This is Amendment 0003 to a solicitation for East Parking Structure Repairs at the Ann Arbor VA Medical Center. The amendment, issued on April 28, 2026, by the Department of Veterans Affairs Network Contracting Office, extends the solicitation deadline and provides responses to Requests for Information (RFI) received from prospective contractors. The project number is 506-25-104, with contract ID 36C25026B0038 and requisition number 506-26-4-586-0014. The amendment clarifies that a Concrete In Place (CIP) wash requirement at the perimeter of spandrel panels and walls, as referenced in Drawing SF501 Details 8 and 9 in conjunction with Drawing SF105, applies only to specific areas where the existing topping slab is designated for demolition and replacement, rather than to all spandrel panels and walls throughout the project.
Contractors must acknowledge receipt of this amendment prior to the extended deadline by completing the required forms and returning them to the issuing office, by acknowledging receipt on each copy of the offer submitted, or by separate letter or electronic communication referencing the solicitation and amendment numbers. All other terms and conditions of the original solicitation remain unchanged and in full force and effect.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25026B0038 0004.docx | DOCX document | |
| 36C25026B0038 0002.docx | DOCX document | |
| S04 Pre-Bid Site Visit Agenda - 506-25-104 and Sign-in Sheet.pdf | ||
| 36C25026B0038 0001.docx | DOCX document | |
| Contractor EMR Certification Form - 506-25-104.docx | DOCX document | |
| Wage Determination MI20260100 1.02.2026.pdf | ||
| ATTACHMENT VAAR 852.219-75 DEVIATION Jan 2023 LIMITATIONS OF SUBCONTRACTING COMPLIANCE CERTIFICATION.docx | DOCX document | |
| 506-25-104 Ann Arbor Emergent Garage Repair Revised Drawings R3.pdf | ||
| RFI Form - 506-25-104.doc | DOC document | |
| 506-25-104 Ann Arbor Emergent Garage Repair Revised Bid Specifications R3.pdf | ||
| 36C25026B0038_1.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25026B0038 – 0003 – East Parking Structure Repairs – 506-25-104 – Ann Arbor VAMC
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority)
THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 05-18-2026 506-26-4-586-0014 506-25-104 36C250 Department of Veterans Affairs Network Contracting Office (NCO) 10 24 Frank Lloyd Wright Dr., Suite M-2200 Ann Arbor MI 48105 Same as Block 6
To all Offerors/Bidders
36C25026B0038 04-28-2026
X X X The purpose of this amendment is:
1. Issue response to RFI received. See Continuation Page.
All other terms and conditions remain the same.
End of Amendment 0003
SCOTT BRENNAN
Senior Contract Specialist
SF 30 CONTINUATION PAGE 36C25026B0038 AMENDMENT 0003
THE FOLLOWING ANSWERS TO REQUESTS FOR INFORMATION QUESTIONS ARE HEREBY PROVIDED TO CLARIFY, UPDATE, REVISE, OR CORRECT CONTRACT SPECIFICATIONS AND/OR DRAWINGS.
QUESTION AND ANSWER
1. Question: Reference Drawing SF501, Details 8 and 9 in conjunction with Drawing SF105: In the details referenced it calls for a CIP Wash at perimeter of all spandrel panels and walls. We assume that this note is only for the areas where these details are called for such as the shaded area on Drawing SF105 and not at all spandrel panels and walls. Is this correct?
Answer 1: Contractor’s assumption is correct. Reference details are applicable only to areas where existing topping slab is called for demo and replacement.
Page 1 of Page 1 of