This is a Standard Form 30 Amendment of Solicitation/Modification of Contract issued by the Department of Veterans Affairs, Network Contracting Office (NCO) 10 on May 5, 2026.
The amendment addresses Solicitation No. 36C25026B0032, originally dated April 3, 2026, for the "Improve Site Security at Cincinnati VAMC" project (Project No. 539-22-208). The amendment is issued to answer Requests for Information (RFIs) received from offerors and to provide the ICRA (Infection Control Risk Assessment) permit relevant to this project. Two attachments accompany this amendment: Attach 2.1 containing RFI Responses and Attach 2.2 containing the ICRA Permit. The amendment requires offerors to acknowledge receipt of this amendment prior to the hour and date specified in the original solicitation by completing the amendment form and returning it, acknowledging receipt on each offer copy submitted, or sending a separate letter or electronic communication referencing both the solicitation and amendment numbers. Failure to acknowledge receipt prior to the specified deadline may result in rejection of the offer. The hour and date specified for receipt of offers is extended per this amendment. All other terms and conditions of the original solicitation remain unchanged and in full force and effect.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25026B0032 0003.pdf | ||
| Attach 2.1 - RFI Responses.pdf | ||
| Attach 2.2 - ICRA Permit.pdf | ||
| Attach 1.1 - Site Visit Sign In Log.pdf | ||
| 36C25026B0032 0001.pdf | ||
| 36C25026B0032_1.pdf | ||
| Attach IV - VAAR 852.219-75 VA NOTICE OF LIMITS ON SUBCONTRACTING_CERT OF COMPLIANCE JAN 2023 DEV.doc.docx | DOCX document | |
| Attach V - Sole Source JA - redact - 539-22-208.pdf | ||
| Attach I - Wage Determination 1.2.2026.txt | TXT text file | |
| Attach III - Site Security Drawings 2.23.26.pdf | ||
| Attach II - Site Security Specifications 2.23.26.pdf | ||
| Attach VI - RFI Site Security.doc | DOC document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solic itation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
0002 05-05-2026
539-26-1-6905-0004
539-22-208
36C250
Network Contracting Office (NCO) 10 Department of Veterans Affairs
260 E. University Ave, Ste 100 Cincinnati OH 45219
36C250
Network Contracting Office (NCO) 10 Department of Veterans Affairs
3140 Governors Place Blvd. Suite 210 Kettering OH 45409
To all Offerors/Bidders
36C25026B0032
04-03-2026
X
X X
539-3660162-6905-854200-3220 23NRNR000
x 1
Improve Site Security at Cincinnati VAMC. Project No. 539-22-208
This amendment is issued to answer the RFIs received and provide the ICRA permit relevant to this project.
Attach 2.1 - RFI Responses.
Attach 2.2 - ICRA Permit
Luke A. Turner
List of Attachments
• Attach 2.1 - RFI Responses.
• Attach 2.2 - ICRA Permit.
| List of Attachments |
| Attach 2.1 - RFI Responses. |
| Attach 2.2 - ICRA Permit. |