36C25219B0035-004.pdf
PDF 7 MB Posted
- Solicitation number
- 36C25219B0035
About this file
36C25219B0035 S02 - Att - Final Drawing 08Mar19 - 1 of 5.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25219C0136-000.docx | DOCX document | |
| 36C25219B0035-A00003001.pdf | ||
| 36C25219B0035-A00003000.docx | DOCX document | |
| 36C25219B0035-A00003002.pdf | ||
| 36C25219B0035-A00002001.pdf | ||
| 36C25219B0035-A00002000.docx | DOCX document | |
| 36C25219B0035-A00002002.pdf | ||
| 36C25219B0035-0001001.pdf | ||
| 36C25219B0035-0001000.docx | DOCX document | |
| 36C25219B0035-007.pdf | ||
| 36C25219B0035-006.pdf | ||
| 36C25219B0035-005.pdf | ||
| 36C25219B0035-002.docx | DOCX document | |
| 36C25219B0035-003.pdf | ||
| 36C25219B0035-008.pdf | ||
| 36C25219B0035-001.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET INDEX
GENERAL
1. G001 TITLE SHEET/LOCATION MAP
ARCHITECTURAL
2. A001 BASEMENT PHASING PLAN
3. A002 FIRST FLOOR PHASING PLAN
4. A003 SECOND FLOOR PHASING PLAN
5. A004 THIRD FLOOR PHASING PLAN
6. A005 FIFTH AND SIXTH FLOOR PHASING PLAN
7. A100 BASEMENT WEST FLOOR PLAN
8. A101 BASEMENT EAST FLOOR PLAN
9. A102 FIRST FLOOR WEST FLOOR PLAN
10. A103 FIRST FLOOR EAST FLOOR PLAN
11. A104 SECOND FLOOR WEST FLOOR PLAN
12. A105 SECOND FLOOR EAST FLOOR PLAN
13. A106 THIRD FLOOR WEST FLOOR PLAN
14. A107 THIRD FLOOR EAST FLOOR PLAN
15. A108 FIFTH FLOOR PLAN
16. A109 SIXTH FLOOR PLAN
17. A500 ARCHITECTURAL DETAILS
FIRE PROTECTION
18. FP101 PARTIAL BASEMENT AND FIFTH FLOOR FIRE PROTECTION PLANS
MECHANICAL
19. M001 MECHANICAL NOTES, SYMBOLS, AND ABBREVIATIONS
20. M002 MECHANICAL NOTES, SYMBOLS, AND ABBREVIATIONS
21. MD099A SUB-BASEMENT MECHANICAL STEAM DEMOLITION PLAN AREA A
22. MD099B SUB-BASEMENT MECHANICAL STEAM DEMOLITION PLAN AREA B
23. MD099C SUB-BASEMENT MECHANICAL STEAM DEMOLITION PLAN AREA C
24. MD100A BASEMENT FLOOR WEST MECHANICAL STEAM DEMOLITION PLAN
25. MD100B BASEMENT FLOOR EAST MECHANICAL STEAM DEMOLITION PLAN
26. MD101A FIRST FLOOR WEST MECHANICAL STEAM DEMOLITION PLAN
27. MD101B FIRST FLOOR EAST MECHANICAL STEAM DEMOLITION PLAN
28. MD102A SECOND FLOOR WEST MECHANICAL STEAM DEMOLITION PLAN
29. MD102B SECOND FLOOR EAST MECHANICAL STEAM DEMOLITION PLAN
30. MD103A THIRD FLOOR WEST MECHANICAL STEAM DEMOLITION PLAN
31. MD103B THIRD FLOOR EAST MECHANICAL STEAM DEMOLITION PLAN
32. MD105A FIFTH FLOOR WEST MECHANICAL STEAM DEMOLITION PLAN
33. MD105B FIFTH FLOOR EAST MECHANICAL STEAM DEMOLITION PLAN
34. MD106 SIXTH FLOOR MECHANICAL STEAM DEMOLITION PLAN
35. MD200C BASEMENT FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA C
36. MD203A THIRD FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA A
37. MD203B THIRD FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA B
38. MD203D THIRD FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA D
