36C25219B0035 S02 - Att - Final Drawing 08Mar19 - 2 of 5.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25219C0136-000.docx | DOCX document | |
| 36C25219B0035-A00003001.pdf | ||
| 36C25219B0035-A00003000.docx | DOCX document | |
| 36C25219B0035-A00003002.pdf | ||
| 36C25219B0035-A00002001.pdf | ||
| 36C25219B0035-A00002000.docx | DOCX document | |
| 36C25219B0035-A00002002.pdf | ||
| 36C25219B0035-0001001.pdf | ||
| 36C25219B0035-0001000.docx | DOCX document | |
| 36C25219B0035-007.pdf | ||
| 36C25219B0035-006.pdf | ||
| 36C25219B0035-002.docx | DOCX document | |
| 36C25219B0035-003.pdf | ||
| 36C25219B0035-004.pdf | ||
| 36C25219B0035-008.pdf | ||
| 36C25219B0035-001.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W
ES
T A1
EA
ST
A
W
ES
T A1
EA
ST
A
39393939
6 6
10 10
12 12 12
1. Light lines indicate existing construction. Dark lines indicate new work.
2. Remove and re-install suspended acoustical tile ceilings as required for work above ceilings for piping at this floor and removal of steam lines serving floor above.
3. Where existing piping is removed from full height partitions patch holes to match partition construction.
4. Where existing piping is removed from floor penetrations seal holes with fire stopping per 07 84 00.
5. At new piping penetrations through full height partitions provide silicone sealant to seal all voids. At fire rated partitions and floors provide fire stopping system per 07 84 00.
6. At new piping penetrations through floors provide fire stopping system per 07 84 00.
7. Many of the pipe sleeves through the floor at steam convectors to be removed have sections of asbestos containing pipe insulation within the sleeves. Where original insulation remains at pipe sleeves remove per 02 82 13.13. See detail 1/M503.
8. All work in OI&T, Travel and Agent Cashier offices (1286A, 1288A) and Union offices will require an escort and must be performed on day shift. Arrange in advance of work with COR.
1. Infill existing convector opening for new convector per detail 4/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.
2. Remove vinyl wall covering from this wall and repair surface to receive new paint finish.
3. Infill existing convector opening for new convector per detail 4/A500. Paint this wall PNT-1 and provide new
4" vinyl wall base to match existing.
4. Infill existing projecting steel convector box for new convector per detail 5/A500. Paint new work to match existing wall and provide 4" vinyl base to match existing.
5. Not used.
6. Infill abandoned convector opening per detail 7/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.
7. Infill abandoned convector opening per detail 8/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.
8. Infill existing convector opening per detail 1/A500.
9. Paint wall PNT-2 and provide new 4" vinyl wall base to match existing.
10.Cut existing gypsum board as required to install new piping. Patch with 5/8" gypsum board to match existing.
11.Paint wall PNT-3 and provide new 4" vinyl wall base to match existing.
12.Infill abandoned convector opening per detail 9/A500. Provide new CT-1 ceramic wall tile. Extend resinous flooring integral cove base up face of wall infill to match existing.
13.Remove existing gypsum board, insulation and studs at former convector opening. Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face. Provide new plastic laminate window stool per detail 3/A500.
14.Paint wall PNT-1 and provide new 4" vinyl wall base to match existing.
15.Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face.
16.Remove existing plaster ceiling in this room including suspension system and hangers. Install new ATC-1 ceiling at height shown.
17.Remove and reinstall pews as needed to access wall.
18.Remove existing plaster and structural clay wall at column. After installation of new piping replace with light gage framing and 5/8" gypsum board.
19.Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face. Provide new plastic laminate window stool per detail 3/A500.
20.Paint wall PNT-4. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
21.Paint wall PNT-4 and provide new 4" vinyl wall base to match existing.
22.Paint wall PNT-5 and provide new 4" vinyl wall base to match existing.
23.Paint wall PNT-6 and provide new 4" vinyl wall base to match existing.
24.Remove existing gypsum board, insulation and studs at former convector opening. Frame opening for new convector per detail 1/A500.
25.Paint wall PNT-2. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
26.Paint wall PNT-7 and provide new 4" vinyl wall base to match existing.
27.Remove and re-install existing casework as required to access wall.
28.Paint wall PNT-8 and provide new 4" vinyl wall base to match existing.
29.Paint wall PNT-9 and provide new 4" vinyl wall base to match existing.
30.Provide new CT-2 ceramic wall tile and cover base over tile backer board at infilled opening to match existing.
31.Coordinate with Owner for removal and reinstallation of lab equipment to access convector.
32.Paint wall PNT-8. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
33.Paint wall PNT-9. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
34.Extend existing pipe pit in concrete floor per detail 10/A500.
35.Remove asbestos containing pipe insulation above ceiling per 02 82 13.13. Approximately 72 LF.
36.Remove asbestos containing pipe insulation above ceiling per 02 82 13.13. Approximately 10 LF.
37.Provide new wall protection sheet and 4" vinyl wall base to match existing.
38.New surface mounted convector in stairwell. Piping to be provided with surface mounted cover per mechanical.
39.Existing convector to remain with new equipment per Mechanical. Remove and reinstall existing cover.
A500
IN BID ALTERNATE 2 ELIMINATE
ALL WORK SHOWN IN
THIS AREA.
IN BID ALTERNATE 3 ELIMINATE
ALL WORK SHOWN IN
THIS AREA.
Keynotes
General Notes
SCALE:
Basement Floor Plan - West
1/8"=1'-0"
N
MEP PROJECT NO.: G29.18.02
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
420 RAIL STREET
NEGAUNEE, MI 49866
PHONE: 906-475-6616
NDW PROJECT NUMBER: 1825
AutoCAD SHX Text
TA
AutoCAD SHX Text
TA
AutoCAD SHX Text
TA
AutoCAD SHX Text
TA
AutoCAD SHX Text
TA
AutoCAD SHX Text
LAUNDRY CHUTE ABOVE
AutoCAD SHX Text
TA
AutoCAD SHX Text
FD
AutoCAD SHX Text
ELECTRIC TRANSFORMERS ON 4" RAISED CONC SLAB
AutoCAD SHX Text
TA
AutoCAD SHX Text
STAIR 5
AutoCAD SHX Text
UP
AutoCAD SHX Text
COIL CABINET
AutoCAD SHX Text
UP
AutoCAD SHX Text
STAIR 7
AutoCAD SHX Text
ELECTRIC TRANSFORMERS ON 4" RAISED CONC SLAB
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
FE
AutoCAD SHX Text
ROOF OF MECHANICAL ROOM 1400
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text L
AutoCAD SHX Text M
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
SUPERVISORY
AutoCAD SHX Text B072
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
GENERAL
AutoCAD SHX Text B074
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
GENERAL
AutoCAD SHX Text B076
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text B070
AutoCAD SHX Text
OFFICER
AutoCAD SHX Text
ADMIN.
