36C25025Q0780 0003.pdf

PDF 289 KB Posted

Attached to
N041 - Bldg 305 Chiller Replacement Federal contract opportunity
Solicitation number
36C25025Q0780
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document is a Request for Information (RFI) Amendment from the Department of Veterans Affairs Network Contracting Office (NCO) 10 in Cincinnati, Ohio, related to a chiller replacement project. The amendment provides detailed answers to eight technical questions about chiller installation, including confirmation that both chillers have dedicated outdoor disconnects, crane parking instructions using turf protection mats, building automation system details (Niagara protocol), and specific technical requirements like louvered side panels and heat trace needs. The RFQ remains due on September 5th, 2025, and a bid guarantee of 20% of the quote price is required. The key technical specifications indicate the new chillers must be connected to the existing Building Automation System without modifications to current hardware or control strategies, and existing pumps in the building's basement will be utilized.

View the file

Other files for this federal contract opportunity

Other files attached to N041 - Bldg 305 Chiller Replacement, newest first.
File Type Posted
Attendance Record Site Visit - 305 Chiller Replacement.pdf PDF
36C25025Q0780 P0002.pdf PDF
36C25025Q0780 0001.pdf PDF
Attachment I - DBA OH20250081.pdf PDF
Attachments V - vha directive 1192.01.pdf PDF
36C25025Q0780_1.pdf PDF
Attachment IV - Limitation on Subcontracting Cert.pdf PDF
Attachment III - RFI.pdf PDF
Attachment I - SCA 2015-4731.pdf PDF
Attachment II - EMR.pdf PDF
Attachment VI - VA NOTICE OF TOTAL SET-ASIDE FOR VERIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 3

0003 09-02-2025

552-25-4-6123-1192

36C250

Department of Veterans Affairs Network Contracting Office (NCO) 10 260 E. University Avenue Cincinnati OH 45219

36C250

Department of Veterans Affairs Network Contracting Office (NCO) 10 260 E. University Avenue Cincinnati OH 45219

To all Offerors/Bidders

36C25025Q0780

X

X X

552-3650162-6123-854100-2580 010050192

X 1

The purpose of this modification is to answer RFI's

The answers to submitted questions can be found on page two of this amendment.

The due date for receipt of RFQs remains September 5th, 2025.

Luke Turner

RFI Questions and Answers

1. On the 40 Ton Chiller, Does It Have Its Own Dedicated Outdoor Disconnect?

Answer: Yes, both chillers have their own disconnect.

2. Where Do We Park the Crane for Removal and Installation of a New Chiller?

Answer: You can park the crane on the grass as long as turf protection mats are used to avoid extensive damage from a crane.

3. Does The Chiller Need a Hail Guard Condenser Protector?

Answer: Whatever standard comes from the manufacturer.

4. Do They Have an Automation Bldg. System and Protocol?

Answer: Yes, we use Niagra building automation

5. Freeze Protection Plan for Glycol Heat Trace Drain System Etc.?

Answer: Non glycol system, heat trace is needed

6. Does The Replacement Chiller Need a Buffer or Pump?

Answer: No, pumps are currently installed in the basement of the building.

7. Does The Customer Need Louvers on Chiller Side Panels or Sound Reduction?

Answer: The chiller should have louvered side panels.

8. The Scope of Work states the new chillers shall be “properly connected to our Building Automation System.” Can the government confirm that it is the intent of this project to connect the new chillers to the existing BAS in the exact same configuration as the existing chillers and, therefore, no modifications to BAS sequences, hardware, or control strategies are required?

Answer: The current chillers are connected to our existing Building Automation System (BAS), which is Niagra protocol, so the new chillers need to be connected to our current system.

9. A bid guarantee is indicated as required on the Standard Form. However, I was unable to locate specific details regarding the amount requirements for the bid guarantee. Could you please provide clarification on these requirements?

Answer: Bid guarantee is 20% of the value of the quote price.