S06 Addendum 1 - 553-21-100.pdf

PDF 6 MB Posted

Attached to
Z1DA--Remodel A2South to Cancer Clinic 553-21-100 - Amendment 006
Solicitation number
36C25026B0024
Issued by

About this file

This is Addendum #1 to 100% Bid Documents for a VA construction project to renovate the A2 South area for a Cancer Clinic at the John D. Dingell VA Medical Center in Detroit, Michigan (Project No. 553-21-100, dated April 2, 2026). The addendum incorporates drawing revisions across multiple disciplines into the contract documents, specifications, and plans.

The addendum specifies reissued sheets across General, Structural, Fire Protection, Plumbing, Mechanical, and Interior Finish disciplines. Key revisions include: updates to Sheet G-001 revising sheet order and sole source list; modifications to life safety and fire extinguisher cabinet locations on Sheet G-102.1; revisions to architectural sheets (A-102.1A through A-102.1D) addressing wall tags, wall types for fire extinguisher cabinets, and plan keynotes; updates to detail sheets A-501 and A-502; revisions to door and frame schedules on Sheet A-601; modifications to interior finish general notes and legends on Sheets I-102.1 through I-102.1C; adjustments to mechanical ductwork routing away from existing shafts near column lines 3N and 6N on Sheets MH102, MH102.I, and M-40I; addition of terminal unit numbers and AFCV identifiers to mechanical systems; revisions to mechanical schedules on Sheets M-601, M-602, and M-802; and updates to plumbing tie-ins on Sheet MP102.I. Bidders must acknowledge receipt of Addendum #1 in the spaces provided on the Bid Form. All revisions maintain fire-rating compliance and coordinate mechanical systems with structural and architectural elements to prevent conflicts during construction.

View the file

Other files

File Type Posted
36C25026B0024 0006.docx DOCX document
36C25026B0024 0005.docx DOCX document
S06 36C25026B0024 0004 - 553-21-100.docx DOCX document
S06 36C25026B0024 0003 - 553-21-100.pdf PDF
S06 Addendum 2 - 553-21-100.pdf PDF
S06 RFI Responses 3 - 553-21-100.pdf PDF
36C25026B0024 0003.docx DOCX document
RFI Responses 2 - 553-21-100.pdf PDF
S06 BSC Product Data - 553-21-100.pdf PDF
36C25026B0024 0002.docx DOCX document
Pre-Bid Site Visit Attendance Log 553-21-100.pdf PDF
RFI Responses - 553-21-100.pdf PDF
36C25026B0024 0001.docx DOCX document
S02 36C25026B0024 - 553-21-100.pdf PDF
Wage Determination MI20260101 - 01-02-2026 - 553-21-100.pdf PDF
Specs Vol2 - 553-21-100.pdf PDF
Specs Vol1 - 553-21-100.pdf PDF
Drawings - 553-21-100.pdf PDF
Contractor EMR Certification Form - 553-21-100.docx DOCX document
RFI Form - 553-21-100.doc DOC document
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum #1

The following changes, revisions, modifications, etc. shall be incorporated into the contract documents, specifications, and plans.

ACKNOWLEDGEMENTS

A1.1 The Bidder shall acknowledge receipt of Addenda #1 by indicating so in the spaces provided on the Bid Form.

DRAWINGS

A1.2 Refer to Sheet G-001 (reissued):

a. Revise sheet order.

b. Revise Sole Source List.

A1.3 Refer to Sheet G-102.1 (reissued):

a. Add distance to common path of travel line.

b. Add existing fire extinguisher cabinet locations to remain.

c. Add new fire extinguisher cabinets as shown.

A1.4 Refer to Sheet AD-102.1 (reissued):

a. Add Plan Keynotes.

b. Revise demolition note.

A1.5 Refer to Sheets A-102.1A and A-102.1B (reissued):

a. Revise wall tags.

b. Revise wall type for new fire extinguisher cabinets.

A1.6 Refer to Sheet A-102.1C (reissued):

c. Revise wall tags.

d. Add missing wall tag.

e. Revise wall type for new fire extinguisher cabinets.

VA Project No.: 553-21-100 Date: April 2, 2026

Project: Renovate A2 South for Cancer Clinic John D. Dingell VA Medical Center Detroit, Michigan

A/E Firm: Walter Mechanical/MEGA/C2AE

Project Manager: Ali Shiraz/Scott Townsend/Kelly Homic

Owner: John D. Dingell VA Medical Center 4646 John R Street Detroit, MI 48201

Renovate A2 South for Cancer Clinic

A1.7 Refer to Sheet A-102.1D (reissued):

a. Revise wall tags.

b. Revise plan keynotes.

A1.8 Refer to Sheet A-501 (reissued):

Revise details as shown.

A1.9 Refer to Sheet A-502 (reissued):

Revise details as shown.

A1.10 Refer to Sheet A-601 (reissued):

Revise door and frame schedule.

A1.11 Refer to Sheets I-102.1, I-102.1A, I-102.1B, and I-102.1D (reissued):

a. Revise Room Finish General Notes.

b. Revise Interior Finish Legend

A1.12 Refer to Sheet I-102.1C (reissued):

a. Revise Room Finish General Notes.

b. Revise Interior Finish Legend

c. Revise length of wall protection.

d. Add keynotes for accent flooring.

e. Revise demarcation line notes.

A1.13 Refer to Sheet I-130 (reissued):

Revise notes.

A1.14 Refer to Sheet MD102.2I (reissued):

Existing ductwork has been moved out of the existing shaft near column line 6N.

A1.15 Refer to Sheet MH102 (reissued):

Add terminal unit numbers to space temperature sensors.

A1.16 Refer to Sheet MH102.I (reissued):

a. Existing and new ductwork has been moved out of the existing shafts near column line 6N and 3N.

b. Add tag numbers to all terminal units.

c. New fire dampers along column line 2 have been identified with a rating of 1.5 hours.

d. Bio Safety Cabinets’ (BSC) Stainless Steel exhaust ductwork has been demonstrated with the proper hatch.

A1.17 Refer to Sheet MP102.I (reissued):

a. New piping has been moved out of the existing shaft near column line 6N.

b. HHWS and HHWR pipe tie-ins to AFCV-2082-A2055-S and AFCV-2082-A2057-S have been drawn more clearly.

Renovate A2 South for Cancer Clinic

A1.18 Refer to Sheet M-40I (reissued):

a. New ductwork has been moved out of the existing shaft near column line 3N.

b. Add Airflow Control Valve (AFCV) numbers to space temperature/humidity stats/sensors.

c. Add Mechanical keynote M18 for Anteroom RPM

d. Revise Mechanical keynotes M14 to M17.

e. Add manual balancing dampers (BD) to BSC exhaust ductworks (near both sides of column 5M).

A1.19 Refer to sheet M-601 (reissued):

Revise the “Single Duct Air Terminal Unit Schedule”.

A1.20 Refer to sheet M-602 (reissued):

Revise the “Room Air Balance Schedule”.

A1.21 Refer to sheet M-802 (reissued):

Revise the “Variable Air Volume Air Handling Unit With 100% Outside Air Control Diagram”.

1.

1.

2.

A.

B.

3.

1.

2.

1.

2.

DEDUCTIVE ALTERNATE #1

REMOVE BUILT-IN CASEWORK AND REPLACING WITH FURNITURE

PACKAGE IN ROOMS: A2013, A2014, A2020, A2022, A2058 AND A2060.

DEDUCTIVE ALTERNATE #2

EVERYTHING IN DEDUCTIVE ALTERNATE #1.

PARTIAL HEIGHT WALL:

REMOVE RESIN PANEL, ALL INTERNAL BLOCKING/ SUPPORTS USED

TO SUPPORT RESIN PANEL, ALL COLD FORMED METAL FRAMING

AND SOLID SURFACE SILL. MODIFY WALL TO BE PARTITION TYPE

'2A', FULL HEIGHT, CONNECTING TO THE DECK ABOVE.

REMOVE CEILING, LMC-1, AND (3) DOWNLIGHTS, L7, LOCATED IN

ALCOVE A2079. REPLACE WITH GYPSUM BOARD BULKHEAD, HEIGHT

AT 7'-0" A.F.F. AND ADD (3) DOWNLIGHTS, L5. PAINT BULKHEAD AS

INDICATED IN REFLECTED CEILING PLAN LEGEND.

REMOVE FOLDING GLASS PARTITION SYSTEM IN ITS ENTIRETY FROM

THE SCOPE OF WORK. TO INCLUDE: RESIN PANELS, HARDWARE,

TRACKS, AND ALL STRUCTURAL STEEL.

DEDUCTIVE ALTERNATE #3

EVERYTHING IN DEDUCTIVE ALTERNATE #1 AND #2.

REMOVE LMC-1 AND LINEAR LIGHT FIXTURES, L22, OVER INFUSION

BAYS A2068, A2070, A2072, A2074, A2076, A2078, A2080, A2081, A2082,

AND A2083. REPLACE WITH SMC-1 AND 2X2 LIGHTING FIXTURES, L2.

LIGHT FIXTURE COUNT TO REMAIN THE SAME.

DEDUCTIVE ALTERNATE #4

EVERYTHING IN DEDUCTIVE ALTERNATE #1, #2, AND #3.

REMOVE IN-FLOOR RECESSED SCALE IN ITS ENTIRETY FROM THE

SCOPE OF WORK. TO INCLUDE: CONCRETE WORK, IN FLOOR POWER /

DATA ASSOCIATED WORK, AND RECESSED SCALE EQUIPMENT IN

WEIGHT ALCOVES A2024 AND A2063.

DEDUCTIVE ALTERNATE LEGEND:

SOLE SOURCE LIST

DIVISION ITEM

CHEMTRONVACUUM SYSTEMS22 63 00

SIEMENSDISTRIBUTION SWITCHBOARDS26 24 11

SIEMENSELECTRICAL PANELBOARDS26 24 16

SIEMENSMOTOR CONTROL CENTERS26 24 19

BRAND

08 71 00 LATCH AND LOCK SETS YALE

CHEMTRONMEDICAL GASES22 63 00

SIEMENSDIRECT-DIGITAL CONTROL SYSTEM FOR HVAC23 09 23

SIEMENSDRY-TYPE TRANSFORMERS26 22 00

SIEMENSMOTOR STARTERS26 29 11

SIEMENSLOW-VOLTAGE DISCONNECT SWITCHES26 29 21

EATONAUTOMATIC TRANSFER SWITCHES26 36 23

SIEMENSTRANSIENT-VOLTAGE SURGE SUPPRESSION26 43 13

RAULAND-BORGNURSE CALL AND CODE BLUE SYSTEMS27 52 23

SIMPLEXFIRE DETECTION AND ALARM28 31 00

07 81 00 FS-1 FOR FIRESTOPPING HILTI

ARJO, SKI-2PATIENT LIFT11 73 00

SECURITY 2000CCTV SYSTEM28 23 00

LYNX ALARM SYSTEMALARM SYSTEM (COMPUTER, 2 ALT

KEYS ON PAD)

28 26 00

08 71 00 PUSH BUTTON COMBINATION LOCKSET ALARM LOCK TRILOGY DL3500

ACCESS CONTROL SYSTEM (CARD

READERS)28 13 00 SECURITY 2000

1.

2.

3.

ALL REFERENCES TO OWNER IN THESE DOCUMENTS REFER TO THE VA,

THE CO AND/OR THE COR.

ALL REFERENCES TO GOVERNMENT IN THESE DOCUMENTS REFER TO

THE VA, THE CO AND/OR THE COR.