AutoCAD SHX Text B069
AutoCAD SHX Text
GEMS
AutoCAD SHX Text I.H. &
AutoCAD SHX Text B067
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
CONFERENCE
AutoCAD SHX Text B077
AutoCAD SHX Text
TOILET
AutoCAD SHX Text B075A
AutoCAD SHX Text
HALLWAY
AutoCAD SHX Text B075
AutoCAD SHX Text
SHOP
AutoCAD SHX Text
CARPENTER
AutoCAD SHX Text B062
AutoCAD SHX Text
SHOP
AutoCAD SHX Text
MACHINE
AutoCAD SHX Text B060
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text B028
AutoCAD SHX Text
EQUIPMENT
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text B027A
AutoCAD SHX Text
SHOP
AutoCAD SHX Text
ELECTRONICS
AutoCAD SHX Text B027
AutoCAD SHX Text
& EMER. MNGT.
AutoCAD SHX Text
ENGINEERING
AutoCAD SHX Text B023
AutoCAD SHX Text
KITCHEN
AutoCAD SHX Text
CANTEEN
AutoCAD SHX Text B175
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
CANTEEN
AutoCAD SHX Text B175A
AutoCAD SHX Text
SERVING
AutoCAD SHX Text
CANTEEN
AutoCAD SHX Text B192
AutoCAD SHX Text
LOCKER ROOM
AutoCAD SHX Text
MENS
AutoCAD SHX Text B021
AutoCAD SHX Text
& WORK LEADER
AutoCAD SHX Text
M&R SUPERVISOR
AutoCAD SHX Text B022
AutoCAD SHX Text
SHOP/OFFICE
AutoCAD SHX Text
MAINTENANCE
AutoCAD SHX Text B014
AutoCAD SHX Text
VESTIBULE
AutoCAD SHX Text B018A
AutoCAD SHX Text
SPCECIALIST
AutoCAD SHX Text
AQUISITION
AutoCAD SHX Text B019
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
MENS
AutoCAD SHX Text B021A
AutoCAD SHX Text
MED/ELECTRNICS
AutoCAD SHX Text
SUPRVSR, BIO-
AutoCAD SHX Text B009
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
HSKG
AutoCAD SHX Text B122
AutoCAD SHX Text
& SUPPLIES
AutoCAD SHX Text
NESS EQUIP. &
AutoCAD SHX Text B129
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text B129A
AutoCAD SHX Text
WASH
AutoCAD SHX Text
CART
AutoCAD SHX Text B129B
AutoCAD SHX Text
UNIFORMS
AutoCAD SHX Text B191
AutoCAD SHX Text
TELE-DIETICIAN
AutoCAD SHX Text B120
AutoCAD SHX Text
STORE
AutoCAD SHX Text
RETAIL
AutoCAD SHX Text B174
AutoCAD SHX Text
CANTEEN
AutoCAD SHX Text
CHIEF,
AutoCAD SHX Text B174A
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
WOMENS
AutoCAD SHX Text B196
AutoCAD SHX Text
LOUNGE
AutoCAD SHX Text
WOMENS
AutoCAD SHX Text B196B
AutoCAD SHX Text
LOCKER
AutoCAD SHX Text
WOMENS
AutoCAD SHX Text B196A
AutoCAD SHX Text
ASSISTANT
AutoCAD SHX Text
PROGRAM
AutoCAD SHX Text B066
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
AutoCAD SHX Text B107A
AutoCAD SHX Text
STOR.
AutoCAD SHX Text
CBOC
AutoCAD SHX Text B187
AutoCAD SHX Text
HSKG
AutoCAD SHX Text B006
AutoCAD SHX Text
HSKG
AutoCAD SHX Text B004
AutoCAD SHX Text
TEMP. STORAGE
AutoCAD SHX Text
NESS
AutoCAD SHX Text B008
AutoCAD SHX Text
TEMP. STORAGE
AutoCAD SHX Text
NESS
AutoCAD SHX Text B010
AutoCAD SHX Text
TOILET
AutoCAD SHX Text B008A
AutoCAD SHX Text
SANITATION
AutoCAD SHX Text B186A
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
MAINT.
AutoCAD SHX Text B018B
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
DATA
AutoCAD SHX Text B117
AutoCAD SHX Text
TEMP. STORAGE
AutoCAD SHX Text
NESS
AutoCAD SHX Text B010
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text B199A-1
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text B199B-1
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text B099A-1
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text B099D-1
AutoCAD SHX Text B099B-1
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text B018
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text B099C-1
AutoCAD SHX Text
CHASE
AutoCAD SHX Text B002A
AutoCAD SHX Text
MECH
AutoCAD SHX Text B002
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text B079
AutoCAD SHX Text
SHOPS
AutoCAD SHX Text
SHARED
AutoCAD SHX Text B087
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text B018C
AutoCAD SHX Text
AND RECEIVING
AutoCAD SHX Text
CANTEEN STORAGE
AutoCAD SHX Text B119
AutoCAD SHX Text
RECORDS
AutoCAD SHX Text
MEDICAL
AutoCAD SHX Text B082
AutoCAD SHX Text
VAULT
AutoCAD SHX Text B081A
AutoCAD SHX Text
CACHE
AutoCAD SHX Text
PHARMACY
AutoCAD SHX Text B081
AutoCAD SHX Text
MNGT. STOR/OFFICE
AutoCAD SHX Text
SUPPLY CHAIN
AutoCAD SHX Text B083
AutoCAD SHX Text
SPLY CHN MNGT.
AutoCAD SHX Text
ASS'T CHIEF
AutoCAD SHX Text B084
AutoCAD SHX Text
PHONE
AutoCAD SHX Text
DATA &
AutoCAD SHX Text B085
AutoCAD SHX Text
ADMIN
AutoCAD SHX Text
LOGISTICS
AutoCAD SHX Text B086
AutoCAD SHX Text
CHAIN MNGT.
