCAD SHX Text
CONSTRUCTION
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
AutoCAD SHX Text
SERVERS
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text 5281A
AutoCAD SHX Text
CONSTRUCTION
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
WOMENS
AutoCAD SHX Text
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
UNISEX
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text 5215A
AutoCAD SHX Text
MEDICINE
AutoCAD SHX Text
CHIEF OF
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
CAC
AutoCAD SHX Text
AutoCAD SHX Text
TOILET
AutoCAD SHX Text 5207A
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
UNION
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
UNION
AutoCAD SHX Text 5205A
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
UNION
AutoCAD SHX Text
AutoCAD SHX Text
NURSING
AutoCAD SHX Text
OFFICE FOR
AutoCAD SHX Text
AutoCAD SHX Text
OEF/IEF
AutoCAD SHX Text
AutoCAD SHX Text
EQUIP
AutoCAD SHX Text
BIOMED
AutoCAD SHX Text
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
CONFERENCE
AutoCAD SHX Text
AutoCAD SHX Text
IMPROVEMENT ADMIN.
AutoCAD SHX Text
PERFORMANCE
AutoCAD SHX Text
AutoCAD SHX Text
OFFICER
AutoCAD SHX Text
COMPLIANCE
AutoCAD SHX Text
AutoCAD SHX Text
IMPROVEMENT
AutoCAD SHX Text
CHIEF, PERFORMANCE
AutoCAD SHX Text
AutoCAD SHX Text
AREA
AutoCAD SHX Text
PRINTER
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
PI/QA
AutoCAD SHX Text
AutoCAD SHX Text
STATIONS
AutoCAD SHX Text
PI/QA WORK
AutoCAD SHX Text
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
CONFERENCE
AutoCAD SHX Text
AutoCAD SHX Text
DIRECTOR
AutoCAD SHX Text
HSS TO
AutoCAD SHX Text
AutoCAD SHX Text
OF STAFF
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
OF NURSING
AutoCAD SHX Text
DIRECTOR
AutoCAD SHX Text
AutoCAD SHX Text
SECRETARY'S
AutoCAD SHX Text
NURSING & DIRECTOR'S
AutoCAD SHX Text
AutoCAD SHX Text
CREDENTIALS
AutoCAD SHX Text
AutoCAD SHX Text
ASSOC. DIRECTOR
AutoCAD SHX Text
HHS TO
AutoCAD SHX Text
AutoCAD SHX Text
AD, COS, AND PRI.CARE
AutoCAD SHX Text
ADMIN SUPPORT FOR
AutoCAD SHX Text
AutoCAD SHX Text
PRI CARE / NURS.
AutoCAD SHX Text
ADMIN SUPPORT
AutoCAD SHX Text
AutoCAD SHX Text
PROGRAM MNGR.
AutoCAD SHX Text
WOMEN VETERAN
AutoCAD SHX Text
AutoCAD SHX Text
ADMIN NURSING
AutoCAD SHX Text
HHS TO COS &
AutoCAD SHX Text
AutoCAD SHX Text
PHONE
AutoCAD SHX Text
DATA &
AutoCAD SHX Text
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
MECH
AutoCAD SHX Text 5281B
AutoCAD SHX Text
LOUNGE
AutoCAD SHX Text
STAFF
AutoCAD SHX Text
AutoCAD SHX Text
NURSING
AutoCAD SHX Text
OFFICE FOR
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text 5211A
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 5299B-1
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 5299D-1
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 5299C-1
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 5199A-1
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
AFFAIRS
AutoCAD SHX Text
PUBLIC
AutoCAD SHX Text
AutoCAD SHX Text
OF NURSING
AutoCAD SHX Text
ASST. CHIEF
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
DIRECTORS
AutoCAD SHX Text
AutoCAD SHX Text
DIRECTOR
AutoCAD SHX Text
ASSOCIATE
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 5299E-1
AutoCAD SHX Text
CONSTRUCTION
AutoCAD SHX Text
UNDER
AutoCAD SHX Text 5180-1
AutoCAD SHX Text
LOBBY
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text 5299A-1
AutoCAD SHX Text
CENTER
AutoCAD SHX Text
CONFERENCE
AutoCAD SHX Text
AutoCAD SHX Text
CONSTRUCTION
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
XXXX
AutoCAD SHX Text
MEN'S RESTRM
AutoCAD SHX Text
AutoCAD SHX Text
RESTROOM
AutoCAD SHX Text
WOMEN'S
AutoCAD SHX Text
AutoCAD SHX Text
CONSTRUCTION
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
XXXX
AutoCAD SHX Text
RM.
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
OFFICES
AutoCAD SHX Text
OI&T
AutoCAD SHX Text
AutoCAD SHX Text
TECH
AutoCAD SHX Text
LEAD IT
AutoCAD SHX Text 5114A
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
OI&T
AutoCAD SHX Text 5114B
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
OI&T
AutoCAD SHX Text
AutoCAD SHX Text
PHONE
AutoCAD SHX Text
DATA
AutoCAD SHX Text
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
TEAM
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
OPEN
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
OPEN
AutoCAD SHX Text
AutoCAD SHX Text
SPECIALIST
AutoCAD SHX Text
WORKERS COMP
AutoCAD SHX Text
AutoCAD SHX Text
WORKROOM
AutoCAD SHX Text
AutoCAD SHX Text
WORKSTATIONS
AutoCAD SHX Text
OPEN
AutoCAD SHX Text
AutoCAD SHX Text
CHIEF HR
AutoCAD SHX Text
ASSISTANT
AutoCAD SHX Text
AutoCAD SHX Text
HR
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
AutoCAD SHX Text
ASSIST.