PRODUCTS LISTED HEREIN BY MANUFACTURER'S TRADE NAME AND

NUMBERS ARE TO BE USED FOR BASIS OF DESIGN ONLY, U.N.O.

PRODUCTS ARE SUBJECT TO COMPLIANCE WITH SALIENT

CHARACTERISTICS AND REQUIREMENTS IN THE SPECIFICATIONS.

PROVIDE PRODUCTS LISTED OR COMPARABLE PRODUCTS BY OTHER

MANUFACTURERS.

GENERAL NOTES:

N

EW

S

LAKE ERIE

GRAND

RAPIDS

TRAVERSE

CITY

LAKE SUPERIOR

UPPER PENINSULA

MACKINAW

CITY LAKE HURONALPENA

PETOSKEY

GAYLORD

GRAYLING

LA

KE

M

IC

HI

GA

N

SAGINAW

FLINT

LANSING

DETROIT

KALAMAZOO ANN

ARBOR

BATTLE

CREEK

LOCATION MAP

NOT TO SCALE

N

EW

S

CAMPUS MAP

NOT TO SCALE

SOUTH

PARKING

DECK

ENERGY

CENTER

NORTH

PARKING

DECK

E. WARREN AVE.

E. HANCOCK ST.

E. CANFIELD ST.

JOHN R ST.

BRUSH ST.

ST. ANTOINE

WOODWARD AVE. E. FOREST ST.

W. FOREST ST.

N

EW

S

VICINITY MAP

NOT TO SCALE

W. FORT ST.

MICHIGAN AVE. 1212

W. GRAND BLVD.

MARTIN LUTHER KING JR. BLVD.

W. WARREN AVE.

WOODWARD AVE.

W. GRAND BLVD.

W. GRAND RIVER AVE.

GR

AT

IO

T A

VE

DETROIT RIVER

MCDOUGALL ST.

E. GRAND BLVD.

E. GRAND BLVD. E. GRAND BLVD.

VAN DYKE.

E. WARREN AVE.

MACK AVE. VERNOR HWY.

E. LAFAYETTE ST.

E. JEFFERSON AVE.

DETROIT

RA

ILR

OA

D

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA STATION

Defining

EXCELLENCE

in the 21st Century

HEALTH

CARE

SIGNATURE DATE

Director

Associated Director

Chief of Staff

Associate Director for Patient Care Services

Chief, FMS

Chief, Engineering Section

Chief, Environmental Management Section

Infection Control Officer

SIGNATURE BLOCK

POSITION

DEPARTMENT OF VETERANS AFFAIRS - JOHN D. DINGELL VA MEDICAL CENTER

DETROIT, MICHIGAN

John D. Dingell VA Medical Center

4646 John R. Street

Detroit , MI 48201

3419 Pierson Place Flushing, Michigan, 48433 810-230-6202

(866) 454-3923 | WWW.C2AE.COM

Au tod es k D oc s:/

/V A

MI

D etr oit

/21

_A

.rv t

4/2 /20

:25 :35

A M

G-001

COVER SHEET RENOVATE A2 SOUTH

FOR CANCER CLINIC

DETROIT, MI

553-21-100

10-JAN-2025 KJH MRB

100% BID DOCUMENTS

RENOVATE A2 SOUTH FOR CANCER

CLINIC

553-21-100

10-JAN-2025

100% BID DOCUMENTS

553-21-100

SHEET

NO. SHEET NAME

GENERAL

G-001 COVER SHEET

G-002 LIFE SAFETY AND ICRA LEGENDS

G-102.1 LIFE SAFETY PLAN - SECOND LEVEL - ZONE 1

GENERAL - ICRA

G-200 ICRA PLAN - LOWER LEVEL

G-201.1I ICRA PLAN – FIRST LEVEL INTERSTITIAL – ZONE 1

G-202.1 ICRA PLAN - SECOND LEVEL - ZONE 1

G-202.1I ICRA PLAN - SECOND LEVEL INTERSTITIAL - ZONE 1

G-203.1 ICRA PLANS - ZONE 1D

STRUCTURAL

S-001 GENERAL NOTES AND LEGENDS

SD102.1 STRUCT DEMO PLAN - SECOND LEVEL - ZONE 1

SD102.1I STRUCT DEMO PLAN - SECOND LEVEL INTERSTITIAL - ZONE 1

S-102.1 FRAMING PLAN - SECOND LEVEL - ZONE 1

S-102.1I FRAMING PLAN - SECOND LEVEL INTERSTITIAL - ZONE 1

S-103.1 PARTIAL FRAMING PLANS - MECHANICAL ROOMS - ZONE 1

S-104.1 PARTIAL FRAMING PLANS - MECHANICAL ROOMS - ZONE 1

S-401 ENLARGED PLANS

S-501 SECTIONS AND DETAILS

ARCHITECTURAL

A-001 ARCHITECTURAL LEGENDS, SYMBOLS, AND ABBREVIATIONS

A-002 PARTITION TYPES

AD102.1 DEMOLITION PLAN - SECOND LEVEL - ZONE 1

A-102.1 FLOOR PLAN - SECOND LEVEL - ZONE 1

A-102.1A FLOOR PLAN - SECOND LEVEL - ZONE 1A

A-102.1B FLOOR PLAN - SECOND LEVEL - ZONE 1B

A-102.1C FLOOR PLAN - SECOND LEVEL - ZONE 1C

A-102.1D FLOOR PLAN - SECOND, THIRD, ROOF LEVELS - ZONE 1D

A-112.1 REFLECTED CEILING PLAN - SECOND LEVEL - ZONE 1

A-112.1A REFLECTED CEILING PLAN - SECOND LEVEL - ZONE 1A

A-112.1B REFLECTED CEILING PLAN - SECOND LEVEL - ZONE 1B

A-112.1C REFLECTED CEILING PLAN - SECOND LEVEL - ZONE 1C

A-112.1D REFLECTED CEILING PLAN - SECOND LEVEL - ZONE 1D

A-122.1 EQUIPMENT PLAN - SECOND LEVEL - ZONE 1

A-122.1A EQUIPMENT PLAN - SECOND LEVEL - ZONE 1A

A-122.1B EQUIPMENT PLAN - SECOND LEVEL - ZONE 1B

A-122.1C EQUIPMENT PLAN - SECOND LEVEL - ZONE 1C

A-122.1D EQUIPMENT PLAN - SECOND LEVEL - ZONE 1D

A-131 ENLARGED PLANS

A-132 ENLARGED PLANS - PHARMACY

A-401 INTERIOR ELEVATIONS - ZONE 1A

A-402 INTERIOR ELEVATIONS - ZONE 1B

A-403 INTERIOR ELEVATIONS - ZONE 1C

A-404 INTERIOR ELEVATIONS - ZONE 1C

A-405 INTERIOR ELEVATIONS - ZONE 1C

A-501 DETAILS

A-502 SECTIONS AND DETAILS

A-503 DETAILS AND ELEVATIONS - EXAM CLINIC - CHECK-IN DESK

A-504 DETAILS - NURSE STATION, CHECK-IN AND CHECK-OUT

A-505 DETAILS - MILLWORK

A-506 DETAILS - INFUSION BAYS

A-601 DOOR SCHEDULE AND DETAILS

INTERIORS

I-001 INTERIORS GENERAL NOTES AND LEGENDS

I-102.1 FINISH PLAN - SECOND LEVEL - ZONE 1

I-102.1A FINISH PLAN - SECOND LEVEL - ZONE 1A

I-102.1B FINISH PLAN - SECOND LEVEL - ZONE 1B

I-102.1C FINISH PLAN - SECOND LEVEL - ZONE 1C

I-102.1D FINISH PLAN - SECOND LEVEL - ZONE 1D

I-111 FURNITURE PLAN - SECOND LEVEL - ZONE 1 (FOR REFERENCE ONLY)

I-120 SIGNAGE PLAN - SECOND LEVEL - ZONE 1

I-130 FLOORING SEAM PLAN - SECOND LEVEL - ZONE 1

SHEET

NO. SHEET NAME

FIRE PROTECTION

FD102 FP DEMO PLAN - SECOND LEVEL- ZONE 1

FD102.I FP DEMO PLAN - SECOND LEVEL INTERSTITAL - ZONE 1

FP102 FP PLAN - SECOND LEVEL - ZONE 1

PLUMBING

PD101.I DEMO PLAN - FIRST LEVEL INTERSTITIAL - ZONE 1

PD102 DEMO PLAN - SECOND LEVEL - ZONE 1

PD102.I DEMO PLAN - SECOND LEVEL INTERSTITIAL - ZONE 1

PP102.I PIPING PLAN - SECOND LEVEL INTERSTITIAL - ZONE 1

PW101.I DWV PLAN - FIRST LEVEL INTERSTITIAL - ZONE 1

PW102.I DWV PLAN - SECOND LEVEL INTERSTITIAL - ZONE 1

P-102 PLUMBING PLAN - SECOND LEVEL - ZONE 1

P-501 PLUMBING DETAILS

P-601 PLUMBING SCHEDULES

MECHANICAL

M-001 MECHANICAL LEGENDS

MD101.I DEMO PLAN - FIRST LEVEL INTERSTITAL - ZONE 1

MD102 DEMO PLAN - SECOND LEVEL - ZONE 1

MD102.1I PIPING DEMO PLAN - SECOND LEVEL INTERSTITIAL - ZONE 1

MD102.2I HVAC DEMO PLAN - SECOND LEVEL INTERSTITIAL - ZONE 1

MD401 ENLARGED MECHANICAL DEMO PLANS

MH102 HVAC PLAN - SECOND LEVEL - ZONE 1

MH102.I HVAC PLAN - SECOND LEVEL INTERSTITIAL - ZONE 1

MP101.I PIPING PLAN - FIRST LEVEL INTERSTITIAL - ZONE 1

MP102 PIPING PLAN - SECOND LEVEL - ZONE 1

MP102.I PIPING PLAN - SECOND LEVEL INTERSTITIAL - ZONE 1

M-401 ENLARGED MECHANICAL PLANS

M-402 ENLARGED MECHANICAL PLANS

M-403 ENLARGED MECHANICAL PLANS

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-503 MECHANICAL AHU DETAILS

M-601 MECHANICAL SCHEDULES

M-602 MECHANICAL SCHEDULES

M-701 MECHANICAL DIAGRAMS & SCHEMATICS

M-801 MECHANICAL CONTROLS

M-802 MECHANICAL CONTROLS

ELECTRICAL

E-000 ELECTRICAL GENERAL INFORMATION

E-001 LIGHTING SCHEDULES

ELD102.1 LIGHTING DEMOLITION PLAN-SECOND LEVEL-ZONE 1

EPD102.1 POWER DEMOLITION PLAN-SECOND LEVEL-ZONE 1

ETD102.1 TECHNOLOGY DEMOLITION PLAN-SECOND LEVEL-ZONE 1

EL102.1 LIGHTING PLAN-SECOND LEVEL-ZONE 1

EL102.1A LIGHTING PLAN-SECOND LEVEL-ZONE 1A

EL102.1B LIGHTING PLAN-SECOND LEVEL-ZONE 1B

EL102.1C LIGHTING PLAN-SECOND LEVEL-ZONE 1C

EL102.1D LIGHTING PLAN-SECOND LEVEL-ZONE 1D

EP102.1 POWER PLAN-SECOND LEVEL-ZONE 1

EP102.1A POWER PLAN-SECOND LEVEL-ZONE 1A

EP102.1B POWER PLAN-SECOND LEVEL-ZONE 1B

EP102.1C POWER PLAN-SECOND LEVEL-ZONE 1C

EP102.1D POWER PLAN-SECOND LEVEL-ZONE 1D

ET102.1 TECHNOLOGY PLAN-SECOND LEVEL-ZONE 1

ET102.1A TECHNOLOGY PLAN-SECOND LEVEL-ZONE 1A

ET102.1B TECHNOLOGY PLAN-SECOND LEVEL-ZONE 1B

ET102.1C TECHNOLOGY PLAN-SECOND LEVEL-ZONE 1C

ET102.1D TECHNOLOGY PLAN-SECOND LEVEL-ZONE 1D

E-300 ELECTRICAL ELEVATIONS

E-500 ELECTRICAL DETAILS

E-501 ELECTRICAL DETAILS

E-600 PANEL SCHEDULES

E-702 LOW VOLTAGE RISER DIAGRAM

TOTAL SHEETS: 117

RESPONSIBILITY MATRIX

DESCRIPTION SPECIFIED BY AI REMARK

TIS - CONDUIT, BOXES AND RACEWAYS ARCHITECT C C COORDINATE W/ SH AND GMH STANDARDS AND

STAFF

TIS - CABLE, CABLE INSTALLATION, AND TERMINATIONS ARCHITECT C C ARCHITECT COORDINATES W/ DESIGN

TIS - MONITOR BRACKETS/MOUNTS GOVERNMENT C C BLOCKING BY CONTRACTOR

TIS - EQUIPMENT ARCHITECT C C ARCHITECT COORDINATES W/ DESIGN, POWER,

ETC.