AutoCAD SHX Text
CHIEF, SUPPLY
AutoCAD SHX Text B086A
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
SHOP
AutoCAD SHX Text B088
AutoCAD SHX Text
ELECTRONICS
AutoCAD SHX Text
BIOMED &
AutoCAD SHX Text B089
AutoCAD SHX Text
MANAGER
AutoCAD SHX Text
SAFETY
AutoCAD SHX Text B020
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
GENERAL
AutoCAD SHX Text B068
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
DINING
AutoCAD SHX Text B172
AutoCAD SHX Text
ELECTRONICS
AutoCAD SHX Text
BIOMED &
AutoCAD SHX Text B009A
AutoCAD SHX Text
HOLDING AREA
AutoCAD SHX Text
SOILED LINEN
AutoCAD SHX Text B003
AutoCAD SHX Text
ADMIN
AutoCAD SHX Text
LOGISTICS
AutoCAD SHX Text B086B
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
CARPENTER SHOP
AutoCAD SHX Text B062A
AutoCAD SHX Text
LOCKERS
AutoCAD SHX Text
STAFF
AutoCAD SHX Text B194
AutoCAD SHX Text
LOCKSMITH
AutoCAD SHX Text B023A
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text B199C-1
AutoCAD SHX Text
SUPERVISORS
AutoCAD SHX Text
HOUSEKEEPING
AutoCAD SHX Text B129C
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
NESS
AutoCAD SHX Text B123
AutoCAD SHX Text
NESS
AutoCAD SHX Text
CHIEF,
AutoCAD SHX Text B121
AutoCAD SHX Text
CNTRL. REP.
AutoCAD SHX Text
CONST.
AutoCAD SHX Text B078
AutoCAD SHX Text
RESTROOM
AutoCAD SHX Text
WOMEN'S
AutoCAD SHX Text B170
AutoCAD SHX Text
RESTROOM
AutoCAD SHX Text
MEN'S
AutoCAD SHX Text B168
AutoCAD SHX Text SMOKE RESISTIVE WALL SMOKE BARRIER WITH ONE HOUR FIRE RATING ONE HOUR FIRE RATED WALL TWO HOUR FIRE WALL
AutoCAD SHX Text
SMOKE/ FIRE/ RATED PARTITION TYPES
AutoCAD SHX Text A100
AutoCAD SHX Text
AutoCAD SHX Text
RU
AutoCAD SHX Text
RU
AutoCAD SHX Text
BASEMENT WEST FLOOR PLAN
AutoCAD SHX Text
UPGRADE HEAT EXCHANGERS AND
AutoCAD SHX Text
REPLACE HEATING DESIGN
AutoCAD SHX Text 585-17-120
AutoCAD SHX Text No. 1
AutoCAD SHX Text
IRON MOUNTAIN, MICHIGAN
AutoCAD SHX Text
MARCH 8, 2019
AutoCAD SHX Text
AutoCAD SHX Text
50%%% REVIEW
AutoCAD SHX Text 10/24/2018
AutoCAD SHX Text
95%%% REVIEW
AutoCAD SHX Text 12/05/2018
AutoCAD SHX Text
100%%% DOCUMENTS
AutoCAD SHX Text 12/21/2018
AutoCAD SHX Text
100%%% BID DOCUMENTS
AutoCAD SHX Text 3/8/2019
T A1
EA
ST
A
W
ES
T A1
EA
ST
A
10'-0"
1. Light lines indicate existing construction. Dark lines indicate new work.
2. Remove and re-install suspended acoustical tile ceilings as required for work above ceilings for piping at this floor and removal of steam lines serving floor above.
3. Where existing piping is removed from full height partitions patch holes to match partition construction.
4. Where existing piping is removed from floor penetrations seal holes with fire stopping per 07 84 00.
5. At new piping penetrations through full height partitions provide silicone sealant to seal all voids. At fire rated partitions and floors provide fire stopping system per 07 84 00.
6. At new piping penetrations through floors provide fire stopping system per 07 84 00.
7. Many of the pipe sleeves through the floor at steam convectors to be removed have sections of asbestos containing pipe insulation within the sleeves. Where original insulation remains at pipe sleeves remove per 02 82 13.13. See detail 1/M503.
8. All work in OI&T, Travel and Agent Cashier offices (1286A, 1288A) and Union offices will require an escort and must be performed on day shift. Arrange in advance of work with COR.
1. Infill existing convector opening for new convector per detail 4/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.
2. Remove vinyl wall covering from this wall and repair surface to receive new paint finish.
3. Infill existing convector opening for new convector per detail 4/A500. Paint this wall PNT-1 and provide new
4" vinyl wall base to match existing.
4. Infill existing projecting steel convector box for new convector per detail 5/A500. Paint new work to match existing wall and provide 4" vinyl base to match existing.
5. Not used.
6. Infill abandoned convector opening per detail 7/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.
7. Infill abandoned convector opening per detail 8/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.
8. Infill existing convector opening per detail 1/A500.
9. Paint wall PNT-2 and provide new 4" vinyl wall base to match existing.
10.Cut existing gypsum board as required to install new piping. Patch with 5/8" gypsum board to match existing.
11.Paint wall PNT-3 and provide new 4" vinyl wall base to match existing.
12.Infill abandoned convector opening per detail 9/A500. Provide new CT-1 ceramic wall tile. Extend resinous flooring integral cove base up face of wall infill to match existing.
13.Remove existing gypsum board, insulation and studs at former convector opening. Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face. Provide new plastic laminate window stool per detail 3/A500.
14.Paint wall PNT-1 and provide new 4" vinyl wall base to match existing.
15.Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face.
16.Remove existing plaster ceiling in this room including suspension system and hangers. Install new ATC-1 ceiling at height shown.
17.Remove and reinstall pews as needed to access wall.
18.Remove existing plaster and structural clay wall at column. After installation of new piping replace with light gage framing and 5/8" gypsum board.
19.Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face. Provide new plastic laminate window stool per detail 3/A500.
20.Paint wall PNT-4. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
21.Paint wall PNT-4 and provide new 4" vinyl wall base to match existing.
22.Paint wall PNT-5 and provide new 4" vinyl wall base to match existing.
23.Paint wall PNT-6 and provide new 4" vinyl wall base to match existing.
24.Remove existing gypsum board, insulation and studs at former convector opening. Frame opening for new convector per detail 1/A500.
25.Paint wall PNT-2. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
26.Paint wall PNT-7 and provide new 4" vinyl wall base to match existing.
27.Remove and re-install existing casework as required to access wall.
28.Paint wall PNT-8 and provide new 4" vinyl wall base to match existing.
29.Paint wall PNT-9 and provide new 4" vinyl wall base to match existing.
30.Provide new CT-2 ceramic wall tile and cover base over tile backer board at infilled opening to match existing.
31.Coordinate with Owner for removal and reinstallation of lab equipment to access convector.
32.Paint wall PNT-8. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
33.Paint wall PNT-9. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
34.Extend existing pipe pit in concrete floor per detail 10/A500.
35.Remove asbestos containing pipe insulation above ceiling per 02 82 13.13. Approximately 72 LF.
36.Remove asbestos containing pipe insulation above ceiling per 02 82 13.13. Approximately 10 LF.
37.Provide new wall protection sheet and 4" vinyl wall base to match existing.
38.New surface mounted convector in stairwell. Piping to be provided with surface mounted cover per mechanical.
39.Existing convector to remain with new equipment per Mechanical. Remove and reinstall existing cover.
IN BID ALTERNATE 2 ELIMINATE
ALL WORK SHOWN IN ROOM
B201.