39. MD203E THIRD FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA E
40. MD205A FIFTH FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA A
41. MD205B FIFTH FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA B
42. MD205C FIFTH FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA C
43. MD206A SIXTH FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA A
44. MP099A SUB-BASEMENT MECHANICAL PIPING PLAN AREA A
45. MP200A BASEMENT FLOOR MECHANICAL PIPING PLAN AREA A
46. MP200B BASEMENT FLOOR MECHANICAL PIPING PLAN AREA B
47. MP200C BASEMENT FLOOR MECHANICAL PIPING PLAN AREA C
48. MP200D BASEMENT FLOOR MECHANICAL PIPING PLAN AREA D
49. MP200E BASEMENT FLOOR MECHANICAL PIPING PLAN AREA E
50. MP200F BASEMENT FLOOR MECHANCIAL PIPING PLAN AREA F
51. MP201A FIRST FLOOR MECHANICAL PIPING PLAN AREA A
52. MP201B FIRST FLOOR MECHANICAL PIPING PLAN AREA B
53. MP201C FIRST FLOOR MECHANICAL PIPING PLAN AREA C
54. MP202A SECOND FLOOR MECHANICAL PIPING PLAN AREA A
55. MP202B SECOND FLOOR MECHANICAL PIPING PLAN AREA B
56. MP203A THIRD FLOOR MECHANICAL PIPING PLAN AREA A
57. MP203B THIRD FLOOR MECHANICAL PIPING PLAN AREA B
58. MP203C THIRD FLOOR MECHANICAL PIPING PLAN AREA C
59. MP203D THIRD FLOOR MECHANICAL PIPING PLAN AREA D
60. MP203E THIRD FLOOR MECHANICAL PIPING PLAN AREA E
61. MP205A FIFTH FLOOR MECHANICAL PIPING PLAN AREA A
62. MP205B FIFTH FLOOR MECHANICAL PIPING PLAN AREA B
63. MP205C FIFTH FLOOR MECHANICAL PIPING PLAN AREA C
64. MP206A SIXTH FLOOR MECHANICAL PIPING PLAN AREA A
65. MP206B SIXTH FLOOR MECHANICAL PIPING PLAN AREA B
66. MP206C SIXTH FLOOR MECHANICAL PIPING PLAN AREA C
67. MH200A PARTIAL BASEMENT MECHANICAL DUCTWORK PLAN DEMO & NEW
68. M501 MECHANICAL DETAILS
69. M502 MECHANICAL DETAILS
70. M503 MECHANICAL DETAILS
71. M601 MECHANICAL SCHEDULES
72. M602 MECHANICAL SCHEDULES
73. M603 MECHANICAL SCHEDULES
74. M701 MECHANICAL CONTROL DIAGRAMS
75. M801 HOT WATER PIPING WEST RISER DIAGRAM
76. M802 HOT WATER PIPING EAST RISER DIAGRAM
77. M803 STEAM DEMOLITION RISER DIAGRAM
78. M804 STEAM DEMOLITION RISER DIAGRAM
79. M805 STEAM DEMOLITION RISER DIAGRAM
ELECTRICAL
80. E001 ELECTRICAL NOTES, SYMBOLS, AND ABBREVIATIONS
81. EP100 ELECTRICAL BASEMENT PLAN
82. EP110 ELECTRICAL FIRST FLOOR PLAN
83. EP130 ELECTRICAL THIRD FLOOR WEST PLAN
84. EP160 ELECTRICAL SIXTH FLOOR WEST PLAN
Electrical, Mechanical, & Plumbing Engineering MEP Associates, LLC 2720 Arbor Court Eau Claire, WI 54701 715.832.5680 www.mepassocaites.com
PREPARED BY:
VA PROJECT NUMBER: 585-17-120
OSCAR G. JOHNSON VA MEDICAL CENTER
325 EAST H STREET
IRON MOUNTAIN, MI 49801
Director
Associate Director
Chief of Staff
Associate Director for N&PCS
Infection Control Nurse
Industrial Hygienist
Chief of Engineering
Chief of Police
Patient Safety
A.F.G.E.