SECURITY SYSTEM - CONDUIT AND BOXES ARCHITECT C C COORDINATE W/ SH AND GMH STANDARDS AND

STAFF

SECURITY SYSTEM - CABLE, CABLE INSTALLATION, AND

TERMINATIONS

ARCHITECT C C COORDINATE W/ SH AND GMH STANDARDS AND

STAFF

SECURITY SYSTEM - EQUIPMENT ARCHITECT C C ARCHITECT COORDINATES W/ DESIGN,

LOCATION, POWER, ETC.

NURSE CALL - CONDUIT, BOXES AND RECEWAYS ARCHITECT C C COORDINATE W/ SH AND GMH STANDARDS AND

STAFF

NURSE CALL - CABLE, CABLE INSTALLATION, AND

TERMINATIONS

ARCHITECT C C -

NURSE CALL - EQUIPMENT ARCHITECT C C ARCHITECT COORDINATES W/ DESIGN

FIRE ALARM - CONDUIT, BOXES AND RECEWAYS ARCHITECT C C -

FIRE ALARM - CABLE, CABLE INSTALLATION, AND

TERMINATIONS

ARCHITECT C C -

FIRE ALARM - EQUIPMENT ARCHITECT C C -

PAGING - CONDUIT, BOXES AND RECEWAYS ARCHITECT C C COORDINATE W/ SH AND GMH STANDARDS AND

STAFF

PAGING - CONDUIT, CABLE INSTALLATION,AND

TERMINATIONS

ARCHITECT C C -

PAGING - EQUIPMENT, SPEAKERS ARCHITECT C C ARCHITECT COORDINATES W/ DESIGN

CCTV - CONDUIT, BOXES AND RACEWAYS ARCHITECT C C COORDINATE W/ SH AND GMH STANDARDS AND

STAFF

CCTV - CABLE, CABLE INSTALLATION, AND

TERMINATIONS

ARCHITECT C C -

CCTV - MONITOR BRACKET/ MOUNTS GOVERNMENT V C BLOCKING BY CONTRACTOR

CCTV - EQUIPMENT ARCHITECT C C ARCHITECT COORDINATES W/ DESIGN,

BLOCKING BY CONTRACTOR

COMMISSIONING GOVERNMENT V V

Revisions: Date:

35% SCHEMATIC DESIGN 02-MAR-2022

65% DESIGN DEVELOPMENT 29-AUG-2023

95% CONSTRUCTION DOCUMENTS 15-APR-2024

95% CONSTRUCTION DOCUMENTS - REVISED 27-AUG-2024

100% BID DOCUMENTS 10-JAN-2025

ADDENDUM 01 02-APR-2026

A01

A01

A01

Page 4 of 27 Addendum #1

74 SF

150 GSF

CLEAN LINEN

115 SF

150 GSF

EXAM

117 SF

150 GSF

ANTI-COAG

121 SF

150 GSF

EXAM

117 SF

150 GSF

EXAM

121 SF

150 GSF

EXAM

116 SF

150 GSF

EXAM

120 SF

150 GSF

EXAM

115 SF

150 GSF

EXAM

126 SF

150 GSF

WORK ROOM

115 SF

150 GSF

EXAM

115 SF

150 GSF

EXAM

115 SF

150 GSF

EXAM

115 SF

150 GSF

EXAM

115 SF

150 GSF

EXAM

122 SF

150 GSF

OFFICE - RN CARE

COORDINATOR

122 SF

150 GSF

OFFICE - RN CARE

COORDINATOR

21 SF

150 GSF

WEIGHT

162 SF

150 GSF

SHARED OFFICE

184 SF

150 GSF

SHARED OFFICE

BREAK ROOM

WOMEN'S

LOCKERS

MENS

LOCKERS

SHARED

OFFICE

SHARED

OFFICE

94 SF

150 GSF

OFFICE

93 SF

150 GSF

OFFICE

106 SF

150 GSF

OFFICE

112 SF

150 GSF

WORK ROOM 196 SF

150 GSF

INFUSION ROOM 3

195 SF

150 GSF

INFUSION ROOM 2

214 SF

150 GSF

INFUSION ROOM 1

75 SF

150 GSF

WEIGHT

105 SF

150 GSF

INFUSION BAY

105 SF

150 GSF

INFUSION BAY

100 SF

150 GSF

INFUSION BAY

105 SF

150 GSF

INFUSION BAY

101 SF

150 GSF

INFUSION BAY

104 SF

150 GSF

INFUSION BAY

105 SF

150 GSF

INFUSION BAY

100 SF

150 GSF

INFUSION BAY

105 SF

150 GSF

INFUSION BAY

102 SF

150 GSF

INFUSION BAY

99 SF

150 GSF

INFUSION BAY

99 SF

150 GSF

INFUSION BAY

54 SF

500 GSF

STRETCHER /

WHEELCHAIR

STORAGE

21 SF

500 GSF

ALCOVE

29 SF

500 GSF

ALCOVE

437 SF

150 GSF

NURSE STATION

40 SF

150 GSF

NUTRITION

207 SF

150 GSF

BREAK ROOM

79 SF

150 GSF

LOCKER ROOM

191 SF

150 GSF

STERILE

HAZARDOUS

DRUG BUFFER

ROOM

91 SF

150 GSF

SOILED UTILITY

81 SF

150 GSF

CLEAN UTILITY

84 SF

150 GSF

MED ROOM

129 SF

150 GSF

PATIENT

EDUCATION (MIND

BODY SOUL)

116 SF

500 GSF

HAC

25 SF

500 GSF

ALCOVE

SMOKE COMPARTMENT 2.1

SMOKE

COMPARTMENT 2.2

194 SF

15 NSF

INFUSION CLINIC

LOBBY

SMOKE COMPARTMENT 2.1

133' - 10"

159' - 10"

ZONE 1ZONE 5

ZONE 5

ZONE 2

ZO

NE

ZO

NE

109 SF

150 GSF

STERILE

NON-HAZARDOUS

DRUG BUFFER

ROOM

132' - 4"191' - 5"

96 SF

500 GSF

HAZARDOUS

DRUG STORAGE

202 SF

150 GSF

PHARMACIST

WORK AREA

235 SF

150 GSF

ANTE ROOM

138 SF

150 GSF

SHARED OFFICE

138 SF

150 GSF

SHARED OFFICE

69 SF

150 GSF

WORK ROOM

562 SF

150 GSF

CHECK-IN/

CHECK-OUT

491 SF

15 NSF

EXAM CLINIC

WAITING

246 SF

150 GSF

GROUP ROOM

MENS TOILET

CORRIDOR

CONSULATION

ROOM OFFICE OFFICE

HAC

STORAGE

PHARMACEUTI

ELECTRICAL

ICU PHYSICIAN

CALL ROOM

BATH

BEDROOM 2

BED

BATH

SIMULATION

ROOM

CORRIDOR

CART LIFT #01

CART LIFT #02

CART LIFT #03

MECHANICAL

ELECTRICAL

STAIR #02

WOMEN'S

TOILET

TOILET

CORRIDOR

PATIENT

TOILET

PATIENT

TOILET

STAFF TOILET

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

89 SF

500 GSF

EQUIPMENT

STORAGE

CORRIDOR

CORRIDOR

BEDROOM -

RESIDENT BATH

BATH

BEDROOM -

RESIDENT

TOILET

TOILET

CORRIDOR

WAITING

CORRIDOR

CORRIDOR

CORRIDOR

STAIR #01

ELEVATOR #03 ELEVATOR #04

ELEVATOR #01ELEVATOR #02

SERVICE

ELEVATOR #05

SERVICE

ELEVATOR #06

FHC

EXISTING

FH

C

FHC

FE

C

FE

C

FEC

FEC

FE

C

57' - 10"

PARTITION / WALL FIRE RATINGS

2-HR. FIRE BARRIER EXISTING 2-HR. FIRE BARRIER

NOTE: EXISTING RATED WALL SHOWN ON PLAN. - VIF WALLS MEET DESIGNATED REQUIREMENTS & ADD

OPENING & PENETRATION PROTECTIVES AS REQ'D

1-HR. SMOKE BARRIER

NON-RATED

SMOKE PARTITION

EXISTING 1-HR. SMOKE BARRIER

EXISTING NON-RATED

SMOKE PARTITION

FIRE EXTINGUISHER CABINET

SYMBOL LEGEND

FEC

1-HR. FIRE BARRIER EXISTING 1-HR. FIRE BARRIER

FIRE HOSE CABINET

FHC

FIRE EXTINGUISHER

FE

SMOKE COMPARTMENT AREAS

SMOKE COMPARTMENT ZONE 2.1

EXIST COMPARTMENT = 21,317 SF

REVISED COMPARTMENT = 21,512 SF

SMOKE COMPARTMENT ZONE 2.2

EXIST COMPARTMENT = 20,016 SF

REVISED COMPARTMENT = 19,820 SF

ONCOLOGY CLINIC AREA

SATELLITE PHARMACY SUITE

TRAVEL DISTANCE TO EXITS

COMMON PATH OF TRAVEL

Length

Length

EXIT# - MAX EGRESS

CAPACITY

A2 NORTH RENOVATIONS

SMOKE COMPARTMENTS

### SF

500 GSF

### SF

15 NSF

### SF

50 GSF

STORAGE / MECHANICAL IN

NON-STORAGE / MERCANTILE

OCCUPANCIES

ROOMS 500 SF GROSS / PERSON

ASSEMBLY: LESS CONCENTRATED

(WITHOUT FIXED SEATING)