Keynotes
General Notes
SCALE:
Basement Floor Plan - East
1/8"=1'-0"
N
MEP PROJECT NO.: G29.18.02
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
420 RAIL STREET
NEGAUNEE, MI 49866
PHONE: 906-475-6616
NDW PROJECT NUMBER: 1825
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FIRE EQUIP
AutoCAD SHX Text
FIRE EQUIP
AutoCAD SHX Text
DUMB WAITER
AutoCAD SHX Text
COILING OH DOOR
AutoCAD SHX Text
FIRE EQUIP
AutoCAD SHX Text
TA
AutoCAD SHX Text
TA
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
FD
AutoCAD SHX Text
HYDRAULIC POWER UNIT
AutoCAD SHX Text
AHU
AutoCAD SHX Text
FD
AutoCAD SHX Text
COILING OH DOOR
AutoCAD SHX Text
COILING OH DOOR
AutoCAD SHX Text
COILING OH DOOR
AutoCAD SHX Text
LIFT
AutoCAD SHX Text
SLOPED CEILING
AutoCAD SHX Text
COILING OH FABRIC DOOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
SERVICE ELEVATOR
AutoCAD SHX Text
STAIR 2
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
STAIR 3
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
TA
AutoCAD SHX Text
TA
AutoCAD SHX Text
BLAST CHILLER
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
PIPE CHASE
AutoCAD SHX Text
ACCESS
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
ELECTRICAL EQUIPMENT
AutoCAD SHX Text
ELECTRIC TRANSFORMERS ON 4" RAISED CONC SLAB
AutoCAD SHX Text
MECH SHAFT
AutoCAD SHX Text D-4
AutoCAD SHX Text D-5
AutoCAD SHX Text
SHAFT
AutoCAD SHX Text
PIPE SHAFT
AutoCAD SHX Text
EXTERIOR PLATFORM
AutoCAD SHX Text
ROOF OF MECHANICAL ROOM 1400
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MNGR'S OFFICE
AutoCAD SHX Text
FOOD SERVICE
AutoCAD SHX Text B186E
AutoCAD SHX Text
PREP.
AutoCAD SHX Text
ROUGH
AutoCAD SHX Text B186H
AutoCAD SHX Text
WASH
AutoCAD SHX Text
CART
AutoCAD SHX Text B186B
AutoCAD SHX Text
UTILITY
AutoCAD SHX Text B186C
AutoCAD SHX Text
& NOURSHMNT. STOR.
AutoCAD SHX Text
AMBIENT DISPOSABLE
AutoCAD SHX Text B186G
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
DIETETICS
AutoCAD SHX Text B186F
AutoCAD SHX Text
WORK RM.
AutoCAD SHX Text
STAFF
AutoCAD SHX Text B186D
AutoCAD SHX Text
FREEZER 1
AutoCAD SHX Text B186L
AutoCAD SHX Text
COOLER 4
AutoCAD SHX Text B186N
AutoCAD SHX Text
FREEZER 2
AutoCAD SHX Text B186M
AutoCAD SHX Text
COOLER 3
AutoCAD SHX Text B186P
AutoCAD SHX Text
KITCHEN
AutoCAD SHX Text
MAIN
AutoCAD SHX Text B186
AutoCAD SHX Text
& BEVERAGE STOR.
AutoCAD SHX Text
CANTEEN VENDING
AutoCAD SHX Text B185
AutoCAD SHX Text
ELECT. RM.
AutoCAD SHX Text
EMERGENCY
AutoCAD SHX Text B267
AutoCAD SHX Text
EQUIPMENT
AutoCAD SHX Text
TELEPHONE
AutoCAD SHX Text B103
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
WAN
AutoCAD SHX Text B105
AutoCAD SHX Text
SUPPLY
AutoCAD SHX Text
LOGISTICS
AutoCAD SHX Text B201
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
WOMENS
AutoCAD SHX Text B204
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
MENS
AutoCAD SHX Text B205
AutoCAD SHX Text
OFFICES
AutoCAD SHX Text
ADMIN.
AutoCAD SHX Text B107B
AutoCAD SHX Text
VESTIBULE
AutoCAD SHX Text B107
AutoCAD SHX Text
LOBBY
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text B224
AutoCAD SHX Text
CHIEF, SPS
AutoCAD SHX Text B291A
AutoCAD SHX Text
SURGERY CASE CART
AutoCAD SHX Text
PRI. SUPPLY/
AutoCAD SHX Text B291
AutoCAD SHX Text
BREAKOUT
AutoCAD SHX Text
STOCK /
AutoCAD SHX Text B287
AutoCAD SHX Text
DECONTAMINATION
AutoCAD SHX Text B295
AutoCAD SHX Text
PACKAGING
AutoCAD SHX Text
PREPARATION
AutoCAD SHX Text B291B
AutoCAD SHX Text
STERLIZER
AutoCAD SHX Text B291C
AutoCAD SHX Text
RECEIVING
AutoCAD SHX Text
SHIPPING &
AutoCAD SHX Text B274
AutoCAD SHX Text
SHREDDER RM.
AutoCAD SHX Text
RECYCLING &
AutoCAD SHX Text B278
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
WAREHOUSE
AutoCAD SHX Text B298
AutoCAD SHX Text
EQUIP.
AutoCAD SHX Text
NON-EXP
AutoCAD SHX Text B298A
AutoCAD SHX Text
LOGISTICS
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text B231
AutoCAD SHX Text
MECH. RM.
AutoCAD SHX Text B202
AutoCAD SHX Text
OF INFO
AutoCAD SHX Text
RRELEASE
AutoCAD SHX Text B203
AutoCAD SHX Text
CHASE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text B284
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
MECH.
AutoCAD SHX Text B224C
AutoCAD SHX Text
EQUIPMENT
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text B224B
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text B224A
AutoCAD SHX Text
& SHOWER
AutoCAD SHX Text
LOCKERS
AutoCAD SHX Text B297
AutoCAD SHX Text
CHUTE
AutoCAD SHX Text
LAUNDRY
AutoCAD SHX Text B230
AutoCAD SHX Text
ACCESS
AutoCAD SHX Text
MECH.
AutoCAD SHX Text B227
AutoCAD SHX Text
ACCESS
AutoCAD SHX Text
MECH.
AutoCAD SHX Text B295A
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
MECH.
AutoCAD SHX Text B231B
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
MECH.