VA MEDICAL CENTER
325 EAST H STREET
IRON MOUNTAIN, MI 49801
Safety
MEP PROJECT NO.: G29.18.02
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
UPGRADE HEAT EXCHANGERS & REPLACE PERIMETER HEAT
3/8/1
3/8/1
1. Not used.
W
ES
T A1
EA
ST
A
W
ES
T A1
EA
ST
A
1. Basement floor project area is a Business occupancy per NFPA 101 - 2018.
2. Light lines indicate existing work to remain, dark lines indicate new work.
3. Field verify all dimensions and clearances before beginning construction.
4. Floor structure is Two-Hour Rated Concrete Construction. Maintain fire rating and provide firestopping at all penetrations.
5. Patch all abandoned holes in floors with concrete to match existing construction.
6. At all removed piping and conduit fill all holes in partitions indicated to be fire rated with firestopping to meet or exceed wall rating. Fill all holes in smoke resistive walls or full height partitions to seal opening.
7. Remove and reinstall ceiling tile as required to install new piping. Replace any damaged ceiling tile to match existing.
8. All work outside of enclosed (limited access) work zones shall be at night, between the hours of 4:30 PM and
10:00 PM.
9. Refer to 01 00 00 General Conditions, Section 1.6H for specific phase requirements and milestones.
10.Contractor may propose alternate phasing plan with COR approval.
PHASE 18
PHASE 20
PHASE 19
PHASE 17
PHASE 0 - WILL COMMENCE WITH THE ISSUANCE OF THE NOTICE TO PROCEED
AND SHALL CONSIST OF SCHEDULE PREPARATION AND APPROVAL.
UNPHASED - THESE SPACES ARE AVAILABLE FOR CONSTRUCTION AT ANY TIME
FROM JUNE THROUGH AUGUST.
PHASING NOTE
A MAXIMUM OF FOUR ROOMS MAY
BE OUT OF USE AT ANY TIME IN
EACH PHASE. EIGHT ROOMS TOTAL
MAY BE OUT OF USE AT ANY TIME
UNLESS APPROVED BY THE COR.
PERIMETER HEAT DOES NOT NEED
TO BE OPERATIONAL BUT ALL
PRESSURE TESTING, FINISHES AND
CLEANING NEED TO BE COMPLETED
BEFORE TURNING ROOMS BACK TO
OWNER.
PHASE 15 - SEE A002 FOR REMAINDER OF PHASE 15 WORK
Keynotes
General Notes
SCALE:
Basement Phasing Plan
1/16"=1'-0"
N
MEP PROJECT NO.: G29.18.02
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
420 RAIL STREET
NEGAUNEE, MI 49866
PHONE: 906-475-6616
NDW PROJECT NUMBER: 1825
AutoCAD SHX Text
TA
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
TA
AutoCAD SHX Text
TA
AutoCAD SHX Text
TA
AutoCAD SHX Text
TA
AutoCAD SHX Text
FIRE EQUIP
AutoCAD SHX Text
LAUNDRY CHUTE ABOVE
AutoCAD SHX Text
TA
AutoCAD SHX Text
FIRE EQUIP
AutoCAD SHX Text
DUMB WAITER
AutoCAD SHX Text
COILING OH DOOR
AutoCAD SHX Text
FIRE EQUIP
AutoCAD SHX Text
TA
AutoCAD SHX Text
TA
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
ELECTRIC TRANSFORMERS ON 4" RAISED CONC SLAB
AutoCAD SHX Text
TA
AutoCAD SHX Text
HYDRAULIC POWER UNIT
AutoCAD SHX Text
AHU
AutoCAD SHX Text
FD
AutoCAD SHX Text
COILING OH DOOR
AutoCAD SHX Text
COILING OH DOOR
AutoCAD SHX Text
COILING OH DOOR
AutoCAD SHX Text
LIFT
AutoCAD SHX Text
STAIR 5
AutoCAD SHX Text
UP
AutoCAD SHX Text
SLOPED CEILING
AutoCAD SHX Text
COILING OH FABRIC DOOR
AutoCAD SHX Text
COIL CABINET
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
SERVICE ELEVATOR
AutoCAD SHX Text