15 SF NET / PERSON

AMBULATORY HEALTH CARE

150 SF GROSS / PERSON

S/M

LC

MAX. FLOOR AREA ALLOWANCES PER OCCUPANT FUNCTION OF SPACES SYMBOL LEGEND

NFPA OCCUPANCY SYMBOL LEGEND

### SF

150 GSF

BUSINESS USE

UNCONCENTRATED

150 SF GROSS / PERSON

N KEY PLAN

NOT TO SCALE

SOUTH

PARKING

DECK

ENERGY

CENTER

NORTH

PARKING

DECK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA STATION

Defining

EXCELLENCE

in the 21st Century

HEALTH

CARE

John D. Dingell VA Medical Center

4646 John R. Street

Detroit , MI 48201

3419 Pierson Place Flushing, Michigan, 48433 810-230-6202

(866) 454-3923 | WWW.C2AE.COM

Au tod es k D oc s:/

/V A

MI

D etr oit

/21

_A

.rv t

4/2 /20

:25 :39

A M

G-102.1

LIFE SAFETY PLAN - SECOND

LEVEL - ZONE 1

RENOVATE A2 SOUTH

FOR CANCER CLINIC

DETROIT, MI

553-21-100

10-JAN-2025 KJH MRB

100% BID DOCUMENTS

1/8" = 1'-0"

LIFE SAFETY PLAN - SECOND LEVEL - ZONE 1

Revisions: Date:

35% SCHEMATIC DESIGN 02-MAR-2022

65% DESIGN DEVELOPMENT 29-AUG-2023

95% CONSTRUCTION DOCUMENTS 15-APR-2024

95% CONSTRUCTION DOCUMENTS - REVISED 27-AUG-2024

100% BID DOCUMENTS 10-JAN-2025

ADDENDUM 01 02-APR-2026

A01

A01

A01

A01

Page 5 of 27 Addendum #1

123456789

LL

MM

NN

QQ

7.4

P.4P.4

Q.4 Q.4

Q.5 Q.5

Q.8 Q.8

Q.9 Q.9

8.6

D1

D2

D5D5

D5

D2

D2 D3

D3

D16

D2

D8 D10

D11 D12

D13D14

D13

D13

D8 D10

D11 D12

D8 D10

D11 D12

D3

D3

D3

D7

D7D7

D7

D9

D4 D6 D4

AD102.1

ZONE 1ZONE 5

ZONE 5

ZONE 2

ZO

NE

ZO

NE

AD102.1

AD102.1

AD102.1

AD102.1

D18

D17

D22

D22

D22

D22

D22

D13

D13

D13

D13

D13

D13

D13

D3

D8

D8 D20

D21

D2

D10 D11

D12

D13 D13

D13

A4

A3

GENERAL DEMOLITION NOTES:

1.

2.

3.

4.

5.

6.

7.

ALL EXISTING ITEMS TO BE RETAINED BY THE OWNER WILL BE REMOVED PRIOR

TO DEMOLITION. ANY ITEMS LEFT IN THE DEMOLITION AREA BECOME THE

PROPERTY OF THE DEMOLITION SUBCONTRACTOR.

REFER TO ALL CONTRACT DOCUMENTS FOR ADDITIONAL DEMOLITION NOTES

AND INFORMATION.

SHORE AND BRACE ALL WORK REQUIRED TO REMAIN.

CONTRACTOR AND SUBCONTRACTORS SHALL VISIT THE SITE PRIOR TO

SUBMITTING A BID TO BECOME FAMILIAR WITH EXISTING CONDITIONS

CONTRACTOR AND DEMOLITION SUBCONTRACTOR TO COORDINATE

DEMOLITION WORK WITH OWNER PRIOR TO START OF WORK.

U.N.O. PATCH AND PREPARE FLOOR W/CONCRETE (OR FLORSTONE) FLUSH

WITH ADJACENT FLOOR SURFACE. FILL ANY SLOPING OR RECESSED AREAS

LEVEL TO TYPICAL FINISH FLOOR ELEVATION TO ACCOMMODATE NEW FLOOR

COVERINGS.

FILL-IN EXISTING CHASE OPENINGS, PENETRATIONS IN THE FLOOR AND CEILING

DECK. FIRE-RATING OF NEW CONSTRUCTION TO MATCH EXISTING. REFER TO

DRAWINGS FOR DETAILS.

DEMO PLAN LEGEND:

EXISTING WALL

OR PARTITION TO

REMAIN

EXISTING DOOR

TO REMAIN

EXISTING

BUILDING

COMPONENT &

STRUCTURE TO

REMAIN

EXISTING

WALL/PARTITION OR

EXISTING ITEMS TO

BE REMOVED

EXISTING DOOR &

FRAME TO BE

REMOVED

EXISTING ASSEMBLY

TO BE REMOVED

NOTE: ALL ITEMS

SHOWN RED AND

DASHED ARE TO BE

DEMOLISHED- U.N.O.

PARTITION / WALL FIRE RATINGS

2-HR. FIRE

BARRIER

EXISTING 2-HR.

FIRE BARRIER

NOTE: EXISTING RATED WALL SHOWN SCREENED ON PLAN. - V.I.F. WALLS MEET

DESIGNATED REQUIREMENTS & ADD OPENING & PENETRATION PROTECTIVES

AS REQ'D

1-HR. SMOKE

BARRIER

NON-RATED

SMOKE PARTITION

EXISTING 1-HR.

SMOKE BARRIER

EXISTING NON-RATED

SMOKE PARTITION

1-HR. FIRE

BARRIER

EXISTING 1-HR.

FIRE BARRIER

D4

D7

D3

D3

D4 D6 D19 D4

D3

L

STAIR #02

SA202

D6 D19 D4

D4

D3

D13 D13

D22

D22

L

D13

D2

D3

D4

D4 D6 D19 D4

D3D22

Q

D4

D4

D3

D2

D4D6D19

N

D2

D3D5

EXISTING FLOOR

FINISH TO REMAIN DEMO FLOOR FINISH

N KEY PLAN

NOT TO SCALE

SOUTH

PARKING

DECK

ENERGY

CENTER

NORTH

PARKING

DECK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA STATION

Defining

EXCELLENCE

in the 21st Century

HEALTH

CARE

John D. Dingell VA Medical Center

4646 John R. Street

Detroit , MI 48201

3419 Pierson Place Flushing, Michigan, 48433 810-230-6202

(866) 454-3923 | WWW.C2AE.COM

Au tod es k D oc s:/

/V A

MI

D etr oit

/21

_A

.rv t

4/2 /20

:25 :44

A M

AD102.1

DEMOLITION PLAN - SECOND

LEVEL - ZONE 1

RENOVATE A2 SOUTH

FOR CANCER CLINIC

DETROIT, MI

553-21-100

10-JAN-2025 KJH MRB

100% BID DOCUMENTS

1/8" = 1'-0"

DEMOLITION PLAN - SECOND LEVEL - ZONE 1

DEMOLITION KEYNOTES

KEY VALUE KEYNOTE TEXT

D1 REMOVE INTERIOR CONTENT IN ITS ENTIRETY UNLESS OTHERWISE

NOTED, INCLUDING ALL WALLS, DOORS, WINDOWS, FINISHES,

EQUIPMENT, CASEWORK, FIXTURES, AND ACCESSORIES UP TO DECK

ABOVE.

D2 REMOVE DOOR ASSEMBLY INCLUDING DOOR(S), SIDELIGHTS, GROUT

FILLED FRAMES, THRESHOLD, HARDWARE, ANCHORS, AND TRIM (ON

BOTH SIDES OF EACH DOOR). PATCH AND REPAIR ADJACENT

WALL/FLOOR SURFACES AT AREAS OF REMOVAL TO MATCH EXISTING

AND/OR AS REQUIRED FOR PROPER INSTALLATION OF NEW FINISHES.

D3 REMOVE WALL, BASE TRIM, ALL ATTACHED/EMBEDDED ITEMS, AND ALL

OTHER ASSOCIATED WALL MATERIALS FROM FLOOR TO DECK ABOVE.

PROTECT EXISTING COLUMNS AND FIREPROOFING FROM DAMAGE.

PATCH AND REPAIR ADJACENT WALL/FLOOR SURFACES AT AREAS OF

REMOVAL TO MATCH EXISTING AND/OR AS REQUIRED FOR PROPER

INSTALLATION OF NEW FINISHES. STEEL STRUCTURE TO REMAIN.

D4 REMOVE GYPSUM BOARD AND METAL STUD FRAMING, BASE TRIM, ALL

ATTACHED / EMBEDDED ITEMS, WALL INSULATION, AND ALL OTHER

ASSOCIATED WALL MATERIALS FROM FLOOR TO DECK ABOVE. EXISTING

EXTERIOR WALL TO REMAIN. PROTECT EXISTING COLUMNS AND

FIREPROOFING FROM DAMAGE. PATCH AND REPAIR ADJACENT

WALL/FLOOR SURFACES AT AREAS OF REMOVAL TO MATCH EXISTING

AND/OR AS REQUIRED FOR PROPER INSTALLATION OF NEW FINISHES.

NOTIFY THE COR AND ARCHITECT OF RECORD OF ANY DAMAGE TO THE

EXISTING EXTERIOR WALL.

D5 SAW CUT WALL FOR NEW DOOR. PATCH AND REPAIR ADJACENT

SURFACES AT AREAS OF REMOVAL TO MATCH EXISTING AND/OR AS

REQUIRED FOR PROPER INSTALLATION OF NEW FINISHES.

D6 REMOVE EXISTING PROTECTOR ON FIN RADIATOR – REFER TO

MECHANICAL.

D7 REMOVE BUILT IN BENCH W/ LOUVERS ALONG EXTERIOR WALL. – REFER

TO MECHANICAL.

D8 REMOVE CEILING INCLUDING ALL BRACKETS, ANCHORS & SUPPORTS.

PATCH AND REPAIR ADJACENT SURFACES AT AREAS OF REMOVAL TO

MATCH EXISTING AND/OR AS REQUIRED FOR PROPER INSTALLATION OF

NEW FINISHES. PROVIDE NEW CEILING TILES FOR ANY ADJACENT TILES

THAT ARE TO REMAIN, THAT ARE DAMAGED DURING DEMOLITION.

D9 REMOVE BULKHEAD INCLUDING ALL BRACKETS, ANCHORS & SUPPORTS.

PATCH AND REPAIR ADJACENT SURFACES AT AREAS OF REMOVAL TO

MATCH EXISTING AND/OR AS REQUIRED FOR PROPER INSTALLATION OF

NEW FINISHES.

D10 REMOVE FINISH FLOOR MATERIALS AND ADHESIVE/MORTAR AS

REQUIRED FOR PROPER INSTALLATION OF NEW FLOOR FINISH. PATCH

AND REPAIR ADJACENT WALL/FLOOR SURFACES AT AREAS OF REMOVAL

TO MATCH EXISTING AND/OR AS REQUIRED FOR PROPER INSTALLATION

OF NEW FINISHES.

D11 REMOVE WALL BASE AND ADHESIVE OR MORTAR AS REQUIRED FOR

PROPER INSTALLATION OF NEW BASE MATERIAL. PATCH AND REPAIR

ADJACENT WALL/FLOOR SURFACES AT AREAS OF REMOVAL TO MATCH

EXISTING AND/OR AS REQUIRED FOR PROPER INSTALLATION OF NEW

FINISHES.

D12 REMOVE WALL COVERING, IF ANY, AND PREPARE WALLS FOR TO

RECEIVE NEW FINISHES.

D13 REMOVE AND DISCARD ALL EXISTING HANDRAIL & BUMPER RAILS. PATCH

AND REPAIR AREA OF REMOVAL AS REQ'D. CONTRACTOR TO VERIFY

QUANTITIES AND LENGTHS IN FIELD.