AutoCAD SHX Text B231A
AutoCAD SHX Text
MECH. ROOM
AutoCAD SHX Text B231C
AutoCAD SHX Text
DATA
AutoCAD SHX Text B296
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text B299C-1
AutoCAD SHX Text
VESTIBULE
AutoCAD SHX Text B276
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text B299D-1
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text B299B-1
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text B299A-1
AutoCAD SHX Text
LOUNGE
AutoCAD SHX Text B226
AutoCAD SHX Text
LOCKER
AutoCAD SHX Text B226A
AutoCAD SHX Text
SHOWER
AutoCAD SHX Text B226C
AutoCAD SHX Text
TOILET
AutoCAD SHX Text B226B
AutoCAD SHX Text
COOLER
AutoCAD SHX Text
MORGUE
AutoCAD SHX Text B273
AutoCAD SHX Text
COOLER 2
AutoCAD SHX Text
FOOD BANK
AutoCAD SHX Text B186Q
AutoCAD SHX Text
COOLER 1
AutoCAD SHX Text
RETHERM
AutoCAD SHX Text B186R
AutoCAD SHX Text
O2 STOR
AutoCAD SHX Text B268
AutoCAD SHX Text
EQUIP. RM.
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text B278A
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text B269
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
BULK MEDICAL
AutoCAD SHX Text B231D
AutoCAD SHX Text
LOGISTICS
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text B298B
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
MECH.
AutoCAD SHX Text B107D
AutoCAD SHX Text
DOCK
AutoCAD SHX Text
LOADING
AutoCAD SHX Text B271
AutoCAD SHX Text
DOCK
AutoCAD SHX Text
LOADING
AutoCAD SHX Text B272
AutoCAD SHX Text
RM.
AutoCAD SHX Text
ELEC.
AutoCAD SHX Text B186I
AutoCAD SHX Text SMOKE RESISTIVE WALL SMOKE BARRIER WITH ONE HOUR FIRE RATING ONE HOUR FIRE RATED WALL TWO HOUR FIRE WALL
AutoCAD SHX Text
SMOKE/ FIRE/ RATED PARTITION TYPES
AutoCAD SHX Text A101
AutoCAD SHX Text
AutoCAD SHX Text
RU
AutoCAD SHX Text
RU
AutoCAD SHX Text
BASEMENT EAST FLOOR PLAN
AutoCAD SHX Text
UPGRADE HEAT EXCHANGERS AND
AutoCAD SHX Text
REPLACE HEATING DESIGN
AutoCAD SHX Text 585-17-120
AutoCAD SHX Text No. 1
AutoCAD SHX Text
IRON MOUNTAIN, MICHIGAN
AutoCAD SHX Text
MARCH 8, 2019
AutoCAD SHX Text
AutoCAD SHX Text
50%%% REVIEW
AutoCAD SHX Text 10/24/2018
AutoCAD SHX Text
95%%% REVIEW
AutoCAD SHX Text 12/05/2018
AutoCAD SHX Text
100%%% DOCUMENTS
AutoCAD SHX Text 12/21/2018
AutoCAD SHX Text
100%%% BID DOCUMENTS
T A1
EA
ST
A
W
ES
T A1
EA
ST
A
WORK IN THIS AREA IS ABOVE CEILING
STEAM PIPING DEMOLITION. REMOVE
AND REPLACE SUSPENDED ACOUSTICAL
TILE CEILINGS AS NEEDED.
WORK IN THIS AREA IS ABOVE CEILING
STEAM PIPING DEMOLITION. REMOVE
AND REPLACE SUSPENDED ACOUSTICAL
TILE CEILINGS AS NEEDED.
1. Light lines indicate existing construction. Dark lines indicate new work.
2. Remove and re-install suspended acoustical tile ceilings as required for work above ceilings for piping at this floor and removal of steam lines serving floor above.
3. Where existing piping is removed from full height partitions patch holes to match partition construction.
4. Where existing piping is removed from floor penetrations seal holes with fire stopping per 07 84 00.
5. At new piping penetrations through full height partitions provide silicone sealant to seal all voids. At fire rated partitions and floors provide fire stopping system per 07 84 00.
6. At new piping penetrations through floors provide fire stopping system per 07 84 00.
7. Many of the pipe sleeves through the floor at steam convectors to be removed have sections of asbestos containing pipe insulation within the sleeves. Where original insulation remains at pipe sleeves remove per 02 82 13.13. See detail 1/M503.
8. All work in OI&T, Travel and Agent Cashier offices (1286A, 1288A) and Union offices will require an escort and must be performed on day shift. Arrange in advance of work with COR.
1. Infill existing convector opening for new convector per detail 4/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.
2. Remove vinyl wall covering from this wall and repair surface to receive new paint finish.
3. Infill existing convector opening for new convector per detail 4/A500. Paint this wall PNT-1 and provide new
4" vinyl wall base to match existing.
4. Infill existing projecting steel convector box for new convector per detail 5/A500. Paint new work to match existing wall and provide 4" vinyl base to match existing.
5. Not used.
6. Infill abandoned convector opening per detail 7/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.
7. Infill abandoned convector opening per detail 8/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.
8. Infill existing convector opening per detail 1/A500.
9. Paint wall PNT-2 and provide new 4" vinyl wall base to match existing.
10.Cut existing gypsum board as required to install new piping. Patch with 5/8" gypsum board to match existing.
11.Paint wall PNT-3 and provide new 4" vinyl wall base to match existing.
12.Infill abandoned convector opening per detail 9/A500. Provide new CT-1 ceramic wall tile. Extend resinous flooring integral cove base up face of wall infill to match existing.
13.Remove existing gypsum board, insulation and studs at former convector opening. Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face. Provide new plastic laminate window stool per detail 3/A500.
14.Paint wall PNT-1 and provide new 4" vinyl wall base to match existing.
15.Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face.
16.Remove existing plaster ceiling in this room including suspension system and hangers. Install new ATC-1 ceiling at height shown.
17.Remove and reinstall pews as needed to access wall.
18.Remove existing plaster and structural clay wall at column. After installation of new piping replace with light gage framing and 5/8" gypsum board.
19.Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face. Provide new plastic laminate window stool per detail 3/A500.
20.Paint wall PNT-4. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
21.Paint wall PNT-4 and provide new 4" vinyl wall base to match existing.
22.Paint wall PNT-5 and provide new 4" vinyl wall base to match existing.
23.Paint wall PNT-6 and provide new 4" vinyl wall base to match existing.
24.Remove existing gypsum board, insulation and studs at former convector opening. Frame opening for new convector per detail 1/A500.
25.Paint wall PNT-2. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
26.Paint wall PNT-7 and provide new 4" vinyl wall base to match existing.
27.Remove and re-install existing casework as required to access wall.
28.Paint wall PNT-8 and provide new 4" vinyl wall base to match existing.
29.Paint wall PNT-9 and provide new 4" vinyl wall base to match existing.
30.Provide new CT-2 ceramic wall tile and cover base over tile backer board at infilled opening to match existing.
31.Coordinate with Owner for removal and reinstallation of lab equipment to access convector.
32.Paint wall PNT-8. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
33.Paint wall PNT-9. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
34.Extend existing pipe pit in concrete floor per detail 10/A500.