STAIR 2
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
STAIR 3
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
TA
AutoCAD SHX Text
TA
AutoCAD SHX Text
UP
AutoCAD SHX Text
STAIR 7
AutoCAD SHX Text
BLAST CHILLER
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
PIPE CHASE
AutoCAD SHX Text
ACCESS
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
ELECTRICAL EQUIPMENT
AutoCAD SHX Text
ELECTRIC TRANSFORMERS ON 4" RAISED CONC SLAB
AutoCAD SHX Text
ELECTRIC TRANSFORMERS ON 4" RAISED CONC SLAB
AutoCAD SHX Text
MECH SHAFT
AutoCAD SHX Text D-4
AutoCAD SHX Text D-5
AutoCAD SHX Text
SHAFT
AutoCAD SHX Text
PIPE SHAFT
AutoCAD SHX Text
COILING OH DOOR
AutoCAD SHX Text
LIFT
AutoCAD SHX Text
COILING OH DOOR
AutoCAD SHX Text
EXTERIOR PLATFORM
AutoCAD SHX Text
EXTERIOR HEATED SLOPED WALKWAY
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
FE
AutoCAD SHX Text
ROOF OF MECHANICAL ROOM 1400
AutoCAD SHX Text A001
AutoCAD SHX Text
AutoCAD SHX Text
RU
AutoCAD SHX Text
RU
AutoCAD SHX Text
BASEMENT PHASING PLAN
AutoCAD SHX Text
UPGRADE HEAT EXCHANGERS AND
AutoCAD SHX Text
REPLACE HEATING DESIGN
AutoCAD SHX Text 585-17-120
AutoCAD SHX Text No. 1
AutoCAD SHX Text
IRON MOUNTAIN, MICHIGAN
AutoCAD SHX Text
MARCH 8, 2019
AutoCAD SHX Text
AutoCAD SHX Text
50%%% REVIEW
AutoCAD SHX Text 10/24/2018
AutoCAD SHX Text
95%%% REVIEW
AutoCAD SHX Text 12/05/2018
AutoCAD SHX Text
100%%% DOCUMENTS
AutoCAD SHX Text 12/21/2018
AutoCAD SHX Text
100%%% BID DOCUMENTS
AutoCAD SHX Text 3/8/2019
ES
T A1
EA
ST
A
W
ES
T A1
EA
ST
A
1. First floor project areas are Healthcare, Business and Ambulatory Healthcare occupancies per NFPA 101 - 2018.
2. Light lines indicate existing work to remain, dark lines indicate new work.
3. Field verify all dimensions and clearances before beginning construction.
4. Floor structure is Two-Hour Rated Concrete Construction. Maintain fire rating and provide firestopping at all penetrations.
5. Patch all abandoned holes in floors with concrete to match existing construction.
6. At all removed piping and conduit fill all holes in partitions indicated to be fire rated with firestopping to meet or exceed wall rating. Fill all holes in smoke resistive walls or full height partitions to seal opening.
7. Remove and reinstall ceiling tile as required to install new piping. Replace any damaged ceiling tile to match existing.
8. All work outside of enclosed (limited access) work zones shall be at night, between the hours of 4:30 PM and
10:00 PM.
9. Refer to 01 00 00 General Conditions, Section 1.6H for specific phase requirements and milestones.
10.Contractor may propose alternate phasing plan with COR approval.
PHASE 15
PHASE 16
PHASE 14
PHASE 0 - WILL COMMENCE WITH THE ISSUANCE OF THE NOTICE TO PROCEED
AND SHALL CONSIST OF SCHEDULE PREPARATION AND APPROVAL.
PHASING NOTE
A MAXIMUM OF FOUR ROOMS MAY
BE OUT OF USE AT ANY TIME IN
EACH PHASE. EIGHT ROOMS TOTAL
MAY BE OUT OF USE AT ANY TIME
UNLESS APPROVED BY THE COR.
PERIMETER HEAT DOES NOT NEED
TO BE OPERATIONAL BUT ALL
PRESSURE TESTING, FINISHES AND
CLEANING NEED TO BE COMPLETED
BEFORE TURNING ROOMS BACK TO
OWNER.