D14 REMOVE CORNER GUARD. PATCH AND REPAIR AREA OF REMOVAL AS

REQ'D. CONTRACTOR TO VERIFY QUANTITIES AND LENGTHS IN FIELD.

D16 REMOVE PLUMBING FIXTURES AND ANY ASSOCIATED PIPING AND

ANCHORS AS NECESSARY FOR INSTALLATION OF NEW FIXTURES AND/OR

FINISHES. COORDINATE WITH PLUMBING DRAWINGS. PATCH AND

REPAIR ADJACENT SURFACES AT AREAS OF REMOVAL TO MATCH

EXISTING AND/OR AS REQUIRED FOR PROPER INSTALLATION OF NEW

FINISHES.

D17 FOR REMOVAL OF EXISTING AIR HANDLING UNITS: REMOVE AND

SALVAGE LOUVER AND METAL STUD(S)FOR REINSTALLATION. REMOVE

AND DISCARD BIRD SCREEN AND FOIL BACKED THERMAL INSULATION.

PATCH AND REPAIR ADJACENT SURFACES AT AREAS OF REMOVAL TO

MATCH EXISTING AND/OR AS REQUIRED FOR PROPER INSTALLATION OF

NEW FINISHES.

D18 REMOVE AND SALVAGE FOR REINSTALLATION PNEUMATIC TUBE PUMP

STATION BY SWISSLOG. MODIFY TRANSPORT TUBES AS REQUIRED FOR

NEW WORK.

D19 REMOVE WINDOW SILL. PATCH AND REPAIR ADJACENT WALL SURFACES

AT AREAS OF REMOVAL TO MATCH EXISTING AND/OR AS REQUIRED FOR

PROPER INSTALLATION OF NEW FINISHES.

D20 REMOVE TILED FLOOR/ WALL FINISH AND MORTAR AS REQUIRED FOR

PROPER INSTALLATION OF NEW BASE MATERIAL. PATCH AND REPAIR

ADJACENT WALL/FLOOR SURFACES AT AREAS OF REMOVAL TO MATCH

EXISTING AND/OR AS REQUIRED FOR PROPER INSTALLATION OF NEW

FINISHES.

D21 REMOVE TOILET ACCESSORIES. PATCH AND REPAIR ADJACENT

SURFACES AT AREAS OF REMOVAL TO MATCH EXISTING AND/OR AS

REQUIRED FOR PROPER INSTALLATION OF NEW FINISHES.

D22 REMOVE GYPSUM BOARD, BASE TRIM, ALL ATTACHED/EMBEDDED ITEMS,

AND ALL OTHER ASSOCIATED WALL MATERIALS FROM FLOOR TO DECK

ABOVE. EXISTING FRAMING TO REMAIN. PROTECT EXISTING COLUMNS

AND FIREPROOFING FROM DAMAGE. PATCH AND REPAIR ADJACENT

WALL/FLOOR SURFACES AT AREAS OF REMOVAL TO MATCH EXISTING

AND/OR AS REQUIRED FOR PROPER INSTALLATION OF NEW FINISHES.

STEEL STRUCTURE TO REMAIN.

1/4" = 1'-0"AD102.1

2 TYPICAL DEMO AT EXTERIOR WALLS

1/4" = 1'-0"AD102.1

3 TYPICAL DEMO AT EXTERIOR WALLS

1/4" = 1'-0"AD102.1

4 TYPICAL DEMO AT EXTERIOR WALLS

1/4" = 1'-0"AD102.1

1 TYPICAL DEMO AT EXTERIOR WALLS

1/4" = 1'-0"AD102.1

5 ENLARGED DEMO PLAN - DOOR

PLAN KEYNOTES

KEY VALUE KEYNOTE TEXT

A3 PNEUMATIC TUBE STATION AND CHASE TO REMAIN, MAINTAIN EXISTING

WALL RATING.

A4 LINEN SHOOT DOORS AND CHASE TO REMAIN, MAINTAIN EXISTING WALL

RATING.

Revisions: Date:

65% DESIGN DEVELOPMENT 29-AUG-2023

95% CONSTRUCTION DOCUMENTS 15-APR-2024

95% CONSTRUCTION DOCUMENTS - REVISED 27-AUG-2024

100% BID DOCUMENTS 10-JAN-2025

ADDENDUM 01 02-APR-2026

A01

A01

A01

Page 6 of 27 Addendum #1

MM

N

7.4 6.5

CONSULATION

ROOM

A2101

OFFICE

A2007

OFFICE

A2005

PATIENT

EDUCATION

(MIND BODY

SOUL)

A2010

HAC

A2103

STORAGE

PHARMACEUTI

A2107

HAC

A2016

ELECTRICAL

A2067

CART LIFT #01

CL-1

CART LIFT #02

CL-2

SHARED

OFFICE

A2108

SHARED

OFFICE

A2109

INFUSION

CLINIC LOBBY

A2011

OFFICE - RN

CARE

COORDINATOR

A2023

WORK ROOM

A2015

OFFICE

A2014

OFFICE

A2061

CHECK-IN/

CHECK-OUT

A2012

CORRIDOR

CA216

OFFICE

A2059

SHARED

OFFICE

A2058

SHARED

OFFICE

A2060

WORK ROOM

A2013

A2

8.1

A2

9.1

A2

2.2

A2

9.1

A2

1.1

A2

0.1

A2

8.1

CA

6.1

A2012.1

A2023.1

A2014.1

CA207.1

CA216.2

CA216.3

ZONE 1A

ZONE 1B

ZO

NE

1A

ZO

NE

1C

ZONE 1AZONE 1B

ZO

NE

1A

ZO

NE

1CZONE 1ZONE 5

ZONE 1A

ZONE 1B

ZO

NE

1A

ZO

NE

1C

ZONE 1AZONE 1B

ZO

NE

1A

ZO

NE

1CZONE 1ZONE 5

A-4012

A-40115

A-401 12

A-401 10

A-401

A-4015 6

A-401

A-4018

FD

2A

2A

2A

2A 2A

2A

2A

2A

2A

9A

2A

2A 2A

1A

1A

2A

2A

8A

1A

1A

2A

2A

1A

1A

2A

2A

8A

10' - 2" 10' - 6 1/4" 3' - 0"

4' - 6"

8' - 0" 3' - 9"

4' - 6"

0"

6 1 /2"

7'

- 1

3/ 4"

9'

- 6

2'

- 3

9"

4' - 11" 1' - 4"

1'

- 4

1'

- 4

8" 1'

- 4

1'

- 4

3' - 7" 1' - 4"

23' - 4 3/4"

2'

- 4

2' - 2"

6' - 5" 4' - 11" 1' - 4" 10' - 8 3/4" 2' - 8 3/4" 7' - 10 1/2" 2' - 4"

3'

- 2

7'

- 3 1/

4" 7'

- 1

3'

- 0

13' - 0" 13' - 2 5/8"

HO

LD

8'

- 0

8' - 8 1/2"

2' - 4"

1'

- 4

2' - 4"

1'

- 4

4'

- 5 3/

4" 0"

13' - 4 5/8" 13' - 3"

ALIGN

A-40118

1A

2A

2A

2A

2A

2A

A2

6.1

9A

ABOVE

9A

9A

ABOVE

ABOVE

A-502

6 TYP.

2' - 8"

1'

- 4

6' - 5"

10' - 7 1/4"

A-503

A-504

A-504

A-401

8A

8A 8AA-40118

Si m

Si m

A-401 18

Si m

DEDUCTIVE

ALTERNATE #1

DEDUCTIVE

ALTERNATE #1

DEDUCTIVE

ALTERNATE #1

8B 8B

2A

2B

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

SUB-CONTRACTORS ARE TO COORDINATE WORK WITH ALL OTHER TRADES.

CONFLICTS BETWEEN NOTES, DETAILS, SPECIFICATIONS, ETC., SHALL BE

VERIFIED WITH THE VA COR OR THE MOST STRINGENT PROVISIONS SHALL

GOVERN.

DETAILS OF CONSTRUCTION NOT FULLY SHOWN SHALL BE OF THE SAME

NATURE AS SHOWN FOR SIMILAR CONDITIONS. ANY UNCLEAR CONDITIONS

SHALL BE VERIFIED WITH VA COR PRIOR TO CONSTRUCTION OF THAT AREA.

DRAWINGS ARE NOT TO BE SCALED. ANY UNCLEAR DIMENSIONS OR

DIMENSIONAL DISCREPANCIES SHALL BE VERIFIED WITH VA COR.

ALL EXISTING CONDITIONS AND ALL RELATED DIMENSIONS INDICATED IN THE

CONTRACT DOCUMENTS SHALL BE FIELD VERIFIED PRIOR TO FABRICATION,

ERECTION, AND/OR CONSTRUCTION. ANY CONDITIONS THAT DIFFER FROM THAT

INDICATED IN THE CONTRACT DOCUMENTS SHALL BE SUBMITTED TO THE VA

COR FOR REVIEW PRIOR TO FABRICATION, ERECTION, AND/OR CONSTRUCTION.

GENERAL CONTRACTOR (GC) TO REVIEW ENTIRE SET OF CONSTRUCTION

DOCUMENTS AND SHALL COORDINATE WORK BETWEEN ALL TRADES. IF

CONFLICTS ARISE DUE TO COORDINATION OF TRADES, CM / GC IS TO VERIFY

CONFLICT WITH VA COR PRIOR TO CONSTRUCTION / INSTALLATION OF

CONFLICTING ITEMS.

PATCH ALL EXPOSED INTERIOR AND EXTERIOR WALLS WHERE ATTACHED OR

IMBEDDED ITEMS WERE REMOVED.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PREPARATIONS OF THE

FLOORS, WALLS, AND CEILINGS FOR NEW FINISHES.

MAINTAIN FIRE RATING AT ALL ASSEMBLIES WHERE OPENINGS PENETRATIONS,

EMBEDMENT, RECESSED EQUIPMENT, ACCESSORIES, ETC. DISRUPT THE

CONTINUITY OF THE RATING

REMOVE ADHESIVE/OR MORTAR LEFT FROM THE REMOVAL OF EXISTING FLOOR

COVERING AND PREP FLOOR W/CONCRETE (OR FLORSTONE) AS NECESSARY TO

ACCOMMODATE NEW FLOOR COVERINGS.

ALL DIMENSIONS ARE FROM FACE OF FINISHED GYPSUM BOARD, C.M.U., OR

CONCRETE , U.N.O.

PROVIDE ISOLATION MATERIAL BETWEEN DISSIMILAR MATERIALS THAT ARE IN

CONTACT WITH ONE ANOTHER

PATCH & REPAIR ALL MAJOR & MINOR BLEMISHES AS REQ'D. DUE TO

DEMOLITION WORK. MATCH ADJACENT MATERIAL & COLOR.

PROVIDE SOLID, CONTINUOUS, NON COMBUSTIBLE BLOCKING AT LOCATIONS

WHERE MILLWORK, PLUMBING FIXTURES, EQUIP., ETC. ATTACH TO WALL OR

CEILING.

GENERAL NOTES:

PARTITION / WALL FIRE RATINGS

2-HR. FIRE

BARRIER

EXISTING 2-HR.

FIRE BARRIER

NOTE: EXISTING RATED WALL SHOWN SCREENED ON PLAN. - V.I.F. WALLS MEET

DESIGNATED REQUIREMENTS & ADD OPENING & PENETRATION PROTECTIVES

AS REQ'D

1-HR. SMOKE

BARRIER

NON-RATED

SMOKE PARTITION

EXISTING 1-HR.