35.Remove asbestos containing pipe insulation above ceiling per 02 82 13.13. Approximately 72 LF.
36.Remove asbestos containing pipe insulation above ceiling per 02 82 13.13. Approximately 10 LF.
37.Provide new wall protection sheet and 4" vinyl wall base to match existing.
38.New surface mounted convector in stairwell. Piping to be provided with surface mounted cover per mechanical.
39.Existing convector to remain with new equipment per Mechanical. Remove and reinstall existing cover.
Keynotes
General Notes
SCALE:
First Floor Plan - West
1/8"=1'-0"
N
MEP PROJECT NO.: G29.18.02
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
420 RAIL STREET
NEGAUNEE, MI 49866
PHONE: 906-475-6616
NDW PROJECT NUMBER: 1825
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
RD
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
CHASE
AutoCAD SHX Text
TUBE STATION
AutoCAD SHX Text
FIREPLACE
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text SMOKE RESISTIVE WALL SMOKE BARRIER WITH ONE HOUR FIRE RATING ONE HOUR FIRE RATED WALL TWO HOUR FIRE WALL
AutoCAD SHX Text
SMOKE/ FIRE/ RATED PARTITION TYPES
AutoCAD SHX Text A102
AutoCAD SHX Text
AutoCAD SHX Text
RU
AutoCAD SHX Text
RU
AutoCAD SHX Text
FIRST FLOOR WEST FLOOR PLAN
AutoCAD SHX Text
UPGRADE HEAT EXCHANGERS AND
AutoCAD SHX Text
REPLACE HEATING DESIGN
AutoCAD SHX Text 585-17-120
AutoCAD SHX Text No. 1
AutoCAD SHX Text
IRON MOUNTAIN, MICHIGAN
AutoCAD SHX Text
MARCH 8, 2019
AutoCAD SHX Text
AutoCAD SHX Text
50%%% REVIEW
AutoCAD SHX Text 10/24/2018
AutoCAD SHX Text
95%%% REVIEW
AutoCAD SHX Text 12/05/2018
AutoCAD SHX Text
100%%% DOCUMENTS
AutoCAD SHX Text 12/21/2018
AutoCAD SHX Text
100%%% BID DOCUMENTS
T A1
EA
ST
A
W
ES
T A1
EA
ST
A
18 1819
14 19
6 19
393939
1. Light lines indicate existing construction. Dark lines indicate new work.
2. Remove and re-install suspended acoustical tile ceilings as required for work above ceilings for piping at this floor and removal of steam lines serving floor above.
3. Where existing piping is removed from full height partitions patch holes to match partition construction.
4. Where existing piping is removed from floor penetrations seal holes with fire stopping per 07 84 00.
5. At new piping penetrations through full height partitions provide silicone sealant to seal all voids. At fire rated partitions and floors provide fire stopping system per 07 84 00.
6. At new piping penetrations through floors provide fire stopping system per 07 84 00.
7. Many of the pipe sleeves through the floor at steam convectors to be removed have sections of asbestos containing pipe insulation within the sleeves. Where original insulation remains at pipe sleeves remove per 02 82 13.13. See detail 1/M503.
8. All work in OI&T, Travel and Agent Cashier offices (1286A, 1288A) and Union offices will require an escort and must be performed on day shift. Arrange in advance of work with COR.
1. Infill existing convector opening for new convector per detail 4/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.
2. Remove vinyl wall covering from this wall and repair surface to receive new paint finish.
3. Infill existing convector opening for new convector per detail 4/A500. Paint this wall PNT-1 and provide new
4" vinyl wall base to match existing.
4. Infill existing projecting steel convector box for new convector per detail 5/A500. Paint new work to match existing wall and provide 4" vinyl base to match existing.
5. Not used.
6. Infill abandoned convector opening per detail 7/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.
7. Infill abandoned convector opening per detail 8/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.
8. Infill existing convector opening per detail 1/A500.
9. Paint wall PNT-2 and provide new 4" vinyl wall base to match existing.
10.Cut existing gypsum board as required to install new piping. Patch with 5/8" gypsum board to match existing.
11.Paint wall PNT-3 and provide new 4" vinyl wall base to match existing.
12.Infill abandoned convector opening per detail 9/A500. Provide new CT-1 ceramic wall tile. Extend resinous flooring integral cove base up face of wall infill to match existing.
13.Remove existing gypsum board, insulation and studs at former convector opening. Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face. Provide new plastic laminate window stool per detail 3/A500.
14.Paint wall PNT-1 and provide new 4" vinyl wall base to match existing.
15.Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face.
16.Remove existing plaster ceiling in this room including suspension system and hangers. Install new ATC-1 ceiling at height shown.
17.Remove and reinstall pews as needed to access wall.
18.Remove existing plaster and structural clay wall at column. After installation of new piping replace with light gage framing and 5/8" gypsum board.
19.Frame opening for new convector per detail 2/A500. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing flooring back to new wall face. Provide new plastic laminate window stool per detail 3/A500.
20.Paint wall PNT-4. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
21.Paint wall PNT-4 and provide new 4" vinyl wall base to match existing.
22.Paint wall PNT-5 and provide new 4" vinyl wall base to match existing.
23.Paint wall PNT-6 and provide new 4" vinyl wall base to match existing.
24.Remove existing gypsum board, insulation and studs at former convector opening. Frame opening for new convector per detail 1/A500.
25.Paint wall PNT-2. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
26.Paint wall PNT-7 and provide new 4" vinyl wall base to match existing.
27.Remove and re-install existing casework as required to access wall.
28.Paint wall PNT-8 and provide new 4" vinyl wall base to match existing.
29.Paint wall PNT-9 and provide new 4" vinyl wall base to match existing.
30.Provide new CT-2 ceramic wall tile and cover base over tile backer board at infilled opening to match existing.
31.Coordinate with Owner for removal and reinstallation of lab equipment to access convector.
32.Paint wall PNT-8. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
33.Paint wall PNT-9. Extend existing welded seam sheet vinyl floor with integral cove base to match existing.
34.Extend existing pipe pit in concrete floor per detail 10/A500.
35.Remove asbestos containing pipe insulation above ceiling per 02 82 13.13. Approximately 72 LF.
36.Remove asbestos containing pipe insulation above ceiling per 02 82 13.13. Approximately 10 LF.
37.Provide new wall protection sheet and 4" vinyl wall base to match existing.
38.New surface mounted convector in stairwell. Piping to be provided with surface mounted cover per mechanical.
39.Existing convector to remain with new equipment per Mechanical. Remove and reinstall existing cover.
IN BID ALTERNATE 2 ELIMINATE ALL WORK IN
THIS AREA.