Keynotes
General Notes
SCALE:
First Floor Phasing Plan
1/16"=1'-0"
N
MEP PROJECT NO.: G29.18.02
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
420 RAIL STREET
NEGAUNEE, MI 49866
PHONE: 906-475-6616
NDW PROJECT NUMBER: 1825
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
FD
AutoCAD SHX Text
6" RAISED ALTAR
AutoCAD SHX Text
FIRE EQUIP
AutoCAD SHX Text
LOCKERS
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DUMB WAITER
AutoCAD SHX Text
SERVICE ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
VOLUNTEER AREA
AutoCAD SHX Text
LDRY CHUT
AutoCAD SHX Text
MECH. CHASE
AutoCAD SHX Text
UP
AutoCAD SHX Text
CARPET
AutoCAD SHX Text
CARPET
AutoCAD SHX Text
CARPET
AutoCAD SHX Text
TILE
AutoCAD SHX Text
TILE
AutoCAD SHX Text
TILE
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
CHASE
AutoCAD SHX Text
FE
AutoCAD SHX Text
FE
AutoCAD SHX Text
TUBE STATION
AutoCAD SHX Text
FIREPLACE
AutoCAD SHX Text
MECH SHAFT
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text D-4
AutoCAD SHX Text D-5
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text A002
AutoCAD SHX Text
AutoCAD SHX Text
RU
AutoCAD SHX Text
RU
AutoCAD SHX Text
FIRST FLOOR PHASING PLAN
AutoCAD SHX Text
UPGRADE HEAT EXCHANGERS AND
AutoCAD SHX Text
REPLACE HEATING DESIGN
AutoCAD SHX Text 585-17-120
AutoCAD SHX Text No. 1
AutoCAD SHX Text
IRON MOUNTAIN, MICHIGAN
AutoCAD SHX Text
MARCH 8, 2019
AutoCAD SHX Text
AutoCAD SHX Text
50%%% REVIEW
AutoCAD SHX Text 10/24/2018
AutoCAD SHX Text
95%%% REVIEW
AutoCAD SHX Text 12/05/2018
AutoCAD SHX Text
100%%% DOCUMENTS
AutoCAD SHX Text 12/21/2018
AutoCAD SHX Text
100%%% BID DOCUMENTS
ES
T A1
EA
ST
A
W
ES
T A1
EA
ST
A
1. Second floor project areas are Healthcare and Ambulatory Healthcare occupancies per NFPA 101 - 2018.
2. Light lines indicate existing work to remain, dark lines indicate new work.
3. Field verify all dimensions and clearances before beginning construction.
4. Floor structure is Two-Hour Rated Concrete Construction. Maintain fire rating and provide firestopping at all penetrations.
5. Patch all abandoned holes in floors with concrete to match existing construction.
6. At all removed piping and conduit fill all holes in partitions indicated to be fire rated with firestopping to meet or exceed wall rating. Fill all holes in smoke resistive walls or full height partitions to seal opening.
7. Remove and reinstall ceiling tile as required to install new piping. Replace any damaged ceiling tile to match existing.
8. All work outside of enclosed (limited access) work zones shall be at night, between the hours of 4:30 PM and
10:00 PM.
9. Refer to 01 00 00 General Conditions, Section 1.6H for specific phase requirements and milestones.
10.Contractor may propose alternate phasing plan with COR approval.
PHASE 13
PHASE 12
PHASE 0 - WILL COMMENCE WITH THE ISSUANCE OF THE NOTICE TO PROCEED
AND SHALL CONSIST OF SCHEDULE PREPARATION AND APPROVAL.
PHASING NOTE
A MAXIMUM OF FOUR ROOMS MAY
BE OUT OF USE AT ANY TIME IN
EACH PHASE. EIGHT ROOMS TOTAL
MAY BE OUT OF USE AT ANY TIME
UNLESS APPROVED BY THE COR.
PERIMETER HEAT DOES NOT NEED
TO BE OPERATIONAL BUT ALL
PRESSURE TESTING, FINISHES AND
CLEANING NEED TO BE COMPLETED
BEFORE TURNING ROOMS BACK TO
OWNER.
Keynotes
General Notes
SCALE:
Second Floor Phasing Plan
1/16"=1'-0"
N
MEP PROJECT NO.: G29.18.02
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
420 RAIL STREET
NEGAUNEE, MI 49866
PHONE: 906-475-6616
NDW PROJECT NUMBER: 1825
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
MECHICAL ROOM ROOF
AutoCAD SHX Text
DUCT THRU FLR
AutoCAD SHX Text
COOLING UNIT FOR PACS RM.
AutoCAD SHX Text
AHU #4 PHARMACY
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
DWV
AutoCAD SHX Text
STM
AutoCAD SHX Text
AHU #15 KITCHEN
AutoCAD SHX Text
ELEC CABINET
AutoCAD SHX Text
AHU #5 SURGERY
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
STAIR 1
AutoCAD SHX Text
STAIR 5
AutoCAD SHX Text
STAIR 3
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
STAIR 2
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
STAIR 4
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DUCT
AutoCAD SHX Text
DUCT
AutoCAD SHX Text
SERVICE ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text 1st. FLOOR ROOF
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
MECH CHASE
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
STAIR 8
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
OPEN TO FIRST FLOOR
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
CHASE
AutoCAD SHX Text
CHASE
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
SUB-STERILIZER MECH SPACE
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
PIPE SHAFT
AutoCAD SHX Text
FOLDING WALL
AutoCAD SHX Text
FAN COIL 2180
AutoCAD SHX Text A003
AutoCAD SHX Text
AutoCAD SHX Text
RU
AutoCAD SHX Text
RU
AutoCAD SHX Text
SECOND FLOOR PHASING PLAN
AutoCAD SHX Text
UPGRADE HEAT EXCHANGERS AND
AutoCAD SHX Text
REPLACE HEATING DESIGN
AutoCAD SHX Text 585-17-120
AutoCAD SHX Text No. 1
AutoCAD SHX Text
IRON MOUNTAIN, MICHIGAN
AutoCAD SHX Text
MARCH 8, 2019
AutoCAD SHX Text
AutoCAD SHX Text
50%%% REVIEW
AutoCAD SHX Text 10/24/2018
AutoCAD SHX Text
95%%% REVIEW
AutoCAD SHX Text 12/05/2018
AutoCAD SHX Text
100%%% DOCUMENTS
AutoCAD SHX Text 12/21/2018
AutoCAD SHX Text
100%%% BID DOCUMENTS
ES
T A1
EA
ST
A
W
ES
T A1
EA
ST
A
1. Third floor project area is a Business occupancy per NFPA 101 - 2018.
2. Light lines indicate existing work to remain, dark lines indicate new work.
3. Field verify all dimensions and clearances before beginning construction.
4. Floor structure is Two-Hour Rated Concrete Construction. Maintain fire rating and provide firestopping at all penetrations.
5. Patch all abandoned holes in floors with concrete to match existing construction.
6. At all removed piping and conduit fill all holes in partitions indicated to be fire rated with firestopping to meet or exceed wall rating. Fill all holes in smoke resistive walls or full height partitions to seal opening.
7. Remove and reinstall ceiling tile as required to install new piping. Replace any damaged ceiling tile to match existing.
8. All work outside of enclosed (limited access) work zones shall be at night, between the hours of 4:30 PM and
10:00 PM.
9. Refer to 01 00 00 General Conditions, Section 1.6H for specific phase requirements and milestones.
10.Contractor may propose alternate phasing plan with COR approval.
PHASE 5
PHASE 4
PHASE 0 - WILL COMMENCE WITH THE ISSUANCE OF THE NOTICE TO PROCEED
AND SHALL CONSIST OF SCHEDULE PREPARATION AND APPROVAL.
PHASE 6
PHASE 7
PHASE 8
PHASE 9
PHASE 10
PHASE 11
PHASING NOTE
A MAXIMUM OF FOUR ROOMS MAY
BE OUT OF USE AT ANY TIME IN
EACH PHASE. EIGHT ROOMS TOTAL
MAY BE OUT OF USE AT ANY TIME
UNLESS APPROVED BY THE COR.
PERIMETER HEAT DOES NOT NEED
TO BE OPERATIONAL BUT ALL
PRESSURE TESTING, FINISHES AND
CLEANING NEED TO BE COMPLETED
BEFORE TURNING ROOMS BACK TO
OWNER.