AutoCAD SHX Text
PROGRAM
AutoCAD SHX Text
AutoCAD SHX Text
WORKSTATIONS
AutoCAD SHX Text
OPEN
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
OFFICER
AutoCAD SHX Text
PRIVACY
AutoCAD SHX Text
AutoCAD SHX Text
LOUNGE
AutoCAD SHX Text
STAFF
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 5199B-1
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 5199C-1
AutoCAD SHX Text
CONST.
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
PI/QA
AutoCAD SHX Text 5299F-1
AutoCAD SHX Text
CLST
AutoCAD SHX Text
HSKG
AutoCAD SHX Text
AutoCAD SHX Text A108
AutoCAD SHX Text
AutoCAD SHX Text
RU
AutoCAD SHX Text
RU
AutoCAD SHX Text
FIFTH FLOOR PLAN
AutoCAD SHX Text
UPGRADE HEAT EXCHANGERS AND
AutoCAD SHX Text
REPLACE HEATING DESIGN
AutoCAD SHX Text 585-17-120
AutoCAD SHX Text No. 1
AutoCAD SHX Text
IRON MOUNTAIN, MICHIGAN
AutoCAD SHX Text
MARCH 8, 2019
AutoCAD SHX Text
AutoCAD SHX Text
50%%% REVIEW
AutoCAD SHX Text 10/24/2018
AutoCAD SHX Text
95%%% REVIEW
AutoCAD SHX Text 12/05/2018
AutoCAD SHX Text
100%%% DOCUMENTS
AutoCAD SHX Text 12/21/2018
AutoCAD SHX Text
100%%% BID DOCUMENTS
1. Light lines indicate existing construction. Dark lines indicate new work.
2. Remove and re-install suspended acoustical tile ceilings as required for work above ceilings for piping at this floor and removal of steam lines serving floor above.
3. Where existing piping is removed from full height partitions patch holes to match partition construction.
4. Where existing piping is removed from floor penetrations seal holes with fire stopping per 07 84 00.
5. At new piping penetrations through full height partitions provide silicone sealant to seal all voids. At fire rated partitions and floors provide fire stopping system per 07 84 00.
6. At new piping penetrations through floors provide fire stopping system per 07 84 00.
7. Many of the pipe sleeves through the floor at steam convectors to be removed have sections of asbestos containing pipe insulation within the sleeves. Where original insulation remains at pipe sleeves remove per 02 82 13.13. See detail 1/M503.
8. All work in OI&T, Travel and Agent Cashier offices (1286A, 1288A) and Union offices will require an escort and must be performed on day shift. Arrange in advance of work with COR.
1. Infill existing convector opening for new convector per detail 4/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.
2. Remove vinyl wall covering from this wall and repair surface to receive new paint finish.
3. Infill existing convector opening for new convector per detail 4/A500. Paint this wall PNT-1 and provide new
4" vinyl wall base to match existing.
4. Infill existing projecting steel convector box for new convector per detail 5/A500. Paint new work to match existing wall and provide 4" vinyl base to match existing.
5. Not used.
6. Infill abandoned convector opening per detail 7/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.
7. Infill abandoned convector opening per detail 8/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.
8. Infill existing convector opening per detail 1/A500.
9. Paint wall PNT-2 and provide new 4" vinyl wall base to match existing.
10.Cut existing gypsum board as required to install new piping. Patch with 5/8" gypsum board to match existing.
11.Paint wall PNT-3 and provide new 4" vinyl wall base to match existing.
12.Infill abandoned convector opening per detail 9/A500. Provide new CT-1 ceramic wall tile. Extend resinous flooring integral cove base up face of wall infill to match existing.
13.Remove existing gypsum board, insulation and studs at former convector opening. Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face. Provide new plastic laminate window stool per detail 3/A500.
14.Paint wall PNT-1 and provide new 4" vinyl wall base to match existing.
15.Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face.
16.Remove existing plaster ceiling in this room including suspension system and hangers. Install new ATC-1 ceiling at height shown.
17.Remove and reinstall pews as needed to access wall.
18.Remove existing plaster and structural clay wall at column. After installation of new piping replace with light gage framing and 5/8" gypsum board.
19.Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face. Provide new plastic laminate window stool per detail 3/A500.
20.Paint wall PNT-4. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
21.Paint wall PNT-4 and provide new 4" vinyl wall base to match existing.
22.Paint wall PNT-5 and provide new 4" vinyl wall base to match existing.
23.Paint wall PNT-6 and provide new 4" vinyl wall base to match existing.
24.Remove existing gypsum board, insulation and studs at former convector opening. Frame opening for new convector per detail 1/A500.
25.Paint wall PNT-2. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
26.Paint wall PNT-7 and provide new 4" vinyl wall base to match existing.
27.Remove and re-install existing casework as required to access wall.
28.Paint wall PNT-8 and provide new 4" vinyl wall base to match existing.
29.Paint wall PNT-9 and provide new 4" vinyl wall base to match existing.
30.Provide new CT-2 ceramic wall tile and cover base over tile backer board at infilled opening to match existing.
31.Coordinate with Owner for removal and reinstallation of lab equipment to access convector.
32.Paint wall PNT-8. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
33.Paint wall PNT-9. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
34.Extend existing pipe pit in concrete floor per detail 10/A500.
35.Remove asbestos containing pipe insulation above ceiling per 02 82 13.13. Approximately 72 LF.
36.Remove asbestos containing pipe insulation above ceiling per 02 82 13.13. Approximately 10 LF.
37.Provide new wall protection sheet…
This is the start of the file's text. The full file is on GovTribe.