Keynotes
General Notes
SCALE:
First Floor Plan - East
1/8"=1'-0"
N
MEP PROJECT NO.: G29.18.02
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
420 RAIL STREET
NEGAUNEE, MI 49866
PHONE: 906-475-6616
NDW PROJECT NUMBER: 1825
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
FD
AutoCAD SHX Text
6" RAISED ALTAR
AutoCAD SHX Text
FIRE EQUIP
AutoCAD SHX Text
LOCKERS
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DUMB WAITER
AutoCAD SHX Text
SERVICE ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
VOLUNTEER AREA
AutoCAD SHX Text
LDRY CHUT
AutoCAD SHX Text
MECH. CHASE
AutoCAD SHX Text
UP
AutoCAD SHX Text
CARPET
AutoCAD SHX Text
CARPET
AutoCAD SHX Text
CARPET
AutoCAD SHX Text
TILE
AutoCAD SHX Text
TILE
AutoCAD SHX Text
TILE
AutoCAD SHX Text
FE
AutoCAD SHX Text
FE
AutoCAD SHX Text
MECH SHAFT
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text D-4
AutoCAD SHX Text D-5
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
CHAPEL
AutoCAD SHX Text
AutoCAD SHX Text
SACREMNT
AutoCAD SHX Text
HOLY
AutoCAD SHX Text 1284A
AutoCAD SHX Text
VESTIBULE
AutoCAD SHX Text 1100A
AutoCAD SHX Text
DAV
AutoCAD SHX Text
AMERICAN LEGION/
AutoCAD SHX Text
AutoCAD SHX Text
WEAPONS
AutoCAD SHX Text 1201C
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
MAIN
AutoCAD SHX Text
AutoCAD SHX Text
HOLDING
AutoCAD SHX Text 1201B
AutoCAD SHX Text
ADVOCATE
AutoCAD SHX Text
PATIENT
AutoCAD SHX Text
AutoCAD SHX Text
ADVOCATE
AutoCAD SHX Text
PATIENT
AutoCAD SHX Text
AutoCAD SHX Text
HEART
AutoCAD SHX Text
PURPLE
AutoCAD SHX Text
AutoCAD SHX Text
POLICE
AutoCAD SHX Text
CHIEF,
AutoCAD SHX Text
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
MENS
AutoCAD SHX Text
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
WOMENS
AutoCAD SHX Text
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
PROCEDURE
AutoCAD SHX Text
AutoCAD SHX Text
ALCOVE
AutoCAD SHX Text
AutoCAD SHX Text
WORKROOM
AutoCAD SHX Text
NURSE
AutoCAD SHX Text
AutoCAD SHX Text
UTILITY
AutoCAD SHX Text
SOILED
AutoCAD SHX Text 1267A
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
PATIENT
AutoCAD SHX Text 1267B
AutoCAD SHX Text
TREATMENT
AutoCAD SHX Text
WOUND CARE
AutoCAD SHX Text
AutoCAD SHX Text
CHASE
AutoCAD SHX Text
CLOSET/PIPE
AutoCAD SHX Text 1182A
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text 1182B
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
CHAPLAIN
AutoCAD SHX Text
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
WAITING
AutoCAD SHX Text
AutoCAD SHX Text
CASHIER
AutoCAD SHX Text
AGENT
AutoCAD SHX Text 1288A
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
WAITING
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
TRAVEL
AutoCAD SHX Text 1286A
AutoCAD SHX Text
KITCHENETTE
AutoCAD SHX Text
AutoCAD SHX Text
RM
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
RM
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
WORK RM
AutoCAD SHX Text
NURSE
AutoCAD SHX Text
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
RM
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
WORKER
AutoCAD SHX Text
SOCIAL
AutoCAD SHX Text
AutoCAD SHX Text
MANAGER
AutoCAD SHX Text
OPC NURSE
AutoCAD SHX Text
AutoCAD SHX Text
WORKER
AutoCAD SHX Text
SOCIAL
AutoCAD SHX Text
AutoCAD SHX Text
DIETICIAN
AutoCAD SHX Text
AutoCAD SHX Text
DIETICIAN
AutoCAD SHX Text
AutoCAD SHX Text
RM
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
/CONSULTATION
AutoCAD SHX Text
PT. EDUCATION
AutoCAD SHX Text
AutoCAD SHX Text
MEDICATION
AutoCAD SHX Text
AutoCAD SHX Text
/SECURITY RM.
AutoCAD SHX Text
FIRE ALARM
AutoCAD SHX Text
AutoCAD SHX Text
DIABETES
AutoCAD SHX Text
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
PATIENT
AutoCAD SHX Text
AutoCAD SHX Text
LOBBY
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text
AutoCAD SHX Text
TOILET
AutoCAD SHX Text 1224A
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
COAT
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
PHARMACY
AutoCAD SHX Text
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
PHARMACY
AutoCAD SHX Text
AutoCAD SHX Text
LOUNGE
AutoCAD SHX Text
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
IV
AutoCAD SHX Text
AutoCAD SHX Text
HOOD RM
AutoCAD SHX Text
HAZARD
AutoCAD SHX Text 1233A
AutoCAD SHX Text
& OFFICES
AutoCAD SHX Text
MED PREP
AutoCAD SHX Text
AutoCAD SHX Text
MED PREP
AutoCAD SHX Text
PHARMACY
AutoCAD SHX Text
AutoCAD SHX Text
PHARMACY
AutoCAD SHX Text
MAIN
AutoCAD SHX Text
AutoCAD SHX Text
VAULT
AutoCAD SHX Text 1228A
AutoCAD SHX Text
MED PREP
AutoCAD SHX Text
SECURE
AutoCAD SHX Text
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
PATIENT
AutoCAD SHX Text
AutoCAD SHX Text
CLERKS
AutoCAD SHX Text
AutoCAD SHX Text
RM
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
WORKRM
AutoCAD SHX Text
NURSE
AutoCAD SHX Text
AutoCAD SHX Text
RM
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
RM
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
DIABETES
AutoCAD SHX Text
AutoCAD SHX Text
SUPPLY
AutoCAD SHX Text
STERILE
AutoCAD SHX Text
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
ANTE
AutoCAD SHX Text 1312A
AutoCAD SHX Text
STATION
AutoCAD SHX Text
NURSE
AutoCAD SHX Text
AutoCAD SHX Text
DICTATION
AutoCAD SHX Text
AutoCAD SHX Text
RM
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
WORKRM
AutoCAD SHX Text
NURSE
AutoCAD SHX Text
AutoCAD SHX Text
RM
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
RM
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
LINEN
AutoCAD SHX Text
CLEAN
AutoCAD SHX Text
AutoCAD SHX Text
HOUSEKEEPING
AutoCAD SHX Text
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
STAFF
AutoCAD SHX Text
AutoCAD SHX Text