SMOKE BARRIER

EXISTING NON-RATED

SMOKE PARTITION

1-HR. FIRE

BARRIER

EXISTING 1-HR.

FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA STATION

Defining

EXCELLENCE

in the 21st Century

HEALTH

CARE

John D. Dingell VA Medical Center

4646 John R. Street

Detroit , MI 48201

3419 Pierson Place Flushing, Michigan, 48433 810-230-6202

(866) 454-3923 | WWW.C2AE.COM

Au tod es k D oc s:/

/V A

MI

D etr oit

/21

_A

.rv t

4/2 /20

:25 :46

A M

A-102.1A

FLOOR PLAN - SECOND LEVEL -

ZONE 1A

RENOVATE A2 SOUTH

FOR CANCER CLINIC

DETROIT, MI

553-21-100

10-JAN-2025 KJH MRB

100% BID DOCUMENTS

1/4" = 1'-0"

FLOOR PLAN - SECOND LEVEL - ZONE 1A

Revisions: Date:

65% DESIGN DEVELOPMENT 29-AUG-2023

95% CONSTRUCTION DOCUMENTS 15-APR-2024

95% CONSTRUCTION DOCUMENTS - REVISED 27-AUG-2024

100% BID DOCUMENTS 10-JAN-2025

ADDENDUM 01 02-APR-2026

A01A01

Page 7 of 27 Addendum #1

56789

MM

NN

QQ

7.4

Q.4

Q.5 Q.5

Q.8 Q.8

Q.9 Q.9

8.6

MENS

LOCKERS

A2113

MENS TOILET

A2113A

STORAGE

PHARMACEUTI

A2107

HAC

A2016

ELECTRICAL

A2067

CORRIDOR

CA217

CART LIFT #03

CL-3

SHARED

OFFICE

A2108

SHARED

OFFICE

A2109

WOMEN'S

LOCKERS

A2110

WOMEN'S

TOILET

A2110A

TOILET

A2017A

BREAK ROOM

A2114

SHARED

OFFICE

A2020

SHARED

OFFICE

A2022

INFUSION

ROOM 2

A2065

INFUSION

ROOM 3

A2066

GROUP ROOM

A2018

EXAM CLINIC

WAITING

A2017

OFFICE - RN

CARE

COORDINATOR

A2023

OFFICE - RN

CARE

COORDINATOR

A2025

WORK ROOM

A2015

OFFICE

A2014

CHECK-IN/

CHECK-OUT

A2012

CORRIDOR

CA216

WEIGHT

A2024

ANTI-COAG

A2026

EXAM

A2028

CORRIDOR

CA208

A-131

A-402 12

A-4026

A-502

A2

8.1

A2

9.1

A2

2.2

A2012.1

A2023.1

A2014.1

CA216.2

CA216.3

A2026.1 A2028.1

A2025.1

A2066.1

A2065.1

A2

0.1

A2

2.1

A2

8.1

A2110.1

A2110A.1

A2

7A .1

A2057.1

ZONE 1A

ZONE 1B

ZO

NE

1A

ZO

NE

1C

ZONE 1AZONE 1B

ZO

NE

1C

ZO

NE

1B

ZO

NE

ZO

NE

ZONE 1A

ZONE 1B

ZO

NE

1A

ZO

NE

1C

ZONE 1AZONE 1B

ZO

NE

1C

ZO

NE

1B

ZO

NE

ZO

NE

A-402

A-4029

A-4023 1

A-405

A-40115

A-401 12

A-401 10

A-401

A-4015 6

FD

2A

2A

2A

2A

9A

2A

2A 2A

1A

1A

9A

2A

2A

2A

2A

2A

2A

2A

2A

2A

2A

2A

2A

2A

2A

8A

8A

8A

1A

1A

2A

2A

2A

2A

1A

1A

2A

1A

8A 8A

2A

8A

9'

- 6

2'

- 3

9"

4' - 11" 1' - 4"

1'

- 4

1'

- 4

8" 1'

- 4

1'

- 4

3' - 7" 1' - 4"

2' - 2"

6' - 5" 4' - 11" 1' - 4" 10' - 8 3/4" 2' - 8 3/4" 7' - 10 1/2" 2' - 4"

3'

- 2

7'

- 3 1/

4" 7'

- 1

3'

- 0

4"

5 1

/2"

13' - 0" 13' - 2 5/8"

12' - 2" 7' - 2"

5' - 6 1/2"

HO

LD

8'

- 0

0"

3 3 /8"

2'

- 3

3/ 4"

5' - 5 1/4" 18' - 6" 2' - 4 3/4"

3'

- 9

6' - 1" 1' - 5" 9' - 6" 7' - 5 1/4"

0' - 4"

8' - 8 1/2" 13' - 0"

2' - 4" 1' - 4"

2'

- 1

0 1 /2"

1'

- 4

12' - 6"

1'

- 4

2'

- 2

5'

- 7

3/ 8"

5'

- 0

6'

- 2 5/

8" 1'

- 4

1'

- 4

3/ 4"

5 1 /4"

8 1 /2"

0"

2' - 4" 1' - 4"

1'

- 4

2'

- 6

A-502

TYP.

1A

2A

9A

8A 8A

CA213.2

A2

6.1

9A

ABOVE

A-502

6 TYP.

A-502

3'

- 6

2' - 8"

1'

- 4

6' - 5"

10' - 7 1/4"

A-503

A-504

A-401

8A 8A 8A

A-502

A-40213

A-40516

Si m

14 Sim

Si m

A-40516

Si m

14 Sim

Si m

A-402 13

Si m

14Sim

A-4054

Si m

1 Sim

Si m

3 Sim

A-4054

Si m

1 Sim

Si m

3 Sim

A-40216

A-402 16

Si m

15 Sim

2B

DEDUCTIVE

ALTERNATE #1

DEDUCTIVE ALTERNATE #1

8B 8B

2A

1A

1A2A

8A

8B 8A 8B

8A

8A

2A

2B

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

SUB-CONTRACTORS ARE TO COORDINATE WORK WITH ALL OTHER TRADES.

CONFLICTS BETWEEN NOTES, DETAILS, SPECIFICATIONS, ETC., SHALL BE

VERIFIED WITH THE VA COR OR THE MOST STRINGENT PROVISIONS SHALL

GOVERN.

DETAILS OF CONSTRUCTION NOT FULLY SHOWN SHALL BE OF THE SAME

NATURE AS SHOWN FOR SIMILAR CONDITIONS. ANY UNCLEAR CONDITIONS

SHALL BE VERIFIED WITH VA COR PRIOR TO CONSTRUCTION OF THAT AREA.

DRAWINGS ARE NOT TO BE SCALED. ANY UNCLEAR DIMENSIONS OR

DIMENSIONAL DISCREPANCIES SHALL BE VERIFIED WITH VA COR.

ALL EXISTING CONDITIONS AND ALL RELATED DIMENSIONS INDICATED IN THE

CONTRACT DOCUMENTS SHALL BE FIELD VERIFIED PRIOR TO FABRICATION,

ERECTION, AND/OR CONSTRUCTION. ANY CONDITIONS THAT DIFFER FROM THAT

INDICATED IN THE CONTRACT DOCUMENTS SHALL BE SUBMITTED TO THE VA

COR FOR REVIEW PRIOR TO FABRICATION, ERECTION, AND/OR CONSTRUCTION.

GENERAL CONTRACTOR (GC) TO REVIEW ENTIRE SET OF CONSTRUCTION

DOCUMENTS AND SHALL COORDINATE WORK BETWEEN ALL TRADES. IF

CONFLICTS ARISE DUE TO COORDINATION OF TRADES, CM / GC IS TO VERIFY

CONFLICT WITH VA COR PRIOR TO CONSTRUCTION / INSTALLATION OF

CONFLICTING ITEMS.

PATCH ALL EXPOSED INTERIOR AND EXTERIOR WALLS WHERE ATTACHED OR

IMBEDDED ITEMS WERE REMOVED.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PREPARATIONS OF THE

FLOORS, WALLS, AND CEILINGS FOR NEW FINISHES.

MAINTAIN FIRE RATING AT ALL ASSEMBLIES WHERE OPENINGS PENETRATIONS,

EMBEDMENT, RECESSED EQUIPMENT, ACCESSORIES, ETC. DISRUPT THE

CONTINUITY OF THE RATING

REMOVE ADHESIVE/OR MORTAR LEFT FROM THE REMOVAL OF EXISTING FLOOR

COVERING AND PREP FLOOR W/CONCRETE (OR FLORSTONE) AS NECESSARY TO

ACCOMMODATE NEW FLOOR COVERINGS.

ALL DIMENSIONS ARE FROM FACE OF FINISHED GYPSUM BOARD, C.M.U., OR

CONCRETE , U.N.O.

PROVIDE ISOLATION MATERIAL BETWEEN DISSIMILAR MATERIALS THAT ARE IN

CONTACT WITH ONE ANOTHER

PATCH & REPAIR ALL MAJOR & MINOR BLEMISHES AS REQ'D. DUE TO

DEMOLITION WORK. MATCH ADJACENT MATERIAL & COLOR.

PROVIDE SOLID, CONTINUOUS, NON COMBUSTIBLE BLOCKING AT LOCATIONS

WHERE MILLWORK, PLUMBING FIXTURES, EQUIP., ETC. ATTACH TO WALL OR

CEILING.

GENERAL NOTES:

PARTITION / WALL FIRE RATINGS

2-HR. FIRE

BARRIER

EXISTING 2-HR.

FIRE BARRIER

NOTE: EXISTING RATED WALL SHOWN SCREENED ON PLAN. - V.I.F. WALLS MEET

DESIGNATED REQUIREMENTS & ADD OPENING & PENETRATION PROTECTIVES

AS REQ'D

1-HR. SMOKE

BARRIER

NON-RATED

SMOKE PARTITION

EXISTING 1-HR.

SMOKE BARRIER

EXISTING NON-RATED

SMOKE PARTITION

1-HR. FIRE

BARRIER

EXISTING 1-HR.

FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA STATION

Defining

EXCELLENCE

in the 21st Century

HEALTH

CARE

John D. Dingell VA Medical Center

4646 John R. Street

Detroit , MI 48201

3419 Pierson Place Flushing, Michigan, 48433 810-230-6202

(866) 454-3923 | WWW.C2AE.COM

Au tod es k D oc s:/

/V A

MI

D etr oit

/21

_A

.rv t

4/2 /20

:25 :49

A M

A-102.1B

FLOOR PLAN - SECOND LEVEL -

ZONE 1B

RENOVATE A2 SOUTH

FOR CANCER CLINIC

DETROIT, MI

553-21-100

10-JAN-2025 KJH MRB

100% BID DOCUMENTS

1/4" = 1'-0"

FLOOR PLAN - SECOND LEVEL - ZONE 1B

Revisions: Date:

65% DESIGN DEVELOPMENT 29-AUG-2023

95% CONSTRUCTION DOCUMENTS 15-APR-2024

95% CONSTRUCTION DOCUMENTS - REVISED 27-AUG-2024

100% BID DOCUMENTS 10-JAN-2025

ADDENDUM 01 02-APR-2026

A01A01

Page 8 of 27 Addendum #1

23456

MM

NN

QQ

INFUSION

ROOM 1

A2064

INFUSION

ROOM 2

A2065

INFUSION

ROOM 3

A2066

SOILED UTILITY

A2052

CLEAN UTILITY

A2050

CLEAN LINEN

A2048

MED ROOM

A2046

NURSE

STATION

A2075

OFFICE - RN

CARE

COORDINATOR

A2025

WEIGHT

A2063

ALCOVE

A2044

EXAM

A2029

EXAM

A2033

EXAM

A2035

EXAM

A2037

EXAM

A2039

ANTI-COAG

A2026

EXAM

A2028

EXAM

A2030

EXAM

A2034

EXAM

A2036

EXAM

A2038

EXAM

A2040

WORK ROOM

A2042

PATIENT

TOILET

A2069

PATIENT

TOILET

A2071

INFUSION BAY

A2068

INFUSION BAY

A2070

INFUSION BAY

A2072

INFUSION BAY

A2074

INFUSION BAY

A2076

INFUSION BAY

A2078

INFUSION BAY

A2080

INFUSION BAY

A2082

INFUSION BAY

A2084

INFUSION BAY

A2086

STRETCHER /

WHEELCHAIR

STORAGE

A2087

ALCOVE

A2085

INFUSION BAY

A2083

INFUSION BAY

A2081

NUTRITION

A2049

BREAK ROOM

A2047

LOCKER ROOM

A2047A

STAFF TOILET

A2045

CORRIDOR

CA213

CORRIDOR

CA208

CORRIDOR

CA212

CORRIDOR

CA211

CORRIDOR

CA209

CORRIDOR

CA207

ALCOVE

A2079

EXAM

A2041

EQUIPMENT

STORAGE

A2043

STERILE

HAZARDOUS

DRUG BUFFER

ROOM

A2057

PHARMACIST

WORK AREA

A2053

ANTE ROOM

A2055

HAZARDOUS

DRUG

STORAGE

A2054

STERILE

NON-HAZARDOUS

DRUG BUFFER

ROOM

A2056

A-4054

A-4056

A-403 10

A-40513

A-4042

A-4046

A-40516 15

A-131

A-131

A-504

A-132

A-403

A-131

A-131

A-131

A-131

A2023.1

A2026.1 A2028.1

A2025.1

A2066.1

A2065.1

A2030.1 A2034.1 A2036.1 A2038.1 A2040.1

A2029.1 A2033.1 A2035.1 A2037.1 A2039.1 A2

2.1

A2

5.1

A2

7.1

A2042.1

A2

1.1

A2064.1

A2

0.1

A2

6.1

A2041.1

A2

8.1

A2043.1

A2069.1

A2053.1

A2055.1

A2

4.1

A2056.1

A2057.1

ZO

NE

1A

ZO

NE

1C

ZO

NE

1A

ZO

NE

1C

ZO

NE

1C

ZO

NE

1D

ZO

NE

1C

ZO

NE

1D

ZO

NE

1C

ZO

NE

1B

ZO

NE

1A

ZO

NE

1C

ZO

NE

1A

ZO

NE

1C

ZO

NE

1C

ZO

NE

1D

ZO

NE

1C

ZO

NE

1D

ZO

NE

1C

ZO

NE

1B

A-405

A-40416

A-40415A-40414

A-405

A-405

A-405 9

A-4036

2A

1A

1A

2A

2A

2A

2A

2A

2B

2B

2A

2A 2A

2A

2A

8A

8A

2A

1A

2A

2A 2A 2A 2A 2C

2A 2A

2C

2A

6A

2A

2A

2A

2A

1A

2A

1A

6A

8A8A8A

8A8A

8A

8A8A

8A

8A

8A 8A 8A

8A

8A 8A

8A

2B

2A 2A 2A

2C

6A

2A

1A 1A

2B

2A

2A

1A 1A 1A 1A 1A 1A

8A

3' - 0" 14' - 5 1/4" 6' - 0" 7' - 9 5/8" 7' - 4 3/8" 32' - 7 1/2" 3' - 4" 1' - 0" 9' - 0 1/8" 10' - 0 3/8" 8' - 9 1/2"

6 1 /2"

7'

- 1

3/ 4"

9"

2' - 4"

13' - 1" 6' - 0"

2' - 4" 1' - 4"

2'

- 1

0 1 /2"

1'

- 4

12' - 6" 12' - 6" 12' - 6" 12' - 6" 12' - 6" 12' - 6" 13' - 3"

1' - 4" 2' - 2"

1'

- 4

10' - 5" 10' - 5" 10' - 5" 10' - 5" 10' - 5" 10' - 5" 15' - 4 1/2"

0'

- 5

0 1

/4" 6'

- 4

3 3 /4"

9'

- 8

1/ 4"

6'

- 0

3'

- 2 1/

4" 4'

- 2 3/

4" 7'

- 9

7'

- 6

2'

- 1 0"

HO

LD

6'

- 0

"1'

- 0

5/ 8"

9'

- 1

1/ 8"

1A

1B

2' - 5 3/8" ± 1' - 4"

1'

- 4

1'

- 4

6 1 /4"

1'

- 4

2'

- 2

5'

- 7

3/ 8"

5'

- 0

6'

- 2 5/

8" 1'

- 4

1'

- 4

3/ 4"

5 1 /4"

8 1 /2"

0"

0"

4'

- 5

3/ 4"

1/

2"

2' - 4" 1' - 4"

1'

- 4

2'

- 6

0" 4'

- 5 3/

4" 0"

7' - 4" 5' - 4" 14' - 8" 5' - 4" 14' - 8" 5' - 4" 14' - 8" 5' - 4" 14' - 8" 5' - 4" 7' - 4"

10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0"

1 1 /4"

3' - 3" 7' - 0 7/8" 2' - 0" 7' - 5" 1' - 1" 7' - 5" 1' - 1" 8' - 8 1/8" 2' - 6"

11' - 2" 6' - 0" 15' - 0" 3' - 6" 4' - 5 7/8" 6' - 4 1/8"

1'

- 4

1'

- 4

1' - 4"

2A

2A 2C2C2D

2A2C2C

2A

1A2A

2A

2A

2A

2A

1B

2C

2C

2C

2C

8A

2A 2A 2A

1'

- 6

A-131

2A

A-502

6 TYP.

A-502

6 TYP.

3' - 4 1/2"

5'

- 9

3/ 4"11' - 1"

8A

8A 8A 8A8A

8A

A-502

A-404

A-40516

Si m

14 Sim

Si m

A-40516

Si m

14 Sim

Si m

A-40516

Si m

14 Sim

Si m

A-40516

Si m

14 Sim

Si m

A-40516

Si m

14 Sim

Si m

A-40516

Si m

14 Sim

Si m

A-40513

Si m

10 Sim

Si m

12 Sim

A-40513

Si m

10 Sim

Si m

12 Sim

A-40513

Si m

10 Sim

Si m

12 Sim

A-40513

Si m

10 Sim

Si m

12 Sim

A-40513

Si m

10 Sim

Si m

12 Sim

A-403 6

Op p

A-4054

Si m

1 Sim

Si m

3 Sim

A-4054

Si m

1 Sim

Si m

3 Sim

2B

1'

- 4

DEDUCTIVE

ALTERNATE #1

DEDUCTIVE

ALTERNATE #1

DEDUCTIVE

ALTERNATE #2

DEDUCTIVE

ALTERNATE #2

DEDUCTIVE

ALTERNATE #2

DEDUCTIVE

ALTERNATE #2

DEDUCTIVE

ALTERNATE #2

8B 8A 8B 8B 8B 8B 8B 8B 8B

8B8B8B8B8B8B8B

1X

1X

ALIGN

1X

8A

3'

- 2

/2

7'

- 1 1"

3/

4"

8'

- 4

8'

- 2 3/

4"

8'

- 2

/4

8'

- 2

/4

8'

- 2

/4

A-502 16 A-502

A2

3.2

MOVABLE

GLASS

PARTITION

MOVABLE

GLASS

PARTITION

MOVABLE

GLASS

PARTITION

MOVABLE

GLASS

PARTITION

2A 2A

FIXED RESIN

PARTITION

8B

A01

2A

2B

2' - 0"

2D 2C

A01

A01

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

SUB-CONTRACTORS ARE TO COORDINATE WORK WITH ALL OTHER TRADES.

CONFLICTS BETWEEN NOTES, DETAILS, SPECIFICATIONS, ETC., SHALL BE

VERIFIED WITH THE VA COR OR THE MOST STRINGENT PROVISIONS SHALL

GOVERN.

DETAILS OF CONSTRUCTION NOT FULLY SHOWN SHALL BE OF THE SAME

NATURE AS SHOWN FOR SIMILAR CONDITIONS. ANY UNCLEAR CONDITIONS

SHALL BE VERIFIED WITH VA COR PRIOR TO CONSTRUCTION OF THAT AREA.

DRAWINGS ARE NOT TO BE SCALED. ANY UNCLEAR DIMENSIONS OR

DIMENSIONAL DISCREPANCIES SHALL BE VERIFIED WITH VA COR.

ALL EXISTING CONDITIONS AND ALL RELATED DIMENSIONS INDICATED IN THE

CONTRACT DOCUMENTS SHALL BE FIELD VERIFIED PRIOR TO FABRICATION,

ERECTION, AND/OR CONSTRUCTION. ANY CONDITIONS THAT DIFFER FROM THAT

INDICATED IN THE CONTRACT DOCUMENTS SHALL BE SUBMITTED TO THE VA

COR FOR REVIEW PRIOR TO FABRICATION, ERECTION, AND/OR CONSTRUCTION.

GENERAL CONTRACTOR (GC) TO REVIEW ENTIRE SET OF CONSTRUCTION

DOCUMENTS AND SHALL COORDINATE WORK BETWEEN ALL TRADES. IF

CONFLICTS ARISE DUE TO COORDINATION OF TRADES, CM / GC IS TO VERIFY

CONFLICT WITH VA COR PRIOR TO CONSTRUCTION / INSTALLATION OF

CONFLICTING ITEMS.

PATCH ALL EXPOSED INTERIOR AND EXTERIOR WALLS WHERE ATTACHED OR

IMBEDDED ITEMS WERE REMOVED.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PREPARATIONS OF THE

FLOORS, WALLS, AND CEILINGS FOR NEW FINISHES.

MAINTAIN FIRE RATING AT ALL ASSEMBLIES WHERE OPENINGS PENETRATIONS,

EMBEDMENT, RECESSED EQUIPMENT, ACCESSORIES, ETC. DISRUPT THE

CONTINUITY OF THE RATING

REMOVE ADHESIVE/OR MORTAR LEFT FROM THE REMOVAL OF EXISTING FLOOR

COVERING AND PREP FLOOR W/CONCRETE (OR FLORSTONE) AS NECESSARY TO

ACCOMMODATE NEW FLOOR COVERINGS.

ALL DIMENSIONS ARE FROM FACE OF FINISHED GYPSUM BOARD, C.M.U., OR

CONCRETE , U.N.O.

PROVIDE ISOLATION MATERIAL BETWEEN DISSIMILAR MATERIALS THAT ARE IN

CONTACT WITH ONE ANOTHER

PATCH & REPAIR ALL MAJOR & MINOR BLEMISHES AS REQ'D. DUE TO

DEMOLITION WORK. MATCH ADJACENT MATERIAL & COLOR.

PROVIDE SOLID, CONTINUOUS, NON COMBUSTIBLE BLOCKING AT LOCATIONS

WHERE MILLWORK, PLUMBING FIXTURES, EQUIP., ETC. ATTACH TO WALL OR

CEILING.

GENERAL NOTES:

PARTITION / WALL FIRE RATINGS

2-HR. FIRE

BARRIER

EXISTING 2-HR.