Keynotes
General Notes
SCALE:
Third Floor Phasing Plan
1/16"=1'-0"
N
MEP PROJECT NO.: G29.18.02
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
420 RAIL STREET
NEGAUNEE, MI 49866
PHONE: 906-475-6616
NDW PROJECT NUMBER: 1825
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
FIRE EQUIP
AutoCAD SHX Text
FIRE EQUIP
AutoCAD SHX Text
LDRY CHUT
AutoCAD SHX Text
RAMP UP 7"
AutoCAD SHX Text
FLOOR UP 7"
AutoCAD SHX Text
AUDIOLOGY SOUND BOOTH
AutoCAD SHX Text
AUDIOLOGY SOUND BOOTH
AutoCAD SHX Text
CARPET
AutoCAD SHX Text
VINYL TILE
AutoCAD SHX Text
FIRE EQUIP
AutoCAD SHX Text
DUCT
AutoCAD SHX Text
DUMB WAITER
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
STAIR 1
AutoCAD SHX Text
STAIR 3
AutoCAD SHX Text
STAIR 2
AutoCAD SHX Text
STAIR 4
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
SERVICE ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
MECHANICAL SHAFT
AutoCAD SHX Text
MECH SHAFT
AutoCAD SHX Text
MECH SHAFT
AutoCAD SHX Text
MECH SHAFT
AutoCAD SHX Text
AUDIOLOGY SOUND BOOTH
AutoCAD SHX Text
AUDIOLOGY SOUND BOOTH
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
LDRY CHUT
AutoCAD SHX Text
STAIR 5
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text K-2005
AutoCAD SHX Text
2ND FLOOR ROOF
AutoCAD SHX Text
2ND FLOOR ROOF
AutoCAD SHX Text
2ND FLOOR ROOF
AutoCAD SHX Text
MECH SHAFT
AutoCAD SHX Text
MECH CHASE
AutoCAD SHX Text
2ND FLOOR ROOF
AutoCAD SHX Text
2ND FLOOR ROOF
AutoCAD SHX Text A004
AutoCAD SHX Text
AutoCAD SHX Text
RU
AutoCAD SHX Text
RU
AutoCAD SHX Text
THIRD FLOOR PHASING PLAN
AutoCAD SHX Text
UPGRADE HEAT EXCHANGERS AND
AutoCAD SHX Text
REPLACE HEATING DESIGN
AutoCAD SHX Text 585-17-120
AutoCAD SHX Text No. 1
AutoCAD SHX Text
IRON MOUNTAIN, MICHIGAN
AutoCAD SHX Text
MARCH 8, 2019
AutoCAD SHX Text
AutoCAD SHX Text
50%%% REVIEW
AutoCAD SHX Text 10/24/2018
AutoCAD SHX Text
95%%% REVIEW
AutoCAD SHX Text 12/05/2018
AutoCAD SHX Text
100%%% DOCUMENTS
AutoCAD SHX Text 12/21/2018
AutoCAD SHX Text
100%%% BID DOCUMENTS
1. Fifth and Sixth floor project areas are Business occupancies per NFPA 101 - 2018.
2. Light lines indicate existing work to remain, dark lines indicate new work.
3. Field verify all dimensions and clearances before beginning construction.
4. Floor structure is Two-Hour Rated Concrete Construction. Maintain fire rating and provide firestopping at all penetrations.
5. Patch all abandoned holes in floors with concrete to match existing construction.
6. At all removed piping and conduit fill all holes in partitions indicated to be fire rated with firestopping to meet or exceed wall rating. Fill all holes in smoke resistive walls or full height partitions to seal opening.
7. Remove and reinstall ceiling tile as required to install new piping. Replace any damaged ceiling tile to match existing.
8. All work outside of enclosed (limited access) work zones shall be at night, between the hours of 4:30 PM and
10:00 PM.
9. Refer to 01 00 00 General Conditions, Section 1.6H for specific phase requirements and milestones.
10.Contractor may propose alternate phasing plan with COR approval.
PHASE 2
PHASE 1
PHASE 0 - WILL COMMENCE WITH THE ISSUANCE OF THE NOTICE TO PROCEED
AND SHALL CONSIST OF SCHEDULE PREPARATION AND APPROVAL.
PHASE 3
UNPHASED - THESE SPACES ARE AVAILABLE FOR CONSTRUCTION AT ANY TIME
FROM JUNE THROUGH AUGUST.
PHASING NOTE
FIFTH FLOOR WORK IS ABOVE
CEILING WORK FOR SIXTH FLOOR
ONLY. REFER TO SIXTH FLOOR
PHASING PLAN.
PHASING NOTE
A MAXIMUM OF FOUR ROOMS MAY
BE OUT OF USE AT ANY TIME IN
EACH PHASE. EIGHT ROOMS TOTAL
MAY BE OUT OF USE AT ANY TIME
UNLESS APPROVED BY THE COR.
PERIMETER HEAT DOES NOT NEED
TO BE OPERATIONAL BUT ALL
PRESSURE TESTING, FINISHES AND
CLEANING NEED TO BE COMPLETED
BEFORE TURNING ROOMS BACK TO
OWNER.
Keynotes
General Notes
SCALE:
Fifth Floor Phasing Plan
1/16"=1'-0"
N
SCALE:
Sixth Floor Phasing Plan
1/16"=1'-0"
N
MEP PROJECT NO.: G29.18.02
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
420 RAIL STREET
NEGAUNEE, MI 49866
PHONE: 906-475-6616
NDW PROJECT NUMBER: 1825
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
RAMP UP
AutoCAD SHX Text
FLOOR RAISED 9"
AutoCAD SHX Text
STEP UP
AutoCAD SHX Text
DUMB WAITER
AutoCAD SHX Text
DN
AutoCAD SHX Text
STAIR 5
AutoCAD SHX Text
LDRY CHUT
AutoCAD SHX Text
FIRE EQUIP
AutoCAD SHX Text
STAIR 1
AutoCAD SHX Text
STAIR 3
AutoCAD SHX Text
STEP UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
STAIR 2
AutoCAD SHX Text
DN
AutoCAD SHX Text
STAIR 4
AutoCAD SHX Text
DUCT INTAKE
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
SERVICE ELEVATOR
AutoCAD SHX Text
MECH SHAFT
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
LDRY CHUT
AutoCAD SHX Text
PIPE SHAFT
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
FE
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text
DN
AutoCAD SHX Text
LDRY CHUT
AutoCAD SHX Text
FIRE EXTG.
AutoCAD SHX Text
FIRE EXTG.
AutoCAD SHX Text
FIRE EXTG.
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
STAIR 2
AutoCAD SHX Text
STAIR 1
AutoCAD SHX Text
STAIR 3
AutoCAD SHX Text
DN
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
SERVICE ELEVATOR
AutoCAD SHX Text 5th FLOOR ROOF
AutoCAD SHX Text
PIPE SHAFT
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
LDRY CHUT
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text 5th FLOOR ROOF
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
PIPE CHASE
AutoCAD SHX Text A005
AutoCAD SHX Text
AutoCAD SHX Text
RU
AutoCAD SHX Text
RU
AutoCAD SHX Text
FIFTH AND SIXTH FLOOR PHASING PLAN
AutoCAD SHX Text
UPGRADE HEAT EXCHANGERS AND
AutoCAD SHX Text
REPLACE HEATING DESIGN
AutoCAD SHX Text 585-17-120
AutoCAD SHX Text No. 1
AutoCAD SHX Text
IRON MOUNTAIN, MICHIGAN
AutoCAD SHX Text
MARCH 8, 2019
AutoCAD SHX Text
AutoCAD SHX Text
50%%% REVIEW
AutoCAD SHX Text 10/24/2018
AutoCAD SHX Text
95%%% REVIEW
AutoCAD SHX Text 12/05/2018
AutoCAD SHX Text
100%%% DOCUMENTS
AutoCAD SHX Text 12/21/2018
AutoCAD SHX Text
100%%% BID DOCUMENTS
| 19.03.08 100% Bid Documents - G001.pdf |
| Sheets and Views |
| G.001 |
File details come from the government source that posted it.