ISOLATION
AutoCAD SHX Text
TREATMENT/
AutoCAD SHX Text
AutoCAD SHX Text
TREATMENT
AutoCAD SHX Text
SECURE
AutoCAD SHX Text
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
WOMENS
AutoCAD SHX Text
AutoCAD SHX Text
EVIDENCE
AutoCAD SHX Text 1201A
AutoCAD SHX Text
LAB/EKG
AutoCAD SHX Text
BLOOD DRAW
AutoCAD SHX Text
AutoCAD SHX Text
LAB/EKG
AutoCAD SHX Text
BLOOD DRAW
AutoCAD SHX Text
AutoCAD SHX Text
PT. TOILET
AutoCAD SHX Text 1312B
AutoCAD SHX Text
PHARMACIST
AutoCAD SHX Text
CLINICAL
AutoCAD SHX Text
AutoCAD SHX Text
SUPPLY
AutoCAD SHX Text
PHARMACY
AutoCAD SHX Text
AutoCAD SHX Text
DISPENSING
AutoCAD SHX Text
OUTPATIENT
AutoCAD SHX Text
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
HSKPG
AutoCAD SHX Text
AutoCAD SHX Text
HSKPG
AutoCAD SHX Text
AutoCAD SHX Text
ELIGIBILITY
AutoCAD SHX Text
ENROLLMENT &
AutoCAD SHX Text
AutoCAD SHX Text
AREA
AutoCAD SHX Text
WAITING
AutoCAD SHX Text
AutoCAD SHX Text
AREA
AutoCAD SHX Text
CLERK
AutoCAD SHX Text
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
AutoCAD SHX Text
CONSULTING
AutoCAD SHX Text
PHARMACY
AutoCAD SHX Text
AutoCAD SHX Text
DATA
AutoCAD SHX Text
AutoCAD SHX Text
DATA & PHONE
AutoCAD SHX Text 1218A
AutoCAD SHX Text
VESTIBULE
AutoCAD SHX Text 1300A
AutoCAD SHX Text
LOBBY
AutoCAD SHX Text
AutoCAD SHX Text
EQUIPMENT
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text
AutoCAD SHX Text
VESTIBULE
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 1299A
AutoCAD SHX Text
AREA
AutoCAD SHX Text
WAITING
AutoCAD SHX Text
AutoCAD SHX Text
CONSULTING
AutoCAD SHX Text 1218B
AutoCAD SHX Text
CONSULTING
AutoCAD SHX Text 1218C
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
AutoCAD SHX Text
TRIAGE
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
WHLCHR
AutoCAD SHX Text
AutoCAD SHX Text
WORKER
AutoCAD SHX Text
SOCIAL
AutoCAD SHX Text 1109A
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
OXYGEN
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
EQUIPMENT
AutoCAD SHX Text
AutoCAD SHX Text
KITCHEN
AutoCAD SHX Text
RESIDENT
AutoCAD SHX Text 1116B
AutoCAD SHX Text
LOCKERS
AutoCAD SHX Text 1105A
AutoCAD SHX Text
LDRY
AutoCAD SHX Text
CHUT
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
STAFF
AutoCAD SHX Text 1340A
AutoCAD SHX Text
WAITING AREA
AutoCAD SHX Text
URGENT CARE
AutoCAD SHX Text
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
PATIENT
AutoCAD SHX Text
AutoCAD SHX Text
ALCOVE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
MENS
AutoCAD SHX Text
AutoCAD SHX Text
ALCOVE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
AutoCAD SHX Text
STAIR4
AutoCAD SHX Text
STAIR8
AutoCAD SHX Text
STAIR2
AutoCAD SHX Text
STAIR3
AutoCAD SHX Text
ALCOVE
AutoCAD SHX Text
PYXIS
AutoCAD SHX Text
AutoCAD SHX Text
CLEAN RM.
AutoCAD SHX Text
NON-HAZ./
AutoCAD SHX Text 1233B
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text SMOKE RESISTIVE WALL SMOKE BARRIER WITH ONE HOUR FIRE RATING ONE HOUR FIRE RATED WALL TWO HOUR FIRE WALL
AutoCAD SHX Text
SMOKE/ FIRE/ RATED PARTITION TYPES
AutoCAD SHX Text A103
AutoCAD SHX Text
AutoCAD SHX Text
RU
AutoCAD SHX Text
RU
AutoCAD SHX Text
FIRST FLOOR EAST FLOOR PLAN
AutoCAD SHX Text
UPGRADE HEAT EXCHANGERS AND
AutoCAD SHX Text
REPLACE HEATING DESIGN
AutoCAD SHX Text 585-17-120
AutoCAD SHX Text No. 1
AutoCAD SHX Text
IRON MOUNTAIN, MICHIGAN
AutoCAD SHX Text
MARCH 8, 2019
AutoCAD SHX Text
AutoCAD SHX Text
50%%% REVIEW
AutoCAD SHX Text 10/24/2018
AutoCAD SHX Text
95%%% REVIEW
AutoCAD SHX Text 12/05/2018
AutoCAD SHX Text
100%%% DOCUMENTS
AutoCAD SHX Text 12/21/2018
AutoCAD SHX Text
100%%% BID DOCUMENTS
T A1
EA
ST
A
W
ES
T A1
EA
ST
A
10 8
2210 10
10 822
1. Light lines indicate existing construction. Dark lines indicate new work.
2. Remove and re-install suspended acoustical tile ceilings as required for work above ceilings for piping at this floor and removal of steam lines serving floor above.
3. Where existing piping is removed from full height partitions patch holes to match partition construction.
4. Where existing piping is removed from floor penetrations seal holes with fire stopping per 07 84 00.
5. At new piping penetrations through full height partitions provide silicone sealant to seal all voids. At fire rated partitions and floors provide fire stopping system per 07 84 00.
6. At new piping penetrations through floors provide fire stopping system per 07 84 00.
7. Many of the pipe sleeves through the floor at steam convectors to be removed have sections of asbestos containing pipe insulation within the sleeves. Where original insulation remains at pipe sleeves remove per 02 82 13.13. See detail 1/M503.
8. All work in OI&T, Travel and Agent Cashier offices (1286A, 1288A) and Union offices will require an escort and must be performed on day shift. Arrange in advance of work with COR.
1. Infill existing convector opening for new convector per detail 4/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.
2. Remove vinyl wall covering from this wall and repair surface to receive new paint finish.
3. Infill existing convector opening for new convector per detail 4/A500. Paint this wall PNT-1 and provide new
4" vinyl wall base to match existing.
4. Infill existing projecting steel convector box for new convector per detail 5/A500. Paint new work to match existing wall and provide 4" vinyl base to match existing.
5. Not used.
6. Infill abandoned convector opening per detail 7/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.
7. Infill abandoned convector opening per detail 8/A500. Paint wall to match existing and provide new 4" vinyl wall base to match existing.
8. Infill existing convector opening…