FIRE BARRIER

NOTE: EXISTING RATED WALL SHOWN SCREENED ON PLAN. - V.I.F. WALLS MEET

DESIGNATED REQUIREMENTS & ADD OPENING & PENETRATION PROTECTIVES

AS REQ'D

1-HR. SMOKE

BARRIER

NON-RATED

SMOKE PARTITION

EXISTING 1-HR.

SMOKE BARRIER

EXISTING NON-RATED

SMOKE PARTITION

1-HR. FIRE

BARRIER

EXISTING 1-HR.

FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA STATION

Defining

EXCELLENCE

in the 21st Century

HEALTH

CARE

John D. Dingell VA Medical Center

4646 John R. Street

Detroit , MI 48201

3419 Pierson Place Flushing, Michigan, 48433 810-230-6202

(866) 454-3923 | WWW.C2AE.COM

Au tod es k D oc s:/

/V A

MI

D etr oit

/21

_A

.rv t

4/2 /20

:25 :52

A M

A-102.1C

FLOOR PLAN - SECOND LEVEL -

ZONE 1C

RENOVATE A2 SOUTH

FOR CANCER CLINIC

DETROIT, MI

553-21-100

10-JAN-2025 KJH MRB

100% BID DOCUMENTS

1/4" = 1'-0"

FLOOR PLAN - SECOND LEVEL - ZONE 1C

Revisions: Date:

65% DESIGN DEVELOPMENT 29-AUG-2023

95% CONSTRUCTION DOCUMENTS 15-APR-2024

95% CONSTRUCTION DOCUMENTS - REVISED 27-AUG-2024

100% BID DOCUMENTS 10-JAN-2025

ADDENDUM 01 02-APR-2026

A01

A01

A01

Page 9 of 27 Addendum #1

MM

NN

P.4P.4

MECHANICAL

A2032

ELECTRICAL

A2031

STAIR #02

SA202

CORRIDOR

CA210

ZO

NE

1C

ZO

NE

1D

ZO

NE

1C

ZO

NE

1D

1A

2A

8A

4'

- 2

3/ 4"

7'

- 9

7'

- 6

2'

- 1

0"

HO

LD

6'

- 0

"1'

- 0

5/ 8"

9'

- 1

1/ 8"

A1A1

1X

1X

ALIGN

1X

1X

1X

A-502

2A

2B A01

LL

MM

NN

P.4P.4

ZO

NE

1C

ZO

NE

1D

ZO

NE

1C

ZO

NE

1D

MECHANICAL

A3032

DATA

A3031A

ELECTRICAL

A3031

STAIR #02

SA302

CORRIDOR

CA312

A2A2

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

SUB-CONTRACTORS ARE TO COORDINATE WORK WITH ALL OTHER TRADES.

CONFLICTS BETWEEN NOTES, DETAILS, SPECIFICATIONS, ETC., SHALL BE

VERIFIED WITH THE VA COR OR THE MOST STRINGENT PROVISIONS SHALL

GOVERN.

DETAILS OF CONSTRUCTION NOT FULLY SHOWN SHALL BE OF THE SAME

NATURE AS SHOWN FOR SIMILAR CONDITIONS. ANY UNCLEAR CONDITIONS

SHALL BE VERIFIED WITH VA COR PRIOR TO CONSTRUCTION OF THAT AREA.

DRAWINGS ARE NOT TO BE SCALED. ANY UNCLEAR DIMENSIONS OR

DIMENSIONAL DISCREPANCIES SHALL BE VERIFIED WITH VA COR.

ALL EXISTING CONDITIONS AND ALL RELATED DIMENSIONS INDICATED IN THE

CONTRACT DOCUMENTS SHALL BE FIELD VERIFIED PRIOR TO FABRICATION,

ERECTION, AND/OR CONSTRUCTION. ANY CONDITIONS THAT DIFFER FROM THAT

INDICATED IN THE CONTRACT DOCUMENTS SHALL BE SUBMITTED TO THE VA

COR FOR REVIEW PRIOR TO FABRICATION, ERECTION, AND/OR CONSTRUCTION.

GENERAL CONTRACTOR (GC) TO REVIEW ENTIRE SET OF CONSTRUCTION

DOCUMENTS AND SHALL COORDINATE WORK BETWEEN ALL TRADES. IF

CONFLICTS ARISE DUE TO COORDINATION OF TRADES, CM / GC IS TO VERIFY

CONFLICT WITH VA COR PRIOR TO CONSTRUCTION / INSTALLATION OF

CONFLICTING ITEMS.

PATCH ALL EXPOSED INTERIOR AND EXTERIOR WALLS WHERE ATTACHED OR

IMBEDDED ITEMS WERE REMOVED.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PREPARATIONS OF THE

FLOORS, WALLS, AND CEILINGS FOR NEW FINISHES.

MAINTAIN FIRE RATING AT ALL ASSEMBLIES WHERE OPENINGS PENETRATIONS,

EMBEDMENT, RECESSED EQUIPMENT, ACCESSORIES, ETC. DISRUPT THE

CONTINUITY OF THE RATING

REMOVE ADHESIVE/OR MORTAR LEFT FROM THE REMOVAL OF EXISTING FLOOR

COVERING AND PREP FLOOR W/CONCRETE (OR FLORSTONE) AS NECESSARY TO

ACCOMMODATE NEW FLOOR COVERINGS.

ALL DIMENSIONS ARE FROM FACE OF FINISHED GYPSUM BOARD, C.M.U., OR

CONCRETE , U.N.O.

PROVIDE ISOLATION MATERIAL BETWEEN DISSIMILAR MATERIALS THAT ARE IN

CONTACT WITH ONE ANOTHER

PATCH & REPAIR ALL MAJOR & MINOR BLEMISHES AS REQ'D. DUE TO

DEMOLITION WORK. MATCH ADJACENT MATERIAL & COLOR.

PROVIDE SOLID, CONTINUOUS, NON COMBUSTIBLE BLOCKING AT LOCATIONS

WHERE MILLWORK, PLUMBING FIXTURES, EQUIP., ETC. ATTACH TO WALL OR

CEILING.

GENERAL NOTES:

PARTITION / WALL FIRE RATINGS

2-HR. FIRE

BARRIER

EXISTING 2-HR.

FIRE BARRIER

NOTE: EXISTING RATED WALL SHOWN SCREENED ON PLAN. - V.I.F. WALLS MEET

DESIGNATED REQUIREMENTS & ADD OPENING & PENETRATION PROTECTIVES

AS REQ'D

1-HR. SMOKE

BARRIER

NON-RATED

SMOKE PARTITION

EXISTING 1-HR.

SMOKE BARRIER

EXISTING NON-RATED

SMOKE PARTITION

1-HR. FIRE

BARRIER

EXISTING 1-HR.

FIRE BARRIER

L

M

N

P.4

ZO

NE

1C

ZO

NE

1D

ZO

NE

1C

ZO

NE

1D

NEW ROOF PENETRATION

ON ROOF: REMOVE ROOF MEMBRANE AND INSULATION DOWN TO EXISTING

ROOF DECK WHERE REQ'D FOR NEW MECHANICAL CURB. CONTRACTOR IS

RESPONSIBLE FOR IDENTIFYING ACTUAL ROOF CONSTRUCTION.

PATCH AND REPAIR EXISTING ROOF WITH SIMILAR MATERIAL, MEANS AND

METHODS AS REQ'D TO MAINTAIN ALL EXISTING ROOF WARRANTIES. PROVIDE

1/2" TAPERED CRICKETS AT NEW CURB AS REQ'D TO PROVIDE PROPER

DRAINAGE TO NEAREST ROOF DRAIN.

A-502

ROOF LEGEND

DENOTES REINF. MEMBRANE WALKWAY MATS -

SEE SPECIFICATIONS.

TAPERED INSULATION - ARROW INDICATES

DIRECTION OF SLOPE.

DENOTES MECHANICAL UNIT - SEE HVAC PLANS

DENOTES AREA OF 1-HOUR FIRE RESISTIVE ROOF

ASSEMBLY

DENOTES EXHAUST FAN OR RELIEF VENT, SEE

MECHANICAL PLANS FOR SPECIFICATIONS.

EFFECTIVE DIRECTION OF ROOF SLOPE DUE TO

STRUCTURE

RD = ROOF DRAIN

OD = OVERFLOW DRAIN

SD = SCUPPER DRAIN

CONDENSING UNIT

EXISTING ROOF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA STATION

Defining

EXCELLENCE

in the 21st Century

HEALTH

CARE

John D. Dingell VA Medical Center

4646 John R. Street

Detroit , MI 48201

3419 Pierson Place Flushing, Michigan, 48433 810-230-6202

(866) 454-3923 | WWW.C2AE.COM

Au tod es k D oc s:/

/V A

MI

D etr oit

/21

_A

.rv t

4/2 /20

:25 :55

A M

A-102.1D

FLOOR PLAN - SECOND, THIRD,

ROOF LEVELS - ZONE 1D

RENOVATE A2 SOUTH

FOR CANCER CLINIC

DETROIT, MI

553-21-100

10-JAN-2025 KJH MRB

100% BID DOCUMENTS

1/4" = 1'-0"

FLOOR PLAN - SECOND LEVEL - ZONE 1D

1/4" = 1'-0"

FLOOR PLAN - THIRD LEVEL - ZONE 1D

1/4" = 1'-0"

ROOF PLAN - ZONE 1D

PLAN KEYNOTES

KEY VALUE KEYNOTE TEXT

A1 CONTRACTOR TO REMOVE SALVAGED LOUVER FROM VA PROPERTY TO

CLEAN, REPAIR, AND PAINT PRIOR TO REINSTALLATION. PROVIDE NEW

BIRD SCREEN AND FOIL BACKED THERMAL INSULATION TO MATCH

EXISTING TO MAKE AIR TIGHT.

A2 INSTALL SALVAGED PNEUMATIC TUBE PUMP STATION. MODIFY EXISTING

TRANSPORT TUBES AS REQUIRED FOR CONNECTION TO NEW PUMP

LOCATION. CORE FLOOR AS REQUIRED TO ALLOW TRANSPORT TUBES

TO PASS THROUGH THE FLOOR. CONTRACTOR TO CONTACT SWISSLOG

TO IDENTIFY MODIFICATION NEEDS.

Revisions: Date:

65% DESIGN DEVELOPMENT 29-AUG-2023

95% CONSTRUCTION DOCUMENTS 15-APR-2024

95% CONSTRUCTION DOCUMENTS - REVISED 27-AUG-2024

100% BID DOCUMENTS 10-JAN-2025

ADDENDUM 01 02-APR-2026

A01

A01

A01A01

Page 10 of 27 Addendum #1

2x WOOD NAILER

ALUMINUM FRAME

CONTINUOUS SEALANT AND

BACKER ROD, ALL SIDES

METAL STUD AND GYP BD

PARTITION

TYPES

SEE PARTITION

DBL METAL STUD AT JAMBS

SOUND ATTENUATION BLANKET

DOOR

2x WOOD NAILER

ALUMINUM FRAME

CONTINUOUS SEALANT

AND BACKER ROD, ALL

SIDES

TYPES

SEE PARTITION

SOUND ATTENUATION BLANKET

8" LIGHT GAUGE METAL

STUD BOX HEADER

METAL STUD AND GYP BD

PARTITION

DOOR

DOOR

HOLLOW METAL FRAME, PAINT

ANCHOR AT HEAD FOR

FRAMES WIDER THAN 3'-0"

8" LIGHT…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .